W3F1-2004-0088, Updated Entergy Nuclear-South Submittal of Security Plan, T&Q Plan and Safeguards Contingency Plans Incorporating RAI Responses
| ML042860183 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/04/2004 |
| From: | Venable J Entergy Nuclear South, Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| EA-03-086, NEI-03-12, W3F1-2004-0088 | |
| Download: ML042860183 (3) | |
Text
-^:Entergy SAFEGUARDS INFORMATION Entergy Nuclear South Entergy Operations, Inc.
17265 River Road Kilona, LA 70066 Tel 504 739 6660 Fax 504 739 6678 ivenabl~entergy.com Joseph E. Venable Vice President. Operations Waterford 3 W3Fl-2004-0088
)
October 4, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 I
Subject:
References Updated Entergy Nuclear-South Submittal of Security Plan, T&Q Plan and Safeguards Contingency Plans Incorporating RAI Responses Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
- 1. September 21, 2004 letter from the NRC to Waterford 3, Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response (TAC NO. MC2987)
- 2. September 9, 2004 letter to Document Control Desk, Entergy Nuclear-South Submittal of Revision to Security Plan, T&Q Plan and Safeguards Contingency Plans Incorporating RAI Responses (W3F1-2004-0081)
Dear Sir or Madam:
The Security Plan changes requested during recent NRC discussions and by reference 1 have been made and incorporated into a revised copy of the proposed Waterford 3 Security Plan on the enclosed CD ROM for your review and approval.
In order to standardize our fleet approach with the NRC-approved industry approach, Entergy's responses to Order EA-03-086 and RAls were based on NEI-03-12, 'Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan" Revision 1 and subsequent guidance provided by NEI and approved by the Staff.
There are no new commitments contained in this submittal. If you have problems with the CD ROM or require additional information, please contact Greg Scott at (504) 739-6703.
Notice: Enclosure contains "Safeguards Information." Upon separation of the Enclosure, this letter and any Attachments become "DECONTROLLED" otc.P
f T
- SAFEGUARDS INFORMATION W3F1 -2004-0088 Page 2 of 3 I declare under penalty of perjury that the foregoing is true and correct. Executed on October 4, 2004.
Sincerely, J.Ebenale Vice President, Operations Waterford Steam Electric Station, Unit 3 JEVIGCS/cbh Enclosure - "002_RevisiontoSecrnTmg andContingencyPlansforW3.pdf" Notice: Enclosure contains "Safeguards Information." Upon separation of the Enclosure, this letter and any Attachments become "DECONTROLLED"
SAFEGUARDS INFORMATION W3Fl-2004-0088 Page 3 of 3 cc:
Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 U. S. Nuclear Regulatory Commission Attn: Ms. M.H. Chernoff Mail Stop 8 G9A NRR Project Manager, SPRT Notice: Enclosure contains "Safeguards Information." Upon separation of the Enclosure, this letter and any Attachments become "DECONTROLLED"