November 5, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - CORRECTION TO ADMINISTRATIVE CHANGE TO RENEWED FACILITY OPERATING LICENSE (TAC NO. MC2962)
Dear Mr. Crane:
On October 28, 2004, the Nuclear Regulatory Commission (NRC) issued an administrative change to Renewed Facility Operating License (FOL) No. DPR-56 for the Peach Bottom Atomic Power Station, Unit 3 (Peach Bottom 3). This amendment was necessary to ensure implementation of design basis threat Order requirements.
Page 3 of the Peach Bottom 3 Renewed Facility Operating License as issued in our October 28, 2004, letter, contained an error in paragraph C.(2) in that it incorporated Technical Specifications through Amendment 252. It should have incorporated Technical Specifications through Amendment No. 253. There were also 2 minor omissions from the page and one typographical error on the page.
Enclosed is a corrected copy of page 3 of the Peach Bottom 3 Renewed FOL. If you have any questions, I can be reached at (301) 415-1494.
Sincerely,
/RA/
George F. Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-278
Enclosure:
Page 3 of Peach Bottom 3 Renewed FOL cc w/encl: See next page
Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - CORRECTION TO ADMINISTRATIVE CHANGE TO RENEWED FACILITY OPERATING LICENSE (TAC NO. MC2962)
Dear Mr. Crane:
On October 28, 2004, the Nuclear Regulatory Commission (NRC) issued an administrative change to Renewed Facility Operating License (FOL) No. DPR-56 for the Peach Bottom Atomic Power Station, Unit 3 (Peach Bottom 3). This amendment was necessary to ensure implementation of design basis threat Order requirements.
Page 3 of the Peach Bottom 3 Renewed Facility Operating License as issued in our October 28, 2004, letter, contained an error in paragraph C.(2) in that it incorporated Technical Specifications through Amendment 252. It should have incorporated Technical Specifications through Amendment No. 253. There were also 2 minor omissions from the page and one typographical error on the page.
Enclosed is a corrected copy of page 3 of the Peach Bottom 3 Renewed FOL. If you have any questions, I can be reached at (301) 415-1494.
Sincerely,
/RA/
George F. Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-278
Enclosure:
Page 3 of Peach Bottom 3 Renewed FOL cc w/encl: See next page DISTRIBUTION PUBLIC SPRT R/F OGC ACRS MOBrien GWunder DCollins (A)
TBoyce GMatakas, RI ADAMS Accession Number: ML043090227 OFFICE PDI-2/PM PDI-2/LA PDI-2/SC(A)
NAME GWunder MOBrien DCollins DATE 11/04/04 11/04/04 11/04/04 OFFICIAL RECORD COPY
Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc:
Site Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Plant Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Regulatory Assurance Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Resident Inspector U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station P.O. Box 399 Delta, PA 17314 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway Baltimore, MD 21224 Correspondence Control Desk Exelon Generation Company, LLC P. O. Box 160 Kennett Square, PA 19348 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township 545 Broad Street Ext.
Delta, PA 17314-9203 Mr. Richard McLean Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Manager Licensing-Peach Bottom Atomic Power Station Exelon Generation Company, LLC 200 Exelon Way, KSA -3E Kennett Square, PA 19348
Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc:
Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President-Operations Mid-Atlantic Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Senior Vice President, Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director-Licensing and Regulatory Affairs Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348
(5)
Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facililty.
C.
This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
(1)
Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit No. 3, at steady state reactor core power levels not in excess of 3514 megawatts thermal.
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 253, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.1 (3)
Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans2, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 0," submitted by letter dated October 21, 2004.
(4)
Fire Protection The Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved in 1Licensed power level was revised by Amendment No. 250, dated November 22, 2002, and will be implemented following the 14th refueling outage currently scheduled for Fall 2003.
2The training and Qualification Plan and Safeguards Contingency Plan and Appendices to the Security Plan.
Page 3 Renewed License No. DPR-56 Revised by letter dated October 28, 2004 Revised by letter dated November 5, 2004 l