MONTHYEARML0416905552004-06-16016 June 2004 Request for Additional Information, Security Plan Sections 10-19 Project stage: RAI ML0418100922004-06-25025 June 2004 Request for Additional Information Security Plan Sections 1-9 Project stage: RAI ML0420200042004-07-0909 July 2004 Request for Additional Information Training and Qualification Plan Project stage: RAI ML0422200112004-07-23023 July 2004 DC Cook Nuclear Plant, Units 1 & 2, RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (Tac Nos. MC2910 and MC2911) Project stage: RAI ML0421003452004-07-23023 July 2004 RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2910 and MC2911) Project stage: RAI ML0421003632004-07-26026 July 2004 Response to Donald C. Cook, Units 1 and 2 - Request for Additional Information Training and Qualification Plan, Dated July 9, 2004 Project stage: Request ML0422902342004-08-12012 August 2004 Response to Request to Additional Information Regarding Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan Project stage: Other ML0427900152004-09-30030 September 2004 Response to Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response, Dated September 21, 2004 Project stage: Other ML0431200342004-10-28028 October 2004 Administrative Change to Facility Operating Licenses in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat (Dbt); and Revisions to Physical Security Plan, Training and Qualification Plan.. Project stage: Other ML0501700012005-01-28028 January 2005 Correction to Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Project stage: Other 2004-07-26
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
Indiana Michigan Power Company C^NuearPkrt One CookPar BrdynmjM1491C6 616 465 5901 IMDIAMA SAFEGUARDS INFORMATION MICHIGAN POWER September 30, 2004 AEP:NRC:2073-20 10 CFR 2.202 10 CFR 50.4 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P 1-17 Washington, DC 20555-0001
SUBJECT:
Response to Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response (TAC Nos. MC2910 and MC291 1), dated September 21, 2004 By letter dated September 9, 2004, Indiana Michigan Power Company (I&M),
the licensee for Donald C. Cook Nuclear Plant Units 1 and 2, Facility Operating Licenses DPR-58 and DPR-74, submitted a revised Security Plan for review and approval by the Nuclear Regulatory Commission (NRC) to comply with NRC Order EA-03-086.
By letter dated September 21, 2004, the NRC notified I&M of additional Security Plan provisions which required changes to I&M's Security Plan. By facsimile and teleconference on September 23, 2004, between l&M's A. Rodriguez, H. Etheridge, and D. Burgoyne, and NRC's D. Huyck, and R. Fretz, additional changes and enhancements to I&M's Security Plan were identified.
The attachment to this letter provides I&M's response to changes identified in the September 21, 2004 letter and the September 23, 2004 facsimile and teleconference. The enclosures to this letter provide for electronic and hardcopy format of l&M's Security Plan with changes incorporated from the attachment.
NOTE: THE ATTACHMENT AND ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT AND ENCLOSURES, THIS LETTER IS "DECONTROLLED".
SAFEGUARDS INFORMATION PrEsI er9 AF.P:AiwJricasEnergy l~lrtiier-" UJlCD
U. S. Nuclear Regulatory Commission AEP:NRC:2073-20 Page 2 There are no new commitments identified in this submittal.
Should you have any questions, please contact Mr. John A. Zwolinski, Director of Safety Assurance, at (269) 466-2428.
Sincerely, N. Jensen Site Vice President Attachment Enclosures HE/jen
REFERENCES:
- 1. Letter from J. N. Jensen, I&M, to NRC Document Control Desk, "Supplemental Response to the April 29, 2003, Order to Donald C. Cook Nuclear Plant Unit 1 and Unit 2," dated April 29, 2004
- 2. Letter from R. J. Fretz, NRC, to J. N. Jensen, I&M, "Donald C. Cook Nuclear Plant, Units I and 2 - Request for Additional Information Re:
Security Plan Sections 10-19 (TAC Nos. MC2910 and MC2911)," dated June 16, 2004
- 3. Letter from R. J. Fretz, NRC, to J. N. Jensen, I&M, "Donald C. Cook Nuclear Plant, Units I and 2 - Request for Additional Information Re:
Security Plan Sections 1-9 (TAC Nos. MC2910 and MC2911)," dated June 25, 2004
- 4. Letter from R. J. Fretz, NRC, to J. N. Jensen, I&M, "Donald C. Cook Nuclear Plant, Units I and 2 - Request for Additional Information Re:
Training and Qualification Plan (TAC Nos. MC2910 and MC2911)," dated July 9, 2004
- 5. Letter from R. J. Fretz, NRC, to J. N. Jensen, I&M, "Donald C. Cook Nuclear Plant, Units 1 and 2 - Request for Additional Information Re:
Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2910 and MC291 1)," dated July 23, 2004
U. S. Nuclear Regulatory Commission AEP:NRC:2073-20 Page 3
- 6. Letter from J. N. Jensen, I&M, to NRC Document Control Desk, "Response to Donald C. Cook Nuclear Plant Units I and 2 - Request for Additional Information Re: Security Plan Sections 10-19 (TAC Nos. MC2910 and MC291 1)," dated July 8, 2004
- 7. Letter from J. N. Jensen, I&M, to NRC Document Control Desk, "Response to Donald C. Cook Nuclear Plant Units I and 2 - Request for Additional Information Re: Security Plan Sections 1-9 (TAC Nos. MC2910 and MC291 1)," dated July 13, 2004
- 8. Letter from J. N. Jensen, I&M, to NRC Document Control Desk, "Response to Donald C. Cook Nuclear Plant Units I and 2 - Request for Additional Information Re: Training and Qualification Plan (TAC Nos. MC2910 and MC291 1)," dated July 26, 2004
- 9. Letter from J. N. Jensen, I&M, to NRC Document Control Desk, "Response to Donald C. Cook Nuclear Plant Units 1 and 2 - Request for Additional Information Re: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC Nos. MC2910 and MC2911)," dated August 12, 2004
- 10. Letter from J. N. Jensen, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2 - Supplemental Response to Requests for Additional Information related to I&M's Submittal of a revised Security Plan," dated August 31, 2004
- 11. Letter from J. N. Jensen, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2 - I&M's Physical Security Plan with NRC RAIs Incorporated from NRC Review of I&M's Submittal of a Revised Security Plan," dated September 9, 2004 c w/o attachment:
J. L. Caldwell - NRC Region III K. D. Curry - AEP Ft. Wayne J. T. King - MPSC J. G. Lamb - NRC Washington DC MDEQ - WHMD/HWRPS NRC Resident Inspector Records Center - INPO
U. S. Nuclear Regulatory Commission AEP:NRC:2073-20 Page 4 AFFIRMATION I, Joseph N. Jensen, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
Indiana Michigan Power Company hNJensen Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS _ DAY OF 2004
- -- Notary ic My Commission Expires ! 1 DANIELLE M. BURGOYNE Notary Public, State of Michigan MY CcmmissionCounty of Berren Expires Apr. 4, 2008 Acting inth,3 C-un~tv cf_________