Jan. 13, 2004 Page 1

of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2004-1903 USER INFORMATION-UGe H*ROS EMPL#:28401 CA#: 0363 Address A2 Pho 254-3 TRANSMITTAL INFORMATION:

TO:

w"gp 01/13/2004 LOCATION: rUSNRC.

FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER

'NUCSA-2)

V HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY

"_-OR ELECTRONIC MANUAL ASSIGNED TO YOU:

TRM2 -

TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/13/2003 ADD MANUAL TABLE OF CONTENTS DATE: 01/12/2004 CATEGORY: DOCUMENTS TYPE: TRM2 ID:

TEXT 3.7.3.8 REMOVE:

REV:0 ADD:

REV: 1 CATEGORY: DOCUMENTS TYPE: TRM2 ID:

TEXT B3.7.3.8 REMOVE:

REV:0 ADD:

REV: 1 CATEGORY: DOCUMENTS TYPE: TRM2 ID:

TEXT LOES REMOVE:

REV:3 ADD:

REV: 4 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, LECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND K-ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

0 1

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effectiv6 Date TOC TABLE OF CONTENTS 10/22/2003 1.0 2.0 3.0 3.1 3.2 USE AND APPLICATION Page TRM /1.0-1 Page TRMI 1.0-2 Page TRM /1.0-3 PLANT PROGRAMS Page 2.0-1

  • Pages TRM / 2.0-2 through TRM / 2.0-4 Page TRM /2.0-5 Page TRM /2.0-6 Page TRM /2.0-7 Page TRM /2.0-8 Page TRM /2.0-9 Pages TRM / 2.0-10 and TRM 2.0-11<\\

Page TRM / 2.0-12 Page TRM / 2.0-13 APPLICABILITY

-;t7 I

Pages TRM / 3.0-1 a dTR

.0-2 Page TRM / 3.0-3 Q)

Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Pages 3 1-Vtfiougg 3.1-6 Pages iT'R73.1-7 and TRM / 3.1-8 Pages-TRWMy31-`9 and TRM / 3.1-9a PreTRM)'3-1-10 CORExOPERATING LIMITS REPORT i Page 3.2-1 Pages TRM / 3.2-2 through TRM I 3.2-37 11,

  • d8/31/1998 10/04/2002 08/31/1998
  • 08/31/1998 06/25/2002 04/12/1999 10/22/2003 10/22/2003
  • 08/30/2001 09/06/2002 04/12/1999 10/22/2003 06/16/2000 04/08/1999 03/15/2002 04/08/1999 08/31/1998 06/05/2002 02/18/1999 02/18/1999 08/31/1998 11/01/2003 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 Pages 3.3-5 through 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Pages TRM / 3.3-10 and TRM / 3.3-11 Page TRM / 3.3-12 Pages TRM / 3.3-13 and TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 03/30/2001 12/14/1998 10/22/2003 06/27/2001 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page 3.3-21 Pages TRM / 3.3-22 through TRM / 3.3-24 Page TRM / 3.3-25 06/14/2002 10/22/2003

.08/31/1998 05/16/2003 10/22/2003 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 10/23/1998 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Pages 3:5-5 through 3.5-7 08/31/1998

-04117/2000

.08131/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 08/3111998 01/07/2002 08/31/1998 12/31/2002 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 through TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12.through TRM 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Pages TRM / 3.7-34 through TRM / 3.7-36 Pages 3.7-37 through 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Pages 3.7-43 through 3.7-47 Page TRM / 3.7-48 Pages TRM / 3.7-49 and TRM / 3.7-50 Pages TRM / 3.7-51 and TRM / 3.7-52 Page TRM / 3.7-53 07/29/1999 08/31/1998 08/02/1999 01/21/2000 08/02/1999 11/16/2001.

01/09/2004 10/05/2002 02/01/1999 08/31/1998 08/11/2000 08/31/1998 10/13/1998 03/08/2003 03/09/2001 04/15/2003 07/29/1999 3.8 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Page 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 08/31/1998 12/31/2002 04/02/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 LIST OFEFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / 3.8-7 through TRM /3.8-8 Page TRM / 3.8-9 Page 3.8-1 0 Page TRM /3.8-11 Page TRM /3.8-l1a Pages 3.8-12 through 3.8-14 Pages TRM / 3.8-15 through TRM 1 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM /3.8-23 Pages 3.8-24 and 3.8-25 08/31/1998 08/24/2001 08/31/1998 04/02/2002 04/02/2002 08/31/1998 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 08/30/1998 03/08/2003 06/05/2002 04/07/2000 Corrected 04117/2002 Page TRM / 3.10-8 3.11 3.12 4.0 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 through 3.11-21 Pages TRM / 3.11-22 through TRM /3.11-24 Pages 3.11-25 through 3.11-32 Pages 3.11-33 through 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM /3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 09/01/1998 08/31/1998 04/02/2002 09/01/1998 08/31/1998 02/05/1999 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 B3.1 B 3.2 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM I B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3

  • PageB3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 03/15/2002 07/13/1999 08/31/1998 07/13/1999 02/18/1999

.08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM/B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9 Pages B 3.3-10 through B 3.3-12 Page TRM / B3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Page TRM / B 3.3-15 Page TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B3.3-22 Page TRM / B3.3-23 04/07/2000 08/31/1998 12/29/2000 03/21/2003 03/30/2001 08/31/1998 10/22/2003 06/25/2002 06/14/2002 06/14/2002 10/22/2003 10/22/2003 10/22/2003 05/16/2003 10/22/2003 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 08/31/1998 10/15/1999 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 B 3.6 CONTAINMENT BASES -

Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 07/26/2001 02/01/1999

  • 08/31/1998 09/23/1999 01/07/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 UST OF EFFECTIVE SECTIONS (TECH NI CAL REQUI REMENTS MANUAL)

Section Title Effective Date Pages TRM / B 3.6-6 through TRM / B 3.6-11 B 3.7 B 3.8 B.3.9 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 through TRM / B 3.7-7 Page TRM / B 3.7-7a

-Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM / B 3.7-1 Oa Pages TRM / B 3.7-11 through TRM / B 3.7-14 Page TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3,7-20 Pages TRM / B 3.7-21 through TRMtB 3.7-21 a Pages TRMtB 3.7-22 and TRM/B 3.7-23 Pages B 3.7-24 through B 3.7-30 Pages TRM / B 3.7-31 and TRM / B 3.7-32 Page TRM / B 3.7-33 Pages TRM / B 3.7-34 and TRM / B 3.7-35 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM I B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM I B 3.8-17 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 12131/2002 08/31/1998

  • 08/02t1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 01/09/2004 02/01/1999 08/31/1998 05/11/2001 04/07/2000
  • 08/31/1998 03/09/2001 04/15/2003 07/05/2000 04/0212002 04/02/2002 04/02/2002 04/02/2002 04/02t2002 04/02/2002 08/31/1998 04/0212002 08/31/1998 10/23/1998 08/31/1998 03/08/2003 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 I

II B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Pages TRM / B 3.11-10 Pages TRM/B 3.11 -11 and TRM/B 3.11 -11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMEN-CS MANUAL)

Section Title Effective Date Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM/B 3.11-20 Page TRM / B 3.11-20a PageTRM/B3.11-21

  • Page TRM / B 3.11-22 Page TRM / B 3.11.23 Page TRM / B 3.1 1-23a Page TRM/ B 3.11-24 PageTRM/B3.11 -25
  • Pages B 3.11-26 through B 3.11-35 Page TRM / B 3.11-36 11/01/1999 02/01/1999 08/31/1998 04/02/2002 04/02/2002 04/02/2002 09/26/2003
  • 04/02/2002 04/02/2002 03/21/2003 04/15/2003 08/31/1998 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 Adept/TRM2 text LOES.doc 11604 02/05/1999 SUSQUEHANNA - UNIT 2 TRM I LOES-6 EFFECTIVE DATE 01/09/2004

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 1 3.7.3 Fire Protection 3.7.3.8 Fire Detection Instrumentation TRO 3.7.3.8 APPLICABILITY:

The fire detection instrumentation for each fire detection zone shown in Table 3.7.3.8-1 shall be OPERABLE.

Whenever equipment protected by the fire detection instrument is required to be OPERABLE.

ACTIONS NNOaI t-

1. Separate condition entry is allowed for each instrument CONDITION REQUIRED ACTION COMPLETION TIME A.

The number of OPERABLE A.1 Establish an hourly fire watch 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire detection instruments patrol less than the Minimum Instruments Operable AND requirement of Table A.2.1 Inspect the accessible Once per hour 3.7.3.8-1 zone(s) with inoperable instrument(s)

OR A.2.2 Inspect the affected area Once per hour surrounding any inaccessible zones SUSQUEHANNA - UNIT 2 TRM / 3.7-26 EFFECTIVE DATE 8/02/1999

Fire Detection Instrumentation 3.7.3.8 PPL Rev. I TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY NOT N/A When a detector is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and required Actions may be delayed for up to 15 minutes.

TRS 3.7.3.8.1 Perform CHANNEL FUNCTIONAL TEST on 12 months accessible fire detection instruments.

TRS 3.7.3.8.2 Verify that the supervised circuits supervision 12 months associated with the detector alarms of each of the fire detection instruments listed in Table 3.7.3.8-1 are OPERABLE.

TRS 3.7.3.8.3 Perform CHANNEL FUNCTIONAL TEST on Prior to startup inaccessible fire detection instruments.

from each COLD SHUTDOWN exceeding 48

-hours unless performed in the previous 12 months SUSQUEHANNA - UNIT 2.

TRM /3.7-27 EFFECTIVE DATE 8/02/1999

Fire Detection Instrumentation 3.7.3.8 PPL:Rev. 1 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION WNSTR ENT LOATON.;:..IN STRUMET OPERALE

.~~ ~~ ~~

~ ~ ~ ~~~ ~~~~

~ ~~~~~~~

Z::

~~~FIRE~~~~~~~.HEAT I.

ONIZATION:;: ::PHOTOELETI

.,,!,,ZONE

'm

"','"""ROOM,

,ORAR, iEA.

EL,,,

E V,

,TOTAL

',MIN.'..

,TOTAL 'MIIN.' "

',"-,TOTAL

""'"MN ""'

igeI,,ig: i2s-si,,.i:-

0-21A Common Equipment Room Elevator 656'-

NA NA 1

1 NA NA obby__

0-22A Above Ceili~ng/Fi',ter Area 687' NA NA 10 5

NA NA 0-22A Elevator Lobby 676-O NA NA 1

1 NA NA Chem Lab OF135 High Temp. Alarm 687-10' 2

1 NA NA NA NA Chem Lab DS-021 68T-10' 2

1 NA NA NA NA

.Chem Lab 0F.138 High Temp. Alarm 687-10' 2

1 NA NA NA NA Chem Lab DS-022 687-10" 2

1 NA NA NA NA Chem Lab 0F141 High Temp. Alarm 687-10" 2

1 NA NA NA NA Chem Lab DS-023 687-10' 2

1 NA NA NA NA Chem Lab OF1 44 High Temp. Aiarm 687-10" 2

1 NA NA NA NA Chem Lab DS-024 687-10" 2

1 NA NA NA NA 0-23 Egress Corridor to South Stairweft 686'-6' NA NA 1

1 NA NA 0-24A UPS Panel Room U-2 698'-0" 4

2 2

1 NA NA 0-24B Corridor 698:-0' NA NA 5

3 NA NA 0-24B Corridor (Under Floor) 697:0' 2

1 NA NA NA NA 0-24B Corridor (Above Ceiling) 698'-:0 4

2 NA NA NA NA 0-24B Corridor Elevator Lobby 698-0" NA NA 1

1 NA NA 0-24D U1 Lower Relay Room 698:-0' 4

2 4

2 NA NA 0-24E Computer Room 698-0" NA NA 6

3 NA NA 0-24E Computer Room (Above Ceiling) 698'.0" 12 6

4 2

NA NA Computer Room 1 U720 697-0" NA NA 4

2 NA NA 0-24E PGCC Underfloor 1 U722 697-0" NA NA 4

2 NA NA 1 U724 697024 NA NA 4

2 NA NA 1 U726 697-0" NA NA 4

2 NA NA 21U721 697'40 NA NA 4

2 NA NA 2U723 697-0" NA NA 4

2 NA NA 2U725 697-0" NA NA 4

2 NA NA 2U727 697-0" NA NA 4

2 NA NA 0-24F Computer Maintenance Rm and Office 698:-0" NA NA 6

3 NA NA 0-24F Comp Maint Rm & Office (Below Floor) 697-0r 2

1 NA NA NA NA 0-24F Comp Maint Rm & Office (Above Ceiing) 698-0" 2

1 NA NA NA NA 0-24G U2 Lower Relay Room 698'-O" 4

2 4

2 NA NA U-2 Lower Relay Room 2U704 697-0" 11 6

6 3

NA NA PGCC Halon Panel 2U705 697-0' 11 6

6 3

NA NA 0-24G Division II 2U706 697-0' 11 6

6 3

NA NA 2U731 697-0" 10 5

6 3

NA NA 2U732 697-0" 11 6

6 3

NA NA I

SUSQUEHANNA - UNIT 2 TRM / 3.7-28 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation 3.7.3.8 PPL Rev. I TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION STRUMENT LOCATION iNSTRUME OPE

-:FIR.E........

l:::ONIZATION:

PHOTO EI..ECIRIC iZi ONE i ii iii ii iROOM OR EA:::::::E

TOTAL -I: i:;N.::: :iTOTAL
MIN.::;

TOTA IN 0-24J South Cable Chase 698'0" I

I NA NA NA NA 0-24L Center Cable Chase 698'O' 1

1 NA NA NA NA 0-24M North Cable Chase 698'-0" 1

1 NA NA NA NA 0-25A U-2 Lower Cable Spreading Room 71 4-0 20 10 6

3

'.NA NA 0-25B South Cable Chase 71 4!C I

I NA NA NA NA 0-25C Center Cable Chase 71 4-0T I

I NA NA NA NA 0-25D North Cable Chase 714!-0 1

1 NA NA NA NA 0-25E U-1 Lower Cable Spreading Room 714'-

26 13 5

3 NA NA M-25E U-1 Lower Cable Spreading Room 714.0" NA NA 1

1 NA NA Elevator Lobby__

0-26A Copy Room 729'-i1 NA NA 1

1 NA NA 0-26B South Cable Chase 729'-1 NA NA 1

1 NA NA 0-26C Center Cable Chase 729'-1 NA NA I

1 NA NA D-26D North Cable Chase 729'-l NA NA 1

1 NA NA 0-26E Locker Room 729'-I NA NA I

I NA -

NA 0-26F Vestibule Elevator Lobby 729:1-

- NA NA I

I NA NA 0-26F Vestibule (Under Floor) 728'-1 NA NA I

1 NA NA 0-26G Shift Office 729 NA NA 1

1 NA NA 0-26G Shift Office (Under Floor) 728'-1 NA NA 2

1 NA NA 0-26H Control Room (Under Floor Unit 1) 728'-1 NA NA 15 8

NA NA 0-26H Control Room (Under Floor Unit 2) 728-1 NA NA 12 6

NA NA 0-26H Control Room 729'-l1 NA NA 10 5

NA NA 0-26H Control Room (Above Ceiling) 729'-.1 NA NA 9

5 NA NA 0-261 Operational Support Center 729'-:

NA NA I

I NA NA 0-261 Operational Suppori Center 729-11 NA NA 2

1 NA NA 0-26i___

(Under Floor) 728' NA NA 2_1_NA_

NA 0-26J Vestibule 729' NA NA I

I NA NA 0-26J fVestibule (Under Floor) 72:

NA NA 1

1 NA NA 0-26K Technical Support Center 741:-1" NA NA 10 5

NA NA 0-26K Technical Support Center Elevator Lobby 74-1:

NA NA 1

1 NA NA 0-26K Technical Support Center 741:1"-

NA NA 5

3 NA NA (Above Ceiling) 0-26L Conference Room 741:-V NA NA 6

3 NA NA 0-26L Conference Room (Above Ceiling) 741:-l NA NA 2

1 NA NA 0-26M U-1 TSC Soffit 729:-I" NA NA 2

1 NA NA 0-26M U-1 TSC Soffd 741:-

NA NA 2-1 NA NA 0-26N U-1 Control Room Soffit 741' NA NA 2

1 NA NA 0-26P U-2 Control Room Soffit 741'-1 NA NA 2

1 NA NA 0-26R U-2TSCSoffit 729'-1' NA NA 2

1 NA NA 0-26R U-2 TSC Soffit 741'-i1 NA NA 2

1 NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-29 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 1 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION

',' NS:'ttTR~UMET LOCATION:':'

IFIStRUMET tPERABL

~~~~~~~~~~~~~~~~... fi

..8g a_l.........

....... l8*s--a__

P::::::

O ZONF E :O..;

EA.....

E.E...O.TT N

TT.

0-26S South Cable Chase 741'-19 1

1 NA NA NA NA 0-26T Center Cable Chase 741,'-i 1

1 NA NA NA NA 0-26V North Cable Chase 741'-1 1

1 NA NA N`A NA 0-27A U-2 Upper Relay Room 754-0' 4

2 3

2 NA NA U-2 Upper Relay Room 2U700 753'-O 11 6

6 3

NA NA PGCC Halon Panel 2U701 753'-'

11 6

6 3

NA NA 0-27A Division I 2U702 753-'

11 6

6 3

NA.

NA 2U703 753Y' 11 6

6 3

NA NA 2U730 753-'

11 6

6.

3 NA NA 0-27B U-2 Upper Cable Spreading Room 753'-0 24 12 5

3 NA NA 0-27B U-2 Upper Cable Spreading Room 753W-C 4

2 NA NA NA NA (Under Floor) 0-27C U-1 Upper Cable Spreading Room 753'-0 27 14 8

4 NA NA 0-27C U-1 Upper Cable Spreading Room 7S3' 4

2.

NA NA NA NA (Under Floor) 0-27C U-Upper Cable Spreading Room

.754-0 NA NA 1

1 NA NA Elevator Lobby 0-27D Electrician's Office 754'-0" 2

1

.I I

NA NA 0-27E U-1 Upper Relay Room 754'-0C 4

2 2

1 NA NA 0-27F South Cable Chase 754'!O 1

1 NA NA NA NA 0-27G Center Cable Chase 754!-V 1

1 NA NA NA NA 0-27H North Cable Chase 754'4 1

1 NA NA NA NA 0-28A-1 Equipment Room 771!-0r NA NA 1

1 NA NA 0-28A-11 Equipment Room 771'-0" NA NA 3

2 NA NA 0-28B-l Equipment Room 771'4Y NA NA 1

1 NA NA 0-281-Il Equipment Room 771'-

NA NA 2

1 NA NA 0-286-I11 Equipment Room Elevator Lobby 771'40 NA NA 1

1 NA NA 0-28C Battery Room 771'40' NA NA I

1 NA NA 0-28D Battery Room 771'-0 NA NA I

I NA NA 0-28E Battery Room 77.-0 NA NA I

I NA NA 0-28F Battery Room 771'-

NA NA I

I NA NA 0-28G Battery Room 771-'

NA NA 1

1 NA NA 0-28H Repair Shop 771:-0 NA NA 2

1 NA NA 0-281 Battery Room 771'-0 NA NA I

1 NA NA 0-28J Battery Room 771'-0' NA NA 1

1 NA NA 0-28K Battery Room 771'-0' NA NA 1

1 NA NA 0-28L Battery Room 771 :0' NA NA 1

1 NA NA 0-28M Battery Room 771 :0' NA NA 1

1 NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-30 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 1 TABLE 3.7.3.891 FIRE DETECTION INSTRUMENTATION

'IflSTRUMENT LOCATION

:RABLES M

E

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.FEr..............ffi. p.f....E iiiET......

.... AtON FIRE HE~..............AT

.......... IONIZATION:::: "PHOTOELECTRIC' Z, OO.A

.T R...........................

TOTAL IN'TOTlIN.T 0-28N Battery Room 771'-Cr NA NA 1

1 NA NA 0-28P South Cable Chase 771'4O I

I NA NA NA NA 0-28Q Center Cable Chase 771'40 1

1 NA NA NA NA 0-28R North Cable Chase 771'4r 1

1 NA NA NA NA 0-28T Battery Room 771'4-NA NA 1

1 NA NA 0-29A Elevator Vestibule 783'-O NA NA I

I NA NA 0-298 H&V Equipment Room 783'-0' NA NA 10 5

NA NA 0.30A HVAC Equipment Room 806'-0 NA NA 19 10 NA NA 0-30A Freight Elevator Lobby 806'-0" NA NA 1

1 NA NA 0-30A CREOASS OF125A High Temp. Alarm 806'-

7 4

NA NA NA NA 0-30A CREOASS DS-091 806' 7

4 NA NA NA NA 0-30A CREOASS OF125B High Temp. Alarm 806-f' 7

4 NA NA NA NA 0-30A CREOASS DS-092 806' 7

4 NA NA NA NA 0-30A SGTS - OF1 69A High Temp. Alarm 806'4r 1

1 NA NA NA NA 0-30A SGTS-DS-093 806'-

1 1

NA NA NA NA 0-30A SGTS - OF1 69B High Temp. Alarm 806'-0 I

I NA NA NA NA 0-30A SGTS - DS-094 806-'

1 1

NA NA NA NA

b. Reaclorflulldlng~~~~~~~~~~~~~~~~~~~~~~~~....................

2-1A Core Spray Pump Room 645'-0" NA NA 8

4 NA NA 2-1B Core Spray Pump Room 645:0'

  • NA NA 6

3 NA NA 2-1 B Elevator Lobby 645-0 NA NA I

I NA NA 2-1C HPCI Pump Room 645'-0' 2

1 NA NA 7

4 2-1 D RCIC Pump Room 645'.0 2

1 NA NA 5

3 2-1 E RHR Pump Room 645'-0" NA NA NA NA 13 7

2-1 F RHR Pump Room 645:-t' NA NA NA NA 15 8

2-1G Sump Room 645'-

NA NA 2

1 NA NA 2-11 Stairwell 202 645-81 8' NA NA 2

1 NA NA 2-2A Access Area and Remote Shutdown 670' NA NA 5

3 NA NA Panel Room 2-2A Elevator Lobby 67aY-o" NA NA I

I NA NA 2-2B Core Spray Pump Room 670'-0 NA NA 11 6

NA NA 2-3A Access Area 683-0 NA NA 4

2 NA NA 2-3A Access Area Elevator Lobby 683'.0' NA NA 1

1 NA NA 2-3B-N Equipment Removal Area - North 683!-0 NA NA 13 7

NA NA 2-38-S Equipment Removal Area - South 683T-0 NA NA I

1 NA NA 2-3B-W Equipment Removal Area - Wraparound 683-0' NA NA 2

1 NA NA 2-3C-N Equipment Access Area - North 683'-0 NA NA NA NA 4

2 SUSQUEHANNA - UNIT 2 TRM / 3.7-31 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation 3.7.3.8 PPL Rev. 1 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION

...N....TR.........EN..... LOCATON..

INSTRUMENTPI;=

Eiji.............

O A

~~FJR~~~~ii~~~.HEAT IONIZA...........ON

-:PHOTO-ELECTRIC::

iiiiZONE '

.ii~i ii iiiiiii i liiiiiiiiiiiiROOM OR AREAiiiiiiii ii s iii E iiiii;

  • iisiE LE V*; TOTAL i iii MIN.

TOTAL!:: '::MIN.:: :: ::TOTAO

MIN
::::

iiiiii-ii ii~iiiiiiii..

i.iiii.i

--ii i i iiiii i i i j j. j ;,_...., ;

..jj,,, ;.-: : !..- _ _

i

- j j j,,

2-30-S Equipment Access Area -South 683-'"

NA NA NA NA 4

2 2-3C-W Equipment Access Area - Wraparound 683'-

NA NA NA NA 5

3 2-4A-N Containment Access Area - North 71 9'-

NA

'NA 11 6

3 2

2-4A-S Containment Access Area -South 71 9-C" NA NA 1 0 5

NA NA 2-4A-S Containment Access Area Elevator 71 0 NA NA 1

1 NA NA 24A___S Lobby 719___-_

NA__

NAI__NAN 2-4A-W Containment Access Area -Wraparound 719-'

NA NA 5

3 NA

'NA 244B Pipe Penetration Room 719-1' NA NA I

I NA NA 2-4C Switchgear Room 719-1' NA NA 2

1 NA NA 2-4D Switchgear Room 719-1' NA NA 2

1 NA NA 2-4G Main Steam Pipeway 719'-1' NA NA NA NA 4

2 2-4G Exhaust Fan Room 7994O NA NA NA NA 2

1 2-5A-N Standby Control Systems Area 7491-0 NA NA 16 8

7 4

2-SA-S General Access Area - South 749-0 NA NA 5

3 2

1 2-5A-S General Access Area Elevator Lobby 749-OT NA NA 1

1 NA NA 2-5A-W Access Corridor -Wraparound 749-0" NA NA 3

2 1

2 1

2-5B Valve Access Area 761V-10" NA NA NA NA 4

2 2-5C RWCU Backwash Tank 749-1l-NA NA NA NA 1

1 2-5D RWCU Pumps & Heat Exchangers 749'-1' NA NA NA NA 8

4 2-5E Penetration Room 749'-1' NA NA NA NA 2

1 2-5F Load Center Room 749'-1' NA NA 2

1 NA NA 2-5G Load Center Room 749'-1' NA NA 2

1 NA NA 2-5H Instrument Repjair Room 749'-1' NA

'NA 2

1 NA NA 2-6A Access Area 779'-1' NA NA 11 6

NA NA 2-4B Load Center Room 779'-1' NA NA 4

2 NA NA 2-SC Electrical Equipment Room 779'-1' NA NA 2

1 NA NA 2-6D H&V Equipment Room 779'-1' NA NA 12 6

NA NA 2-6E Hatch and Laydown Area 779'-1 NA NA 2

1 NA NA 2-7A H&V Fan & Filter Rooms 799'-1' NA NA 14 7

NA NA 2-7A HVAC Filter 2F257A High Temp. Alarm 799-O" 7

4 NA NA NA NA 2-7A HVAC Filter 2F257A DS-281 799-0" 7

4 NA NA NA NA 2-7A HVAC Filter 2F257B High Temp. Alarm 799-0" 7

4 NA NA NA NA 2-7A HVAC Filter 2F257B DS-282 799-0' 7

4 NA NA NA NA' 2-7A HVAC Filter 2F217A High Temp. Alarm 799'-0" 5

3 NA NA NA NA 2-7A HVAC Filter 2F217A DS-283 799'-0" 5

3 NA NA NA NA 2-7A HVAC Filter 2F217B High Temp. Alarm 799-0" 5

3 NA NA NA NA Inaccessible SUSQUEHANNA - UNIT 2 TRM / 3.7-32 EFFECTIVE DATE 01/09/2004

fire Detection Instrumentation 3.7.3.8

  • PPL Rev. I TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION

.STRUMENT L.ATION:..INSTRUME T OPERABLE.

HEAT IONIZAT~~~~~OPION HOTELECTRIC-F~~~~~~~~~~~~~~~~~~......

.ZONE ROQIW ~~~OR AREA ELEV

.TOTAL "WIN.

ToTAL MN OTL MN 2-7A HVAC Filter 2F217B DS-284 799-O 5

3 NA NA NA NA O-6G Surge Tank Vault 779g4" NA NA 2

1 NA NA 0-8A Refueling Floor 81'-1V NA NA NA NA 60 30 O-8A Refueling Floor Elevators 818-1" NA NA 2

1 NA NA

a.

SW~um p.o e 0-51 Pump Room 685'-6" NA NA 6

3 NA NA 0-52 Pump Room 685'-6" NA NA 6

3 NA NA

.a j

,,,i. ;

.ESWPumph ue 0-51 Pump Room 685'-6 NA NA 6

3 NA NA 0-52 Pump Room 685'-6 NA NA 6

3 NA NA 0-41A Diesel Generator "A" Bay 227°'0 11 2

1 15 8

710'P-T NA NA N/A N3A 8

4 0W1 B Diesel Generator "B" Bay e67°7'-0

  • 2 12 2

.1 15 8

0.52 Pump Room 5710'-9" N/A N/A N/A N/A 9

5 0-41 C Diesel Generator "C" Bay 60-8 22 11 2

1 15 8

~~710-9" N/A N/A N/A N/A 8

4 041A Diesel Generator "D" Bay 66-W&

22 11 2

1 15 8

677'-0 71 0'S' N/A NIA N/A N/A 8

4 e.. ;

DleselGene,3t.oE uilding Hi-
iR RD OI4TO' 0-41 E Diesel Generator Rooms 656'-" 8 1

NA NA 21 11 675'-6"8 NA NA 6

3 3

j 2

708'-9' NA NA 4

2 NA NA 0-00 Startup Transformer (0X103) 014 NA 10 5

NA lNA NA NA 0-00 Startup Transformer (0X104)05-015 NA 12 6

NA NA NA NA 0-00 ESS Transformer-DS-016 OX201 NA 6

3 NA NA NA NA

____0X 213 NA 6

3 NA NA NA NA 0-00 ESS TransformerD-DS-017 0X203 NA 6

3 NA NA NA NA

.OX211 NA 6

3 NA NA NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-33 EFFECTIVE DATE 10/05/2002

Fire Detection Instrumentation

  • PPL Rev. I B 3.7.3.8 B 3.7.3.8 Fire Detection Instrumentation BASES TRO OPERABILITY of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of

'fires. This capability is required in order to detect and locate fires in

  • their early stages. Prompt detection of fires will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility fire protection program.

The basis for the detection instrumentation included within the scope of this TRO includes both Safety Related and Safe Shutdown System protection. Fire Detection Instrumentation associated with building elevators are listed as separate line items in Table 3.7.3.8-1 due to their specific function and their layout being in a vertical string.

ACTIONS The Actions are defined to ensure proper corrective measures and compensatory. actions are taken in response to the inoperable systems or components.

In the event that a portion of the fire detection instrumentation is inoperable, establishing hourly firewatch patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to OPERABILITY.

Inaccessible Fire Detection Instrumentation can affect the compensatory actions for inoperable Fire Rated Assemblies (Ref. TRO 3.7.3.7 and B 3.7.3.7).

Hourly Firewatch Patrols shall be completed once each clock hour.

Individual zon6s on the hourly firewatch patrol shall be'toured at intervals (i.e., zone A and back to zone A) of sixty minutes with a margin of fifteen minutes.

A continuous Firewatch must remain in the specified area at all times and must patrol the required fire zones in the specified area at least once per fifteen minutes with a margin of five minutes. The specified area can be as small as one fire zone or as large as a firewatch can reasonably patrol within the fifteen minute time period. The specified area is limited to two floors of the Control Structure or Reactor Buildings. The floors must be adjacent or serviced by an operable elevator.

(continued)

SUSQUEHANNA - UNIT 2 TRM I B 3.7-14 EFFECTIVE DATE 8/02/1999

. I ' I Fire Detection Instrumentation PPL Rev. 1 B 3.7.3.8 B 3.7.3.8 Fire Detection Instrumentation BASES ACTIONS Areas exist within the plant where the posting of a firewatch does not (continued) provide acceptable radiological ALARA practices. For4hese inaccessible areas, alternate measures should be taken to assure an adequate level of fire protection is maintained.

TRS The TRSs are defined to be performed at the specified Frequency to ensure that the Fire Detection Instrumentation is maintained OPERABLE.

The Surveillances are modified by a Note to indicate that when a detector is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 15 minutes for each detector. Upon completion of each detector test, or expiration of the 15 minute allowance, the detector must reset and alarm must clear, or the applicable Condition entered and Required Action taken. This note is based on the assumption of time to perform a detector test. Under normal conditions, it is expected that the detector would reset and alarm clear within minutes after detector test initiation. It is recognized that while the detector being tested is in the tripped condition, other alarms originating on the string of detectors being tested will be masked.

TRS 3.7.3.8.1 / TRS 3.7.3.8.2 The surveillance frequency of 12 months is based on NFPA 72-1996, National Fire Alarm Code.

TRS 3.7.3.8.3 Fire Detection Instrumentation that is inaccessible during unit operation is defined as those fire detection instruments that are located within high radiation areas or where access is limited due to operating conditions, AND remote testing capability (i.e., smoke tubes) does not exist. Inaccessible Fire Detection Instruments need only be tested when the Unit is in cold shutdown for longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, unless it has been tested in the previous 12 months. Inaccessible Fire Detection Instrumentation must then be surveilled during the cold shutdown prior to startup. Inaccessible Fire Detection Instrumentation remains OPERABLE during Unit operation even though the surveillance frequency for accessible Fire Detection Instrumentation may have been exceeded.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.7-14a EFFECTIVE DATE 01/09/2004

Fire Detection Instrumentation PPL Rev. 1 B 3.7.3.8 B 3.7.3.8 F

BASES REFERENCES

-ire Detection Instrumentation z

1.

-FPRR Section 4.12 SUSQUEHANNA - UNIT 2 TRM / B 3.7-14b EFFECTIVE DATE 01/09/2004