SAFEGUARDS INFORMATION October 28, 2004 Mr. Dale E. Young Vice President c/o Scott Young Progress Energy Crystal River Nuclear Generating Plant, Unit 3 Crystal River Energy Complex 15760 West Power Line Street Crystal River, FL 34428
SUBJECT:
CRYSTAL RIVER NUCLEAR GENERATING PLANT, UNIT 3 -
ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER EA-03-086 REGARDING REVISED DESIGN BASIS THREAT; AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2909)
Dear Mr. Young:
By letter dated April 29, 2004, Progress Energy submitted a supplemental response in accordance with Order EA-03-086, the Order requiring compliance with the revised design basis threat, dated April 29, 2003, (DBT Order) for the Crystal River Nuclear Generating Plant, Unit 3.Section III.A of the DBT Order required licensees to revise physical security plans (PSPs), training and qualification plans (T&Q Plans), and safeguards contingency plans (SCPs) in order to provide protection against the revised DBT set forth in Attachment 2 to the DBT Order. These revised plans, along with an implementation schedule, were required to be submitted to the Nuclear Regulatory Commission (NRC or the Commission) for review and approval no later than April 29, 2004.
The NRC staffs review of the Crystal River Nuclear Generating Plant, Unit 3 PSP, SCP, T&Q Plan submitted in your letter dated April 29, 2004, as supplemented on May 19, July 8, July 23, August 16, September 9, September 30, and October 20, 2004, has focused on ensuring the necessary programmatic elements are contained in these plans in order to provide the high assurance that activities involving special nuclear material are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety.
SAFEGUARDS INFORMATION NOTICE: Enclosure 2 contains Safeguards Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.
In addition, the NRC staff noted that your PSP included alternatives to certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 73.55. In each case, the NRC staff found that the alternative measures provide an equivalent level of protection to that of the associated requirement and meet the high assurance objective of 10 CFR 73.55(a). The NRC staff, therefore, approves the alternatives shown in the table below. The NRC staffs evaluation is discussed further in the enclosed Safety Evaluation (SE).
Approved Alternatives to the Requirements of 10 CFR Part 73 SE Section PSP Section Alternative to 10 CFR Description 3.6.2 6.2 73.55(c)(3)
Isolation Zones 3.9.4.3 9.4.3 73.55(d)(4)
Protected Area (PA) vehicle search requirements 3.9.4.4 9.4.4 73.55(d)(1)
PA personnel search requirements 3.9.5.2 9.5 73.55(d)(1) 73.55(d)(4)
PA access control requirements 3.10.1 10.1 73.55(c)(5)
PA illumination requirements 3.13.1 14.1 73.55(c)(1) 73.55(d)(7)(i)(B)
Temporary reclassification of Vital Areas to PA status (devitalization)
Finally, consistent with the DBT Order, conforming administrative changes to Facility Operating Licenses (FOLs) are required to ensure implementation of DBT Order requirements.
Therefore, an administrative license change to FOL No. DPR-72 is being made to incorporate the reference to the revised PSP, SCP, and T&Q Plan required by the DBT Order. This change complies with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I.
Please replace the enclosed page to your FOL as indicated in Enclosure 1.
A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.
Sincerely,
/RA/
John A. Nakoski, Section Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosures:
- 2. SE Regarding the Security Plans (SAFEGUARDS INFORMATION) cc w/encl 1 only: See mailing list 1 cc w/encls 1 and 2: Scott Young, Site Security Manager
Finally, consistent with the DBT Order, conforming administrative changes to Facility Operating Licenses (FOLs) are required to ensure implementation of DBT Order requirements.
Therefore, an administrative license change to FOL No. DPR-72 is being made to incorporate the reference to the revised PSP, SCP, and T&Q Plan required by the DBT Order. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I.
Please replace the enclosed page to your FOL as indicated in Enclosure 1.
A copy of our SE with regard to your security plans (designated as Safeguards Information) is provided in Enclosure 2.
Sincerely,
/RA/
John A. Nakoski, Section Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosures:
- 2. SE Regarding the Security Plans (SAFEGUARDS INFORMATION) cc w/encl 1 only: See mailing list 1 cc w/encls 1 and 2: Scott Young, Site Security Manager DISTRIBUTION:
PUBLIC SPRT R/F OGC ACRS EDunnington BMozafari MRoss-Lee EHackett GHill (2)
DLPM DPR TBoyce VMcCree, RII Accession No.: ML043120016 OFFICE SPRT/TL SPRT/PM SPRT/LA SPRT/PL OGC NSIR/SC SPRT/SC NAME JCreed BBenney CRaynor JPeralta DCummings SMorris JNakoski DATE 10-27-04 10-27-04 10-27-04 10-24-04 10-23-04 10-26-04 10-26-04 OFFICIAL RECORD COPY
Crystal River cc: w/o encl.:
Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042 Mr. Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Steven R. Carr Associate General Counsel - Legal Dept.
Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. Richard L. Warden Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
Attn: Supervisor, Licensing and Regulatory Programs 15760 W. Powerline Street Crystal River, FL 34428-6708
PROGRESS ENERGY DOCKET NO. 50-302 CRYSTAL RIVER NUCLEAR GENERATING PLANT, UNIT 3 ADMINISTRATIVE LICENSE CHANGE TO FACILITY OPERATING LICENSE License No. DPR-72 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
Consistent with Order EA-03-086, the Order requiring compliance with revised design basis threat, (DBT Order) issued on April 29, 2003, conforming administrative changes to Facility Operating Licenses (FOLs) are required to ensure implementation of DBT Order requirements. Therefore, an administrative license change to FOL No. DPR-72 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the DBT Order. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this administrative license change can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this administrative license change will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this administrative license change is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the FOL is changed, as indicated in the attachment.
3.
This administrative license change is effective as of its date of issuance and shall be implemented on or before October 29, 2004.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Section Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the FOL Date of Issuance: October 28, 2004
CHANGES TO FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the following page of the Facility Operating License DPR-72 with the attached revised page as indicated. The revised page is identified by a revision date and contains marginal lines indicating the area of change.
Remove Page Insert Page 5c 5c
- 5c -
2.D Physical Protection The licensee shall fully implement and maintain in effect all provisions of the l
Commission-approved physical security, training and qualification, and safeguards l
contingency plans including amendments made pursuant to provisions of the l
Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 l
(51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
l The combined set of plans, which contains Safeguards Information protected under l
10 CFR 73.21 is entitled: "Crystal River Nuclear Power Plant Security, Training and l
Qualification, and Safeguards Contingency Plan, Revision 0" submitted by letter dated l
September 30, 2004, as supplemented by letter dated October 20, 2004.
l Amendment No. 164, 212 Revised by letter dated October 28, 2004