November 2002 Retake Exam 50-400/2002-302 Draft JPMs
ML040560231
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/21/2002
From:
Carolina Power & Light Co
To: Ernstes M
NRC/RGN-II
References
50-400/02-302
Download: ML040560231 (34)


Text

Final Submittal (Blue Paper)

HARRIS EXAM 50-400/2002-302 OPERATING TEST)

NOVEMBER 21,2002 DRAFT JPMS

HARRIS NUCLEAR PLANT 2002 SWQ NRC RETEST JPMS

TABLE OF CONTENTS SlMULATOR JPMS

1. B.1 .a - Emergency Boratian
2. B.1.b - Isolate Ruptured SG - MSIV Will NOT Close
3. B.1.c - Restoring the Control Room Area HVAC System to Normal After A Control Koom Isolation Signal IN PLANT JPMS
4. B.2.a - Energize A Dead Bus With A Diesel Locally
5. B.2.b - Emergency Makeup To Fuel Fools From Emergency Service Water System

JPM-B.l.a H A N S Retake REGION I1 INITIAL LICENSE EXAMINATION JOB P E W B M A N C E MEASURE JPM -B. 1.a Emergency Booration CANDIDATE:

EXAMINER:

Page 1 of 7 Rev Date 10/28/02

JF'M-B. I .a HARRIS Retake REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE IvEASURE TASK: Perform AOP-002, Emergency Boration ALTERNATE PATH: Emergency Boration using RWST path via LCV-115B and/or LCV-l15D, to the CSIP suction FACILITY JFM NUMBER CR-037 KA: 004A2.14 IMPORTANCE: SRO 3.9 RO 3.8 KA STATEMENT: Ability to (a) predict the impacts ofthe following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency boration TASK STANDARD: At least 90 gpm Boration flow as indicated on F%-l22A.1is being delivered from the running Charginglsafety Injection Pump to the Reactor coolant System P R E F E W D EVALUATION LOCATION: SIMULATOR X - INPLANT -

PREFERRED EVALUATION METHOD: PEWOM -X SIMULATE

REFERENCES:

AOP-002, Emergency Boration VALIDATION TIME: 10 MINUTES TIME CRITICAL: No CANDIDATE:

START TIME: FINISH TIME:

PERFORMANCE TIME: MINUTES PERFORMANCE RATING: SAT UNSAT COMMENTS:

EXAMINER:

Signature Date Page 2 of7 Rev Date 10/28/02

JPM-B.1.a H A M S Retake TOOLS / EQUIPMENr / PROCEDURE§ NEEDED:

e Initialize to a 100% power IC-19 (OK to a saved IC with the following setup) o Fail two rods to insert on a Keactor Trip.

o MFP GW16A rod D-4 severity 220 steps (control bank C) o MFP CRF16B rod H-14 severity 220 steps (control bank B) e Fail the following valves shut:

o 1CS-278 Emergency Boration Valve (OW XA2II50 as is) o FCV-lI3A Boric Acid to Blender (OW XA2IlS1 as is) o Perform a manual reactor trip.

o PATH-1 until transition to EPP-004 directions to borate for rods failing to insert.

FREEZE the simulator in a stable condition. (An KO maybe required to maintain the plant stable and silence annunciators not associated with this JPM) e When candidate is ready, place simulator in RUN.

o AOP-002, Emergency Boration READ TO OPERATOR INSTRUCTIONS TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. AI1 control room steps shall be perfomied for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed or asked by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task, return the handout sheet I provide you.

INITIAL CONDITIONS:

The reactor has just tripped from IO0 percent power.

INITIATING CUE(§):

You are the Kcactor Operator. Observation of DKPI following the reactor trip indicates two control rods are stuck out. EPP-EOP-004 is being performed and the SCO directs you to refer to AOP-002 and initiate emergency boration.

Page 3 of 7 Rev Date 10!28/02

JPM-B.1.a HARRIS Retake

  • DENOTES CRITICAL STEP CANDIDATE SHOULD OBTAIN A CQPY OF AOP-002 1 NA Obtain procedure Obtain current copy of AOP-002 2 3 .O Go to Section 3.0, Refers to Section 3.0 OPERATOR ACTlQNS.

3 NA NOTE: This procedure Reads note and contains no immediate continues with actions procedure 4 3.1 Start a Boric Acid pump Locates a Boric Acid Pump running Pump Control Switch indication light and takes it to START changes from green to red 5 3.2 ESTABLISH buration Locates and 16s-278 Valve is failed in the flowpath using 1CS-278 as Control Switch and CLOSED position.

follows: takes it to OPEN 1CS-278 position indication light

a. OPEN 1CS-278, remains green.

Emergency Boric Acid Addition I

6 3.2.a RNO GO TO Step 3 Determines that 1CS-278 will not open and follows the response not obtained instructions- go to step 3 Page 4 of 7 Rev Date 10/28/02

P M - B . 1.a HARRIS Retake

__r_

JPM

____e PROC ELEMENT STANDARD NOTES

- SAT I STEF STEP UMSAl 4 3.3 ESTABLISH boration Locates FCV-113A Valve is failed in tht flowpath using FCV- Control Switch and CLOSED position.

113- as follows: takes it to OPEN IFCV-113A indication light

a. OPEN the following remains green.

valves ICs-283 Boric Acid to Boric Acid Blender FCV- I 13A 8 l.3.a RNO ;O TO Step 6 Determines that IFCV-I l3A will not open and follows the response not obtained instructions- go to step 6 1.6 STAIBLISH boration [Critical that Low from RWST as LCS-291 and/or oliows: LCS-292 are 3pened -parallel

a. OPEN the following path from RWST) valves e 1CS-291, Locates LCV- I 15B "osition indication Suction From and takes the controi ight for CCV-1158 RWST LCV- switch to OPEN :hanges from green 1 l5B o red IO .6.a a 1'3-292, Locates LCV- 1 151) and 'osition indication cont) Suction From takes the control switch ight for LCV- 1 15D RWST LCV- to OPEN :hanges from green 115D o red Page 5 of 7 Rev Date 10128XI2

IPM-B. 1 .a HARRIS Retake JPM PROC ELEMENT STANDARD SAT I STEP STEP (Critical that UNSAT "111 3.6.b SHUT the following valves IC§-165 and/or IC§-166 arefis closed- series path from VCT) 0 ICs-165, YCT Locates 1CS-165, VCT Position indication Outlet LCV-I ISC Outlet LCV- 1 15C and light for LCV-11SC takes the control switch changes from red to to CLOSE green 12 3.6.b 0 IC§-166, VCT Locates 1CS-166, YCT Position indication

cant) Outlet LCV-I 1% Outlet LCV- 1 15E and light for LCV-I 15E takes the control switch changes from red to to CLOSE green
  • I3 J.6.C VERIFY and MANTAIN Locates Controller it least 90 gpm charging FK-122.1 charging flow, OW to RCS (FI- 122A.I ) and places it in manual.

inti6 required boration is Increases the output to

ompleted. > 90 gpm and monitors charging flow on FI- 122A1.

14 VA XUTION - Low VCT Reads caution and eve1 is a precursor to gas continues with inding the CSIPs procedure 15 I.G.d :HECK VCT level greater Locates LI- I 15 and han or equal to 5% and can monitors YCT level

,e maintained on scale rA§K COMPLETE WEEK 5 90 GPM FLOWRATE OF BORIC ACID FROM RWST TO RCS S BEING .MAINTAIR'ED AND MONITORED STOP TIME:

Page 6 of?

Rev Date 10i28i02

JPM-B. I .a H A M S Retake CANDIDATE CUE SHEET (TO BE RETURNED TQ EXAMIhTR UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Ilie reactor has just tripped from 100 percent power.

INITIATING CUE@):

You are the Reactor Operator. Observation of DRPI following the reactor trip indicates two control rods are stuck out. EPP-EOP-004 is being perfomed and the SCO directs you to refer to AOP-002 and initiate emergency boration.

Page 7 of 7 Rev Date 10/28/02

. JF'M-B.1.b HARRIS Retake rnCION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM -B. 1.b ISOLATE RUBTI.IREB SG;--MSIVWILL NOT CLOSE CANDIDATE:

Page 1 of 9 Rev Date 10/28/02

JPM-B.1.b H A N S Retake REGION I1 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE TASK: Implement EOP-PATH 2. Steam Generator 'rube Rupture ALTERNATE PATH: Ruptured SG MSIV Will NOT isolate. Operator performs a manual isolation of intact SG's from the ruptured SG and minimizes the steani flow from the ruptured SG FACILITY JPM NUMBER: CR-105 KA: 035A2.01 IMPORTANCE: SRO 4.6 RO 4.5 MA STATEMENT: Ability to (a) predict the impacts of the following malfunctions or operations on the SG; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Faulted or ruptured S/Gs TASK STANDARD: Steam Generator B isolated per PATH-2 and PATH-2 Guide PREFERRED EVALUATION LOCATION: SIMULATOK X - INPLANT -

PREFERRED EVALUATION METHOD:

REFERENCES:

EOP-PATH 2 GUIDE PERFORM -X SIMULATE -

VALIDATION TIME: ~

15 MINTIJTES TIME CRITICAL: No CANDIDATE:

STAKT TIME: FINISH TIME:

PERFOWANCE TIME: MINUTES PERFORMANCE RATING: SAT UNSAT COMMENTS:

EXAMINER:

Signature Date Page 2 of 9 Rev Date 10/28!02

IPM-B.1.b HARRIS Retake TOOLS f EQUIPMENT / PROCEDURES NEEDED:

o Initialize to a 100% power IC-19. (OR to a saved IC with the following setup) o Fail B Steam Generator MSIV 1MS-82 o ORP XB21037 as is (will not shut from MCB switch) o iMFP MSS05B fail to close (will not shut on Main Steam Isohtion Signal) o Insert an SGTR of sufficient size to require an SI o MFP SGNOSB final severity 160 0 Select GRID 5 on RM-11 Complete PATH-I until the first PATH-2 transition point. (Step 16--Secondary Radiation Normal.) Transition to PATH-2 tlvough step 5.

J Re-OPEN MS-70 and MS-92 (ifclosed to reduce AFW) and minimize AFW flow o Clear all annunciators, RM-I 1 alarms, and stabilize the plant o FREEZE the simulator When candidate is ready, place simulator in RUN.

PArH-2 GUIDE READ TO OPERATOR INSTRUCTIONS TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room stips shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed or asked by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task, return the handout sheet I provide you.

INITIAL CONDITIONS:

The Reactor was at 100% power when a tube rupture exceeds the VCT makeup capability. l h e crew manually Safety Injected and have performed the actions of PATV- 1. A tr,ansilion to PATH-2 was made and the B SG has been identified as ruptured by Main Steam line radiation readings. PATH-2 step 5 has just been completed.

INITIATING CIJE(S):

You are the Balance of Plant Operator. You are to continue with PATH-2 starting at step 6 until otherwise directed. Other operators have the foldout responsibilities.

Page 3 of 9 Rev Date 10!28!02

JPM-B. I .b HARRIS Retake

  • DENOTES CRfTICAL STEP STANDARD §AS I WSAT CANDIDATE SHOULD OBTAIN A COPY OF PATH-2 CUE STEPS 1-5 of PATH-2 have been completed Obtain procedure Obtain current copy of PATH-2 Reviews caution prior tc CAUTION proceeding with step.

At least one Sei must be maintained available for RCS cooldown s Ifthe TDAFW pump is the only available source of feed flow, one steam supply valve from an intact SG must be maintained open "3 6 Isolate Flow From ,ocates 1MS-60 1 MS-60 COntFOlkI Ruptured SG :ontroller and depresses retpoint AUTO

a. Adjust ruptured etpoint raise pushbutton pushbutton is lit Sei PORV inti1 setpoint is at 88%.

controller setpoint Jerifies controller is in to 88% IUTO.

( 1 145 PSIG) AND place in ALJTO 4 6.b Check ruptured SG PORV m a t e s Main Steam 'CV 308B SHUT 'ORV Position ndication light is idication for PCV 308B :reen nd verifies shut Page 4 of 9 Rev Date 10!28/02

JPM-B.1.b HARRIS Retake JPM PRO6 ELEMENT STANDARD NOTES

- SAT f STEF STEP

_i__l - -UNSAT

  • 5 6.c Shut ruptured SG steam Locates control switch 1MS-70 indication supply valve to IDAFW for 1MS-70 and shuts light changes from pump: valve. red to green SGB: IMS-70 6 6.d Verify blowdown isolatior On AEP-I, locates 1BD-20,26, and 30 valves from ruptured indications for 1RD-20, indication lights are SG - SHUT 1BD-26, and 1BD-30 green.

and verifies them SHUT

  • 7 6.e Shut ruptured SG main Locates control switch IMS-266 indication steam drain isolation for 1MS-266 and shuts light changes from before MSIV: r.alve red to green SGB: 1MS-266 8 6.f Shut ruptured SG MISV Locates IMS-82 control hdication light for AND bypass valve. ;witch and takes it to 1 MS-82 does not SHUT. (May initiate :hange. Red vlain Ste.am isolation in indication light is in attempt to shut the still lit.

vlSIV.)

9 6.f RNO 3 0 TO Step 7 leads RNO and

ontimes with step 7
  • la) 7 solate Intact SG(s) From ,ocates control switches IMS-80 and IMS-iuptured SG AND or 1MS-80 and IMS-84 $4 indicator lights vlinimize Steam Flow nd takes them to w i l l change from red Zrom Ruptured SG: ;HUT. (May initiate o green.

dain Steam Isolation to

a. Shut all remaining hut valves - if MSI MSIV AND nitiated in step 8 valves bypass valves may already he shut.)

Page 5 of 9 Rev Date 1028/02

JPM-H.1.h HARRIS Retake

-JPM PROC ELEMENT STANDARD STEP STEP

  • %I 7.b Place both steam dump Locates and places both Both Steam Dump interlock bypass switches Steam Dump Interlock Interlock switches to OFF//KESET switches to OFFRESET are in the OFFRESET position.

12 4.C Use intact SG(s) PORV for all further steam I

Uses A and C Steam Generator PORVs to dumping. control RCS temperature if necessary.

[EVALUATOR DISCIbETION: IF PROGRESS IN THE PROCEDURE IS NOT CONTINUING THEN CUE:]

CUE OTHER OPEKATORS WILL MONITOR RCS TEMPERATURE AND MAKE 4DDITIONAL ADJUSTMENTS USING A & C PORVS. CONTINUE WITH PATH-2 13 1.d Isolate steam release path Reviews Attachment 1 from ruptured SG using to PATH-2 Guide.

Attachment I .

14 NA NOTE: Isolation of Reviews NOTE and possible steam release continues with paths downstream of the procedure.

MSIVs may be completed in parallel with KCS cooidown and subsequent recovery actions.

15 1 Verify the following Locates valve test panel All throttle valve I valves SHUT: and chesks TV-I, TV-2, indications are green.

i Turbine stop TV-3, and TV-4 SHUT.

valves j Page 6 of 9 Rev Date 10/28!02

JPM-B.1.b H A N S Retake JPM PROC ELEMENT STAR43ARD STEP STEP 16 I (cont)

  • Condenser steam Locates indications on All condenser s t e m dump valves Status Light Box 1 for CNDSR STEAM indications are I

DUMP PCV valves and green.

DNDSR COOLDOWN STEAM DUMP Valves and verifies valves are shut.

I 17 1 (cont)

  • Atmospheric Locates indications on All atmospheric I steam dump Status Light Box 1 for steam dump valve valves ATMOSPIIERIC indications are STEAM DUMP PCV green.

valves and checks valves SWT.

Verifies that Indication lights for i

I 18 1 (cont) 0 MSRshutoff AND purge IMS-15 I, 1MS-I 52,

- valves: IMS-149, 1MS-161, I 1MS-151 LMS-I 52 1MS-151 LMS-152 MS-150, and IMS-163 are green i IMS-149 iMS-149 IMS-161 1MS- 161 1MS-150 1MS- I50 IMS-163 IMS-163 are SI1UT.

19 Main steam to Contacts Radwaste auxiliary steam Control Room and isolation valve: directs them to SHUT IAS-244 - Main Stearn 1 AS-244 To Auxiliary Steam Kadwaste Control Room) Isolation Valve.

1 CUE I (AS RADWASTE OPERATOR) -Understand SHUT 1AS-244 Main Steam To Auxiliary Stearn Isolaiion Valve. --- Wait a few seconds and j report - 1AS-244 Main Steam To Auxiliary Steam Isolation Valve is SHUT.

Page 7 of 9 Rev Date 10/28!02

JPM-B.1.b H A M S Retake JPM PROC ELEMENT STANDARD NOTES STEP STEP I

20 2 Locally Shut Main Steam Contacts AQ and directs Deain LCV Inlet Isolations implementation of AND Orifice Inlet remaining steps in Isolation Valves: Attachment 1 sheet 2 of 2 0 Main steam drains after MSIVs (platform 10 fl above 26 1 steam tunnel):

1 MS-249 1MS-252 1MS-284 IMS-287 IMS-319 1 MS-322

1MS-374 (north side) 1MS-377 (north side)

IMS-425 (north side) 1MS-428 (north side) lMS-433(north side) 1MS-409 (north side)

IMS-391 (west side) 1MS-394 (west side)

CUE LOACKNOWLEGES m Q U E S T TO PERFORM ATTACHMENT 1 STEPS. ALL OTHER LEMAINING STEPS WILL BE PERFORMED BY ANOTHER OPERATOR ASK COMPLETE Page 8 af 9 Rev Date 10!28/02

JPM-R. 1 .b HARRIS Retake CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL. CONDITIONS:

The Reactor was at 100% power when a tube rupture exceeds the VCT makeup capability. The crew manually Safety Injected and have performed the actions of PATH-I. A transition to PATH-2 was made and the B SG has been identified as ruptured by Main S t e m line radiation readings. PATH-2 step 5 has just been completed.

INITIATING CUE@):

You are the Balance of Plant Operator. You are to continue with PATH-2 starting at step 6 until otherwise directed. Other operators have the foldout responsibilities.

Page 9 of 9 Rev Date 10!28!02

JPM-B.1.c HARRIS Retake RJ3GION II INITIAL LICENSE EXAMINATION JOB BEWORh/lANCE MEASURE JPM-B.1.c Restoring the Control Room Area HVAG System to N ~ m aAfter l a Control Room Isolation Signal CANDIDATE:

EXAMINER:

Page 1 of 8 Rev Date 10/28/02

IPM-B. I .c HARRIS Retake REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE TASK: Return the Control Room Area Ventilation Isolation System to Normal ALTERNATE PATH: None FACILITY JPM NUMBER: NEW KA: 01384.02 IMPORTANCE: SRO 4.4 RO 4.3 KA STATEMENT: Ability to manually operate and/or monitor in the control room: Reset of ESFAS channel TASK STANDARD: Control Room Area HVAC system returned to normal mode (no longer in Recirculation lineup) and periodic monitoring for 0 2 and CO2 is no longer required.

PREFERRED EVALUATION LOCATION: SIMULATOR X - INPLANT -

PREFERRED EVALUATION METHOD: PERFORM -

X SIMULATE -

REFERENCES:

OP-173, Control Room Area W A C System VALIDATION TIME: 15 MINUTES TIME CRITICAL: No CANDIDATE:

START TIME: FINISH ma:

PERFORMANCE TIME: MINUTES PERFORMANCE RATING: SAT UNSAT COMMENTS:

EXAMINER:

Signature Date Page 2 of 8 Rev Date 10/28/02

JPM43.l.c H A W S Ketake TOOLS /EQUIPMENT / PROCEDURES NEEDED:

e Initialize to a 100% power IC. (OR to a saved IC with the following setup) e Entcr an inadvertent SI signal e Respond to SI IAW Path-l to step 28 e Transition to EPP-008. Perform step 1 through step 35.b - perform Attachment 1 Plant Systems Realignment (step 8 in Attachment 1 is realign control room area HVAC per OP-173 section 8.4) e Clear all annunciators and stabilize the plant e FREEZE the simulator e When candidate is ready, place simulator in RUN.

e UP-173, Control Room Area HVAC System READ TO OPERATOR INSTRUCTIONS TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed or asked by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task, return the handout sheet I provide you.

INITIAL CONDITIONS:

The plant was operating at 100% power when an inadvertent Safety Injection signal was received. The operators have performed the actions of path-1 and transitioned to EPP-008. The crew is now at the point of realigning plant systems for normal operation per Attachment 1. The SCO has directed you to perform Step 8 of Attachment I Realign Control Room Area IIVAC using OF-1 73, CONTROL ROOM A E A HVAC SYSTEM, Section 8.4. The initial conditions are satisfied and the HVAC system is in operation per section 8.1 ofOP-173.

INITIATING CUE@):

You are the Balance of Plant Operator. Restore the Control Room Area HVAC System to normal in accordance with OP-173 CONTROL ROOM AREA KVAC SYSTEM, Section 8.4.

Page 3 of 8 Rev Date 10/28/02

JPM-B. 1.c HARRIS Retake

  • DENOTES CRITICAL STEP JPM PROC STEP ELEMENT STANDARD I NOTES SAT f STEP CUE PROVIDE CAhXUDATE WITH COPY OF OP-173 section 8.4 E UNSAT 1 NA Obtain procedure Obtain current copy of OP- 173 section 8.4 2 8.4 Go to Section 8.4, Refers to Section 8.4 Restoring the Control Room Area W A C System to Normal after a Control Room Isolation Signal or Manual Recirc.

CUE THE LNITlAL CONDITIONS AME SATISFIED ANXI THE CONTROL MOQM AREA IWAC SYSTEM IS IN OPERATION PER SECTION 8.1 3 8.4.1 Initial Conditions

1. Control Room Isolation Signal clear
2. Control Room Isolation Signal clear "4 8.4.2.1 Place the CONTROL Locates and manually ROOM ISOI, TRAIN A operates the Control Room and B RESET switches to lsol Train A reset switch to RESET reset and the Train B reset switch to reset 5 8.4.2.2 Shut any EMER FILT Locates valves and verifies Valves SOUTH (NORTH) ALL outside air inlets are ICZ-9 SA OUTSIDE AIR INLET closed. ICZ-IO SB valves that are open, ICZ-I1 SA 1 CZ-9 SA and 1 CZ- 10 SB ICZ-12 SB or1CZ-11 SAand position 1CZ-12 SB. indication lights

__i Page 4 of S Rev Date 10:28/02

JPM-B. 1 .E HARRIS Retake JPM PROC

-~

ELEMENT STANDARD NOTES SAT f STEP STEP UNSA NA NOTE Performing steps 8.4.2.03 Reads note, reviews steps through 8.4.2.05 quickly will and locates associated minimize excessive control board switches prio pressurization of the Main to performance of steps to Control Room. allow minimal time to perform steps.

p_

  • 6 3.4.2.3 Open NORMAL INTAKES Locates and Opens Position ICZ-l SA and NORMAL INTAKES indication lights ICZ-2 SB. ICZ-1 SA and change from ICZ-2 SE green to red 7 1.4.2.4 [f more than one NORMAL Locates and STOPS Selected Supply SUPPLY FAN AH- 15 ASA NORMAL SUPPLY FAN fernrunning
ESR) is running, stop one (either AH- 15 ASA or indication light Fan and verify associated AH-15 ESB and verifies changes from ialvesfdampers align for the the associated red to green
topped train as follows
valves/dampers align for the stopped train AH- I5 IN CZ-DI (CZ-D2) AH- I5 IN CZ-DI (CZ-D2) SLB indication Shut SLB-5 (6) Shut light changes (indication) OR SL13-5(6) from red to green AH- 15 IN CZ-25 (CZ-26) AH-15 IN CZ-25 (CZ-26) SLR indication Shut SLB-5 (6) Shut Light changes (indication) on SLB-5 (6) from red to green CONT ROM NORMAE CONT ROM NORMAL Damper position RECIRC DAMPER RECIRC DAMPER indication light CZ-D69 SA (CZD70 SR) CZ-I169 SA (CZ-D70 SB) changes from Shut Shut red to green Page 5 of 8 Rev Date 10/28i02

IPM-B. I .c HARRIS Retake PM PROC ELEMENT STANDARD NOTES SAT I STEP STEP WNSA1 8 8.4.2.5 Start NORMAL EXHAUST Locates arid starts NORMAL Selected fan FAN E-9 A (B) and verify: EXHAUST FAN E-9 A indication OR (B) and verifies: light changes from green to red E-9A(B) IN CZ-D6 (CZ-D7) E-9A(B) IN CZ-D6 (CZ-D7) Indication Open (loc.ated on SLB-7) Open (located on SLB-7) light changes from green to red E-9A(B) OUT CZ-D12 (CZ-13) E-9A(W) OUT CZ-DI2 (CZ-13) both green Modulates (located on SLB-4) Modulates (located on SLB-7) and red lights are on NORMAL EXHAUST NORMAL EXHAUST Indication 1CZ-3 SA and ICZ-4 SE IC%-3 SA and 1CZ-4 SB light Open Open changas from green to red 9 1.4.2.6 Stop both EMEKGENCY Locates and stops both Indication FILTRATION FANS R-2 A- SMERGENCY FILTRATION light SA and K-2 B-SB and verify: ANS R-2 A-SA and K-2 B-SB changes ind verities: from red to green R2 INLET CZ-23 ((2524) 12 ISLE? CZ-23 (CZ-24) Indication Shut [located on SLR-5 (611 Shut [located on SLB-5 (6)J light changes from red to green K2 DISCH CZ-21 (CZ-22) t2 DISCH CZ-21 (CZ-22) Indication Shut [Located on SLE-5 (6)] Shut [located on SLB-5 (6)] light shanges From red

- :o green Page 6 of 8 Rev Date 10/28/02

IPM-5.1 .C HARRIS Retake

-PROC ELEMENT STANDARD NOTES STEP 8.4.2.7 Shut the EMERGENCY Locates the cone01 switches FILTRATION RECIKC dampers and shuts the EMERGENCY FILTRAFIOX RECIRC dampers C%-D66 SA CZ-D66 SA Indication light changes from and and red to green CZD61 SB Z D 6 1 SB Indication light changes from red to green

%hWTPIER OPERATOR WILL CO1MPLETE THE REMAINING VENTILATION ZEESTORATION rASK COMPLETE STOP TIME:

Page 7 of 8 Rev Date 10!28/02

IPM-B.1 .c HARRIS Retake CANDIDATE CUE SHEET (TO BE RETLXmD TO EXAMN3.R UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The plant was operating at 100% power when an inadvertent Safety injection signal was received. The operators have performed the actions of Path-] and transitioned to EPP-008. The crew is now at the point of realigning plant systems for normal operation per Attachment I. The SCO has directed you to perform Step 8 of Attachment 1 Realign Control Room Area HVAC using OP-173, CONTROL ROOM AREA HVAC SYSTEM, Section 8.4. The initial conditions are satisfied and the HVAC system is in operation per section 8.1 of OP-173.

INITIATING CUE(S):

You are the Balance of Plant Operator. Restore the Control Room Area HVAC System to normal in accordance with OP-193 CONTROL ROOM AREA HVAC SYSTEM, Section 8.4.

Page 8 of 8 Rev Date 10/28/02

JPM-B.2.a HARRIS Retake REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEAS ENERGIZE A DEAD BUS WITH A DIESEL LOCALLY CANDIDATE:

EXAMNEW:

Page 1 of 7 Rev Date 10R8/02

JPM-B.2.a HAURlS Retake REGION I1 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE TASK: Load a Diesel Generator Locally per OP-155 ALTERNATE PATH: NO FACILITY JPM NUMBER: IP-135 KA: 062A2.05 IMPORTANCE: SRO 3.3 RO 2.9 KA STATEMENT: Ability io (a) predict the impacts of the following malfunctions or operations on the AC Distribution System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Methods for energizing a dead bus TASK STANDARD: Emergency Diesel Generator Output Breaker 126 is CLOSED.

PRJiTERRED EVALUATION LOCATION: SIMklLATOR

- INPLANT - X PREFERRED EVALUATION METHOD: PERFORM - SIMULATE X -

KEFEIRENCES: OP-155 VALIDATION TIME: - 10 MINUTES TIME CRITICAL: No CANDIDATE:

START TIME: FINISH TIME:

PERFORMANCE TIME: MTI\UTES PERFORMANCE RATING: SAT UNSAT COMMENTS:

EXAMINER:

Signature Date fage 2 of 7 Rev Date 10!28i0?

JPM-B.2.a HARRIS Rehke TOOLS / EQIJIPMENT / PROCEDURES NEEDED:

e None OP-155, Section 8.13 READ TO OPERATOR INSTRUCTIONS TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. A11 control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed or asked by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task, return the handout sheet I provide you.

INHTHAE CONDITIONS:

Due to a fire, the Main Control Room has been evacuated and AOP-004 is being implemented. During the transfer to the ACP, the normal power feed to 6.9KV bus 1B-SB was lost. EDG lBSR has been locally started per OP-IS5 Section 8.14 but has not been loaded.

INITIATING CUE@):

The SCO instructs you to locally energize 6.9KV bus 1B-SB from the Emergency Diesel Generator per OP-155 Section 8.13.

Page 3 O f 7 Rev Date 10!28!02

JPM-B.2.a HARRIS Retake

  • DENOTES CRITICAL STEP JPM PROC ELEMENT STANDARD NOTES SAT 1 STEP STEP UNSAl CUE PROVIDE CANDIDATE WITH COPY O F OP-155,Section 8.13 and Attachment 9 1

01'-155, Section 8.13 g _ _

>rovidewhen aF the Generator Control Panel:

2UE kLL Initial Conditions are wet.

nitial conditions:

1. EDG 1B-SB is running
2. At GCP, UNIT-PARALLEL switch in PARALLEL
3. At GCP, VOLTAGE REGULATOR TRANSFER SWITCH in AUTO
4. At GCP, CONTROL TRANSFER SELECTOR SWITCH in LOCAL 2 8.13.2.1 At GCP, Position Locates synchronizing switch #2 in SYNCHRONIZING ON SWITCH #2 and takes it to ON.

WE iynchronizing Switch #2 is pointing to ON.

I 3 NOTE e 'The Synch Check Reviews note and Relay will be continues with the bypassed on an procedure undervoltage on the safety bus e When EDG output breaker is closed, the sequencer will place loads onto the EDG and the maximum load will be that of the

-- safctv bus.

Page 4 of 7 Rev Date 10/28!02

JPM-5.2.a HARRIS Retake rrpee JPM STEP 4

indicates closed.

3UE Green light is oat, amber light is out, and red light is lit.

6 CAUTION Do not exceed engine Reviews Attachment 9.

and generator limitations Checks local indications listed in Attachment 9 for Watts and VARS and verifies EDG operation is in the acceptable operation region of Attachment 9.

Examiner note: When EDG Output Breaker 126-SB closes the sequencer will load equipment onto the DUS over the next 45 seconds. The readings below are the bus load AFTER ail loads have sequenced sn.

Located on the upper right portion of the Generator Control Panel are 5 meten.

From left to sight - AC Volts, Megawatts, MegaVars, Freqaency, AC Ammeter. The MegaWatts and MegaVar meters are checked for Attachment 9 eapaeity curve.)

XJE Meter readissgs -

6800 AC Volts 4 MW 2WARS 60 Hz 370 Amps These reudings u m within /in& of.4Ftrochment 9)

IF asked about the two Generator meters on the middle o f t h e panel)

enerator Field Amps = I80 Amps Field DC Voltage = 60 volts Page 5 o f 1 Rev Date 10!28/02

JPM-H.2.a H.4RRIS Retake PROC ELEMEN1 STANDARD STEP 8.13.2.4 Position EDG Takes the EDG SYNCHRONIZING SYXCIIRONIZING SWITCH #2 in OFF SWITCH # 2 to the OFF position.

I Synchronizing Switch #2 is pointing to OFF CAUTION To prevent EDG Reviews caution and NOTE: Candidate damage, service water continues with the may contact ACP should be supplied as procedure operator to verify soon as possible that service water following emergency flow has been bus reenergization. estabiished.

(If so read CUE after step IO) 8.13.2.5 Monitor EDG Locates Temperature temperatures Selector switch on the Engine Control Panel and monitors the temperatures.

Diesel temperatures are normal for the engine load.

8.13.2.6 Verify service water is sirpplicd to EDG to verify service water established.

4CP operator reports that Service Water flow has been established. TASK COMPLETE STOP TIME:

Page 6 of 7 Rev Date 10128102

I JPM-B.2.a HARRIS Retake I

CANDIDATE CUE SHEET (TO BE RIETFURNED TO EXAIVINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Due to a fire, the Main Control Room has been evacuated and AOP-004 is bring implemented. During the transfer to the ACP, the normal power feed to 6.9KV bus 1B-SB was lost. EDG lBSB has been locally started per OP-I55 Section 8.14 but has not been loaded.

INITIATPJG CUE@):

The SCO instructs you to locally energize 6.9KV bus 1B-SB from the Emergency Diesel Generator per OP-155 Section 8.13.

Page 9 of 7 Rev Date 10/28/02