MONTHYEARML23117A3742023-05-0202 May 2023 Northstar Lessons Learned Meeting Slides, May 2, 2023 ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML19248C2302019-09-10010 September 2019 Final NEIMA Meeting Slides - Vermont Yankee ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17160A1952017-06-12012 June 2017 Meeting Slides for Pre-Submittal Meeting with Entergy Regarding the Plan for Decommissioning Licensing Actions ML17193A7562017-05-25025 May 2017 NRC Presentation ML17192A6032017-05-25025 May 2017 Entergy Presentation ML17193A7392017-05-25025 May 2017 Entergy/Northstar Presentation ML17024A1062017-01-24024 January 2017 Decommissioning Reactor License Transfer Review Process ML17019A1452017-01-24024 January 2017 Presentation by Northstar and Entergy for January 24, 2017 Public Meeting on the Proposed License Transfer of Vermont Yankee for Decommissioning ML15057A4242015-02-19019 February 2015 NRC Slides Vermont Yankee PSDAR Public Meeting February 19 2015 ML15057A4432015-02-19019 February 2015 Entergy Slides, Vermont Yankee PSDAR Public Meeting, February 19, 2015 ML15036A4682015-02-0505 February 2015 Webinar Meeting to Discuss the Decommissioning Process for Nuclear Power Reactors and How It Relates to Vermont Yankee Nuclear Power Station - Slide Presentation ML15030A2742015-01-28028 January 2015 the NRC Reactor Decommissioning Process Presented at Vyndcap Meeting 1/28/2015 ML14204A3442014-06-26026 June 2014 Decommissioning - FEMA Meeting, June 26, 2014 ML14154A2522014-05-28028 May 2014 5/28/14 - Vermont Yankee 2013 EOC Aam NRC Presentation ML1118105622011-06-30030 June 2011 Aam NRC Slides, June 30, 2011 ML1021600822010-08-0404 August 2010 Annual Assessment Meeting Slides ML0810504132008-04-14014 April 2008 Slides for the Vermont Yankee 2007 Annual Assessment Meeting ML0801002822008-01-0808 January 2008 Presentation to NRC by Vermont Yankee Regarding Environmental Fatigue Analyses for License Renewal ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0729000982007-08-16016 August 2007 E-mail from K. Toukatly of USNRC to Various, Regarding Bridge Call: Today (August 16) 12:15 Pm - 1:30 Pm (3 Pages) / Exemption 2 ML0715704482007-05-24024 May 2007 Slides - 5/24/07 (Final) ML0711502692007-04-25025 April 2007 NRC Annual Performance Assessment of Vermont Yankee, 2006 Reactor Oversight Process ML0707000032007-02-27027 February 2007 VY Dseis Presentation for VT Legislature 02/27/2007 ML0705405272007-01-31031 January 2007 Meeting Slides, Preliminary Results of Environmental Review Vermont Yankee Nuclear Power Station, from VYNPS Draft SEIS Public Meeting - Presentation ML0617904762006-06-0707 June 2006 2006/06/07-Slides Used During the Scoping Meeting for VYNPS License Renewal ML0609402092006-04-0404 April 2006 NRC Slides for 04/20/2006 VY Annual Assessment Meeting ML0615901582006-03-0707 March 2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. Mccann - License Renewal ML0615902322006-03-0707 March 2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0602605762006-01-18018 January 2006 E-mail, Lobel, NRR, to Ennis, NRR, VY EPU Rg 1.82 Slides ML0533202252005-12-0101 December 2005 Ri Schedule 05- Mcmurtray; Lessons Learned from Security-Based Table Top Drills ML0527904952005-08-16016 August 2005 Mantg Conference, 8/16/05 - Breakout - Breakout Session Outline by NRC (Todd Fish, Peter Presby) and Entergy Nuclear Vermont Yankee (John Taylor) ML0506901392005-03-10010 March 2005 Presentation Slides for Vermont Yankee Annual Assessment Meeting BVY 04-113, Vermont Yankee Nuclear Power Station - Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides2004-09-29029 September 2004 Vermont Yankee Nuclear Power Station - Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides ML0425103952004-09-0202 September 2004 Attachments 1 Through 4 of 07/21/2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis ML0430302692004-06-29029 June 2004 Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps ML0430302742004-06-29029 June 2004 Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps ML0430302772004-06-29029 June 2004 Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps ML0430204972004-06-0909 June 2004 Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps ML0411203682004-05-17017 May 2004 Enclosure 14, 03/31/2004 Meeting Summary for Vermont Yankee. Slides Presentation Proposed Power Uprate ML0411100212004-03-31031 March 2004 NRC Region I Slides for the Vermont Yankee Annual Assessment Meeting ML0533300492004-03-26026 March 2004 E-Mail from Skay to Holian, Et. Al., Slides for VY Public Meeting ML0528000192004-03-16016 March 2004 E-mail from D. Florek, USNRC, to A. Mcmurtray, B. Holian, C. Anderson, D. Pelton, D. Florek, N. Sheehan, R. Ennis, and W. Ruland, USNRC, Re VY Annual Assessment Strategy Meeting 2023-05-02
[Table view] |
Text
Vermont Yankee Annual Assessment Meeting Reactor Oversight Program - CY 2003 Nuclear Regulatory Commission - Region I King of Prussia, PA March 3 1,2004 Agenda a Introduction a Review of Reactor Oversight Process a National Summary of Plant Performance a Discussion of Plant Performance Results a Licensee Response and Remarks a NRC Closing Remarks a NRC available to address public questions
NRC Representatives Brian Holian, Deputy Director of Division of Reactor Projects
- (610) 337-5080 Cliff Anderson, Branch Chief
- (610) 337-5227 David Pelton, Senior Resident Inspector
- (802) 257-43 19 Beth Sienel, Resident Inspector
- (802) 257-4319 Donald Florek, Senior Project Engineer
- (610) 337-5185 Rick Ennis, Project Manager, NRR
- (301) 415-1420 Region I Organization A. Randolph Blough Wayne Lanning Director Division of Reactor Projects Director Division of Reactor Safety Brian Holian Richard Crlenjak Deputy Director Deputy Director
, iI Cliff Anderson Branch Chief I
Regional Specialists I
David Pelton Amar Patel Bill Raymond Beth Sienel Chris Welch
Reactor Oversight Process L Cornerstones Regulatory Response REACTOR OVERSIGHT PROCESS I Agency Response I Management Conference Monitor Licensee Actions Action Matrix
I , NRCInspections : Communications L-u-lr----r--.
I-+piiqp&&q~RitinformsdI Inspections (SI/AIT/IIT) Inspections Baseline Insoections I I
Action Matrix Concept Licensee RegulatoV Degraded MultipleDtep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRCLicensee Management Involvement Increasing Regulatory Actions Examples of Baseline Inspections 0
Equipment Alignment -92 hrs/yr 0 Triennial Fire Protection -200 hrs every 3 yrs 0 Operator Response -125 hrs/yr 0 Emergency Preparedness -80 hrs!y-r 0 Rad Release Controls -100 hrs every 2 yrs 0 Worker Radiation Protection -100 hrs/yr 0 Corrective Action Program -250 hrs every 2 yrs 0 Corrective Action Case Reviews -60 hrs/yr 0 Safety System Design -475 hrs every 2 yrs
National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2 MultipleRepetitive Degraded Cornerstone 3 Unacceptable 0 Total Units 102*
~
Vermont Yankee - Performance Indicators
_uI -llXll www.nrc.gov/NRR/OVERSIGHT/ASSESS/ then click VY Reactor jnitiating MitQating Occupational Events Systems lntegnty Preparedness Performance Indicators
Vermont Yankee - Inspection Results Reactor Radiation Safety Mitigating Barrier Emergency occupationa~ Physical Initiating Radiation Events + Systems +
Protection t
Most Significant Inspection Findings Vermont Yankee Inspection Activities (Jan 1 - Dec 31,2003) a 4633 hours0.0536 days <br />1.287 hours <br />0.00766 weeks <br />0.00176 months <br /> of inspection related activities a 2 resident inspectors assigned to the site 0 12 regional inspections a 2 team inspections 0 Inspection Findings 10 findings of very low safety significance (Green)
Vermont Yankee Assessment Results
-1I " 11-"--~
(Jan 1 - Dec 31,2003)
Operated safely Licensee Response column of the Action Matrix for all four quarters of 2003 (cornerstone objectives fully met)
NRC will conduct baseline inspections during the next cycle Vermont Yankee Baseline Inspection Activities (Jan 1 - Dec 31,2004) 2 resident inspectors assigned to the site 10 regional inspector visits scheduled 2 team inspections scheduled b Safety System Design b Fire Protection
Vermont Yankee Power Uprate Inspection Activities Inspection Procedure 7 1004 "Power Uprate" Additional inspection hours above baseline program Specific area inspections Some resident and specialist baseline inspections focused on power uprate activities Reactor Oversight Process b http://www.nrc.gov/NRR/OVERSIGHT/AS SESS/index.html Public Electronic Reading Room b http://www.nrc.godreading-rm.html Public Document Room b 1-800-397-4209 (Toll Free)