ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS N
P S
- 1.
Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
- 2.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 3.c and 3.f; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions other than 3.c and 3.f provided the associated Function or the redundant Function maintains ECCS initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.5.1.2 Perform CHANNEL FUNCTIONAL TEST.
92 days SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.
92 days SR 3.3.5.1.4 Perform CHANNEL CALIBRATION.
18 months
TEMPORARY NOTE -----------------
The next required performance of this SR for Functions l.a and 1.b 18 months may be delayed until the current cycle refueling outage, but no later than February 2, 2005. This temporary note expires upon startup from that refueling outage.
SR 3.3.5.1.5 Perform LOGIC SYSTEM FUNCTIONAL TEST.
Cooper 3.3-36 Amendment 2n.
LOP Instrumentation 3.3.8.1 SURVEILLANCE REQUIREMENTS
- 1.
Refer to Table 3.3.8.1-1 to determine which SRs apply for each LOP Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> provided the associated Function maintains DG initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.8.1.1 Perform CHANNEL FUNCTIONAL TEST.
31 days
TEMPORARY NOTE -----------------
The next required performance of this SR for Division 1 may be delayed 18 months until the current cycle refueling outage, but no later than February 2, 2005. This temporary note expires upon startup from that refueling outage.
SR 3.3.8.1.2 Perform CHANNEL CALIBRATION.
TEMPORARY NOTE -----------------
The next required performance of this SR for Division 1 may be delayed 18 months until the current cycle refueling outage, but no later than February 2, 2005. This temporary note expires upon startup from that refueling outage.
SR 3.3.8.1.3 Perform LOGIC SYSTEM FUNCTIONAL TEST.
Cooper 3.3-65 Amendment 205
RPS Electric Power Monitoring 3.3.8.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D.
Required Action and D.1 Initiate action to fully insert Immediately associated Completion all insertable control rods Time of Condition A or B in core cells containing not met In MODE 5 with one or more fuel any control rod withdrawn assemblies.
from a core cell containing one or more fuel assemblies.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TEMPORARY NOTE -----------------
The next required performance of this SR for Division 1 may be delayed 18 months until the current cycle refueling outage, but no later than February 2, 2005. This temporary note expires upon startup from that refueling outage.
SR 3.3.8.2.1 Perform CHANNEL CALIBRATION. The Allowable Values shall be:
- a.
Overvoltage < 131 V with time delay set to
< 3.8 seconds.
- b.
Undervoltage > 109 V, with time delay set to
< 3.8 seconds.
- c.
Underfrequency 2 57.2 Hz, with time delay set to < 3.8 seconds.
-- TEMPORARY NOTE -----------------
The next required performance of this SR for Division 1 may be delayed 18 months until the current cycle refueling outage, but no later than February 2, 2005. This temporary note expires upon startup from that refueling outage.
SR 3.3.8.2.2 Perform a system functional test.
l Cooper 3,3-68 Amendment 205
ECCS-Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY 1*
TEMPORARY NOTE -----------------
The next required performance of this SR for the Core Spray Subsystems A and B may be delayed until the current cycle refueling outage, but no later than February 2, 2005. 'This temporary note expires upon startup from that refueling outage.
NOTES -
- 1.
For HPCI only, not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
- 2.
Vessel injection/spray may be excluded.
Verify each ECCS injectionlspray subsystem actuates on an actual or simulated automatic initiation signal.
18 months SR 3.5.1.10 N
OTE-----
Valve actuation may be excluded.
Verify the ADS actuates on an actual or simulated 18 months automatic initiation signal.
SR 3.5.1.11
-NOTE------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify each ADS valve opens when manually 18 months actuated.
Cooper 3.5-6 Amendment No.205
ECCS - Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.4 Verify each required ECCS pump develops the specified flow rate against a system head corresponding to the specified reactor pressure.
In accordance with the Inservice Testing Program SYSTEM HEAD NO.
CORRESPONDING OF TO A REACTOR PUMPS PRESSURE OF SYSTEM FLOW RATE CS
> 4720 gpm LPCI
> 7700 gpm 1
I
> 113 psig
> 20 psig SR 3.5.2.5 V
eNOTE ny Vessel injection/spray may be excluded.
TEMPORARY NOTE ----------------
The next required performance of this SR for the Core Spray Subsystems A and B may be delayed until the current cycle refueling outage, but no later than February 2, 2005. This temporary note expires upon startup from that refueling outage.
Verify each required ECCS Injection/spray subsystem actuates on an actual or simulated automatic initiation signal.
18 months Cooper 3.5-10 Amendment No. 205
Primary Containment 3.6.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1.1 Perform required visual examinations and leakage In accordance rate testing except for primary containment air lock with the Primary testing, in accordance with the Primary Containment Containment Leakage Rate Testing Program.
Leakage Rate Testing Program
-TEMPORARY NOTE -----------
The next required performance of this SR may be delayed until the current cycle refueling outage, but no later than February 2, 2005. This temporary note expires upon startup from that refueling outage.
SR 3.6.1.1.2 Verify drywell to suppression chamber bypass 18 months leakage is equivalent to a hole < 1.0 inch in diameter.
AND
--- NOTE--
Only required after two consecutive tests fail and continues until two consecutive tests pass 9 months Cooper 3.6-2 Amendment No. 205
SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. (continued)
E.2 Suspend CORE Immediately ALTERATIONS.
AND E.3 Initiate action to Immediately suspend OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each SGT subsystem for > 10 continuous 31 days hours with heaters operating.
- TEMPORARY NOTE -----------------
The next required performance of this SR may be delayed until the current cycle refueling outage, but no later than February 2. 2005. This temporary note expires upon startup from that refueling outage.
. Perform required SGT filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP).
with the VFTP SR 3.6.4.3.3 Verify each SGT subsystem actuates on an actual 18 months or simulated initiation signal.
- TEMPORARY NOTE -----------------
The next required performance of this SR may be delayed until the current cycle refueling outage, but no later than February 2, 2005. This temporary note expires upon startup from that refueling outage.
SR 3.6.4.3.4 Verify the SGT units cross tie damper is in the 18 months correct position, and each SGT room air supply check valve and SGT dilution air shutoff valve can be opened.
I Cooper 3.6-40 Amendment No. 205
DC Sources-Operating 3.8.4 SURVEILLANCE REQU]REMENTS (continued)
SURVEILLANCE FREQUENCY 1
SR 3.8.4.6 Verify:
18 months
- a. Each required 125 V supplies > 200 amps
> 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s: and
- b. Each required 250 V supplies > 200 amps
> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
battery charger at > 125 V for battery charger at > 250 V for 1*
- TEMPORARY NOTE -----------------
The next required performance of this SR for the Division I batteries may be delayed until the current cycle refueling outage, but no later than February 2, 2005. This temporary note expires upon startup from that refueling outage.
SR 3.B.4.7 NOTES-------------------
- 1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.
- 2.
This Surveillance shall not be performed in MODE 1. 2. or 3.
However, credit may be taken for unplanned events that satisfy this SR.
18 months Verify battery capacity is adequate to supply, and maintain in OPERABLE status.
the required emergency loads for the design duty cycle when subjected to a battery service test.
(continued)