Letter Sequence Other |
---|
|
|
MONTHYEARML0400900482004-01-0808 January 2004 Relief Request of 6/12/03 Project stage: Other ML0407701502004-03-17017 March 2004 Withholding from Public Disclosure, Diagram Identified as E 232-587 in the February 18, 2004, Letter, (TAC MB9636, MB9637 & MB9639) Project stage: Other ML0418904222004-07-0808 July 2004 Deferral of Review of Licensing Actions Project stage: Approval ML0435600752004-12-20020 December 2004 Proposed Relief Requests to the Requirements of 10CFR50.55a Concerning the Third Ten-Year Interval Lnservice Inspection Program - Response to Request for Additional Information Project stage: Response to RAI ML0500504762005-02-0202 February 2005 Third 10-Year Inservice Inspection Interval Requests for Relief Project stage: Other ML0618405492006-06-29029 June 2006 American Society of Mechanical Engineers Inservice Inspection Program Request for Relief I-ISI-16, I-ISI-17, I-ISI-18 and I-ISI-19, Request for Additional Information Project stage: Request ML0624802322006-10-27027 October 2006 Relief Requests Nos. 1-ISI-16, 1-ISI-17, 1-ISI-18, and 1-ISI-19 Requesting Relief from the Inservice Inspection (ISI) Program Project stage: Other 2004-07-08
[Table View] |
Withholding from Public Disclosure, Diagram Identified as E 232-587 in the February 18, 2004, Letter, (TAC MB9636, MB9637 & MB9639)ML040770150 |
Person / Time |
---|
Site: |
Oyster Creek |
---|
Issue date: |
03/17/2004 |
---|
From: |
Tam P NRC/NRR/DLPM/LPD1 |
---|
To: |
Crane C AmerGen Energy Co |
---|
Tam P, NRR/DLPM, 415-1451 |
References |
---|
TAC MB9636, TAC MB9637, TAC MB9638, TAC MC9639 |
Download: ML040770150 (5) |
|
|
---|
Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] Category:Proprietary Information Review
MONTHYEARML18253A2212018-10-0404 October 2018 Request for Withholding Information from Public Disclosure - 8/31/18 Affidavit Executed by Andrew Ryan, Holtec International, Related to Proprietary Enclosure 2A to the License Transfer Application ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML14309A6842014-11-18018 November 2014 Request for Withholding Information from Public Disclosure Regarding Revision of the Core Operating Limits Report for Cycle 25, Revision 10 ML13016A5002013-01-30030 January 2013 Request for Withholding Information from Public Disclosure for Braidwood Station, Units 1 & 2; Byron Station, Units 1 & 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 2 & 3; LaSalle County Station, Units 1 & 2 ML12173A0942012-07-12012 July 2012 Request for Withholding Information from Public Disclosure ML0920100762009-07-17017 July 2009 Request for Withholding Information from Public Disclosure ML0907103302009-04-30030 April 2009 Corp., Request for Withholding Information from Public Disclosure ML0822807952008-08-22022 August 2008 Amergen Energy Company, LLC - Request for Withholding Information from Public Disclosure for Clinton Power Station, Unit No. 1, Oyster Creek Nuclear Generating Station, and Three Mile Island Nuclear Station, Unit 1 ML0622001012006-08-0707 August 2006 2006/08/07-CB&I Request for Withholding Information from Public Disclosure for Containment Fabrication Drawings for Oyster Creek Generating Station, License Renewal Application ML0534600702006-01-24024 January 2006 Withholding from Public Disclosure, GE-NE-0000-0046-3343-P, Oyster Creek SSV (Steam Safety Valve) Set-point Tolerance Change Effects on Anticipated Operational Occurrences, Revision I, Class III, November 2005 ML0506805102005-03-18018 March 2005 Request for Withholding Information from Public Disclosure ML0407701502004-03-17017 March 2004 Withholding from Public Disclosure, Diagram Identified as E 232-587 in the February 18, 2004, Letter, (TAC MB9636, MB9637 & MB9639) ML0312602042003-05-0606 May 2003 Request for Withholding Information from Public Disclosure, Oyster Creek Nuclear Generating Station Generating ML0300906352003-01-0909 January 2003 Withholding from Public Disclosure, Proprietary Additional Information Regarding the Cycle Specific SLMCPR (Safety Limit Minimum Critical Power Ratio) for Oyster Creek Cycle 19, MB6959 ML0224203602002-08-30030 August 2002 Withholding from Public, Response to Request for Additional Information - Technical Specification Change Request No. 291, Safety Limit Minimum Critical Power Ratio, MB5505 ML0219705332002-07-24024 July 2002 Request for Withholding Information from Public Disclosure, Oyster Creek Nuclear Generating Station ML0214003812002-05-16016 May 2002 Request for Withholding Information from Public Disclosure ML0213600712002-05-16016 May 2002 Request for Withholding Infornmation from Public Disclosure, Oyster Creek Nuclear Generating Station 2018-10-04
[Table view] |
Text
March 17, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE, OYSTER CREEK NUCLEAR GENERATING STATION (TAC NOS. MB9636, MB9637, MB9638, AND MB9639)
Dear Mr. Crane:
By your letter dated February 18, 2004, and affidavit dated February 13, 2004, executed by Mr. Ian C. Rickard of Westinghouse Electric Company, LLC, Mr. M. P. Gallagher submitted supplemental information to a letter dated June 12, 2003, requesting relief from certain requirements for the inservice inspection program. Mr. Gallagher requested that a diagram identified as E 232-587 in the February 18, 2004, letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390. A non-proprietary copy of this diagram was also submitted and has been placed in the Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) Where prevention of its use by any of Westinghouses competitors without license from Westinghouse constitutes a competitive economic advantage over other companies; (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs or potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
C. M. Crane We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390, and on the basis of your statements, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right , if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1451.
Sincerely,
\RA\
Peter S. Tam, Senior Project Manager, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-219 cc: See next page
C. M. Crane We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390, and on the basis of your statements, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right , if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1451.
Sincerely,
\RA\
Peter S. Tam, Senior Project Manager, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-219 cc: See next page DISTRIBUTION:
PUBLIC S. Little C. Bixler, RGI PDI-1 Reading File R. Laufer P. Tam OGC A. Howe Accession Number: ML040770150 OFFICE PDI-1\PM PDI-1\LA OGC PDI-1\SC NAME PTam SLittle JHeck RLaufer DATE 3/11/04 3/11/04 3/15/04 3/17/04 OFFICIAL RECORD COPY
Oyster Creek Nuclear Generating Station cc:
Chief Operating Officer H. J. Miller AmerGen Energy Company, LLC Regional Administrator, Region I 4300 Winfield Road U.S. Nuclear Regulatory Commission Warrenville, IL 60555 475 Allendale Road King of Prussia, PA 19406-1415 Senior Vice President - Nuclear Services AmerGen Energy Company, LLC Mayor of Lacey Township 4300 Winfield Road 818 West Lacey Road Warrenville, IL 60555 Forked River, NJ 08731 Site Vice President - Oyster Creek Senior Resident Inspector Generating Station U.S. Nuclear Regulatory Commission AmerGen Energy Company, LLC P.O. Box 445 P.O. Box 388 Forked River, NJ 08731 Forked River, NJ 08731 Director Licensing Vice President - Mid-Atlantic AmerGen Energy Company, LLC Operations Nuclear Group Headquarters AmerGen Energy Company, LLC P.O. Box 160 4300 Winfield Road Kennett Square, PA 19348 Warrenville, IL 60555 Manager Licensing - Oyster Creek and John E. Matthews, Esquire Three Mile Island Morgan, Lewis, & Bockius LLP AmerGen Energy Company, LLC 1111 Pennsylvania Avenue, NW Nuclear Group Headquarters Washington, DC 20004 Correspondence Control P.O. Box 160 Kent Tosch, Chief Kennett Square, PA 19348 New Jersey Department of Environmental Protection Oyster Creek Generating Station Plant Bureau of Nuclear Engineering Manager CN 415 AmerGen Energy Company, LLC Trenton, NJ 08625 P.O. Box 388 Forked River, NJ 08731 Vice President - Licensing and Regulatory Affairs Regulatory Assurance Manager Exelon Generation Company, LLC Oyster Creek 4300 Winfield Road AmerGen Energy Company, LLC Warrenville, IL 60555 P.O. Box 388 Forked River, NJ 08731 Vice President - Operations Support AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
Oyster Creek Nuclear Generating Station cc:
Vice President, General Counsel and Secretary AmerGen Energy Company, LLC 2301 Market Street, S23-1 Philadelphia, PA 19101 Pete Eselgroth, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Correspondence Control Desk AmerGen Energy Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348