Category:Annual Report
MONTHYEARML22320A5592022-11-16016 November 2022 2022 Annual Report - Guarantees of Payment of Deferred Premiums RS-15-124, 10 CFR50.46 Annual Report2015-05-0101 May 2015 10 CFR50.46 Annual Report ML14321A7052014-11-14014 November 2014 2014 Annual Report - Guarantees of Payment of Deferred Premiums RS-13-104, 10 CFR 50.46 Annual Report2013-05-0303 May 2013 10 CFR 50.46 Annual Report RS-07-070, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors, Annual Report2007-05-0707 May 2007 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors, Annual Report ML0632404372006-11-13013 November 2006 Byron Station, Dresden, LaSalle County Station, Peach Bottom Atomic Station, Limerick Station and Quad Cities Nuclear Power Station, 2006 Annual Report - Guarantees of Payment of Deferred Premiums ML0612202042006-04-28028 April 2006 Attachment 1, Quad Cities, Units 1 and 2 - 2005 Annual Radioactive Effluent Release Report SVP-06-028 RS-05-052, Corporation Annual Financial Statements for 20042005-05-0202 May 2005 Corporation Annual Financial Statements for 2004 RS-04-066, Transmittal of 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for light-water Nuclear Power Reactors, Annual Report2004-05-0505 May 2004 Transmittal of 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for light-water Nuclear Power Reactors, Annual Report SVP-04-034, Radioactive Effluent Report for January Through December 20032004-04-30030 April 2004 Radioactive Effluent Report for January Through December 2003 SVP-02-039, . Transmittal of 10CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors, Annual Report2002-05-0909 May 2002 . Transmittal of 10CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors, Annual Report 2022-11-16
[Table view] Category:Letter type:RS
MONTHYEARRS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges2023-04-24024 April 2023 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR2023-03-0303 March 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location RS-23-034, Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program2023-02-0202 February 2023 Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-033, Request for Exemption from 10 CFR 2.109(b)2023-01-27027 January 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves RS-22-127, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair2022-12-14014 December 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-119, Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval2022-10-31031 October 2022 Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-112, Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval2022-10-0707 October 2022 Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-102, Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times2022-08-18018 August 2022 Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-098, Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-282022-08-0101 August 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 RS-22-094, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements2022-07-25025 July 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements 2024-08-20
[Table view] |
Text
Exel o n.
Exelon Generation 4300 Winfield Road www.exeloncorp.com Nuclear Warrenville, IL 60555 10 CFR 50.46 RS-04-066 May 5, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
Transmittal of 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors," Annual Report for Quad Cities Nuclear Power Station, Units 1 and 2
Reference:
Letter from T. J. Tulon (Exelon Generation Company, LLC) to U. S. NRC, "Transmittal of 10 CFR 50.46, 'Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors,' Annual Report for Quad Cities Nuclear Power Station, Units 1 and 2," SVP-03-063, dated May 8, 2003 The purpose of this letter is to provide the annual report required by 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors," for Quad Cities Nuclear Power Station, Units 1 and 2. The attachments describe the changes in accumulated Peak Cladding Temperature (PCT) since the previous annual submittal (Reference).
Should you have any questions concerning this letter, please contact Mr. Thomas G. Roddey at (630) 657-2811.
Rspectfully, Patrick R. Simpson Manager - Licensing Attachments: Attachment A: Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report Attachment B: Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report Attachment C: Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Quad Cities Nuclear Power Station Illinois Emergency Management Agency - Division of Nuclear Safety k00
Attachment A Quad Cities Nuclear Power Station Unit I 10 CFR 50.46 Report PLANT NAME: Quad Cities Unit 1 ECCS EVALUATION MODEL: SAFER/GESTR-LOCA REPORT REVISION DATE: 05/05/04 CURRENT OPERATING CYCLE: 18A ANALYSIS OF RECORD Evaluation Model:
The GESTR-LOCA and SAFER Models for the Evaluation of the Loss-of-Coolant Accident, Volume l1l, SAFER/GESTR Application Methodology, NEDE-23785-1-PA, General Electric Company, Revision 1, October 1984.
Calculations:
"SAFERIGESTR-LOCA Loss-of-Coolant Accident Analysis for Dresden Nuclear Station 2 and 3 and Quad Cities Nuclear Station Units 1 and 2," NEDC-32990P, Revision 2, GE Nuclear Energy, September 2003.
Fuel Analyzed in Calculation: GE9/10, ATRIUM-9B and GE14 Limiting Fuel Type: GE14 Limiting Single Failure: Diesel Generator Limiting Break Size and Location: 1.0 Double-Ended Guillotine in a Recirculation Suction Pipe Reference Peak Cladding Temperature (PCT) PCT = 2110 0 F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated December 6, 2002 (See Note 2) APCT = 0F 10 CFR 50.46 Report dated May 8, 2003 (See Note 4) APCT = 00 F Net PCT 2110 0F B. CURRENT LOCA MODEL ASSESSMENTS SAFER Level/olume Table Error (See Note 5) APCT =O0 F Steam Separator Pressure Drop Error (See Note 6) APCT = 0F Mid-Cycle Reload of GE14 Fuel (See Note 7) APCT = 0°F Total PCT change from current assessments l ZAPCT = 0F Cumulative PCT change from current assessments l APCT l= 00F Net PCT 2110 OF
Attachment B Quad Cities Nuclear Power Station Unit 2 10 CFR 50.46 Report PLANT NAME: Quad Cities Unit 2 ECCS EVALUATION MODEL: SAFER/GESTR-LOCA REPORT REVISION DATE: 05/05/04 CURRENT OPERATING CYCLE: 18 ANALYSIS OF RECORD Evaluation Model:
The GESTR-LOCA and SAFER Models for the Evaluation of the Loss-of-Coolant Accident, Volume 1II,SAFERIGESTR Application Methodology, NEDE-23785-1-PA, General Electric Company, Revision 1, October 1984.
Calculations:
"SAFER/GESTR-LOCA Loss-of-Coolant Accident Analysis for Dresden Nuclear Station 2 and 3 and Quad Cities Nuclear Station Units 1 and 2," NEDC-32990P, Revision 2, GE Nuclear Energy, September 2003.
Fuel Analyzed in Calculation: GE9/10, ATRIUM-9B and GE14 Limiting Fuel Type: GE14 Limiting Single Failure: Diesel Generator Limiting Break Size and Location: 1.0 Double-Ended Guillotine in a Recirculation Suction Pipe Reference Peak Cladding Temperature (PCT) PCT = 21100 F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated March 28, 2002 (See Note 1) APCT = 00 F 10 CFR 50.46 Report dated May 9, 2002 (See Note 3) APCT = 00 F 10 CFR 50.46 Report dated May 8, 2003 (See Note 4) APCT = 00 F Net PCT 21100 F B. CURRENT LOCA MODEL ASSESSMENTS SAFER LevelNolume Table Error (See Note 5) APCT = 00F Steam Separator Pressure Drop Error (See Note 6) APCT = 00F Second Reload of GE14 in Cycle 18 Core (See Note 8) APCT = 00F Total PCT change from current assessments ZAPCT = 0F Cumulative PCT change from current assessments l APCT I = 0°F Net PCT 2110°F
Attachment C Quad Cities Nuclear Power Station Units 1 and 2 10 CFR 50.46 Report Assessment Notes
- 1. Prior LOCA Model Assessment The 50.46 letter dated March 28, 2002 reported a new LOCA analysis to support extended power uprate (EPU) and transition to GE14 fuel for Quad Cities Unit 2.
[
Reference:
Letter from Timothy J. Tulon (Exelon) to U.S. NRC, "10 CFR 50.46, 30-Day Report for Quad Cities Unit 2," SVP-02-025, dated March 28, 2002.]
- 2. Prior LOCA Assessment A new LOCA analysis was performed to support EPU and transition to GE14 fuel for Quad Cities Unit 1. In the referenced letter, the impact of CS and LPCI leakage, GE LOCA error in the WEVOL code and change in DG start time requirement were reported. There is no assessment penalty.
[
Reference:
Letter from Timothy J. Tulon (Exelon) to U.S. NRC, "10 CFR 50.46, 30-Day Report for Quad Cities Nuclear Power Station, Unit 1," SVP-02-104, dated December 6, 2002.]
- 3. Prior LOCA Assessment In the referenced letter, no LOCA model assessment was reported for Unit 2 PCT.
[
Reference:
Letter from Timothy J. Tulon (Exelon) to U.S. NRC, "Transmittal of 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light water nuclear power reactors," Annual Report for Quad Cities Units 1 and 2," SVP-02-039, dated May 9, 2002.]
- 4. Prior LOCA Assessment The referenced letter provided the annual 50.46 report for Units 1 and 2. This letter reported no LOCA model assessment for Unit 1 whereas it reported the impact of GE LOCA error in the WEVOL code and change in DG start time requirement for Unit 2. The PCT impact for these errors was determined to be 0F.
[
Reference:
Letter from Timothy J. Tulon (Exelon) to U.S. NRC, "Transmittal of 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light water nuclear power reactors," Annual Report for Quad Cities Nuclear Power Station, Units 1 and 2," SVP-03-063, dated May 8, 2003.]
- 5. Current LOCA Assessment GE reported that an error was found in the initial level/volume table for SAFER. The level/volume tables were generated with incorrect initial water levels. This resulted in an incorrect volume split in the nodes above and below the water surface, and incorrect initial liquid mass. GE determined that the PCT impact of this error on all fuel types to be negligible.
[
Reference:
GE Letter, "10 CFR 50.46 Notification Letter, " 2003-01, May 6, 2003.]
Page 1 of 2
Attachment C Quad Cities Nuclear Power Station Units I and 2 10 CFR 50.46 Report Assessment Notes
- 6. Current LOCA Assessment GE reported that an error was found in the initial steam pressure drop input to the SAFER model. The calculation of this value for some plant/fuel types applied the wrong loss coefficient or erroneously included a term to account for the hydrostatic pressure. These errors resulted in a higher initial steam separator pressure drop and overly restricted the flow through the separator during the LOCA event. GE determined that the PCT impact of this error on all fuel types to be negligible.
[
Reference:
GE Letter, "10 CFR 50.46 Notification Letter," 2003-03, May 6, 2003.]
- 7. Current LOCA Assessment Additional 233 new GE14 fuel bundles were introduced into the Quad Cities Unit 1 Cycle 18A core to replace the same number of ATRIUM-9B fuel bundles. GE evaluated this change and determined that the impact on the licensing basis PCT to be 0F.
[
Reference:
Supplemental Reload Licensing Report for Quad Cities 1 Ql Ml 6 Cycle 18A, 0000-0014-8357-SRLR, Revision 0, May 2003.]
- 8. Current LOCA Assessment A second reload of GE14 fuel was introduced into the Quad Cities Unit 2 Cycle 18 core. GE evaluated this change and determined that the impact on the licensing basis PCT to be 00F.
[
Reference:
Supplemental Reload Licensing Report for Quad Cities Unit 2 Reload 17 Cycle 18, 0000-0024-0751-SRLR, Revision 0, January 2004.]
Page 2 of 2