ML043120033
| ML043120033 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/28/2004 |
| From: | John Nakoski NRC/NRR/DLPM/LPD2 |
| To: | Crane C AmerGen Energy Co, Exelon Generation Co |
| Nakoski J A, NRR/DLPM, 415-1068 | |
| References | |
| EA-03-086, TAC MC2904 | |
| Download: ML043120033 (11) | |
Text
SAFEGUARDS INFORMATION October 28, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION, UNIT 1 - ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSES IN CONJUNCTION WITH THE COMMISSION ORDER EA-03-086 REGARDING REVISED DESIGN BASIS THREAT (DBT); AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2904)
Dear Mr. Crane:
By letter dated April 29, 2004, AmerGen Energy Company submitted a supplemental response in accordance with Order EA-03-086, the Order requiring compliance with the revised design basis threat, dated April 29, 2003, (DBT Order) for the Clinton Power Station, Unit 1 (Clinton).
Section III.A of the DBT Order required licensees to revise physical security plans (PSPs),
training and qualification plans (T&Q Plans), and safeguards contingency plans (SCPs) to provide protection against the revised DBT set forth in Attachment 2 to the DBT Order. These revised plans, along with an implementation schedule, were required to be submitted to the Nuclear Regulatory Commission (NRC or the Commission) for review and approval no later than April 29, 2004.
The NRC staffs review of the Clinton PSP, SCP, and T&Q Plan submitted in your letter dated April 28, 2004, as supplemented on July 6, July 9, July 23, August 4, August 12, September 9, October 14, and October 21, 2004, has focused on ensuring the necessary programmatic elements are contained in these plans in order to provide high assurance that activities involving special nuclear material are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety.
SAFEGUARDS INFORMATION NOTICE: Enclosure 2 contains Safeguards Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.
C. Crane The NRC staff has determined that, subject to subsequent inspection and evaluation, these plans contain the necessary programmatic elements that, when effectively implemented, will provide the required high assurance that Clinton will be protected against the revised DBT. The NRC staff, therefore, approves the PSP, SCP, and T&Q Plan for Clinton. However, ultimately the effectiveness of these plans will be judged on your ability to meet regulatory requirements through facility implementing procedures and site practices. As such your facility implementing procedures and practices will continue to be subject to future NRC review and inspection, including NRC-conducted force-on-force exercises.
In addition, the NRC staff noted that your PSP included alternatives to certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 73.55. In each case, the NRC staff found that the alternative measures provide an equivalent level of protection to that of the associated requirement and meet the high assurance objective of 10 CFR 73.55(a). The NRC staff, therefore, approves the alternatives shown in the table below. The NRC staffs evaluation is discussed further in the enclosed Safety Evaluation (SE).
Approved Alternatives to NRC Regulations SE Section PSP Section Alternative to 10 CFR Description 3.6.2 6.2 73.55(c)(3)
Isolation Zones 3.9.4.3 9.4.3 73.55(d)(4)
PA vehicle search requirements 3.9.4.4 9.4.4 73.55(d)(1)
PA personnel search requirements 3.9.5.2 9.5 73.55(d)(1) 73.55(d)(4)
PA access control requirements 3.9.6 9.6 73.55(d)(7)(i)(D)
VA barrier locking and alarm requirements 3.10.1 10.1 73.55(c)(5)
PA illumination requirements 3.13.1 14.1 73.55(c)(1) 73.55(d)(7)(i)(B)
Temporary reclassification of VAs to PA status (devitalization)
Finally, consistent with the DBT Order, conforming administrative changes to Facility Operating Licenses (FOLs) are required to ensure implementation of DBT Order requirements.
Therefore, an administrative license change to FOL No. NPF-62 is being made to incorporate the reference to the revised PSP, SCP, and T&Q Plan required by the DBT Order. This change complies with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I.
Please replace the enclosed page to your FOL as indicated in Enclosure 1.
C. Crane A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.
Sincerely,
/RA/
John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosures:
- 2. Safety Evaluation (Safeguards Information) cc w/encl 1 only: See mailing list 1 cc w/encls 1 and 2: Charles Williamson, Superintendent Security
C. Crane A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.
Sincerely,
/RA/
John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosures:
- 2. Safety Evaluation (Safeguards Information) cc w/encl 1 only: See mailing list 1 cc w/encls 1 and 2: Charles Williamson, Superintendent Security DISTRIBUTION (w/o Enclosure 2):
PUBLIC SPRT R/F OGC ACRS PCoates DPickett AMendiola WRuland DLPM DPR GHill (2)
SReynolds, RIII Accession No.: ML043120033
- See previous concurrence OFFICE SPRT/TL*
SPRT/PM*
SPRT/LA*
SPRT/PL*
OGC*
NSIR/ SC NRR/SC NAME DHuyck RFretz CRaynor JPeralta MBupp NLO SMorris JNakoski DATE 10/8/04 10/8/04 10/12/04 10/13/04 10/22/04 10/28/04 10/28/04 OFFICIAL RECORD COPY
Clinton Power Station, Unit 1 cc:
Senior Vice President - Nuclear Services AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President of Operations - Mid-West Boiling Water Reactors AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Dresden, Quad Cities, and Clinton AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Clinton AmerGen Energy Company, LLC Clinton Power Station RR3, Box 228 Clinton, IL 61727-9351 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Document Control Desk-Licensing AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Clinton Power Station AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Clinton Power Station Plant Manager AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Resident Inspector U.S. Nuclear Regulatory Commission RR #3, Box 229A Clinton, IL 61727 Chief Operating Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Associate General Counsel AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Chairman of DeWitt County c/o County Clerks Office DeWitt County Courthouse Clinton, IL 61727
Clinton Power Station, Unit 1 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, IL 60603 Illinois Emergency Management Agency Division of Disaster Assistance &
Preparedness 110 East Adams Street Springfield, IL 62701-1109
AMERGEN ENERGY COMPANY, LLC CLINTON POWER STATION, UNIT 1 DOCKET NO. 50-461 ADMINISTRATIVE LICENSE CHANGE TO FACILITY OPERATING LICENSE License No. NPF-62 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
Consistent with Order EA-03-086, the Order requiring compliance with the revised design basis threat (DBT Order), issued on April 29, 2003, conforming administrative changes to Facility Operating Licenses (FOLs) are required to ensure implementation of DBT Order requirements. Therefore, an administrative license change to FOL No. NPF-62 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the DBT Order. These changes comply with the standards and requirements of the Atomic Energy Act (the Act) of 1954, as amended and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this administrative license change can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this administrative license change will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this administrative license change is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the FOL is changed as indicated in the Attachment.
3.
This administrative license change is effective as of its date of issuance and shall be implemented on or before October 29, 2004.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the FOL Date of Issuance: October 29, 2004
CHANGES TO FACILITY OPERATING LICENSE NO. NPF-62 DOCKET NO. 50-461 Replace the following page of the Facility Operating License NPF-62 with the attached revised page as indicated. The revised page is identified by a revision date and contains marginal lines indicating the area of change.
Remove Page Insert Page 8
8 These exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. The exemptions in items (b) and (c) above are granted pursuant to 10 CFR 50.12. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E.
AmerGen Energy Company, LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled:
"Clinton Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 0," submitted by letter dated October 21, 2004.
F.
AmerGen Energy Company, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report as amended, for the Clinton power Station, Unit No. 1, and as approved in the Safety Evaluation Report (NUREG-0853) dated February 1982 and Supplement Nos. 1 thru 8 thereto subject to the following provision:
AmerGen Energy Company, LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G.
Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, AmerGen Energy Company, LLC shall report any violations of the requirements contained in Section 2.C of this license in the following manner:
initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within thirty days in accordance with the procedures described in 10 CFR 50.73(b), (c), and (e).
1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Amendment No. 123 Revised by letter dated October 28, 2004