Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0417002862004-06-16016 June 2004 Request for Additional Information Exelon Generation Company and Amergen Energy Company Physical Security Plans Sections 10-19 (TAC Nos. MC2890, MC2891, MC2897, MC2898, MC2904, MC2915, MC2916, MC2932, MC2933, MC2934, MC2935, MC2948, MC2953. Project stage: RAI ML0418101252004-06-25025 June 2004 Request for Additional Information Exelon Generation Company and Amergen Energy Company Physical Security Plans Sections 1-9 (TAC Nos. MC2890, MC2891, MC2897, MC2898, MC2904, MC2915, MC2916, MC2932, MC2933, MC2934, MC2935, MC2948, MC2953, M Project stage: RAI ML0420200232004-07-0909 July 2004 Request for Additional Information Exelon Generation Company and Amergen Energy Company Training and Qualification Plans Project stage: RAI ML0421003482004-07-23023 July 2004 Request for Additional Information Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2890, MC2891, MC2897, MC2898, MC2904, MC2932, MC2933, MC2934, MC2935, MC2948, MC2953, MC2954, MC2961, MC2962, MC2981, Project stage: RAI RS-04-119, (Exelon) and Amergen Energy Co, LLC (Amergen), Response to Request for Additional Information Related to the Safeguards Contingency Plans and Section 9.4.1 of the Physical Security Plans2004-08-12012 August 2004 (Exelon) and Amergen Energy Co, LLC (Amergen), Response to Request for Additional Information Related to the Safeguards Contingency Plans and Section 9.4.1 of the Physical Security Plans Project stage: Response to RAI ML0431200352004-10-29029 October 2004 Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat (Dbt); and Revisions to Physical Security Plan, Training and Qualification Plan, and ... Project stage: Acceptance Review 2004-06-25
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23192A6292023-07-11011 July 2023 Correction Letter - Issuance of Amendment Nos. 281 and 274 Regarding Transition to GNF3 Fuel (EPID L-2022-LLA-0121) (Non-Proprietary) ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20233012023-05-30030 May 2023 NRC Initial License Examination Report 05000237/2023301; 05000249/2023301 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23132A0932023-05-17017 May 2023 Information Meeting (Public Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Power Station, Units 2 and 3 RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report IR 05000237/20230012023-05-0404 May 2023 Integrated Inspection Report 05000237/2023001 and 05000249/2023001 SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000237/20234012023-04-26026 April 2023 Cyber Security Inspection Report 05000237/2023401 and 05000249/2023401 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration IR 05000237/20235012023-04-21021 April 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2023501 and 05000249/2023501 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 ML23088A2242023-04-0505 April 2023 Regulatory Audit Report Regarding License Amendment Request to Transition to GNF3 Fuel ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 2024-02-02
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23032A3602023-03-22022 March 2023 Issuance of Amendment Nos. 279 and 272 New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20343A1372020-12-0707 December 2020 Acceptance Review Dresden, Units 2 and 3, LAR for Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML20265A2402020-10-23023 October 2020 Issuance of Amendment Nos. 272 and 265 to Increase Allowable Main Steam Isolation Valve Leakage ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19301A3392019-12-0404 December 2019 Issuance of Amendments to Revise Technical Specification 2.1.1, Reactor Core Safety Limits, the Minimum Critical Power Ration Safety Limits ML19266A5272019-10-0808 October 2019 Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18254A3672018-10-29029 October 2018 County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18137A2712018-06-29029 June 2018 Issuance of Amendments Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies (Cac. Nos. MF9687 and MF9688; EPID L-2017-LLA-0228) (RS-17-060) ML17272A7832018-01-0808 January 2018 Issuance of Amendments to Adopt TSTF-542 TS Changes (CAC Nos. MF9295 and MF9296; EPID L-2017-LLA-0176) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML17037D2122017-02-16016 February 2017 Issuance of Amendments to Revise Surveillance Requirement for Secondary Containment Access Doors ML16218A4852016-10-20020 October 2016 DNPS Unit Nos. 2 and 3, QCNPS Unit Nos. 1 and 2 - Issuance of LAR to Renewed Facility Operating License Nos. DPR-19, 25, 29, 30 TS Revision to Support Areva Atrium 10XM Fuel Transition ML16141A7502016-06-0707 June 2016 Correction Letter to Renewed Facility Operating License No. DPR-19 License Page ML16111A1042016-05-11011 May 2016 Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) ML15343A1262016-04-29029 April 2016 Issuance of Amendments to Amend Facility Operating License Nos. DPR-19 and DPR-25 to Revise Technical Specifications to Support Use of a New Nuclear Criticality Safety Analysis Methodology ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) ML15183A3512015-08-0505 August 2015 Issuance of Amendments Concerning Adding Topical References to Technical Specifications (TAC Nos. MF3359, MF3363, MF3361, and MF3362)(RS-13-288) ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15114A1882015-06-19019 June 2015 Issuance of Amendments Adoption of Technical Specification Task Force (TSTF) Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training ML14295A3002015-01-29029 January 2015 Issuance of Amendments Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements ML13079A3722013-06-20020 June 2013 Issuance of Amendments Staff Qualifications Education and Experience Eligibility Requirments for Licensed Operators (ME9047) ML1118613412011-08-10010 August 2011 Issuance of License Amendments Regarding Exelon Cyber Security Plan ML1018806162010-08-16016 August 2010 Issuance of Amendments Authorizing Alternative Methods of Verifying Leakage within the Drywell ML1006105942010-04-0101 April 2010 Issuance of Amendments RCS Leakage Detection Instrumentation and Core Operating Limits Report Changes ML0925101522009-10-20020 October 2009 License Amendments, Modify the Technical Specifications to Risk-informed Requirements Regarding Selected Required Action End States as Provided in Technical Specification Task Force (TSTF) Change Traveler TSTF-423, Revision 0 2023-08-03
[Table view] |
Text
SAFEGUARDS INFORMATION October 29, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - ADMINISTRATIVE CHANGE TO RENEWED FACILITY OPERATING LICENSES IN CONJUNCTION WITH THE COMMISSION ORDER EA-03-086 REGARDING REVISED DESIGN BASIS THREAT (DBT); AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NOS. MC2932 AND MC2933)
Dear Mr. Crane:
By letter dated April 28, 2004, the Exelon Generation Company and AmerGen Energy Company submitted a supplemental response in accordance with Order EA-03-086, the order requiring compliance with revised design basis threat, dated April 29, 2003 (DBT Order), for Dresden Nuclear Power Station, Units 2 and 3 (Dresden).Section III.A of the DBT Order required licensees to revise physical security plans (PSPs), training and qualification plans (T&Q Plans), and safeguards contingency plans (SCPs) in order to provide protection against the revised DBT set forth in Attachment 2 to the DBT Order. These revised plans, along with an implementation schedule, were required to be submitted to the Nuclear Regulatory Commission (NRC or the Commission) for review and approval no later than April 29, 2004.
The NRC staffs review of the Dresden PSP, SCP, and T&Q Plan submitted in your letter dated April 28, 2004, as supplemented on July 6, July 9, July 23, August 4, August 12, September 9, October 14, and October 21, 2004, has focused on ensuring that the necessary programmatic elements are contained in these plans in order to provide high assurance that activities involving special nuclear material are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety.
NOTICE: Enclosure 2 contains Safeguards Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.
SAFEGUARDS INFORMATION
C. Crane The NRC staff has determined that, subject to subsequent inspection and evaluation, these plans contain the necessary programmatic elements that, when effectively implemented, will provide the high assurance that Dresden will be protected against the revised DBT. The NRC staff, therefore, approves the PSP, SCP, and T&Q Plan for Dresden. However, ultimately the effectiveness of these plans will be judged on your ability to meet regulatory requirements through facility implementing procedures and site practices. As such, your facility implementing procedures and practices will continue to be subject to future NRC review and inspection, including NRC-conducted force-on-force exercises.
In addition, the NRC staff noted that your PSP included alternatives to certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 73.55. In each case, the NRC staff found that the alternative measures provide an equivalent level of protection to that of the associated requirements and meets the high assurance objectives of 10 CFR 73.55(a). The NRC staff, therefore, approves the alternatives shown in the table below. The NRC staffs evaluation is discussed further in the enclosed Safety Evaluation (SE).
Approved Alternatives to the Requirements of 10 CFR Part 73 SE Section PSP Section Alternative to 10 CFR Description 3.6.2 6.2 73.55(c)(3) Isolation zones 3.9.4.3 9.4 73.55(d)(4) PA vehicle search requirements 3.9.4.4 9.4 73.55(d)(1) PA personnel search requirements 3.9.5.2 9.5 73.55(d)(1) PA access control requirements 73.55(d)(4) 3.10.1 10.1 73.55(c)(5) PA illumination requirements 3.13.1 14.1 73.55(c)(1) Temporary reclassification of VAs to PA 73.55(d)(7)(i)(B) status (devitalization)
Finally, consistent with the DBT Order, conforming administrative changes to Renewed Facility Operating Licenses (FOLs) are required to ensure implementation of DBT Order requirements.
Therefore, administrative license changes to Renewed FOL Nos. DPR-19 and DPR-25 are being made to incorporate the reference to the revised PSP, SCP, and T&Q Plan required by the DBT Order. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I.
Please replace the enclosed pages to your Renewed FOLs as indicated in Enclosure 1.
C. Crane A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.
Sincerely,
/RA/
John A. Nakoski, Section Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-237 and 50-249
Enclosures:
- 1. Administrative Change to Renewed FOL Nos. DPR-19 and DPR-25
- 2. Safety Evaluation (Safeguards Information) cc w/encl 1 only: See Mailing List 1 cc w/encls 1 and 2: Val Gengler, Manager, Nuclear Security
C. Crane A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.
Sincerely,
/RA/
John A. Nakoski, Section Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-237 and 50-249
Enclosures:
- 1. Administrative Change to Renewed FOL Nos. DPR-19 and DPR-25
- 2. Safety Evaluation (Safeguards Information) cc w/encl 1 only: See Mailing List 1 cc w/encls 1 and 2: Val Gengler, Manager, Nuclear Security DISTRIBUTION (w/o Enclosure 2):
PUBLIC SPRT R/F OGC ACRS PCoates MBaneerjee AMendiola WRuland DLPM DPR GHill (4) SReynolds, RIII Accession No.: ML043120035 *See previous concurrence OFFICE SPRT/TL* SPRT/PM* SPRT/LA SPRT/PL OGC* NSIR/SC NRR/SC NAME DHuyck RFretz CRaynor JPeralta RBaum NLO SMorris JNakoski DATE 10/25/04 10/25/04 10/25/04 10/25/04 10/25/04 10/28/04 10/28/04 OFFICIAL RECORD COPY
Dresden Nuclear Power Units 2 and 3 cc:
Site Vice President - Dresden Nuclear Power Station Senior Vice President, Nuclear Services Exelon Generation Company, LLC Exelon Generation Company, LLC 6500 N. Dresden Road 4300 Winfield Road Morris, IL 60450-9765 Warrenville, IL 60555 Dresden Nuclear Power Station Plant Manager Vice President of Operations - Mid-West Exelon Generation Company, LLC Boiling Water Reactors 6500 N. Dresden Road Exelon Generation Company, LLC Morris, IL 60450-9765 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC Vice President - Licensing and Regulatory 6500 N. Dresden Road Affairs Morris, IL 60450-9765 Exelon Generation Company, LLC 4300 Winfield Road U.S. Nuclear Regulatory Commission Warrenville, IL 60555 Dresden Resident Inspectors Office 6500 N. Dresden Road Director - Licensing and Regulatory Affairs Morris, IL 60450-9766 Exelon Generation Company, LLC 4300 Winfield Road Chairman Warrenville, IL 60555 Grundy County Board Administration Building Associate General Counsel 1320 Union Street Exelon Generation Company, LLC Morris, IL 60450 4300 Winfield Road Warrenville, IL 60555 Regional Administrator U.S. NRC, Region III Manager Licensing - Dresden, 801 Warrenville Road Quad Cities and Clinton Lisle, IL 60532-4351 Exelon Generation Company, LLC 4300 Winfield Road Illinois Emergency Management Warrenville, IL 60555 Agency Division of Disaster Assistance &
Preparedness 110 East Adams Street Springfield, IL 62701-1109 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
EXELON GENERATION COMPANY, LLC DRESDEN NUCLEAR POWER STATION, UNIT 2 DOCKET NO. 50-237 ADMINISTRATIVE LICENSE CHANGE TO RENEWED FACILITY OPERATING LICENSE License No. DPR-19
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. Consistent with Order EA-03-086, the Order requiring compliance with the revised design basis threat (DBT Order), issued on April 29, 2003, conforming administrative changes to Renewed Facility Operating Licenses (FOLs) are required to ensure implementation of DBT Order requirements. Therefore, an administrative license change to Renewed FOL No. DPR-19 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the DBT Order. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this administrative license change can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this administrative license change will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this administrative license change is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the Renewed FOL is changed, as indicated in the attachment.
- 3. This administrative license change is effective as of its date of issuance and shall be implemented on or before October 29, 2004.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Section Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed FOL Date of Issuance: October 29, 2004
CHANGES TO RENEWED FACILITY OPERATING LICENSE NO. DPR-19 DOCKET NO. 50-237 Replace the following page of Renewed Facility Operating License DPR-19 with the attached revised page as indicated. The revised page is identified by revision date and contains marginal lines indicating the area of change.
Remove Page Insert Page 8 8
requirements, schedules and acceptance criteria for tests of the leak-tight integrity of the primary reactor containment and systems and components which penetrate the containment. These exemptions were granted and sent to the licensee in a letter dated June 25, 1982.
These exemptions granted pursuant to 10 CFR 50.12 are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated March 22, 1978 with supplements dated December 2, 1980, and February 12, 1981; January 19, 1983; July 17, 1987; September 28, 1987; and January 5, 1989, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
F. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Dresden Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 0," submitted by letter dated October 21, 2004.
G. The licensee shall report any violations of the requirements contained in Section 2, Items C(1), C(3), and C(4) of this license in the following manner: initial notification shall be made within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> to the NRC Operations Center via the Emergency Notification System with written follow-up within 30 days in accordance with the procedures described in 10 CFR 50.73(b), (c), and (e).
1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed License No. DPR-19 Revised by letter dated October 29, 2004
EXELON GENERATION COMPANY, LLC DRESDEN NUCLEAR POWER STATION, UNIT 3 DOCKET NO. 50-249 ADMINISTRATIVE LICENSE CHANGE TO RENEWED FACILITY OPERATING LICENSE License No. DPR-25
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. Consistent with Order EA-03-086, the Order requiring compliance with the revised design basis threat (DBT Order), issued on April 29, 2003, conforming administrative changes to Renewed Facility Operating Licenses (FOLs) are required to ensure implementation of DBT Order requirements. Therefore, an administrative license change to Renewed FOL No. DPR-25 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the DBT Order. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this administrative license change can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this administrative license change will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this administrative license change is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the Renewed FOL is changed, as indicated in the attachment.
- 3. This administrative license change is effective as of its date of issuance and shall be implemented on or before October 29, 2004.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Section Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed FOL Date of Issuance: October 29, 2004
CHANGES TO RENEWED FACILITY OPERATING LICENSE NO. DPR-25 DOCKET NO. 50-249 Replace the following page of Renewed Facility Operating License DPR-25 with the attached revised page as indicated. The revised page is identified by revision date and contains marginal lines indicating the area of change.
Remove Page Insert Page 5 5
F. The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:
The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.
G. The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated March 22, 1978 with supplements dated December 2, 1980, and February 12, 1981; January 19, 1983; July 17, 1987; September 28, 1987; and January 5, 1989, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
H. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Dresden Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 0," submitted by letter dated October 21, 2004.
I. Deleted J. Deleted K. Deleted L. Deleted [Amdt. 87, 7-24-86]
1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed License No. DPR-25 Revised by letter dated October 29, 2004