ML040090048

From kanterella
Jump to navigation Jump to search

Relief Request of 6/12/03
ML040090048
Person / Time
Site: Oyster Creek
Issue date: 01/08/2004
From: Tam P
NRC/NRR/DLPM/LPD1
To: David Helker
Exelon Corp
References
TAC MB9636, TAC MB9637, TAC MB9638, TAC MB9639
Download: ML040090048 (3)


Text

From:

Peter Tam To:

David Helker Date:

1/8/04 4:08PM

Subject:

Oyster Creek Relief Request of 6/12/03 (TAC MB9636, 7, 8, 9)

Dave:

This refers to Oyster Creek relief request of 6/12/03 (your letter no. 2130-03-20180). Our reviewer, Tom McLellan, has prepared the following draft RAI. We would like to discuss these questions and comments with you in a conference call, during which we will agree on future disposition of these questions and comments.

Request for Relief No. OC-32 Are you aware that when requesting the use of a later Edition of the Code or parts of the Code, all associated requirements needs to be used? In the text of the basis, you referenced Code item numbers instead of weld identification numbers. It is not clear for what components you are requesting an alternative examination schedule, and as noted above, you need to consider applying this request to all welds/components in the ISI program.

Reuest for Relief No. OC-33 Please provide a drawing of the shell-to-flange weld and weld identification number, if available.

Request for Relief No. OC-34 Please provide drawings of the components listed in the tables. In the text of the basis, you referenced Code item numbers instead of weld identification numbers as listed in the tables. It is not clear what weld or inter-radius that you are discussing, or as to why the Code requirement is impractical. We need details for each component/weld as to why the Code requirement is impractical and why the limited coverage provides reasonable assurance of structural integrity of the components.

You need to discuss material type and environment of the component/weld in order to state that you have examined a representative and significant sample of the welds. Further, you need to feel confident that there is no degradation mechanisms occurring or that you have examined fully other nozzles of similar materials and environments and can relate to that experience to the subject components. For example, Weld No. NR02 2-567, there is no discussion why 34.1% ultrasonic coverage provides reasonable assurance of structural integrity of the weld.

You need to discuss the various factors as noted above to ensure that the component is structurally sound. But, the discussion is not to be limited to the one weld. Has any of these components received an essentiality 100% surface examination? If needed, you should provide the results of the surface examinations in its basis.

For CRD Return Nozzle N9, it is not clear if you are discussing the shell-to-nozzle weld or nozzle inter-radius examinations. Has this line been capped off to address industry experience with fatigue in these lines? If you are discussing the weld, have you considered the recent experience at Pilgrim? Also, have you considered the BWRVIP requirements and how they apply to these welds? There was no discussion regarding IGSCC susceptibility of the subject

welds which should have been part of your basis of relief (you should also discuss IGSCC in RR OC-35 for piping welds).

If you are discussing the inter-radius of the CRD nozzles, are these nozzles susceptible to thermal fatigue cracking? Did you consider supplementing your UT examinations with an EVT-1 and are you considering the same for the next interval?

These questions and comments aim solely to prepare you and others for the requested conference call. These questions and comments do not at present convey a formal NRC position, nor do they constitute a formal request for additional information.

Peter S. Tam, Senior Project Manager Project Directorate I-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation e-mail: pst@nrc.gov Tel.: 301-415-1451 CC:

David Distel; David Robillard; Thomas Loomis; Thomas McLellan Mail Envelope Properties (3FFDC6DB.CE0 : 10 : 20510)

Subject:

Oyster Creek Relief Request of 6/12/03 (TAC MB9636, 7, 8, 9)

Creation Date:

1/8/04 4:08PM From:

Peter Tam Created By:

PST@nrc.gov Recipients Action Date & Time David Transferred 01/08/04 04:08PM distel CC (David Distel) owf2_po.OWFN_DO Delivered 01/08/04 04:08PM TKM CC (Thomas McLellan)

Opened 01/09/04 07:37AM exeloncorp.com Transferred 01/08/04 04:08PM david.helker (David Helker)

David.Robillard CC (David Robillard) thomas.loomis CC (Thomas Loomis)

Post Office Delivered Route David INTernet:exeloncorp.

com owf2_po.OWFN_DO 01/08/04 04:08PM exeloncorp.com Files Size Date & Time

MESSAGE 5054 01/08/04 04:08PM Options Auto Delete:

No Expiration Date:

None Notify Recipients:

Yes Priority:

Standard Reply Requested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard To Be Delivered:

Immediate Status Tracking:

Delivered & Opened ML040090048