Additional Information Concerning the License Amendment Request: Extension of Diesel Generator Required Action Completion Time
ML041000428
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/06/2004
From: Montgomery B
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MB8976, TAC MB8977
Download: ML041000428 (21)


Text

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Constellation Generation Group, LLC Lusby, Maryland 20657 Constellation Energy Group April 6, 2004 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-3 18 Additional Information Concerning the License Amendment Request: Extension of Diesel Generator Required Action Completion Time (TAC Nos. MB8976 and MB8977)

REFERENCES:

(a) Letter from Mr. P. E. Katz (CCNPP) to Document Control Desk (NRC),

dated May 12, 2003, License Amendment Request: Extension of Diesel Generator Required Action Completion Time (b) Letter from Mr. K. J. Nietinann (CCNPP) to Document Control Desk (NRC), dated February 23, 2004, Response to Request for Additional Information Concerning the License Amendment Request: Extension of Diesel Generator Required Action Completion Time (TAC Nos. MB8976 and MB8977)

In our letter dated May 12, 2003 (Reference a), we requested a License Amendment that would extend several Required Action Completion Times for inoperable diesel generators. During a pre-implementation review, we determined that the original marked-up Technical Specification Insert 4 does not accurately reflect the discussion in Reference (a). Changes to the original marked-up Insert 4 are necessary so that it reflects and supports the extension of the diesel generator Required Action Completion Times requested in Reference (a) as modified by Reference (b). Specifically, Insert 4 should have included an additional statement that allowed the Control Room Emergency Ventilation System, Control Room Emergency Temperature System, and H2 Analyzer to be declared inoperable after 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This change will support the discussion found on page 6 of Attachment 1 of Reference (a).

Attachment (1) contains the revised Insert 4. Attachment (2) contains new final pages that reflect the revised Insert 4.

This information does not change the conclusions of the No Significant Hazards Consideration Determination or the Environmental Impact Review provided in Reference (a).

PDO t

Document Control Desk April 6, 2004 Page 2 Should you have questions regarding this matter, we will be pleased to discuss them with you.

STATE OF MARYLAND

TO WIT:

COUNTY OF CALVERT I, Bruce S. Montgomery, being duly sworn, state that I am Manager - Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP) Engineering Services Department, and that I am duly authorized to execute and file this License Amendment Request on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPP employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.

Subscribed and sworn before me, a Notary Eublic in an the State of Maryl and County of

[ I ,this jVA day of 04.

W1TI~I$5 iiyHand and Notarial Seal:

Notary Public My Commission Expires: dI/ oet Daq

__ A064 BSMIDJM/bjd Attachments: (1) Marked-up Technical Specification Page (2) Final Technical Specification Pages cc: J. Petro, Esquire H. J. Miller, NRC J. E. Silberg, Esquire Resident Inspector, NRC Director, Project Directorate I-I, NRC R. I. McLean, DNR G. S. Vissing, NRC

ATTACHMENT (1)

MARKED-UP TECHNICAL SPECIFICATION PAGE Insert 4 Calvert Cliffs Nuclear Power Plant, Inc.

April 6, 2004

INSERT 4 CONDITION REQUIRED ACTION COMPLETION TIME F. Required Action and F.l.1 Restore both LCO 3.8.1.b 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> associated Completion DGs and other unit's DG to Time of Required Action OPERABLE status and OC E. I not met. DG to available status.

OR F.1.2 Restore DG to OPERABLE status.

OR F.1.3 Declare CREVS, CRETS, and H2 Analyzer supported by the inoperable DG inoperable.

ATTACHMENT (2)

FINAL TECHNICAL SPECIFICATION PAGES Section 3.8.1 Calvert Cliffs Nuclear Power Plant, Inc.

April 6,2004

AC Sources-Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:

a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System;
b. Two diesel generators (DGs) each capable of supplying one train of the onsite Class IE AC Electrical Power Distribution System; and
c. One qualified circuit between the offsite transmission network and the other unit's onsite Class lE AC electrical power distribution subsystems needed to supply power to the Control Room Emergency Ventilation System (CREVS), Control Room Emergency Temperature System (CRETS), and H2 Analyzer and one DG from the other unit capable of supplying power to the CREVS, CRETS, and H2 Analyzer.

APPLICABILITY: MODES 1, 2, 3, and 4.

CALVERT CLIFFS - UNIT 1 3.8.1-1 Amendment No. 227 CALVERT CLIFFS - UNIT 2 Amendment No. 201

AC Sources-Operating 3.8.1 ACTIONS CONDITION I REQUIRED ACTION COMPLETION TIME A. One required A.1 Perform SR 3.8.1.1 or 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> LCO 3.8.1.a offsite SR 3.8.1.2 for circuit inoperable. required OPERABLE AND offsite circuits.

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no discovery of no offsite power offsite power to available inoperable one train when its redundant concurrent with required feature(s) inoperability of is inoperable. redundant required feature(s)

AND A.3 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> offsite circuit to OPERABLE status. AND 17 days from I discovery of failure to meet LCO 3.8.1.a or LCO 3.8.1.b

_______________________ .1 1 CALVERT CLIFFS - UNIT 1 3.8.1-2 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION I REQUIRED ACTION COMPLETION TIME B. One LCO 3.8.1.b DG B.1 Verify both DGs on 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. the other unit OPERABLE and OC DG AND available.

Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter AND B.2 Perform SR 3.8.1.1 or 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SR 3.8.1.2 for the OPERABLE required AND offsite circuit(s).

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND B.3 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from I feature(s) supported discovery of by the inoperable DG Condition B inoperable when its concurrent with redundant required inoperability of feature(s) is redundant inoperable. required feature(s)

AND B.4.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I DG(s) is not inoperable due to common cause failure.

OR CALVERT CLIFFS - UNIT 1 3.8.1-3 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.4.2 Perform SR 3.8.1.3 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I for OPERABLE DG(s).

AND B.5 Restore DG to 14 days I OPERABLE status.

AND 17 days from I discovery of failure to meet LCO 3.8.1.a or LCO 3.8.1.b C. Required Action and C.1.1 Restore both DGs on 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> associated Completion the other unit to Time of Required OPERABLE status and Action B.1 not met. OC DG to available status.

OR C.1.2 Restore DG to OPERABLE status.

CALVERT CLIFFS - UNIT 1 3.8.1-4 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION I REQUIRED ACTION I COMPLETION TIME D. LCO 3.8.1.c offsite ----------- NOTE------------ I circuit inoperable. Enter applicable Conditions and Required Actions of LCO 3.8.9, Distribution Systems-Operating," when Condition D is entered with I no AC power source to a train.

D.1 Perform SR 3.8.1.1 or 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> I SR 3.8.1.2 for required OPERABLE AND offsite circuit(s).

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND D.2 Declare, CREVS, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from I CRETS, or H2 Analyzer discovery of no with no offsite power offsite power to available inoperable one train when the redundant concurrent with CREVS, CRETS, or H2 inoperability of Analyzer is redundant inoperable. required feature(s)

AND D.3 Declare CREVS, CRETS, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> I and H2 Analyzer supported by the inoperable offsite circuit inoperable.

CALVERT CLIFFS - UNIT 1 3.8.1-5 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION L REQUIRED ACTION COMPLETION TIME E. LCO 3.8.1.c DG ----------- NOTE------------ I inoperable. Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems-Operating," when Condition E is entered with I no AC power source to a train.

E.1 Verify both LCO 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 3.8.1.b DGs OPERABLE, the other unit's DG AND OPERABLE and the OC DG available. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter AND E.2 Perform SR 3.8.1.1 or 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SR 3.8.1.2 for the OPERABLE required AND offsite circuit(s).

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> I thereafter AND E.3 Declare CREVS, CRETS, 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from I or H2 Analyzer discovery of supported by the Condition E I inoperable DG concurrent with inoperable when the inoperability of redundant CREVS, redundant CRETS, or H2 Analyzer required is inoperable. feature(s)

___________________________________ I ______________________________________ J CALVERT CLIFFS - UNIT 1 3.8.1-6 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. (continued) E.4.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG(s) is not inoperable due to common cause failures.

OR E.4.2 Perform SR 3.8.1.3 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE DG(s).

AND E.5 Declare CREVS, CRETS, 14 days and H2 Analyzer supported by the inoperable DG inoperable.

F. Required Action and F.1.1 Restore both LCO 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> associated Completion 3.8.1.b DGs and other Time of Required unit's DG to OPERABLE Action E.1 not met. status and OC DG to available status.

OR F.1.2 Restore DG to OPERABLE status.

OR F.1.3 Declare CREVS, CRETS, and H2 Analyzer supported by the inoperable DG inoperable.

CALVERT CLIFFS - UNIT 1 3.8.1-7 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME G. Two required G.1 Declare required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from LCO 3.8.1.a offsite feature(s) inoperable discovery of circuits inoperable. when its redundant Condition G required feature(s) concurrent with OR is inoperable. inoperability of redundant One required required LCO 3.8.1.a offsite feature(s) circuit that provides power to the CREVS, AND CRETS. and H2 Analyzer inoperable G.2 Restore one required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the required offsite circuit to LCO 3.8.1.c offsite OPERABLE status.

circuit inoperable.

H. One required ----------- NOTE------------

LCO 3.8.1.a offsite Enter applicable Conditions circuit inoperable. and Required Actions of LCO 3.8.9, when Condition H AND is entered with no AC power source to any train.

One LCO 3.8.1.b DG inoperable.

H.1 Restore required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> offsite circuit to OPERABLE status.

OR H.2 Restore DG to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status.

CALVERT CLIFFS - UNIT 1 3.8.1-8 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME I. Two LCO 3.8.1.b DGs I.1 Restore one DG to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable. OPERABLE status.

OR LCO 3.8.1.b DG that provides power to the CREVS, CRETS, and H2 Analyzer inoperable and LCO 3.8.1.c DG inoperable.

J. Required Action and J.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> I associated Completion Time of Condition A, AND C, F. G. H. or I not met. J.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Required Action and associated Completion Time of Required Action B.2, B.3, B.4.1, B.4.2, or B.5 not met.

OR Required Action and associated Completion Time of Required Action E.2, E.3, E.4.1, E.4.2, or E.5 not met.

CALVERT CLIFFS - UNIT 1 3.8.1-9 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME K. Three or more K.1 Enter LCO 3.0.3. Immediately I required LCO 3.8.1.a and LCO 3.8.1.b AC sources inoperable.

SURVEILLANCE REQUIREMENTS


NOTE-------------------------------------

SR 3.8.1.1 through SR 3.8.1.15 are only applicable to LCO 3.8.1.a and LCO 3.8.1.b AC sources. SR 3.8.1.16 is only applicable to LCO 3.8.1.c AC sources.

Y SURVEILLANCE FREQUENCY SR 3.8.1.1 -------------------NOTE------------_ -_

Only required to be performed when SMECO is being credited for an offsite source.

Verify correct breaker alignment and Once within indicated power availability for the 69 kV 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after SMECO offsite circuit. substitution for a 500 kV offsite circuit AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter SR 3.8.1.2 Verify correct breaker alignment and 7 days indicated power availability for each required 500 kV offsite circuit.

CALVERT CLIFFS - UNIT 1 3.8.1-10 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) T SURVEILLANCE FREQUENCY SR 3.8.1.3 ------------------ NOTES ----------------

1. Performance of SR 3.8.1.9 satisfies this Surveillance Requirement.
2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this Surveillance Requirement as recommended by the manufacturer. When modified start procedures are not used, the voltage and frequency tolerances of SR 3.8.1.9 must be met.

Verify each DG starts and achieves steady 31 days state voltage 2 4060 V and

  • 4400 V. and frequency 2 58.8 Hz and
  • 61.2 Hz.

CALVERT CLIFFS - UNIT 1 3.8. 1-11 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY 4

SR 3.8.1.4 ------------------ NOTES ------------------

1. DG loadings may include gradual loading as recommended by the manufacturer.
2. Momentary transients below the load limit do not invalidate this test.
3. This Surveillance shall be conducted on only one DG at a time.
4. This Surveillance Requirement shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.3 or SR 3.8.1.9.

Verify each DG is synchronized and loaded, 31 days and operates for 2 60 minutes at a load 2 4000 kW for DG 1A and 2 2700 kW for DGs 1B, 2A, and 2B.

SR 3.8.1.5 Verify each day tank contains 2 325 gallons 31 days of fuel oil for DG 1A and 2 275 gallons of fuel oil for DGs 1B, 2A, and 2B.

SR 3.8.1.6 Check for and remove accumulated water from 31 days each day tank.

SR 3.8.1.7 Verify the fuel oil transfer system operates 31 days to automatically transfer fuel oil from storage tank~s] to the day tank.

CALVERT CLIFFS - UNIT 1 3.8.1-12 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.8 Verify interval between each sequenced load 31 days block is within + 10% of design interval for the load sequencer.

SR 3.8.1.9 ------------------- NOTE-------------------

All DG starts may be preceded by an engine prelube period.

Verify each DG starts from standby condition 184 days and achieves, in s 10 seconds, voltage

> 4060 V and frequency > 58.8 Hz, and after steady state conditions are reached, maintains voltage 2 4060 V and

  • 4400 V and frequency of > 58.8 Hz and
  • 61.2 Hz.

SR 3.8.1.10 Verify manual transfer of AC power sources 24 months from the normal offsite circuit to the alternate offsite circuit.

SR 3.8.1.11 -------------------NOTE-------------------

Momentary transients outside the load and power factor limits do not invalidate this test.

Verify each DG, operating at a power factor 24 months of < 0.85, operates for 2 60 minutes while loaded to 2 4000 kW for DG 1A and - 3000 kW for DGs 1B, 2A, and 2B.

SR 3.8.1.12 Verify each DG rejects a load 2 500 hp 24 months without tripping.

CALVERT CLIFFS - UNIT 1 3.8.1-13 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.13 Verify that automatically bypassed DG trips 24 months are automatically bypassed on an actual or simulated required actuation signal.

SR 3.8.1.14 Verify each DG: 24 months

a. Synchronizes with offsite power source while loaded upon a simulated restoration of offsite power;
b. Manually transfers loads to offsite power source; and
c. Returns to ready-to-load operation.

CALVERT CLIFFS - UNIT 1 3.8.1-14 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.15 -------------------NOTE-----------

All DG starts may be preceded by an engine prelube period.

Verify on an actual or simulated loss of 24 months offsite power signal in conjunction with an actual or simulated Engineered Safety Feature actuation signal:

a. De-energization of emergency buses;
b. Load shedding from emergency buses;
c. DG auto-starts from standby condition and:
1. energizes permanently connected loads in < 10 seconds,
2. energizes auto-connected emergency loads through load sequencer,
3. maintains steady state voltage 2 4060 V and
  • 4400 V,
4. maintains steady state frequency of 2 58.8 Hz and < 61.2 Hz, and
5. supplies permanently connected and auto-connected emergency loads for 2 5 minutes.

CALVERT CLIFFS - UNIT 1 3.8.1-15 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.16 For the LCO 3.8.1.c AC electrical sources, In accordance SR 3.8.1.1, SR 3.8.1.2, SR 3.8.1.3, with applicable SR 3.8.1.5, SR 3.8.1.6, and SR 3.8.1.7 are Surveillance required to be performed. Requirements CALVERT CLIFFS - UNIT 1 3.8.1-16 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.