May 27, 2004 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING LICENSE AMENDMENT REQUEST FOR A ONE-TIME EXTENSION OF CERTAIN SURVEILLANCE REQUIREMENTS (SRs)
Dear Mr. Edington:
Nebraska Public Power District (the licensee) requested the Nuclear Regulatory Commission (NRC) staff approve a license amendment request for a one-time extension of certain technical specification SRs, including SR 3.3.8.1.2, performance of channel calibration for loss of power instrumentation.
The NRC staff has reviewed the information provided in the January 30, 2004, submittal and determined that additional information is required in order to complete the review of the proposed change to SR 3.3.8.1.2. Specifically, the last paragraph on Page 15 of Attachment 1 to the submittal states:
For functions 4a, 4b, and 5a, the setpoint calculation assumes an 18-month calibration interval. Conservatively assuming a 24-month calibration interval for these functions results in a maximum expected drift that remains well within the desired level of confidence for avoidance of either a spurious trip or exceeding the instrument Allowable Value.
Please indicate the methodology used to extend the instrument Allowable Value from the 18-month interval to a 24-month interval. As agreed upon in telephone call on May 27, 2004, the licensee will respond to the RAI within 30 days.
Sincerely,
/RA/
Michelle C. Honcharik, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-298 cc: See next page
May 27, 2004 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING LICENSE AMENDMENT REQUEST FOR A ONE-TIME EXTENSION OF CERTAIN SURVEILLANCE REQUIREMENTS (SRs)
Dear Mr. Edington:
Nebraska Public Power District (the licensee) requested the Nuclear Regulatory Commission (NRC) staff approve a license amendment request for a one-time extension of certain technical specification SRs, including SR 3.3.8.1.2, performance of channel calibration for loss of power instrumentation.
The NRC staff has reviewed the information provided in the January 30, 2004, submittal and determined that additional information is required in order to complete the review of the proposed change to SR 3.3.8.1.2. Specifically, the last paragraph on Page 15 of Attachment 1 to the submittal states:
For functions 4a, 4b, and 5a, the setpoint calculation assumes an 18-month calibration interval. Conservatively assuming a 24-month calibration interval for these functions results in a maximum expected drift that remains well within the desired level of confidence for avoidance of either a spurious trip or exceeding the instrument Allowable Value.
Please indicate the methodology used to extend the instrument Allowable Value from the 18-month interval to a 24-month interval. As agreed upon in telephone call on May 27, 2004, the licensee will respond to the RAI within 30 days.
Sincerely,
/RA/
Michelle C. Honcharik, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-298 cc: See next page DISTRIBUTION:
PUBLIC PDIV-1 r/f RidsNrrDlpmLpdiv (HBerkow)
RidsNrrDlpmLpdiv1 (RGramm)
RidsNrrPMMHoncharik RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsOgcRp S. Mazumdar RidsRgn4MailCenter(KKennedy)
RidsNrrDlpmDpr RidsNrrDeDpr
- LA concurrence deferred per memo from Tad Marsh Deferral of Activities Necessary to Support Security Plan Review Team.
ACCESSION NO: ML041540467 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME MHoncharik DBaxley RGramm DATE 5/27/04 N/A*
5/27/04 OFFICIAL RECORD COPY
May 2004 Cooper Nuclear Station cc:
Mr. William J. Fehrman President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. Clay C. Warren Vice President of Strategic Programs Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. John R. McPhail, General Counsel Nebraska Public Power District P. O. Box 499 Columbus, NE 68602-0499 Mr. Paul V. Fleming Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P. O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305 Ms. Cheryl K. Rogers, Program Manager Nebraska Health & Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P. O. Box 95007 Lincoln, NE 68509-5007 Mr. Ronald A. Kucera, Director of Intergovernmental Cooperation Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Jerry Uhlmann, Director State Emergency Management Agency P. O. Box 116 Jefferson City, MO 65101 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson Suite 310 Topeka, KS 66612-1366 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street Suite D Des Moines, IA 50309 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 May 2004 Jerry C. Roberts, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321