Response to RAI Concerning the License Amendment Request: Extension of Diesel Generator Required Action Completion Time
ML040570709
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/23/2004
From: Nietmann K
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MB8976, TAC MB8977
Download: ML040570709 (30)


Text

1-Kevin J. Nietmann Plant General Manager Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 410 495-4787 Fax Constellation Energy Group February 23, 2004 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 Response to Request for Additional Information Concerning the License Amendment Request:

Extension of Diesel Generator Required Action Completion Time (TAC Nos. MB8976 and MB8977)

REFERENCES:

(a)

Letter from Mr. P. E. Katz (CCNPP) to Document Control Desk (NRC),

dated May 12, 2003, License Amendment Request: Extension of Diesel Generator Required Action Completion Time (b)

Telephone Conference between Ms. D. J. Mitchell, et.al. (CCNPP) and Mr. G. S. Vissing, et.al. (NRC), on February 3, 2004, same subject (c)

Letter from Mr. G. Vanderheyden (CCNPP) to Document Control Desk (NRC), dated December 5, 2003, Response to Request for Additional Information Concerning the License Amendment Request: Extension of Diesel Generator Required Action Completion Time In our letter dated May 12, 2003 (Reference a), we requested a License Amendment that would extend several Required Action Completion Times for inoperable Diesel Generators (DGs). This letter provides the information requested in Reference (b). This information does not change the conclusions of the No Significant Hazards Consideration Determination or the Environmental Impact Review provided in Reference (a).

One of the proposed Technical Specification changes requested in Reference (a) involves Required Action Completion Time 3.8.1.E.5 for declaring the Control Room Emergency Ventilation System (CREVS), Control Room Emergency Temperature System (CRETS), and H2 Analyzer trains inoperable when the safety-related back-up power supply (DG) is inoperable. The original request was to extend the current 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 21 days when a single DG is inoperable (i.e., OC DG is available and three other safety-related DGs are operable) before the CREVS, CRETS, and H2 Analyzer trains are declared inoperable. We are revising the proposed Technical Specification change to extend the current 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days when a single DG is inoperable before the CREVS, CRETS, and H2 Analyzer trains are declared inoperable.

Document Control Desk February 23, 2004 Page 2 An additional proposed Technical Specification change (Technical Specification 3.8.1 Condition 1) involves the condition when both DGs dedicated to redundant safety-related equipment are inoperable.

The original request was to extend the current Required Action Completion Time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

We are withdrawing this proposed change.

In our letter dated December 5, 2003 (Reference c), we provided a list of compensatory actions that will be taken when utilizing the 14-day DG Completion Time for Condition B. We are adding the following compensatory action:

The condition of the grid will be evaluated prior to entering the extended DG 3.8.1 Condition B Completion Time for elective maintenance. An extended DG Completion Time will not be entered to perform elective maintenance when grid stress conditions are considered "High" per our procedures.

This will include conditions such as extreme summer temperatures and/or high demand.

The information provided in this letter results in changes to the original marked-up Technical Specification pages. Therefore, this letter also provides a complete set of revised marked-up Technical Specification pages (see Attachment 1) and new final pages (see Attachment 2).

Please replace Reference (a) Attachments (3) and (4) with the Attachments to this letter.

Document Control Desk February 23, 2004 Page 3 Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, STATE OF MARYLAND COUNTY OF CALVERT

TO WIT:

1, Kevin J. Nietmann, being duly sworn, state that I am Plant General Manager - Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this License Amendment Request on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct.

To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPP employees and/or consultants.

Such information has been reviewed in accordance with company practice and I believe it to be reliable.

Sub ribed and sworn before me, a Notary Public in and for the State of Maryland and County of Ah/_ )

l.;

, this by3 day of _1 tt

, 2004.

I

,- WITNESS my Hand and Notarial Seal:

NotarD(Vublic My Commission Expires:

9 // 'V6

/

/ Date KJN/DJM/bjd Attachments:

(1)

Marked-up Technical Specification Pages (2)

Final Technical Specification Pages cc:

J. Petro, Esquire J. E. Silberg, Esquire R. J. Laufer, NRC G. S. Vissing, NRC H. J. Miller, NRC Resident Inspector, NRC R. 1. McLean, DNR

ATTACHMENT (1)

MARKED-UP TECHNICAL SPECIFICATION PAGES 3.8.1-2 3.8.1-3 3.8.1-4 3.8.1-5 3.8.1-6 3.8.1-7 3.8.1-8 Calvert Cliffs Nuclear Power Plant, Inc.

February 23, 2004

9 AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME or A. One required LCO 3.8.1.a offsite circuit inoperable.

A.1 Perform SR 3.8.1.1 SR 3.8.1.2 for required OPERABLE offsite circuits.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required feature(s) with no offsite power available inoperable when its redundant required feature(s) is inoperable.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of no offsite power to one train concurrent with inoperability of redundant required feature(s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND fr' ays from discovery of failure to meet LCO 3.8.1.a or LCO 3.8.1.b A.3 Restore required offsite circuit to OPERABLE status.

CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-2 Amendment No. 227 Amendment No. 201

r AC Sources-Operating 3.8.1 ACTIONS (conti nued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One LCO 3.8.1.b DG inoperable.

(

B,)

AND WND V,

Perform SR 3.8.1.1 or SR 3.8.1.2 for-the OPERABLE required offsite circuit(s).

Declare required feature(s) supported by the inoperable DG inoperable when its redundant required feature(s) is inoperable.

Determine OPERABLE DG(s) is not inoperable due to common cause failure.

OR.

Perform SR 3.8.1.3 for OPERABLE DG(s).

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 hours AND

___ I CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-3 Amendment No. 227 Amendment No. 201

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME 4

4 B. (continued)

4) q Restore DG to OPERABLE status.

A AND ays from discovery of failure to meet LCO 3.8.1.a or LCO 3.8.1.b L.-

.4.

4 LCO 3.8.1.c offsite circuit inoperable.


NOTE------------

Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems-Operating," when Conditi o is entered with ITsFpower source to a Perform SR 3.8.1.1 or SR 3.8.1.2 for required OPERABLE offsite circuit(s).

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND L

I CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-4 Amendment No. 227 Amendment No. 201

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME S~(I continued) 2 p

Declare, CREYSi CRETS, or Hz Analyzer with no offsite power available inoperable when the redundant CREVS, CRETS, or H2 Analyzer is inoperable.

Declare CREVS, CRETS, and H2 Analyzer supported by the inoperable offsite circuit inoperable.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of no offsite power to one train concurrent with inoperability of redundant required feature(s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND L3

+

LCO 3.8.1.c DG Inoperable.

NOTE------------

Enter-applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems-Op.ating," when Conditioi

'is en ered with no AC power source to a train.

Perform SR 3.8.1.1 or SR 3.8.1.2 for the OPERABLE required offsite circuit(s).

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND

&ce-er 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> hereafter AND CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-5 Amendment No. 227 Amendment No. 201

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION N

COMPLETION TIME (continued)

Declare CREVS, CRETS, or H2 Analyzer supported by the inoperable DG inoperable when the redundant CREVS, CRETS, or H2 Analyzer is inoperable.

Determine OPERABLE DG(s) is not inoperable due to common cause failures.

AND f1 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery gfj->

Condition concurrent with inoperability of redundant required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 hours OR t

2 AND D.

Perform SR 3.8.1.3 for OPERABLE DG(s).

Declare CREVS, CRETS, and H2 Analyzer supported by the inoperable DG inoperable.

7J745ePC( V CALVERT CLIFFS -

UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-6 Amendment No. 227 Amendment No. 201

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION I

REQUIRED ACTION COMPLETION TIME Two required LCO 3.8.1.a offsite circuits inoperable.

Declare required feature(s) inoperable when its redundant required feature(s) is inoperable.

OR One required LCO 3.8.1.a offsite circuit that provides power to the CREVS, CRETS, and H2 Analyzer inoperable and the required LCO 3.8.1.c offsite circuit inoperable.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from discovery Condition r

concurrent with inoperability of redundant required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND 2

Restore one required offsite circuit to OPERABLE status.

One required LCO 3.8.1.a offsite circuit inoperable.

AND One LCO 3.8.1.b DG inoperable.


NOTE------------

Enter applicable Conditions and Required Actions of LCO 3.8.9, when Conditio e f

is entered with no AC power source to any train.

1 OR Restore required offsite circuit to OPERABLE status.

Restore DG to OPERABLE status.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 12 hours a _____________________________________

£ CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-7 Amendment No. 227 Amendment No. 201

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION I

REQUIRED ACTION I COMPLETION TIME Two LCO 3.8.1.b DGs inoperable.

OR Restore one DG to OPERABLE status.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> LCO 3.8.1.b DG that provides power to the CREVS, CRETS, and H2 Analyzer inoperable and LCO 3.8.1.c DG inoperable.

Required Action and

( 5 J associated Completion.

U.../

Time of Condition A, B

, E, Fig t

1 AD 2

Be in MODE 3.

Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours I.

Three or more required LCO 3.8.1.a and LCO 3.8.1.b AC sources inoperable.

Fl Enter LCO 3.0.3.

Immediately CALVERT CLIFFS -

UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-8 Amendment No. 227 Amendment No. 201

INSERT 1 CONDITION REQUIRED ACTION COMPLETION TIME B. I Verify both DGs on the I hour other unit OPERABLE and OC DG available.

AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter AND INSERT 2 CONDITION REQUIRED ACTION COMPLETION TIME C.

Required Action and C.1.1 Restore both DGs on 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> associated Completion the other unit to Time of Required Action OPERABLE status and B.l not met.

OC DG to available status.

OR C.1.2 Restore DG to OPERABLE status.

INSERT 3 CONDITION REQUIRED ACTION COMPLETION TIME E.1 Verify both LCO I hour 3.8.I.b DGs OPERABLE, the other AND unit's DG OPERABLE and the OC DG Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter available.

AND

INSERT 4 CONDITION I

REQUIRED ACTION I

COMPLETION TIME F.

Required Action and associated Completion Time of Required Action E. I not met.

F.1.1 Restore both LCO 3.8.1.b DGs and other unit's DG to OPERABLE status and OC DG to available status.

OR F.1.2 Restore DG to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

.1

ATTACHMENT (2)

FINAL TECHNICAL SPECIFICATION PAGES Section 3.8.1 Calvert Cliffs Nuclear Power Plant, Inc.

February 23, 2004

AC Sources-Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 '.

The following AC electrical sources shall be OPERABLE:

a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System;
b. Two diesel generators (DGs) each capable of supplying one train of the onsite Class 1E AC Electrical Power Distribution System; and
c. One qualified circuit between the offsite transmission network and the other unit's onsite Class 1E AC electrical power distribution subsystems needed to supply power to the Control Room Emergency Ventilation System (CREVS), Control Room Emergency Temperature System (CRETS), and H2 Analyzer and one DG from the other unit capable of supplying power to the CREVS, CRETS, and H2 Analyzer.

APPLICABILITY:

MODES 1, 2, 3, and 4.

CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-1 Amendment No. 227 Amendment No. 201

AC Sources-Operating 3.8.1 ACTIONS CONDITION R

REQUIRED ACTION l COMPLETION TIME A. One required LCO 3.8.1.a offsite circuit inoperable.

A.1 Perform SR 3.8.1.1 or SR 3.8.1.2 for required OPERABLE offsite circuits.

AND A.2 Declare required feature(s) with no offsite power available inoperable when its redundant required feature(s) is inoperable.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of no offsite power to one train concurrent with inoperability of redundant required feature(s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 17 days from discovery of failure to meet LCO 3.8.1.a or LCO 3.8.1.b AND A.3 Restore required offsite circuit to OPERABLE status.

I CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-2 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One LCO 3.8.1.b DG inoperable.

B.1 Verify both DGs on the other unit OPERABLE and OC DG available.

AND B.2 Perform SR 3.8.1.1 or SR 3.8.1.2 for the OPERABLE required offsite circuit(s).

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.3 Declare required feature(s) supported by the inoperable DG inoperable when its redundant required feature(s) is inoperable.

I AND B.4.1 Determine OPERABLE DG(s) is not inoperable due to common cause failure.

OR I

CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-3 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. (continued)

B.4.2 Perform SR 3.8.1.3 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE DG(s).

AND B.5 Restore DG to 14 days OPERABLE status.

AND 17 days from discovery of failure to meet LCO 3.8.1.a or LCO 3.8.1.b C. Required Action and C.1.1 Restore both DGs on 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> associated Completion the other unit to Time of Required OPERABLE status and Action B.1 not met.

OC DG to available status.

OR C.1.2 Restore DG to OPERABLE status.

I I

I CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-4 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION I

REQUIRED ACTION J

COMPLETION TIME D. LCO 3.8.1.c offsite circuit inoperable.


NOTE--------

Enter applicable Conditions and Required Actions of LCO 3.8.9. "Distribution Systems-Operating," when Condition D is entered with no AC power source to a train.

I I

D.1 Perform SR 3.8.1.1 or SR 3.8.1.2 for required OPERABLE offsite circuit(s).

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of no offsite power to one train concurrent with inoperability of redundant required feature(s)

D.2 Declare, CREVS, CRETS, or H2 Analyzer with no offsite power available inoperable when the redundant CREVS, CRETS, or H2 Analyzer is inoperable.

AND D.3 Declare CREVS, CRETS, and H2 Analyzer supported by the inoperable offsite circuit inoperable.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> I

CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-5 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION I

REQUIRED ACTION I COMPLETION TIME E. LCO 3.8.1.c DG inoperable.


NOTE-----------

Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems-Operating," when Condition E is entered with no AC power source to a train.

I E.1 Verify both LCO 3.8.1.b DGs OPERABLE, the other unit's DG OPERABLE and the OC DG available.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND AND E.2 Perform SR 3.8.1.1 or SR 3.8.1.2 for the OPERABLE required offsite circuit(s).

AND E.3 Declare CREVS, CRETS, or H2 Analyzer supported by the inoperable DG inoperable when the redundant CREVS, CRETS, or H2 Analyzer is inoperable.

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition E concurrent with inoperability of redundant required feature(s)

I I

I AND CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-6 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. (continued)

E.4.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG(s) is not inoperable due to common cause failures.

OR E.4.2 Perform SR 3.8.1.3 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE DG(s).

AND E.5 Declare CREVS, CRETS, 14 days and H2 Analyzer supported by the inoperable DG inoperable.

F. Required Action and F.1.1 Restore both LCO 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> associated Completion 3.8.1.b DGs and other Time of Required unit's DG to OPERABLE Action E.1 not-met.

status and OC DG to available status.

OR F.1.2 Restore DG to OPERABLE status.

CALVERT CLIFFS - UNIT CALVERT CLIFFS - UNIT 1

2 3.8.1-7 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME G. Two required G.1 Declare required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from LCO 3.8.1.a offsite feature(s) inoperable discovery of circuits inoperable.

when its redundant Condition G required feature(s) concurrent with OR is inoperable.

inoperability of redundant One required required LCO 3.8.1.a offsite feature(s) circuit that provides power to the CREVS, AND CRETS, and H2 Analyzer inoperable G.2 Restore one required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the required offsite circuit to LCO 3.8.1.c offsite OPERABLE status.

circuit inoperable.

H. One required


NOTE------------

LCO 3.8.1.a offsite Enter applicable Conditions circuit inoperable.

and Required Actions of LCO 3.8.9, when Condition H AND is entered with no AC power source to any train.

One LCO 3.8.1.b DG inoperable.

H.1 Restore required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> offsite circuit to OPERABLE status.

OR H.2 Restore DG to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status.

I I

CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-8 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME I. Two LCO 3.8.1.b DGs I.1 Restore one DG to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable.

OPERABLE status.

OR LCO 3.8.1.b DG that provides power to the CREVS, CRETS, and H2 Analyzer inoperable and LCO 3.8.1.c DG inoperable.

J. Required Action and J.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, AND B, C, E, F, G, H, or I not met.

J.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> K. Three or more K.1 Enter LCO 3.0.3.

Immediately required LCO 3.8.1.a and LCO 3.8.1.b AC sources inoperable.

I I

CALVERT CLIFFS - UNIT CALVERT CLIFFS - UNIT 1

2 3.8.1-9 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS


NOTE-------------------------------------

SR 3.8.1.1 through SR 3.8.1.15 are only applicable to LCO 3.8.1.a and LCO 3.8.1.b AC sources.

SR 3.8.1.16 is only applicable to LCO 3.8.1.c AC sources.

SURVEILLANCE FREQUENCY SR 3.8.1.1


NOTE--------------

Only required to be performed when SMECO is being credited for an offsite source.

Verify correct breaker alignment and indicated power availability for the 69 kV SMECO offsite circuit.

Once within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after substitution for a 500 kV offsite circuit AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter SR 3.8.1.2 Verify correct breaker alignment and 7 days indicated power availability for each required 500 kV offsite circuit.

CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-10 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) 7.

SURVEILLANCE FREQUENCY 1-SR 3.8.1.3


NOTES ------------------

1. Performance of SR 3.8.1.9 satisfies this Surveillance Requirement.
2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this Surveillance Requirement as recommended by the manufacturer. When modified start procedures are not used, the voltage and frequency tolerances of SR 3.8.1.9 must be met.

Verify each DG starts and achieves steady state voltage 2 4060 V and < 4400 V, and frequency 2 58.8 Hz and < 61.2 Hz.

31 days CALVERT CLIFFS - UNIT CALVERT CLIFFS - UNIT 1

2 3.8. 1-11 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY l-SR 3.8.1.4


NOTES ------------------

1. DG loadings may include gradual loading as recommended by the manufacturer.
2. Momentary transients below the load limit do not invalidate this test.
3. This Surveillance shall be conducted on only one DG at a time.
4. This Surveillance Requirement shall be preceded by and immediately follow without shutdown a successful performance of SR 3.8.1.3 or SR 3.8.1.9.

Verify each DG is synchronized and loaded, and operates for 2 60 minutes at a load 2 4000 kW for DG 1A and 2 2700 kW for DGs 1B, 2A, and 2B.

31 days SR 3.8.1.5 Verify each day tank contains 2 325 gallons 31 days of fuel oil for DG 1A and 2 275 gallons of fuel oil for DGs 1B, 2A, and 2B.

SR 3.8.1.6 Check for and remove accumulated water from 31 days each day tank.

SR 3.8.1.7 Verify the fuel oil transfer system operates 31 days to automatically transfer fuel oil from storage tank[s] to the day tank.

CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-12 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.8 Verify interval between each sequenced load 31 days block is within + 10% of design interval for the load sequencer.

SR 3.8.1.9


NOTE-------------------

All DG starts may be preceded by an engine prelube period.

Verify each DG starts from standby condition 184 days and achieves, in < 10 seconds, voltage

> 4060 V and frequency > 58.8 Hz, and after steady state conditions are reached, maintains voltage 2 4060 V and < 4400 V and frequency of > 58.8 Hz and 5 61.2 Hz.

SR 3.8.1.10 Verify manual transfer of AC power sources 24 months from the normal offsite circuit to the alternate offsite circuit.

SR 3.8.1.11


NOTE-------------------

Momentary transients outside the load and power factor limits do not invalidate this test.

Verify each DG, operating at a power factor 24 months of < 0.85, operates for 2 60 minutes while loaded to 2 4000 kW for DG 1A and 2 3000 kW for DGs 1B, 2A, and 2B.

SR 3.8.1.12 Verify each DG rejects a load 2 500 hp 24 months without tripping.

CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-13 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.13 Verify that automatically bypassed DG trips 24 months are automatically bypassed on an actual or simulated required actuation signal.

SR 3.8.1.14 Verify each DG:

24 months

a. Synchronizes with offsite power source while loaded upon a simulated restoration of offsite power;
b. Manually transfers loads to offsite power source; and
c. Returns to ready-to-load operation.

CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-14 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.15


NOTE-------------------

All DG starts may be preceded by an engine prelube period.

Verify on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated Engineered Safety Feature actuation signal:

a.

De-energization of emergency buses;

b. Load shedding from emergency buses;
c. DG auto-starts from standby condition and:
1. energizes permanently connected loads in < 10 seconds,
2. energizes auto-connected emergency loads through load sequencer,
3. maintains steady state voltage 2 4060 V and < 4400 V,
4. maintains steady state frequency of 2 58.8 Hz and < 61.2 Hz, and
5. supplies permanently connected and auto-connected emergency loads for 2 5 minutes.

24 months CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-15 Amendment No.

Amendment No.

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.16 For the LCO 3.8.1.c AC electrical sources, In accordance SR 3.8.1.1, SR 3.8.1.2,.SR 3.8.1.3, with applicable SR 3.8.1.5, SR 3.8.1.6, and SR 3.8.1.7 are Surveillance required to be performed.

Requirements CALVERT CLIFFS - UNIT 1 CALVERT CLIFFS - UNIT 2 3.8.1-16 Amendment No.

Amendment No.