Summary of Meeting with Constellation Energy Group (Constellation) to Discuss the Planning License Renewal Application for Nine Mile Point, Units 1 and 2
ML040930139
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/31/2004
From: Hoffman S
NRC/NRR/DRIP/RLEP
To: Katz P
Constellation Energy Group
Hoffman ST, NRR/DRIP/RLEP, 415-3245
References
Download: ML040930139 (35)


Text

March 31, 2004 LICENSEE:

Constellation Energy Group (Constellation)

FACILITY:

Nine Mile Point Nuclear Station, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS THE PLANNED LICENSE RENEWAL APPLICATION FOR NINE MILE POINT, UNITS 1 AND 2 On February 25, 2004, representatives of Constellation met with the Nuclear Regulatory Commission (NRC) staff to discuss the submittal of a license renewal application for Nine Mile Point (NMP), Units 1 and 2. The renewal application is scheduled to be submitted by May 31, 2004. Attendees at the meeting are listed in Enclosure 1 and the agenda is provided in. Constellation's presentation materials used at the meeting are contained in.

Constellation provided an overview of the intended format and content for each of the sections in the license renewal application. The license for NMP Unit 1 expires on August 22, 2009, and for Unit 2 on October 31, 2026. A May 31, 2004, submittal, will meet the five year timely renewal provision contained in 10 CFR 2.109.

The NMP renewal application will be the first application for a GE BWR 2/Mark I design (Unit 1) and a GE BWR 5/Mark 11 design (Unit 2). One document will be submitted addressing both units. Designators "A" and "B" will be used for subsections where significant differences exist between Units 1 and 2. The application will follow the "Class of 2003" standard license renewal application format and will address both draft and final Interim Staff Guidance positions.

There are a total of 37 aging management programs for NMP Units 1 and 2 consisting of 32 existing and 5 new programs. Approximately 75% of the programs are consistent with the Generic Aging Lessons Learned Report. Constellation had not decided yet whether to spend the resources to perform the review to identify where its programs are consistent with those previously approved (past precedent). They will monitor the experience of other applicants who performed the review and currently have applications under review before making a decision.

The NRC staff requested clarification on selected topics and provided comments but did not identify any significant problems with Constellation's proposed approach.

/RA/

Stephen T. Hoffman, Senior Project Manager License Renewal Section B License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Dockets Nos.: 50-220 and 50-410

Enclosures:

As stated cc w/encls: See next page Distribution: See next page Document Name: G:\\RLEP\\License Renewal Section-B\\Hoffman\\Mtg NMP 2-25-04.wpd OFFICE RLEP:DRIP:LA RLEP:DRIP:P" RLEP:DRIP:SO g NAME I YEdmonds by_

SHoffman SWest A)%

IDATE 3/30/04 V53 J104 3W& /04 OFFICIAL RECORD COPY

DISTRIBUTION: Dated: March 31. 2004 HARD COPY RLEP RF Stephen Hoffman E-MAIL:

PUBLIC J. Craig D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair S. Black B. Boger D. Thatcher R. Pettis G. Galletti C.Li M. Itzkowitz R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff C. Holden R. Laufer P. Tam B. Fuller, RI E. Knutson, RI J. Trapp, RI T. Mensah Receptionist OPA

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 31, 2004 LICENSEE:

Constellation Energy Group (Constellation)

FACILITY:

Nine Mile Point Nuclear Station, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS THE PLANNED LICENSE RENEWAL APPLICATION FOR NINE MILE POINT, UNITS 1 AND 2 On February 25, 2004, representatives of Constellation met with the Nuclear Regulatory Commission (NRC) staff to discuss the submittal of a license renewal application for Nine Mile Point (NMP), Units 1 and 2. The renewal application is scheduled to be submitted by May 31, 2004. Attendees at the meeting are listed in Enclosure 1 and the agenda is provided in. Constellation's presentation materials used at the meeting are contained in.

Constellation provided an overview of the intended format and content for each of the sections in the license renewal application. The license for NMP Unit 1 expires on August 22, 2009, and for Unit 2 on October 31, 2026. A May 31, 2004, submittal, will meet the five year timely renewal provision contained in 10 CFR 2.109.

The NMP renewal application will be the first application for a GE BWR 2/Mark I design (Unit 1) and a GE BWR 5/Mark 11 design (Unit 2). One document will be submitted addressing both units. Designators "A" and "B" will be used for subsections where significant differences exist between Units 1 and 2. The application will follow the "Class of 2003" standard license renewal application format and will address both draft and final Interim Staff Guidance positions.

There are a total of 37 aging management programs for NMP Units 1 and 2 consisting of 32 existing and 5 new programs. Approximately 75% of the programs are consistent with the Generic Aging Lessons Learned Report. Constellation had not decided yet whether to spend the resources to perform the review to identify where its programs are consistent with those previously approved (past precedent). They will monitor the experience of other applicants who performed the review and currently have applications under review before making a decision.

The NRC staff requested clarification on selected topics and provided comments but did not identify any significant problems with Constellation's proposed approach.

Stephen T. Hoffman, Senior Project Manager License Renewal Section B License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Dockets Nos.: 50-220 and 50-410

Enclosures:

As stated cc w/encls: See next page

Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego,NY 13126 Mr. James R. Evans LIPA P.O. Box 129 Lycoming, NY 10393 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 C. Adrienne Rhodes Chairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group, Inc.

750 East Pratt Street Baltimore, MD 21202 Mr. James M. Petro, Jr., Esquire Counsel Constellation Energy Group 750 East Pratt Street, 5V Floor Baltimore, MD 21202 Mr. Peter R. Smith, Acting President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Fred Emerson Nuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-3708 M. Steven Leonard, Acting General Supervisor - Regulatory Matters Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Peter A. Mazzaferro Site Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Mr. Peter E. Katz Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

ATTENDANCE LIST NRC STAFF MEETING WITH CONSTELLATION ENERGY GROUP NINE MILE POINT, UNITS 1 AND 2 FEBRUARY 25, 2004 NAME Steve Hoffman David Dellario Ernie Taormina Tony Grenci Russ Wells Peter Mazzaferro TJ Kim Dennis Vandeputte Jenny Weil Greg Makar Al Fulvio Peter Tam David C. Jeng Barry Elliot Angelo Stubbs Duc Nguyen Leslie Fields Greg Cranston Stewart Bailey Sam Lee Kimberley Corp Raj Auluck Mike Masnick P.T. Kuo ORGANIZATION NRC/NRRIDRIP/RLEP NMPNS/CNS NMPNS/CNS CNS CNS Constellation/NMP NRC/NRRIDRIP/RLEP NMPNS McGraw-Hill NRC/NRRIDE/EMCB Exelon NRC/NRR/DLPM NRC/NRRIDE/EMEB NRC/NRR/DE/EMCB NRC/NRR/DSSA/SPLB NRC/NRR/DE/EEIB NRC/NRRIDRIP/RLEP NRC/NRR/DRIP/RLEP NRC/NRR/DE/EMEB NRC/NRR/DRIP/RLEP NRC/NRR/DRIP/RLEP NRC/NRR/DRIP/RLEP NRC/NRRIDRIP/RLEP NRC/NRR/DRIP/RLEP

AGENDA NRC MEETING WITH CONSTELLATION ENERGY GROUP CONCERNING THE LICENSE RENEWAL APPLICATION FOR NINE MILE POINT (NMP), UNITS 1 AND 2 FEBRUARY 25, 2004 (Times are approximate)

Topic 1.

2.

3.

4.

5.

6.

7.

8.

Opening remarks and introduction NMP License renewal organization Description and background of NMP1 & NMP2 Outline and format of NMP renewal application Programs overview Questions and answers Public participation Closing Constellation Presenter Bill Holston David Dellario Rus Wells Rus Wells Pete Mazzaferro Time 9:00 -

9:10 a.m.

9:10 - 9:20 a.m.

9:20 - 9:35 a.m.

9:35 -

9:50 a.m.

9:50 - 10:00 a.m.

10:00 - 10:45 a.m.

10:45 - 10:55 a.m.

10:55 - 11:00 a.m.

Nine Mile Point Units 1 and 2 License Renewal Application l~~~~..,

.fu-00gS;b HenS dy m

cx2/25/2004

Constellation Attendees NAME David Dellario Tony Grenci TITLE CNS LR Project Manager CNS Director License Renewal Pete Mazzaferro Ernie Taormina Dennis Vandeputte Russ Wells NMP LR Project Manager CNS IPA Lead NMP Licensing Engineer CNS Lead Licensing Engineer 2

Agenda m Opening Remarks/Introduction m NMP License Renewal Organization

  • Description and Background of NMP 1 & 2
  • Programs Overview w Questions and Answers
  • Public Participation D. Dellario D. Dellario P. Mazzaferro R. Wells P. Mazzaferro 3

NMP License Renewal Organization Bill Holston 1

CGG Projed Sponsor 4

I 'i

,i, 4

Description and Background of NMP 1 & 2

  • The Nine Mile Point Nuclear Station (NMPNS) consists of two nuclear plants, on the shore of Lake Ontario, approximately 5 miles northeast of Oswego, NY.
  • Constellation Energy Group purchased the NMPNS on November 7, 2001.
  • Long Island Power Authority owns 18% of NMP2.

5

Description and Background of NMP 1 &.2 Z

NMP1 is a BWR/2 design (1850 MWt) with a Mark I containment.

  • NMP2 is a BWR/5 design containment.

(3467 MWt) with a Mark II 6

Description and Background of NMP 1 & 2

  • NMP1 OL expires August 22, 2009.
  • NMP2 OL expires October 31, 2026.
  • LRA to be submitted by May 31, 2004.
  • NMP2 received an exemption from 10 CFR 54.17(c) in order to submit prior to 20 years of operating experience.

7

Outline and Format of NMP LRA

. The Standard LRA (SLRA) has been incorporated into NEI 95-10, Rev. 4.

  • The LRA for NMPNS follows the format and content of the SLRA.
  • The LRA addresses the NRC Interim Staff Guidance (ISG) documents.

8

LRA TABLE OF CONTENTS

  • Section 1 - Administrative Information
  • Section 2 - Scoping and Screening Methodology for Identifying Structures and Components Subject to Aging Management Review, and Implementation Results
  • Section 4 - Time-Limited Aging Analyses
  • Appendix C - Commodity Groups (Optional) (not used)
  • Appendix D - Technical Specification Changes
  • Appendix E - Environmental Report 9

LRA Section 1 Contents Contains general information such as:

  • Expiration dates of OLs
  • Organization and Management of NMPNS, LLC
  • Application Structure
  • Description of NMP1 and NMP2 10

LRA Section 2 Contents

  • 2.1, Scoping and Screening Methodology

- 2.1.1, Introduction

- 2.1.2, Plant Level Scoping

- 2.1.3, System Realignment and Commodity Groupings

- 2.1.4, Application of License Renewal Scoping Criterion

- 2.1.5, Component Screening

- 2.1.6, ISG Discussion

- 2.1.7, References

  • 2.2, Plant Level Scoping Results

- Lists all of the plant systems and structures and identifies whether they are in scope or not.

11

LRA Section 2 Contents cont'd) m 2.3, Scoping and Screening Results: Mechanical Systems Section 2.3.1.A, NMP1 Reactor Vessel, Internals, and Reactor Coolant Systems Section 2.3.1.B, NMP2 Reactor Vessel, Internals, and Reactor Coolant Systems Section 2.3.2.A, NMP1 Engineered Safety Features Systems

- Section 2.3.2.B, NMP2 Engineered Safety Features Systems

- Section 2.3.3.A, NMP1 Auxiliary Systems

- Section 2.3.3.1B, NMP2 Auxiliary Systems

- Section 2.3.4.A, NMP1 Steam and Power Conversion Systems

- Section 2.3.4.B, NMP2 Steam and Power Conversion Systems 12

LRA Section 2 Contents (cont'd)

  • 2.4, Scoping and Screening Results: Structures 2.4.A, NMP1 Structures 2.4. B NMP2 Structures 2.4.C, NMPNS Structural Commodities
  • Section 2.4.C.1, Component Supports
  • Section 2.4.C.2, Fire Stops and Seals 13

LRA Section 2 Contents (cont'd)

  • 2.5, Scoping and Screening Results: Electrical and Instrumentation and Controls 2.5.A, NMP1 Electrical and I&C Systems 2.5.B, NMP2 Electrical and I&C Systems

- 2.5.C, NMPNS Electrical Commodities

  • Section 2.5.C.1, Cables and Connectors
  • Section 2.5.C.2, Bus Bars

LRA Section 3 Contents

- Table 3.0-1, Environments

- Table 3.0-2, Aging Effects Requiring Management

- Separate "Table is" for NMP1 and NMP2 (e.g., Table 3.1.1.A for NMP1 Reactor Coolant Systems and Table 3.1.1.B for NMP2 Reactor Coolant Systems)

Each system subject to an AMR has its own "Table 2" which is the SLRA nine-column format (e.g., Table 3.1.2.A-1 NMP1 Reactor Pressure Vessel and Table 3.1.2.B-1 NMP2 Reactor Pressure Vessel) 15

LRA Section 3 Contents (cont'd)

- Section 3.2, Aging Management of Engineered Safety Features Systems

- Section 3.3, Systems Aging Management of Auxiliary

LRA Section 4 Contents

  • Section 4.1, Identification of Time Limited Aging Analyses

- 4.1.1,

- 4.1.2,

  • Section

- 4.2.1,

- 4.2.2,

- 4.2.3,

- 4.2.4, Process Overview Identification Of Exemptions 4.2, Reactor Vessel Neutron Embrittlement Upper Shelf Energy Pressure-Temperature (P-T) Limits Elimination of Circumferential Weld Inspection Reactor Vessel Axial Weld Failure Probability 17

LRA Section 4 Contents (cont'd)

  • Section 4.3, Metal Fatigue Analysis

- 4.3.1, Reactor Vessel Fatigue Analysis

- 4.3.2, ASME Section III Class I Piping and Components Fatigue Analysis (NMP2 only)

- 4.3.3, Feedwater Nozzle Fatigue and Control Rod Drive Return Line (CRDL) Nozzle Cracking

- 4.3.4, Non-ASME Section III Class 1 Piping and Components Fatigue Analysis

- 4.3.5, Reactor Vessel Internals Fatigue Analysis

- 4.3.6, Environmentally Assisted Fatigue Analysis

- 4.3.7, Fatigue of the Emergency Condenser (NMP1 only) 18

LRA Section 4 Contents (cont'd)

  • Section 4.4, Environmental Qualification (EQ) of Electrical Equipment

- 4.4.1, Electrical Equipment EQ Analysis

- 4.4.2, Mechanical Environmental Equipment Qualification (NMP2 only)

  • Section 4.5, Loss of Prestress in Concrete Containment Tendons - N/A (the NMP1 and NMP2 containments do not have prestress tendons) 19

LRA Section 4 Contents (cont'd)

  • Section 4.6, Containment Liner Plate, Metal Containment and Penetrations Fatigue Analysis 4.6.1, NMP1 Torus Shell and Vent System Fatigue

- 4.6.2, NMP1 Torus Attached Piping Analysis

- 4.6.3, NMP1 Torus Thickness 4.6.4, NMP2 Containment Liner Analysis

  • Section 4.7, Other Plant Specific TLAAs

- 4.7.1, NMP2 RPV Biological Shield Wall

- 4.7.2, NMP2 Main Steam Isolation Valve Corrosion Allowance

- 4.7.3, NMP2 Core Plate Holdown Bolts

- 4.7.4, NMPI Reactor Vessel and Reactor Vessel Closure Head Weld Flaw Evaluations 20

Appendix A - Updated (Final) Safety Analysis Report Supplement

  • Appendix Al, NMPI Updated Report (UFSAR) Supplement
  • Appendix A2, NMP2 Updated Final Safety Analysis Safety Analysis Report (USAR) Supplement m Both Appendices contain:

- A summarized description of the programs and activities for managing the effects of aging

- A summary of the TLAAs

Appendix B - Aging Management Programs

  • Provides a list of Aging Management Programs (AMPs) alphabetically identifying whether the program iS a new or existing program.
  • The information in this appendix applies to both NMP1 and NMP2, unless otherwise specified.

22

Appendix D - Technical Specification Changes No new Technical Specifications (Tech. Specs.)

are required.

  • Tech. Spec. changes will be needed for the Pressure-Temperature (P-T) curves and NMP1 Tech. Spec. 5.3, Reactor Vessel (design 40 years).

lifetime of

  • These changes to the Tech. Specs. will be submitted under the normal license amendment process.

23

Appendix E Environmental Report

  • Purpose and need for action
  • Description of site and environmental interfaces
  • Proposed action
  • Impact analyses for applicable Category 2 issues (including Severe Accident Mitigation Alternatives)
  • New & significant information review process

- Analysis of new and significant issues not in GEIS

- Analysis of new and significant information relative to Category 1 issues

  • Comparative impact analysis of alternatives
  • Compliance status 24

Programs Overview

  • Total of 37 programs 32 existing
  • 2 plant specific programs

- 5new

  • 2 plant specific programs
  • '%'75%/o of the programs are consistent with NUREG-1801 25

NUREG-1801 Programs

  • Boraflex Monitoring Program
  • Buried Piping and Tanks Inspection Program (new)

[WF)

WL)

IWB, IWC, 26

NUREG-1801 Programs

  • BWR Vessel Internals Program
  • Closed Cycle Cooling Water System Program
  • Compressed Air Monitoring Program
  • Environmental Qualification Program
  • Fatigue Monitoring Program
  • Fire Water System Program
  • Fuel Oil Chemistry Program
  • Inspection of Overhead Heavy Load and Light Load Handling Systems Program 27

NUREG-1801 Programs

  • Masonry Wall Program
  • Non EQ Electrical Cables and Connections Program (new)
  • Non EQ Electrical Cables Used in Instrumentation Circuits Program
  • One Time Inspection Program (new)
  • Open Cycle Cooling Water System Program
  • Preventive Maintenance Program
  • Reactor Head Closure Studs Program
  • Reactor Vessel Surveillance Program
  • Selective Leaching of Materials Program (NMPI only)
  • Structures Monitoring Program
  • Water Chemistry Control Program 28

Plant Specific Programs w Bus Inspection Program (new)

  • Fuse Holder Program (new) m Systems Walkdown Program
  • Torus Corrosion Monitoring Program (NMP1 only) 29