Technical Specification 3.4.1-1, for Amendment Nos. 219 and 201, Respectively
ML040560387
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/19/2004
From: Martin R
NRC/NRR/DLPM/LPD2
To: Gordon Peterson
Duke Energy Corp
Martin R, NRR/DLPM, 415-1493
Shared Package
ML040560045 List:
References
Download: ML040560387 (1)


Text

RCS Pressure, Temperature, and Flow DNB Limits 3.4.1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits LCO 3.4.1 APPLICABILITY:

RCS DNB parameters for pressurizer pressure, RCS average temperature, and RCS total flow rate shall be within the limits specified in Table 3.4.1-1.

MODE 1.


--------NOTE Pressurizer pressure limit does not apply during:

a.

THERMAL POWER ramp > 5% RTP per minute; or

b.

THERMAL POWER step > 10% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressurizer pressure or A.1 Restore DNB parameter(s) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> RCS average to within limit.

temperature DNB parameters not within limits.

B.

RCS total flow rate>

B.1 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 99%, but < 100% of the POWER to < 98% RTP.

limit specified in the COLR.

AND B.2 Reduce the Power Range 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Neutron Flux - High Trip Setpoint below the nominal setpoint by 2% RTP.

(continued)

McGuire Units I and 2 3.4.1-1 Amendment Nos.21 9 & 201