Jan. 28, 2004 Page 1
of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2004-4485 TI cZR TN R
TON GER H
OSE M EMPL#:28401 CA#: 0363 Address NUCSA2 Phon
- 2 3194 TRANSMITTAL INFORMATION:
TO:
E
-A b
01/28/2004 LOCATION: UUSNRCA FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
\\Y-HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/23/2004 ADD MANUAL TABLE OF CONTENTS DATE: 01/27/2004 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT 3.11.2.1 REMOVE:
REV:0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT 3.11.2.6 REMOVE:
REV:0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT B3.11.2.6 REMOVE:
REV:0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT LOES REMOVE:
REV:4 DD:
REV: 5 CATEGORY: DOCUMENTS TYPE: TRM2 oc)
Jan. 28, 2004 Page 2
ID:
TEXT TOC REMOVE:
REV:1 ADD:
REV: 2 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Tile Effective Date TOC TABLE OF CONTENTS 01/21/04 I
1.0 USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 3.1 3.2 3.3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 through TRM /2.0-4 Page TRM /2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9 Pages TRM / 2.0-10 and TRM /2.0-11 Page TRM / 2.0-12 Page TRM / 2.0-13 APPLICABILITY (2i Pages TRM / 3.0-1 and TRMI 30-2 J Page TRM / 3.0-3
/
Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 thjo6gh3 -16 Pages TRM / 3.A-7,andTRM /3.1-8 Pages TRM73.1-9 and TRM / 3.1-9a PageTRM).3.1:.0-7 CORE LIMITS REPORT Daon 2 1D 08/31/1998 10104/2002 08/31/1998 08/31/1998 06/25/2002 04/12/1999 10/22/2003 10/22/2003 08/30/2001 09/06/2002 04/12/1999 10/22/2003 06/16/2000 04/08/1999 03/15/2002 04/08/1999 08/31/1998 06/05/2002 02/18/1999 02/18/1999 08/31/1998 11/01/2003
/ 3.2-2 through TRM 3.2-37 STRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 Pages 3.3-5 through 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Pages TRM / 3.3-10 and TRM / 3.3-11 Page TRM / 3.3-12 Pages TRM / 3.3-13 and TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Pages TRM / 3:3-17 and TRM / 3.3-18 07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 03/30/2001 12/14/1998 10/22/2003 06/27/2001 06/14/2002 SUSQUEI-IANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 01/21/2004 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 01/21/2004
I SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.3-19 and TRM / 3.3-20 Page 3.3-21 Pages TRM / 3.3-22 through TRM / 3.3-24 Page TRM / 3.3-25 10/22/2003 08/31/1998 05/16/2003 10/22/2003 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 10/23/1998 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7
. 08/31/1998 04/17/2000 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 through TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 through TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Pages TRM / 3.7-34 through TRM / 3.7-36 Pages 3.7-37 through 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Pages 3.7-43 through 3.7-47 Page TRM / 3.7-48 Pages TRM / 3.7-49 and TRM / 3.7-50 Pages TRM / 3.7-51 and TRM / 3.7-52 Page TRM / 3.7-53 07/29/1999 08/31/1998 08/02/1999 01/21/2000 08/02/1999 11/16/2001 01/09/2004 10/05/2002 02/01/1999 08/31/1998 08/11/2000 08/31/1998 10/13/1998 03/08/2003 03/09/2001 04/15/2003 07/29/1999 3.8 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Page 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-8 Page TRM / 3.8-9 04/02/2002 08/31/1998 12/31/2002 04/02/2002 08/31/1998 08/24/2001 SUSQUEHANNA-UNIT 2 TRM / LOES-2 EFFECTIVE DATE 01/21/2004 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-11a Pages 3.8-12 through 3.8-14 Pages TRM /3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 04/02/2002 04/02/2002 08/31/1998 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 08/31/1998 3.9 3.10 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 08/30/1998 03/08/2003 06/05/2002 04/07/2000 Corrected 04/17/2002 Page TRM / 3.10-8 3.11 3.12 4.0 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 and 3.11-18 Page TRM / 3.11-19 Pages 3.11-20 and 3.11-21 Pages TRM /3.11-22 through TRM / 3.11-24 Page 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-32 Pages 3.11-33 through 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 09/01/1998 08/31/1998 01/21/2004 08/31/1998 04/02/2002 09/01/1998 01/21/2004 08/31/1998 02/05/1999 08/31/1998 1-1 SUSQUEHANNA - UNfl 2 TRM / LOES-3 EFFECTIVE DATE 01/21/2004 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM / B 3.0-15 08/31/1998 03/15/2002 B3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 07/13/1999 08/31/1998 07/13/1999 02/18/1999 B3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM/B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9 Pages B 3.3-10 through B 3.3-12 Page TRM / B3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Page TRM / B 3.3-15 Page TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B3.3-22 Page TRM / B3.3-23 04/07/2000 08/31/1998 12/29/2000 03/21/2003 03/30/2001 08/31/1998 10/22/2003 06/25/2002 06/14/2002 06/14/2002 10/22/2003 10/22/2003 10/22/2003 05/16/2003 10/22/2003 05/16/2003 B3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 08/31/1998 10/15/1999 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Pages TRM / B 3.6-6 through TRM / B 3.6-11 07/26/2001 02/01/1999 08/31/1998 09/23/1999 01/07/2002 12/31/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 through TRM I B 3.7-7 Page TRM / B 3.7-7a Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM / B 3.7-1 Oa Pages TRM / B 3.7-11 through TRM / B 3.7-14 Page TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM I B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 through TRM/B 3.7-21a Pages TRM/B 3.7-22 and TRM/B 3.7-23 Pages B 3.7-24 through B 3.7-30 Pages TRM / B 3.7-31 and TRM I B 3.7-32 Page TRM / B 3.7-33 Pages TRM / B 3.7-34 and TRM / B 3.7-35 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-17 08/3111998 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 01/09/2004
.02/01/1999 08/31/1998 05/11/2001 04/07/2000 08/31/1998 03/09/2001 04/15/2003 07/05/2000 B 3.8 B.3.9 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 04/02/2002 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 08/31/1998 10/23/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM I B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 08/31/1998 03/08/2003 08/23/1999 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Pages TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM/B 3.1 1-14 Page TRM B 3.11-15 08/31/1998 02/01/1999 04/07/2000 02/01/1999 11/01/1999 02/01/1999 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 01121/2004 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 5 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM I B 3.11-20a Page TRM / B 3.11-21 Page TRM / B 3.11-22 Page TRM / B 3.11.23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 Effective Date 08/31/1998 04/02/2002 04/02/2002 04/02/2002 09/26/2003 04/02/2002 04/02/2002 01/21/2004 08/31/1998 02/12/1999 I
02/05/1999 AdepVTRM2 text LOES.doc 115104 SUSQUEHANNA - UNFr 2 TRM / LOES-6 EFFECTIVE DATE 01/21/2004 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 2 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)-
SECTION TITLE PAGE 1.0 USE AND APPLICATION..................................
1.0-1 1.1 Definitions.........................................................................................TRM/1.0-2 2.0 PLANT PROGRAMS..................................
2.0-1 2.1 Plant Programs.........................................................................................2.-1 2.2 Instrument Trip Setpoint Table...................................
TRM/2.0-5 3.0 APPLICABILITY...................................
TRI3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability................................. TRM/3.0-1 3;0 (TRS) - TR Surveillance (TRS) Applicability................................. :.TRM3.0-3 3.1 REACTIVITY CONTROL SYSTEMS................................
3.1-1 3.1.1 Alternate Rod Injection................................
3.1-1 3.1.2 CRD Housing Support.................................
3.1-4 3.1.3 Control Rod Block Instrumentation................................
3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve....................................
TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT...................................
3.2-1 3.2.1 Core Operating Limits Report...................................
3.2-1 3.3 INSTRUMENTATION...................................
TRM/3.3-1.
3.3.1 Radiation Monitoring Instrumentation...............................................TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation...................................
TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation................................
3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation............................... TRM/3.3-9 3.3.5 Section Not Used.................................
TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation..
TRM/3.3-13 3.3.7 Turbine Overspeed Protection System.
.............................. TRM/3.3-17 3.3.8 Section Not Used...............................
TRM/3.3-19 3.3.9 LPRM Upscale Alarm Instrumentation..............................
3.3-21 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops..........................................
TRM/3.3-22 3.3.11 MVP Isolation Instrumentation.........................................
TRM/3.3-24 3.4 REACTOR COOLANT SYSTEM.........................................
3.4-1 3.4.1 Reactor Coolant System Chemistry..........................................
3.4-1 3.4.2 Structural Integrity...........................................
3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors.......................................4 3-9 3A.4 Reactor Recirculation Flow and Rod Line Limit....................................... 3.4-12 3.4.5 Reactor Vessel Material Surveillances Program...................................... 3.4-13 3.5 EMERGENCY CORE COOLING AND RCIC.........................................
3.5-1 3.5.1 ADS Manual Inhibit.........................................
3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation.............................. 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS..........................................
3.5-6 SUSQUEHANNA -UNIT 2 TRM / TOC-1 EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 2 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.6 CONTAJNMENT.....................................
3.6-1 3.6.1 VENTING or PURGING.....................................
3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication.....................................
3.6-3 3.6.3 Suppression Pool Alarm Instrumentation.....................................
3.6-4 3.6.4 Primary Containment Closed System Boundaries.......................... TRM/3.6-7 3.7 PLANT SYSTEMS......................................
TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown)............................. TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level.....................................
3.7-3 3.7.3.1 Fire Suppression Water Supply System....................................... TRMI3.7-4 3.7.3.2 Spray and Sprinkler Systems......................................
TRM/3.7-8 3.7.3.3 C02 systems.....................................
TRM/3.7-12 3.7.3.4 Halon Systems.....................................
TRM/3.7-16 3.7.3.5 Fire Hose Stations.....................................
TRM/3.7-1.
3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................... TRM/3.7-22 3.7.3.7 Fire Rated Assemblies................................
TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation...............................
TRM/3.7-26 3.7.4 Solid Radwaste System................................
TRM/3.7-35 3.7.5.1 Main Condenser Offgas Hydrogen Monitor...............................................3.7-38 3.7.5.2 Main Condenser Explosive Gas Mixture
................................ 3.7-39 3.7.5.3 Uquid Holdup Tanks...............................
TRM/3.7-40 3.7.6 ESSW Pumphouse Ventilation.................................
3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation..................................
3.742 3.7.8 Snubbers..................................
3.7-44 3.7.9 Control Structure HVAC..................................
TRM/3.7-50 3.7.10 Spent Fuel Storage Pools (SFSPs)..................................
TRM/3.7-51 3.8 ELECTRICAL POWER...................................
TRN.3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.....
TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
Continuous.....
TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
Automatic........................................
TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintanence Activities..................................
3.8-13 3.8.4 24VDC Electrical Power Subsystem..................................
TRM/3.8-15 3.8.5 Degraded Voltage Protection..................................
TRM3.8-21 3.8.6 Emergency Switchgear Room Cooling..................................
3.8-24 3.9 REFUELING OPERATIONS..................................
3.9-1 3.9.1 Decay Time..................................
3.9-1 3.9.2 Communications..................................
3.9-2
'3.9.3 Refueling Platform..................................
3.9-3 SUSQUEHANNA-UNIT2 TRM / TOC-2 EFFECTIVE DATE 01/21/2004
-~ ~ ~ ~ ~ ~ - -
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)-
PPL Rev. 2 SECTION 3.10 3.10.1 3.10.2 3.10.3 3.10.4 3.11 3.11.1 3.11.1.1 3:11.1.2 3.11.1.3 3.11.1.4 3.11.1.5 3.11.2 3.11.2.1 3.11.2.2 3.11.2.3 3.11.2.4 3.11.2.5 3.11.2.6 3.11.3 3.11.4 3.11.4.1 3.11.4.2 3.11.4.3 3.12 3.12.1 3.12.2 3.12.3 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 TITLE PAGE MISCELLANEOUS.........................................
3.10-1 Sealed Source Contamination........................................
3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation............................. 3.104 Independent Spent Fuel Storage Installation (ISFSI)....................... TRM/3.10-7 Leading Edge Flow Meter (LEFM)........................................
TRM/3.10-8 RADIOACTIVE EFFLUENTS........................................
3.11-11 Liquid Effluents........................................
3.11-1 Liquid Effluents Concentration........................................
3.11-1 Liquid Efflu ents Dose.........................................
3.114 Liquid Waste Treatment System........................................
3.11-6 Liquid Radwaste Effluent Monitoring Instrumentation............................... 3.11-8 Radioactive Liquid Process Monitoring Instrumentation........................... 3.11-13 Gaseous Effluents.............
3.11-17 Dose Rate............
3.11-17 Dose - Noble Gases............
3.11-20 Dose - odine, Tritium, and Radionuclides in Particulate Form...........
3.11-21 Gaseous Radwaste Treatment System............................
TRM/3.11-22 Ventilation Exhaust Treatment System...........................
TRM/3.11-23 Radioactive Gaseous Effluent Monitoring Instrumentation...........................
3.11-26 Total Dose...........................
3.11-33 Radiological Environmental Monitoring...........................
3.11-35 Monitoring Program.
3.11-35 Land Use Census.
3.1145 Interlaboratory Comparison Program
.3.11-47 LOADS CONTROL PROGRAM.............................
TRM/3.12-1 Crane Travel - Spent Fuel Storage Pool.............................
TRMI3.12-1 Heavy Loads Requirements.............................
TRM/3.12.3 Light Loads Requirements.............................
TRM/3.12-5 ADMINISTRATIVE CONTROLS.............................
4.0-1 Organization.....................
1........
.0-1 Reportable Event Action.............................
4.0-2 Safety Limit Violation.............................
4.0-3 Procedures and Programs.............................
4.0-4 Reporting Requirements.............................
4.0-5 Radiation Protection Program.............................
4.0-7 Training.............................
4.0-8 SUSQUEHANNA-UNIT2 TRM I TOC-3 EFFECTIVE DATE 01/2112004 SUSQUEHANNA - UNIT 2 TRM I TOC-3 EFFECTIVE DATE 01121/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 2 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability................................
B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability.................................
B 3.0-9 B 3.1.1 Alternate Rod Injection.................................
TRM/B 3.1-1 B 3.1.2 CRD Housing Support.................................
B 3.1-4 B 3.1.3 Control Rod Block Instrumentation................................
TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve................................
TRM/B 3.1-8 B-3.2.1 Core Operating Limits Report (COLR)................................
B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation..................;
...... TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation.........................
B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation.........................
TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation.........................
TRM/B 3.3-4 B 3.3.5 Section Not Used.........................
TRM/B 3.3-7 B 3.3.6 TRM Containment Isolation Instrumentation.........................
B 3.3-10 B 3.3.7 Turbine Overspeed Protection System.........................
TRM/B 3.3-14.
B 3.3.8 Section Not Used.........................
TRM/B 3.3-15 B 3.3.9 LPRM Upscale Alarm Instrumentation.........................
B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops......................................
TRMB 3.3-20 B 3.3.11 MVP Isolation Instrumentation....................................
TRMlB 3.3-22 B 3.4.1 Reactor Coolant System Chemistry....................................
B 3.4-1 B 3.4.2 Structural Integrity.....................................
B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors.................................... B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit............................. TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program.................................... B 3.4-6 B 3.5.1 ADS Manual Inhibit....................................
B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation.............................. B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS....................................
B 3.5-4 B 3.6.1 VENTING or PURGING....................................
TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication.B 3.6-3 B 3.6.3 Suppression Pool Alarm Instrumentation
.B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries.TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)
.B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level
.B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System.TRMB 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems./
TRM 3.7-5 B 3.7.3.3 C02 systems.TRM/B 3.7-7 B 3.7.3.4 Halon Systems.TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations.TRMB 3.7-10 SUSQUEHANNA-UNI`172 TRM / TOC-4 EFFECTIVE DATE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)-
PPL Rev. 2 SECTION B 3.7.3.6 B 3.7.3.7 B 3.7.3.8 B 3.7.4 B 3.7.5.1 B 3.7.5.2 B 3.7.5.3 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 TITLE PAGE Yard Fire Hydrants and Hydrant Hose Houses............................... TRM/B 3.7-11 Fire Rated Assemblies..........................................
TRM/B 3.7-12 Fire Detection Instrumentation..........................................
TRM/B 3.7-14 Solid Radwaste System..........................................
TRM/B 3.7-15 Main Condenser Offgas Hydrogen Monitor..........................................
B 3.7-17 Main Condenser Explosive Gas Mixture..........................................
B 3.7-19 Liquid Holdup Tanks..........................................
B 3.7-20 ESSW Pumphouse Ventilation..........................................
TRMJB 3.7-21 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation..........................................
TRMIB 3.7-22 Snubbers..........................................
B 3.7-24 Control Structure HVAC..........................................
TRM/B 3.7-31 Spent Fuel Storage Pools..........................................
TRMIB 3.7-33 B 3.8.1.
B 3.8.2.1 B 3.8.2.2 B 3.8.3 B 3.8.4 B 3.8.5 B 3.8.6 B.3.9.1 B 3.9.2 B 3.9.3 Primary Containment Penetration Conductor Overcurrent Protective Devices.............
Motor Operated Valves Thermal Overload Protection -
Continuous......................................................................................
Motor Operated Valves Thermal Overload Protection -
Automatic........................................................................................
TRMJB 3.8:1 TRM/B 3.8-3 TRM/B 3.8-4
- Diesel Generator (DG) Maintanence Activities............................... TRMIB 3.8-5 24VDC Electrical Power Subsystem...............................
TRM/B 3.8-6 Degraded Voltage Protection...............................
TRMIB 3.8-16 Emergency Switchgear Room Cooling...............................
TRMIB 3.8-17 Decay Time...........
Communications...
Refueling Platform.
I................................................................................... - -
B 3.9-2 B3 3.9-3 B 3.10.1 Sealed Source Contamination.........
B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation.........
B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)..........
TRM/B 3.10-4.
B 3.10.4 Leading Edge Flow Meter (LEFM).........
TRM/B3 3.10-6 B 3.11.1.1 Liquid Effluents Concentration.........
B 3.11 -1 B 3.11.1.2 Uquid Effluents Dose.........
B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System.........
B 3.11-6 B 3.11.1 A Uquid Radwaste Effluent Monitoring Instrumentation.........
B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation.........
TRM/B 3.11 -10 B 3.11.2.1 Dose Rate.........
TRMIB 3.11-12 B 3.11.2.2 Dose - Noble Gases.........
B 3.11-16 B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form.........
B 3.11 -18 B 3.11.2.4 Gaseous Radwaste Treatment System.........
TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System TRM/B 3.11-21 SUSQUEHANNA - UNIT 2 TRM I TO C-S EFFECTIVE DATE 91/21/2004 SUSQUEHANNA - UNIT 2 TRM / TOC-5 EFFECTIVE DXTE 01/21/2004
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 2 SECTION B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B 3.12 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Radioactive Gaseous Effluent Monitoring Instrumentation............................
TRM/B 3.11-24 Total Dose............................
B 3.11-26 Monitoring Program.............................
B 3.11-28 Land Use Census............
B 3.11-34 Interlaboratory Comparison Program............................
TRM/B 3.11-36 LOADS CONTROL PROGRAM...........................
TRMIB 3.12-1 Crane Travel - Spent Fuel Storage Pool.
............................ TRMIB 3.12-1 Heavy Loads Requirements...........................
TRMIB 3.12-2 Light Loads Requirements..................
TRMB 3.12-3 Adept TRM2 Text TOC SUSQUEHAINNA -UNIT 2 TRM TOC-6 EFFECTIVE DATE 01/21/2004
Dose Rate 3.11.2.1 PPL Rev. 1 3.11 Radioactive Effluents-3.11.2 Gaseous Effluents 3.11.2.1 Dose Rate TRO 3.11.2.1 The dose rate due to radioactive materials released in gaseous effluents to areas at and beyond the SITE BOUNDARY (See FSAR Section 2.1.1.3) shall be limited to the following:
I.
For Noble Gases:
A Less than or equal to 500 mrems/yr to the total body, and B.
Less than or equal to 3000 mrems/yr to the skin
- AND II.
For iodine-131, iodine-1 33, tritium, and all radionuclides in particulate form with half lives greater than 8 days A
Less than or equal to 1500 mrem/yr to any organ (Inhalation pathways only.)
APPLICABILITY At all times.
ACTIONS CONDITION J REQUIRED ACTION tCOMPLETION TIME A
Dose rate(s) exceed the A.1 Restore the release rate to Immediately above limits within the above limits SUSQUEHANNA - UNIT 2 3.1 1-17 EFFECTIVE DATE 08/31/1998
PPL Rev. 1 Dose Rate 3.11.2.1 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.11.2.1.1 Determine the dose rate due to noble gases in See ODCM gaseous effluents.
TRS 3.11.2.1.2 The dose rate due to iodine-131, iodine-133, See Table tritium, and all radionuclides in particulate form 3.11.2.1-1 with half-lives greater than 8 days in gaseous effluents shall be determined to be within the limits in accordance with the methodology and parameters of the ODCM by obtaining representative samples and performing analyses in accordance with the sampling and analysis program specified in Table 3.11.2.1-1 SUSQUEHANNA - UNIT 2 3.11-18 EFFECTIVE DATE 08/31/1998
Dose Rate 3.11.2.1 PPL Rev. 1 TABLE 3.11.2.1-1 RADIOACTIVE GASEOUS EFFLUENT SAMPLING AND ANALYSIS Sampling Minimum Analysis Type of Activity Lower Limit of Gaseous Release Type Methlodand Frequency Analysis Detection (LLD)
Frequency lc/)
A, Containment Purge Prior to each purge Prior to each Principal Noble I E-4 Grab Sample purge Gas Gamma Emitters H-3 I E-6 B.
Reactor Building 31 days) 31 daya)
Principal Noble 1E-4 Vents, Turbine Grab Sample Gas Gamma Emitters Building Vents, and SGTS H-3 1 E-6 Continuous°b Iodine 7days()
1-131 1E-12 Cartridge Sample 1-133 1E-10 Continuous° 7 days "
Principal 1 E-11 Particulate sample Particulate Gamma Emitters 1-131 Continuous°b 92 days Gross Alpha 1 E-11 Composited Particulate Sample Continuous°
(
92 days Sr-89. Sr-90 I E-11 Composite(d)
Particulate sample Continuous°b Noble Gas Noble Gases, Gross 1 E-6 Monitor Beta or Gamma (Xe-133 equivalent)
(a)
Noble gas analyses, shall be performed following shutdown, startup, or a THERMAL POWER change exceeding 15% of the RATED THERMAL POWER within a 1-hour period.
(b)
The ratio of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with TROs 3.11.2.1, 3.11.2.2. and 3.11.2.3.
(c)
Samples shall be changed at least once per 7 days and analyses shall be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after changing, or after removal from sampler. Sampling shall also be performed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for at least 7 days following each shutdown, startup, or THERMAL POWER change exceeding 15% of RATED THERMAL POWER in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and analyses, completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of changing. When samples collected for 5 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are analyzed, the corresponding LLDs may be increased by a factor of 10.
(d)
Minimum frequency for initiation of required analysis.
I SUSQUEHANNA - UNIT 2 TRM / 3.11-19 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 1 3.11 Radioactive Effluents 3.11.2 Gaseous Effluents 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.
APPLICABILITY According to Table 3.11.2.6-1 ACTIONS NOTE-
- 1. Separate condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME
- A Radioactive gaseous A.1 Suspend the release of Immediately effluent monitoring radioactive gaseous effluents instrumentation channel monitored by the affected alarm/trip setpoint less channel conservative than required to ensure that OR the limits of Requirement A2 Declare the channel Immediately 3.11.2.1 are not inoperable exceeded (continued)
SUSQUEHANNA - UNIT 2 3.11-25 EFFECTIVE DATE 9/01/1998
Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 1 3.11.2.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Reactor Building B.1 Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Ventilation System Noble while release is in Gas Activity Monitor low progress.
range channel inoperable AND B.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the grab sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)
AND B.3 Restore monitoring 30 days instrumentation.
C. Deleted D. Reactor Building Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Ventilation Monitoring D.1 Estimate flow rate.
while release is in System Effluent System progress Flow Rate Monitor or AND Sampler Flow Rate Monitor inoperable D.2 Restore monitoring 30 days instrumentation.
(continued)
I SUSQUEHANNA - UNIT 2 TRM 3.1 1-26 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. Turbine Building Ventilation E.1 Verify mechanical vacuum Immediately System Noble Gas Activity pump is not in operation.
Monitor low range channel AND inoperable E.2 Take grab samples.
Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AND while release is in progress E.3 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after isotopic activity to the sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1).
AND E.4 Restore monitoring 30 days instrumentation F. Deleted G. Turbine Building Ventilation G.1 Estimate flow rate.
Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Monitoring System Effluent while release is in System Flow Rate Monitor progress.
or Sampler Flow Rate AND Monitor inoperable G.2 Restore monitoring 30 days instrumentation (continued)
SUSQUEHANNA - UNIT 2 TRM / 3.11-27 EFFECTIVE DATE 01121/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION IME H. Standby Gas Treatment H.1 Take grab samples.
Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> System Noble Gas Activity.
AND while release is in Monitor low range channel progress.
inoperable H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the required grab sample being LLDs for principal noble gas taken.
gamma emitters (Table 3.11.2.1-1).
AND H.3 Restore monitoring 30 days instrumentation.
I.
Deleted J.
SGTS Ventilation J.1 Estimate flow rate.
Once per4 hours Monitoring System Effluent while release is in flow rate monitor or sample progress.
flow rate monitor AND Inoperable.
J.2 Restore monitoring 30 days Instrumentation.
(continued) 1 I
SUSQUEHANNA - UNIT 2 TRM 3.1 1-28 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 0
3.11.2.6 PPL Rev. I 2*
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME K. Required Actions and K.1 Explain why this inoperability In the next Annual Completion Times not was not corrected in a timely Radioactive Effluents met for Conditions B manner.
Release Report per through J.
TECHNICAL REQUIREMENT SURVEILLANCE NOTE Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.
SURVEILLANCE FREQUENCY TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months I
I
/S SUSQUEHANNA - UNIT 2 TRM / 3.1 1 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 0
3.11.2.6 PPL Rev. 1
.,)M..
TABLE 3.11.2.6-1 (Page 1 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS REACTOR BUILDING VENTILATION MONITORING SYSTEM
- a.
Noble Gas Activity Monitor At all Times 1
TRS 3.11.2.6.1 (Low Range)
TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- b.
Deleted C.
Deleted d
Effluent System Flow Rate Monitor At all Times 1
TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- e.
Sampler Flow Rate Monitor At all Times 1
TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
SUSQUEHANNA - UNIT 2 TRM / 3.1 1-30 EFFECTIVE DATE 01/2112004
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 1 TABLE 3.11.2.6-1 (Page 2 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 2.
TURBINE BUILDING VENTILATION MONITORING SYSTEM
- a.
Noble Gas Activity Monitor At all Times 1
TRS 3.11.2.6.1 (Low Range)
TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- b.
Deleted
- c.
Deleted
- d.
Effluent System Flow Rate Monitor At all Times 1
TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- e.
Sanpler Flow Rate Monitor At all Times 1
TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
I
.j SUSQUEHANNA - UNIT 2 TRM 3.1 1-31 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 PPL Rev. 1 TABLE 3.11.2.6-1 (Page 3 of 3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 3.
STANDBY GAS TREATMENT SYSTEM (SGTS) MONITOR
- a.
Noble Gas Activity Monitor During I
TRS 3.11.2.6.1 (Low Range) operation of
.TRS 3.11.2.6.3 SGTSfa)
- b.
Deleted
- c.
Deleted
- d.
Effluent System Flow Rate Monitor During 1
TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS(a)
TRS 3.11.2.6.5
- e.
Sampler Flow Rate Monitor During 1
TRS 3.11.2.6.1 operation of TRS 3.11.2.6.4 SGTS"a TRS 3.11.2.6.5 I
I j
i (a)
The provisions of TRO 3.0.4 are not applicable.
SUSQUEHANNA - UNIT 2 TRM 1 3.1 1-32 EFFECTIVE DATE 01/2112004
Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 1 B 3.11.2.6 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation BASES TRO The radioactive gaseous effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents. The alarm/trip setpoints for these instruments shall be calculated in accordance with the procedures in the ODCM (Reference 2) to ensure that the alarm/trip will occur prior to exceeding the release rate limits corresponding to dose rates above background to a member of the public at or beyond the site boundary to < 500 mrem/yr to the total body or to *3000 mremlyr to the skin. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 10 CFR Part 50. (References 3 and 4)
OPERABILITY requires their alarm/trip setpoints set to ensure that the limits of Requirement 3.11.2.1 are not exceeded. The alarm/trip setpoints of these channels shall be determined in accordance with the methodology and parameters in the ODCM.
This section of the TRM is also part of the ODCM (Reference 2).
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
Low range Noble Gas channel readings from the local vent monitor may be used to meet the requirement for a Noble Gas grab sample and grab sample analysis.
Noble Gas release grab samples are not required to be taken when there are no releases via that pathway. Effluent flow is to be determined by vent flow instrumentation or by a vent flow estimate every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Continuous sample collection shall be on the same basis as described in the Bases for TRO 3.11.2.1 Monitoring may be nterrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.
(continued)
)
SUSQUEHANNA - UNIT 2 TRM / B 3.11-24 EFFECTIVE DATE 01/21/2004
Radioactive Gaseous Effluent Monitoring Instrumentation PPL Rev. 1 B 3.11.2.6
).
B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation BASES (continued)
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the monitoring instrumentation is maintained OPERABLE.
The TRSs shall be performed in accordance with the Technical Specification definition for the test with the following additional requirements:
The CHANNEL FUNCTIONAL TEST for all noble gas activity monitors shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:
- 1. Instrument indicates measured levels above the alarm/trip setpoint,
- 2. Circuit failure, and
- 3. Instrument indicates a downscale failure.
The initial CHANNEL CALIBRATION for all noble gas activity monitors shall be performed using one or more of the reference standards certified by the National Institute of Standards and Technology (NIST) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NIST. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration may be used in lieu of reference standards associated with the initial calibration.
Particulate or iodine sampling required to be in continuous service will be considered to remain and have been in continuous service when its service is interrupted for a period of time not to exceed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per sampling period.
For particulate and iodine sampling, this is a small fraction of the normal minimum analysis frequency.
REFERENCES
- 1. Technical Specification 5.5.4 - Radioactive Effluent Controls program.
- 3. 10 CFR Part 20.
- 4. 10 CFR Part 50.
I SUSQUEHANNA - UNIT 2 TRM B 3.11-25 EFFECTIVE DATE 01/21/2004