May 21, 2004 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Dear Mr. Kansler:
As you are aware, on April 23, 2004, the New England Coalition submitted a 10 CFR 2.206 petition to the Nuclear Regulatory Commission (NRC) for the Vermont Yankee Nuclear Power Station (Vermont Yankee). The New England Coalition petition requested that until such time as the licensee has rendered an accurate and NRC-verified account of the location, disposition, and condition of all irradiated fuel, including fuel currently loaded in the reactor core, the NRC order a halt to all fuel movement at Vermont Yankee. By conference call on May 5, 2004, the NRC Petition Review Board (PRB) spoke with Raymond Shadis who is representing the New England Coalition. Entergy personnel participated in the conference call. The PRB explained that the fuel movement had been completed for the spring 2004 outage and offered Mr. Shadis an opportunity to clarify or modify the request. Mr. Shadis reaffirmed the petition request to stop all fuel movement, but he understood that at the present time the request would be limited to the spent fuel pool. He still wanted a 100-percent verification of the inventory of all the special nuclear material in the spent fuel pool. He stated that this request to halt fuel movement does not apply to fuel in the spent fuel pool if it is related to the inventory inspection.
The NRC is conducting a special inspection with regard to potentially-missing spent fuel segments at Vermont Yankee. Entergy has informed the NRC of its plan to perform a comprehensive search of the spent fuel pool, conduct a core load verification, verify the location of the remaining damaged spent fuel rod sections stored in the bundles, and perform a records review in an effort to determine the location of the missing segments. As discussed with Mr. James DeVincentis of your staff on May 11, 2004, we request Entergy to:
(1) document the verification of the inventory of all special nuclear material in the spent fuel pool; (2) document all other actions you are performing to locate the missing fuel; (3) document that the location of the remaining portions of the two spent fuel rod segments have been verified; (4) provide the results of your actions to locate the missing fuel when the current efforts are completed; and (5) provide a schedule for these actions by June 8, 2004.
The petition process affords the opportunity for the licensee to provide a response to the petition. Therefore, the staff is requesting that you provide a response to this petition. Since,
M. Kansler this response will be made publicly available you should avoid using proprietary or personal privacy information that requires protection from public disclosure.
We have enclosed the petition for your information. If you have any questions, please call Alan Wang of my staff at (301) 415-1445.
Sincerely,
/RA/
Eric Leeds, Deputy Director Division of Licensing Project Management Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/encl: See next page
M. Kansler M. Kansler this response will be made publicly available you should avoid using proprietary or personal privacy information that requires protection from public disclosure.
We have enclosed the petition for your information. If you have any questions, please call Alan Wang of my staff at (301) 415-1445.
Sincerely,
/RA/
Eric Leeds, Deputy Director Division of Licensing Project Management Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
Public WTravers SLewis PDI-2 Reading PNorry EDO (G20040284)
CPaperiello RidsNrrOd WKane RidsNrrAdpt SCollins RidsNrrDlpm(Leeds\\Marsh)
WDean RidsNrrDlpmLpdi SBurns RidsNrrDlpmLpdiv HMiller, RI RidsNrrDlpmLpdi-2 KCyr, OGC RidsNrrLACRaynor SECY (LTR-04-0249)
RidsNrrPMAWang RidsNrrPMREnnis RidsNrrPMDSkay RidsOpaMail RidsOcaMail RidsNrrWpcMail JGoldberg RidsRgn1MailCenter Package No.: ML041390290 Incoming No.: ML041180245 Response: ML041390284 OFFICE PDIV-2/PM PDI-1/PM PDI-2/PM PDI-2/LA VY:SC PDI-2\\D NAME AWang DSkay REnnis CRaynor AHowe CHolden DATE 5/17/04 05/19/04 5/19/04 5/20/04 5/20/04 5/20/04 OFFICE DLPM/DD NAME ELeeds DATE 5/21/04 OFFICIAL RECORD COPY
Vermont Yankee Nuclear Power Station cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. David R. Lewis Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, DC 20037-1128 Ms. Christine S. Salembier, Commissioner Vermont Department of Public Service 112 State Street Montpelier, VT 05620-2601 Mr. Michael H. Dworkin, Chairman Public Service Board State of Vermont 112 State Street Montpelier, VT 05620-2701 Chairman, Board of Selectmen Town of Vernon P.O. Box 116 Vernon, VT 05354-0116 Operating Experience Coordinator Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354 G. Dana Bisbee, Esq.
Deputy Attorney General 33 Capitol Street Concord, NH 03301-6937 Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108 Ms. Deborah B. Katz Box 83 Shelburne Falls, MA 01370 Ms. Carla A. White, RRPT, CHP Radiological Health Vermont Department of Health P.O. Box 70, Drawer #43 108 Cherry Street Burlington, VT 05402-0070 Mr. James M. DeVincentis Manager, Licensing Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Resident Inspector Vermont Yankee Nuclear Power Station U. S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354 Director, Massachusetts Emergency Management Agency ATTN: James Muckerheide 400 Worcester Rd.
Framingham, MA 01702-5399 Jonathan M. Block, Esq.
Main Street P.O. Box 566 Putney, VT 05346-0566 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213
Vermont Yankee Nuclear Power Station cc:
Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Danny L. Pace Vice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Jay K. Thayer Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Mr. Kenneth L. Graesser 38832 N. Ashley Drive Lake Villa, IL 60046 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Ronald Toole 1282 Valley of Lakes Box R-10 Hazelton, PA 18202 Ms. Stacey M. Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113 Mr. Raymond Shadis New England Coalition Post Office Box 98 Edgecomb, ME 04556 Mr. James P. Matteau Executive Director Windham Regional Commission 139 Main Street, Suite 505 Brattleboro, VT 05301 Mr. William K. Sherman Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620-2601