Additional Information Concerning the License Amendment Request: Extension of Diesel Generator Required Action Completion Time
ML040900254
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/26/2004
From: Vanderheyden G
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MB8976, TAC MB8977
Download: ML040900254 (8)


Text

George Vanderheyden 1650 Calvert Cliffs Parkway Vice President Lusby, Maryland 20657 Calvert Cliffs Nuclear Power Plant 410 495-4455 Constellation Generation Group, LLC 410 495-3500 Fax Constellation Energy Group March 26, 2004 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 Additional Information Concerning the License Amendment Request: Extension of Diesel Generator Required Action Completion Time (TAC Nos. MB8976 and MB8977)

REFERENCES:

(a) Letter from Mr. P. E. Katz (CCNPP) to Document Control Desk (NRC),

dated May 12, 2003, License Amendment Request: Extension of Diesel Generator Required Action Completion Time (b) Telephone Conference between Ms. D. J. Mitchell, et. al. (CCNPP) and Mr. G. S. Vissing, et. al. (NRC) on March 23, 2004, same subject (c) Letter from Mr. K. J. Nietmann (CCNPP) to Document Control Desk (NRC), dated February 23, 2004, Response to Request for Additional Information Concerning the License Amendment Request: Extension of Diesel Generator Required Action Completion Time (TAC Nos. MB8976 and MB8977)

In our letter dated May 12, 2003 (Reference a), we requested a License Amendment that would extend several Required Action Completion Times for inoperable diesel generators (DGs). This letter provides the information requested in Reference (b). This information does not change the conclusions of the No Significant Hazards Consideration Determination or the Environmental Impact Review provided in Reference (a).

During the telephone conference (Reference b), the NRC staff questioned the delta core damage frequency (CDF) and delta large early release frequency (LERF) results provided in Attachment (1) of Reference (a). The NRC staff requested we provide the Risk Metric Results for the delta CDF and delta Co

Document Control Desk March 26, 2004 Page 2 LERF assuming the OC Diesel Generator ventilation system modification is in place. These results are provided below.

RiskM^tri- Risk Metric-Result1 Delta CDF 2.6E-7 9.6E-8 Delta LERF 1.IE-8 3.7E-9 It should be noted that the modification on the OC Diesel Generator ventilation system was installed for the sole purpose of reducing the risks associated with our request to extend the Diesel Generator Required Action Completion Times (Reference a).

During pre-implementation review, we determined that the original marked-up Technical Specification Condition J does not match the discussion in Reference (a). Changes to the original marked-up Condition J are necessary so that it reflects and supports the extension of the DG Required Action Completion Times requested in Reference (a) as modified by Reference (c). Attachment (1) contains the revised, marked-up Condition J. Attachment (2) contains new final pages that reflect the revised Condition J.

Document Control Desk March 26, 2004 Page 3 Should you have questions regarding this matter, we will be pleased to discuss them with you.

Ve l ours, S1

-. ~ I01MRARLAKND fP uA

~Vflh3 USMMA A&1r -

TO WIT:

COUNTY OF CALVERT I, George Vanderheyden, being duly sworn, state that I am Vice President - Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this License Amendment Request on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPP employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe is to be reliable.

Subscribed and sworn before me a Notary Public in and for the State of Maryland and County of 0 /yw42 , this day of c La -- 2004.

(/ '5k4 WITNESS my Hand and Notarial Seal:

/ ~//

Notary Pubjjz'/

My Commission Expires: mm 2& 62L9/V Dat6 GV/DJM/bjd Attachments: (1) Marked-up Technical Specification Page (2) Final Technical Specification Pages cc: J. Petro, Esquire H. J. Miller, NRC J. E. Silberg, Esquire Resident Inspector, NRC Director, Project Directorate I-1, NRC R. I. McLean, DNR G. S. Vissing, NRC

ATTACHMENT (1)

MARKED-UP TECHNICAL SPECIFICATION PAGE 3.8.1-8 Calvert Cliffs Nuclear Power Plant, Inc.

March 26, 2004

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION] REQUIRED ACTION [COMPLETION TIME Two LCO 3.8.1.b DGs 1 Restore one DG to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable. OPERABLE status.

OR LCO 3.8.1.b DG that provides power to the CREVS, CRETS, and H2 Analyzer inoperable and LCO 3.8.1.c DG inoperable.

1-Required Action and Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, F no Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I

O Three or more required LCO 3.8.1.a I1 Ente r LCO 3.0.3. Immediately and LCO 3.8.1.b AC sources inoperable.

66. 4AHo" 5 ep-"Aes aNQaX ct t mf 65 CALVERT CLIFFS - UNIT 1 3.8.1-8 Amendment No. 227 CALVERT CLIFFS - UNIT 2 Amendment No. 201

ATTACHMENT (2)

FINAL TECHNICAL SPECIFICATION PAGES 3.8.1-9 3.8.1-10 Calvert Cliffs Nuclear Power Plant, Inc.

March 26, 2004

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME I. Two LCO 3.8.1.b DGs I.1 Restore one DG to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable. OPERABLE status.

OR LCO 3.8.1.b DG that provides power to the CREVS, CRETS, and H2 Analyzer inoperable and LCO 3.8.1.c DG inoperable.

J. Required Action and J.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> I associated Completion Time of Condition A, AND C, F, G, H, or I not met. J.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Required Action and associated Completion Time of Required Action B.2, B.3, B.4.1, B.4.2, or B.5 not met.

OR Required Action and associated Completion Time of Required Action E.2, E.3, E.4.1, E.4.2, or E.5 not met.

CALVERT CLIFFS - UNIT 1 3.8.1-9 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME K. Three or more K.1 Enter LCO 3.0.3. Immediately I required LCO 3.8.1.a and LCO 3.8.1.b AC sources inoperable.

SURVEILLANCE REQUIREMENTS


NOTE-------------------------------------

SR 3.8.1.1 through SR 3.8.1.15 are only applicable to LCO 3.8.1.a and LCO 3.8.1.b AC sources. SR 3.8.1.16 is only applicable to LCO 3.8.1.c AC sources.

SURVEILLANCE FREQUENCY

.4 SR 3.8.1.1 -------------------NOTE----------

Only required to be performed when SMECO is being credited for an offsite source.

Verify correct breaker alignment and Once within indicated power availability for the 69 kV 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after SMECO offsite circuit. substitution for a 500 kV offsite circuit AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter SR 3.8.1.2 Verify correct breaker alignment and 7 days indicated power availability for each required 500 kV offsite circuit.

CALVERT CLIFFS - UNIT 1 3.8.1-10 Amendment No.

CALVERT CLIFFS - UNIT 2 Amendment No.