ML040210526

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual
ML040210526
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/13/2004
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
28401
Download: ML040210526 (20)


Text

Jan. 13, 2004 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2004-1797 USER NFORMATION:

  • ROS MPL#:28401 CA#: 0363 Addres SA2 Pho TM: 254-TRANSMITTAL INFORMATION:

TO: _ 01/13/2004 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)

\JHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

TRM1 - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/13/2003 ADD MANUAL TABLE OF CONTENTS DATE: 01/12/2004 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT 3.7.3.8 REMOVE: REV:0 ADD: REV: 1 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT B3.7.3.8 REMOVE: REV:0 ADD: REV: 1 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT LOES REMOVE: REV:3 ADD: REV: 4 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS,

LECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND

'-ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

t-1

z . S

.SUSQUEHANNA STEAM ELECTRIC STATION PPL-Rev. 4 UST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 10/22/2003 1.0 USE AND APPLICATION Pages TRM / 1.0-1 through TRM /1.0-3 10/04/2002 2.0 PLANT PROGRAMS Pages 2.0-1 through 2.0-2 08/31/1998 Page TRM / 2.0-3 08/01/2001 Page TRM /2.0-4 06/25/2002 Page TRM / 2.0-5 04/02/1999 Pages TRM / 2.0-6 and TRM 12.0-7 10/22/2003 Page TRM / 2.0-8 03/29/2000 Page TRM / 2.0-9, - 09/04/2002 Pages TRM /2.0-10 and TRM /2.0-11 04/02/1999 Page TRM / 2.0-12 10/22/2003 PageTRM/2.0-13 06/16/2000 3.0 APPLICABILITY - \-X Pages TRM / 3.0-1 and TRM,/3 04/08/ 999 Pages TRM /3.0-3 t_.-AJ A 03/15/2002 Page TRM /3.0-4<>), 04/08/1999 3.1 REACTIVITY CONTROL SYSTEMS Pages 3.1-1,hrough 3.1`6 08/31/1998 Pages TRM,3.1-7arid TRM / 3.1-8 06/05/2002 Pages TRM 31-9 and TRM / 3.1-9a 02/18/1999 Page TRM/ -3:1 -10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT

-7KPage.TRM / 3.2-1 07/07/1999 (s1 Pag'es TRM / 3.2-2 through TRM / 3.2-37 11/01/2003 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM/3.3-4 11/28/2000 Pages 3.3-5 through 3.3-8 08/31/1998 Pages TRM / 3.3-9 and TRM / 3.3-9a 12/17/1998 Pages TRM / 3.3-10 and TRM / 3.3-11 12/17/1998 Page TRM / 3.3-12 03/30/2001 Pages TRM / 3.3-13 and TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Pages TRM / 3.3-17 and TRM / 3.3-18 06/14/2002 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 SUSQUEHANNA - UNIT 1. TRM / LOES-1 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 3.3-22 08131/1998 Pages TRM 1 3.3-23 through TRM / 3.3-25 .05116/2003 Page TRM 13.3-26 10122/2003 3.4 REACTOR COOLANT SYSTEM

. Pages 3.4-1 through 3.4-5 10123/1998 Pages 3.4-6 through 3.4-13 .08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 08/31/1998 Page TRM / 3.5-4 04/17/2000 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-3 08/31/1998 Page TRM 13.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM I 3.6-6 through TRM / 3.6-8 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Pages TRM 13.7-4 through TRM / 3.7-10 08/02/1999 Page TRM /3.7-11 12/29/1999 Pages TRM /3.7-12 through TRM 3.7-27 08/02/1999 Pages TRM / 3.7-28 through TRM / 3.7-32 11/1612001 Page TRM / 3.7-33 01/09/2004 Page TRM /3.7-34 11/16/2001 Page TRM / 3.7-34a 10/05/2002 Pages TRM / 3.7-35 through TRM / 3.7-37 02/01/1999 Pages 3.7-38 through 3.7-40 08131/1998 Pages TRM /3.7-41 and TRM i 3.7-41 a .08/1112000 Pages 3.7-42 and 3.7-43 08131/1998 Pages 3.7-44 through 3.7-48 10/113/1998 Page TRM /3.7-49 03/08/2003 Pages TRM / 3.7-50 and TRM / 3.7-51 03/09/2001 Pages TRM / 3.7-52 and TRM 13.7-53 04/1512003 Page TRM 1 3.7-54 07129/1999 3.8 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 04/02/2002 Page 3.8-3 08131/1998 Page TRM 3.8-4 1213112002 Pages TRM / 3.8-5 and TRM / 3.8-6 04/0212002 Pages TRM / 3.8-7 through TRM / 3.8-9 08131/1998 SUSQUEHANNA - UNIT 1 TRM LOES-2 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION - PPL Rev. 4 UST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.8-10 07/19/2001 Page TRM I 3.8-11 04/02/2002 Page TRM / 3.8-11 a 04/02/2002 Pages 3.8-12 through 3.8-14 08/31/1998 Pages TRM 3.8-15 through TRM /3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM / 3.8-19 04/02/2002

'Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 through TRM /3.8-23

  • 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Pages 3.10-1 through 3.10-4 08/31/1998 Page TRM / 3.10-5 03/08/2003 Page TRM 3.10-6 06/05/2002 Page TRM / 3.10-7 04/07/2000 Corrected Page TRM / 3.10-8 04/17/2002 3.11 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 08/31/1998 Pages 3.11-13 through 3.11-16 09/01/1998 Pages 3.11-17 through 3.11-21 08/31/1998 Pages TRM / 3.11-22 through TRM /3;11-24 04/02/2002 Pages 3.11-25 through 3.11-32 09/01/1998 Pages 3.11-33 through 3.11-47 08/31/1998 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 1 TRM LOES-3 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

I *.v .. ...

Section Title Effective Date B3.0 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 through TRM / B 3.0-15 03/15/2002 B3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM /B 3.1-3 07/13/1999 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM B 3.1-7 -07/13/1999 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/0712000

'Page B 3.3-2 08/31/1998 Pages TRM / B 3.3-3 and TRM / B 3.3-3A 12/2912000 Pages TRM / B 3.3-4 through TRM / B 3.3-6 03/21/2003 Pages TRM / B 3.3-7 through TRM / B 3.3-9 03/30/2001 Pages B 3.3-10 through B 3.3-12 08/31/1998 Page TRM / B 3.3-13 10/22/2003 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 06/14/2002 Page TRM / B 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 and TRM / B 3.3-16 10/22/2003 PageTRM/B3.3-17 04/07/2000 Pages TRM / B3.3-18 and TRM / B 3.3-19 05/16/2003 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-21 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B .3.4-4 08/31/1998 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B 3.5 ECCS AND RCIC BASES .

Pages B 3.5-1 through B 3.5-5 08/31/1998 B3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02101/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 09/23/1999 Page TRM / B 3.6-5 01/07/2002 SUSQUEHANNA - UNIT 1 . TRM /.LOES4 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION- PPL Rev. 4 LIST OF EFFECTIVESEC77ONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / B 3.6-6 through TRM / B 3.6-11 12/31/2002 B3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 through TRM / B 3.7-7 08/02/1999 Page TRM / B 3.7-7a 08/02/1999 Pages TRM / B 3.7-8 through TRM / B 3.7-10 08/02/1999 Page TRM / B 3.7-1 Oa 08/02/1999 Pages TRM / B 3.7-11 and TRM / B 3.7-1 Ia :08/02/1999 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Page TRM / B 3.7-14a 08/02/1999 Page TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM/B 3.7-21 through TRM/B 3.7-21a 05/11/2001 Pages TRM/B 3.7-22 and TRM/B 3.7-23 04/07/2000 Pages B 3.7-24 through B 3.7-30 08/31/1998 Pages TRM / B 3.7-31 and TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Pages TRM / B 3.7-34 and TRM / B 3.7-35 07/05/2000 B3.8 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 04/02/2002 Page TRM / B 3.8-2a 04/02/2002 PageTRM/B3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 04/02/2002 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-17 04/02/2002 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 08/31/1998 Page TRM / B 3.10-3 03/08/2003 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Pages TRM / B 3.10-6 and TRM / B 3.10-7 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 PageTRM/B3.11-10* 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11 -11a 04/07/2000 SUSQUEHANNA - UNIT TRM / LOES-5 EFFECTIVE DATE 01/09/2004

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRMIB 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 11/01/1999 Page TRM B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/30199a Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Page TRM / B 3.11-21 04/02/2002 Page TRM / B 3.11-22 09/2612003 Page TRM / B 3.11-23 04/0212002 Page TRM / B 3.11-23a 04/02/2002 Page TRM / B 3.11-24 0321/2003 Page TRM / B 3.11-25 04/15/2003 Pages B 3.11-26 through B 3.11-35 08/30/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM /B 3.12-3 02/05/1999 Adept\TRMI text LOES 1/5104 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 01/09/2004

Fire Detection Instrumentation PPL Rev. I 3.7.3.8 3.7.3 Fire Protection 3.7.3.8 Fire Detection Instrumentation TRO 3.7.3.8 The fire detection instrumentation for each fire detection zone shown in Table 3.7.3.8-1 shall be OPERABLE.

APPLICABILITY: Whenever equipment protected by the fire detection instrument is required to be OPERABLE.

ACTIONS

-- NOTE

1. Separate condition entry is allowed for each instrument.

CONDITION REQUIRED ACTION COMPLETION TIME A. The number of OPERABLE A. Establish an hourly fire 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire detection

  • watch patrol instruments less than the Minimum AND Instruments Operable requirement of Table A.2.1 Inspect the accessible Once per hour

-3.7.3.8-1 zone(s) with inoperable instrument(s)

OR A.2.2 Inspect the affected Once per hour area surrounding any inaccessible zones SUSQUEHANNA - UNIT 1 TRM / 3.7-26 AEFFECTIVE DATE 8/02/1999

Fire Detection Instrumentation PPL Rev. 1 3.7.3.8 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY

-NOTE--

When a detector is placed in an inoperable status solely N/A for performance of required Surveillances, entry into associated Conditions and required Actions may be delayed for up to 15 minutes.

TRS 3.7.3.8.1 Perform CHANNEL FUNCTIONAL TEST on 12 months accessible fire detection instruments.

TRS 3.7.3.8.2 Verify that the supervised circuits 12 months supervision associated with the detector alarms of each of the fire detection instruments listed in Table 3.7.3.8-1 are OPERABLE.

TRS 3.7.3.8.3 Perform CHANNEL FUNCTIONAL TEST on Prior to inaccessible fire detection instruments. startup from each COLD I'

SHUTDOWN exceeding 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> unless performed in the previous 12 months SUSQUEHANNA - UNIT 1 TRM / 3.7-27 EFFECTIVE DATE 8/02/1999 L- .

Fire Detection Instrumentation

-PPLRev. 1 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION

.,.NSTRUMENT,,L.T IO -J'.,.?'NT.UElPERABLE.--_ 0 A; Xt8 OR;ARE~~~~~~~~~~~~~A TAt PHICYTO EL MIH WlOTj 0-21A Common Equipment-Room Elevator Lobby 656' NA NA 1 1 NA NA Chem Lab OF135 High Temp. Alarm 687'-10' 2 1 NA NA -NA NA I Chem Lab DS-021 687'-0r 2 1 NA NA NA NA Chem Lab OF1 38 High Temp. Alarm 68T-10r 2 1 NA NA NA 'NA Chem Lab DS2 68T-101, 2 1 NA NA NA NA 0-22A Chem Lab OF1 41 High Te'mp. Alarm 68T-10" 2 1 NA NA NA NA Chem Lab DS-023 68T-1 (r 2 1 NA NA NA NA Chem Lab OF144 High Temp. Alarm 68T-10' 2 1 NA NA NA NA Chem Lab DS-024 ,68T-10"' 2 1 NA NA NA NA 0-22A Above CeffingfFifter Area '687Tr NA NA 10 5 NA NA 0-22A Elevator Lobby 676' NA NA I I -NA NA D-23 Egress Corridor to South Stairwell 686'ST NA NA 1 1 NA NA 0-24B Corridor 698'-0' NA NA 5 3 NA NA 0-24B Corridor (Under Floor) 69T-V 2 1 NA NA NA NA 0-24B Corrdor (Above Ceiling) 698' 4 2 NA NA NA NA 0-24B Corridor Elevator Lobby 699gV NA NA 1 1 NA NA 0-24C UPS Panel Room U-1 698'r 4 2 2 1 NA NA U-1 Lower Relay Room 1U704 69T-0" I11 6 6 3 NA NA PGCC Halon Panel Division II 1U705 69TV 11 6 6 3 NA NA 0-24D 1U706 69TVr 11 6 6 3 NA NA I U731 69Tr I10 5 6 3 NA NA 1U732 69TT I11 6 6 3 NA NA 0-24D U-1 Lower Relay Room 698'tr 4 2 4 2 NA NA 0-24E Computer Room 698'-0' NA NA 6 3 NA NA 02E Computer Room (Above Ceiling) 698: 12 6 4 2 NA NA Computer Room 1U720 697:- NA' NA 2 NA NA I PGCC Underfloor I U722 697:0O NA NA 4 NA NA 0-24E I U724 697'-0" NA NA 4 NA NA 1U726 6sr-or NA NA NA NA SUSQUEHANNA - UNIT 1 TRM I 3.7-28 EFFECTIVE DATE 11/1612001

Fire Detection Instrumentation PPL Rev. I 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION 5iliUMENT.LOCATION

_____ *..*:.. INSTRMENTpEkAL 'E FI.... . 'l...x IOHOZA t- NC:

ZONE- ~ROOMOR AREA. TOTALS  ;-IN. TOTAL.  :; MNiTOTAL;-IAIN.9.:

Computer Room 2U721 697'-0" NA NA 4 2 NA NA PGCC Underfloor 2U723 6974r .NA *.NA 4 2 NA NA 0-24E 2U725 6974r NA NA 4 2 NA NA

______ 2U727~~~~~~~W 697'-0 NA NA 4 2 NA NA 0-24F Computer Maintenance Rm and Office 698'4r NA NA 6 3 NA NA 0-24F Comp Maint Rm & Office (Below Floor) 69r7r 2 1 NA NA NA NA 0-24F Comp Maint Rm & Office (Above Ceiling) 698' 2 1 NA NA NA NA 0-24J South Cable Chase 698O'r 1 1 NA NA NA NA 0-24L Center Cable Chase 698'4r I I NA NA NA NA 0-24M North Cable Chase 698-' I I NA NA NA NA 0-25A U-2 Lower Cable Spreading Room 71 4-r 20 10 6 3 NA NA 0-25B South Cable Chase 714'-0 1 1 NA NA NA NA 0-25C Center Cable Chase 714-r 1 1 NA NA NA NA 0-25D North Cable Chase 714'-0 1 1 NA NA NA NA 0-25E U-1 Lower Cable Spreading Room 714-0' 26 13 5 3 NA NA 0-25E U-1 Lower Cable Spreading Room Elevator 71 4*- NA NA I I NA NA

_ __ Lobby _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

0-26A Copy Room - 729'-1 NA NA 1 1 NA NA 0-26B South Cable Chase 729'-1' NA NA 1 1 NA NA 0-26C Center Cable Chase 729' NA NA 1 1 NA NA

-26D North Cable Chase 729' NA NA I I NA NA 0-26E Locker Room 729 NA NA I I NA NA 0-26F Vestibule Elevator Lobby 729'- NA NA 1 - NA NA 0-26F Vestibule (Under Floor) 728-1 NA NA I I NA NA 0-26G Shift Office 729'-1 NA NA I 1 NA NA 0-26G Shift Office (Under Floor) 728-1" NA NA 2 1 NA NA 0-26H Control Room (Under Floor Unit 1) 728'-1* NA NA 15 8 NA NA 0-26H Control Room (Under Floor Unit 2) 728-1' NA NA 12 6 NA NA 0-26H Control Room 729- NA NA 10 5 NA NA 0-26H Control Room (Above Ceiling) 729-1" NA NA 9 5 NA NA 0-261 Operational Support Center 729'-1 NA NA I I NA NA SUSQUEHANNA - UNIT 1 TRM / 3.7-29 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation PPL Rev. 1 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION

NS1RUMENT LO ' N NSTRUMENT OPER BL E F,,,,  ;.  ; h; ai gW,,S,,, i<;?>> ;Ti; HEATi~;

{i 'ONIATO.

J ': POTO 's'ELECC OEX ROOM OR AREA 3.: ; 2>: EL V. TOTAL ; lMIN. :. TOTAL l 'lAIR. TOTAL, ,ll 0-261 Operational Support Center (Under Floor) 728'-1 NA NA 2 1 NA NA 0-26J Vestibule (Under Floor) 728-1 NA NA 1 1 NA NA 0-26J Vestibule 729-1" NA NA 1 I NA NA 0-26K Technical Support Center 741-1' NA NA 10 5 NA NA 0-26K Technical Support Center Elevator Lobby 741-1" NA NA I 1 NA NA 0-26K Technical Support Center (Above Celing) 741-1" NA NA 5 3 NA NA 0-26L Conference Room 741'-1 NA NA 6 3 NA NA

/

0-26L Conference Room (Above Ceiling) 741:1' NA NA 2 1 NA NA 0-26M U-1 TSC Soffit 729'-1 NA NA 2 1 NA NA 0-26M U-1 TSC Soffit 741:1- NA NA 2 1 NA NA 0-26N U-1 Control Room Soffit 741 NA NA 2 1 NA NA 0-26P U-2 Control Room Soffit 741 -1' NA NA 2 1 NA NA 0-26R U-2 TSC Soffit 729'.1- NA NA 2 1 NA NA 0-26R U-2TSC Soffit 741'-I' NA NA 2 1 NA NA 0-26S South Cable Chase 741'. I I NA NA NA NA 0-26T Center Cable Chase ' 741 '-1' 1 1 NA NA NA NA 0-26V North Cable Chase 74-1 1 1 NA NA NA NA 0-27B U-2 Upper Cable Spreading Room 753'-0 24 12 5 3 NA NA 0-27B U-2 Upper Cable Spreading Room 753-0 4 2 NA NA NA NA (Under Floor)__ _ __ _ _ _

0-27C U-1 Upper Cable Spreading Room 753-' 23 12 7 4 NA NA 0-27C U-1 Upper Cable Spreading Room Elevator 753-O' NA , NA 1 1 NA NA 0 2 C Lobby__ _ ___ _ ___ _ _

0-27C U-1 Upper Cable Spreading Room 753 4 2 NA NA NA NA

-2C (Under Floor) 75____4_ NA__ NANANA 0-27D Electrician's Office 754' 2 1 1 1 NA NA 0-27E U-1 Upper Relay Room 754'-0 4 2 2 1 NA NA SUSQUEHANNA - UNIT .TRM 37-30 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation PPL Rev. 1 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTAT1ON

.INSTR.UM~ENTL ATO NSTRUMEN OPERBLE';

FIR.0E RARAELV TOA .. INA o-nw _- PHoTO EETI m~~~~~~~~~~~~~~~~~AN TOTAL -IDNl-:tlLh TOTAV ,lIIIN."-

U-1 Upper Relay Room I U700 753-C 11 6 6 3 NA NA PGCC Halon Panel Division 1U701 753:a0 11 6 6 3 NA NA 0-27E 1U702 753'-0C 11 6 6 3 > NA NA 1U703 753'-0 11 6 6 3 NA NA 1U730 753'-0 11 6 6 3 NA NA 0-27F South Cable Chase 754'-O' 1 1 NA .NA NA NA 0-27G Center Cable Chase 7544O 1 1 NA NA NA NA 0-27H North Cable Chase 754-O" 1 1 NA NA NA NA 28A-1 Equipment Room 771'-0' NA NA 1 1 NA NA 0-28A-11 Equipment Room 771'-0 NA NA 3 2 NA NA 0-28B-I Equipment Room 771'-0 NA NA 1 1 NA NA 0-28B-Il Equipment Room 771'-0' NA NA 2 1 NA NA 0-28B-11 Equipment Room Elevator Lobby 77-0" l NA NA I 1 NA NA 0-28C Battery Room 771'-01 NA NA 1 1 NA NA 0-28D Battery Room 771'-0 NA NA 1 1- NA NA 0-28E Battery Room 771'4V NA NA 1 1 NA NA 0-28F Battery Room 771'4O' NA NA 1 1 NA NA 0-28G Battery Room 771'-0 NA NA 1 1 NA NA 0-28H Repair Shop 771' NA NA 2 1 NA NA 0-281 Battery Room 771'4O NA NA 1 1 NA NA 0-28J Battery Room 771' NA NA 1 1 NA NA 0-28K Battery Room 771'-0 NA NA 1 1 NA NA 0-28L Battery Room 771' NA NA 1 1 NA NA 0-28M Battery Room .771' NA NA 1 1 NA NA 0-28N Battery Room 771-O' NA NA 1 1 NA NA 0-28P South Cable Chase 771' 1 1 NA NA NA NA 0-280 Center Cable Chase - 771'-0 I I NA NA NA NA 0-28R North Cable Chase 771'O' I I NA NA NA NA 0-28T Battery Room 7714' NA NA I I NA NA 0-29A Elevator Vestibule 783'-0 NA NA I I NA NA 0-29B H&V Equipment Room 783'-0 I NA NA 10 5 NA NA SUSQUEHANNA - UNIT 1 TRIM / 3.7-31 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation PPL Rev. 1 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION tsi,NSTRUMENTLOCATION iNSTRUMENT OPERABLE

  • .FIrE -- <X

.~.. mHEAT <e ZTI -PHOTO ELECR:4ioc 7ZONE OMOR AREA E T g1IN M.. TOTAL IN; l ToTAL 0-30A HVAC Equipment Room 806'-O NA NA 19 10 NA NA O-30A Freight Elevator Lobby 806-' NA NA 1 1 -NA NA 0-30A CREOASS OF125A High Temp. Alarm 806'-0' 7 4 NA NA NA NA 0-30A CREOASS DS-091 806'O 7 4 NA NA NA NA D-30A CREOASS OF125B High Temp. Alarm 806-' 7 4 NA NA *NA NA 0-30A CREOASS DS-092 80694 7 4 NA NA NA NA 0-30A SGTS - OF169A High Temp. Alarm 806'-( I I NA NA NA NA 0-3A SGTS- DS-093 806-O 1 1 NA NA NA NA 0-30A SGTS - OFI 69B High Temp. Alarm 806 . 1 1 NA NA NA NA 0-30A_ SGTS- DS-094 806'-O 1 1 NA NA NA NA

. eactor~ilding ~ K ________- ___ __

O-6G Surge Tanr Vault 779-4r NA NA 2 1 NA NA O-BA Refueling Floor 818'-1' NA NA NA NA 60 30 0-8A Refueling Floor Elevators 8186-1 NA NA 2 1 NA NA 1-1A Core Spray Pump Room 645' NA NA 7 4 NA NA 1-118 Core Spray Pump Room 645'-0 NA NA 5 3 NA NA 1-1 B Elevator Lobby 645-' NA NA 1 1 NA NA 1-IC HPCI Pump Room 645'-0 2 1 NA NA 7 4 1-D RCIC Pump Room 645'-0 2 1 NA NA 5 3 1-1E RHR Pump Room 645'- NA NA NA NA 13 7 1-IF RHR Pump Room 645'4O NA NA NA NA 15 8 1-1G Sump Room 645' NA NA 2 1 NA NA 1-11 NW Stairway and Elevator Vestibule 676' NA NA 1 1 NA NA 1-2A Access Area 670' NA NA 7 4 NA NA 1-2B Access Area 670'-0' NA NA 9 5 NA NA 1-2B Access Area Elevator Lobby 670'- NA NA I I NA NA 1-2D Remote Shutdown Panel Room 670' NA NA 2 1 NA NA 1-3A Access Area - 683'0' NA 'NA 9 5 NA NA 1-3B-N Equipment Removal Area - North 6830 NA NA 8 4 NA NA 1-3B-N Equipment Removal Area Elevator Lobby 683-0 NA NA I I NA NA SUSQUEHANNA - UNIT TRM 37-32 UTEFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation PPL Rev. 1 3.7.3.8 0

TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION m

D INSTRUMENT

's LQCATION - < TNSTRUMENT OPERBL FIRE .....-' HEAT -. 2~~~~~~~~~~~~~~. ELECTRIC~`t' z2 RM OR ARE AELF. TOTAI' JlNR ITOTAL - MIN*- TOTAL MN.

1-3B-S Equipment Removal Area - South 683' NA NA 1 1 NA NA 1-3B-W Equipment Removal Area - Wraparound 683!-0 NA NA 2 1 NA NA 1-3C-N Equipment Access Area - North 683-0 NA NA NA NA 4 2 1-3C-S Equipment Access Area - South 683-" NA NA NA NA 4 2 1-3C-W Equipment Access Area - Wraparound 683!-0 NA 'NA NA NA 5 3 1-4A-N Containment Access Area - North 719- NA NA 11 6 4 2 1-4A-N Containment Access Area Elevator Lobby 71 gr-O NA NA 1 1 NA NA 1-4A-S Containment Access Area - South 71 G9- NA NA 10 5 NA NA 1-4A-W Containment Access Area -Wraparound 71 9r-0 NA NA 6 3 NA NA 14B Pipe Pehetration Room 719'-1 NA NA 1 1 NA NA 1-4C 14D 14G SwitchgearRoom Switchgear Room Main Steam Pipeway 719' 719' 719'-1 NA NA NA

-NA NA NA NA 2

2 1

1 NA NA NA 4

NA NA 2

I, 1-4G Exhaust Fan Room 719-1" NA NA NA NA 2 1 1-BA-N General Access Area - North 74-1". NA NA 5 3 1 1 1-5A-N General Access Area Elevator Lobby 74-1" NA NA 1 1 NA NA 1-BA-S SLC Chiller Area - South 74g-1. NA NA 15 8 7 4 1-5A-W Access Corridor-Wraparound 749 NA NA 7 4 NA NA 1-SB Valve Access Area 761'-10" NA NA NA NA 2 1 1-51 RWCU Pumps& Heat Exchangers 749' NA NA NA NA 10 5 1-5E Penetration Room 749-1 NA NA NA NA 2 1 1-SF Load Center Room 749'- NA NA 2 1 NA NA 1-5G Load Center Room 749-1 NA NA 2 1 NA NA 1-SH Instrument Repair Shop/Sample Station 749- NA NA 1 1 NA NA 1-6A Access Area 779'-V NA NA 9 5 NA NA 1-6A Access Area Elevator Lobby 779'- NA NA 1 1 NA NA 1-6B Load Center Room 779'-P NA NA 4 2 NA NA 1-6C Electrical Equipment Room 779-V NA NA 2 1 NA NA 1-61 H&V Equipment Room 779'-r NA NA 12 6 NA NA SUSQUEHANNA - UNIT TRM / 3.7-33 EFFECTIVE DATE 01/09/2004

Fire Detection Instrumentation PPL Rev. 1 3.7.3.8 0

TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION 1~~NSTRUMENT LOCATION -  : -mNTUM P

~~~~~~wMU "E~~~t.."L60A... IO...  : INSTRUMENT OPERABLE~

nW::. iONIZATION .. PHoToELECTRC ZOE O RJ.m!~~.A E ... 7Jl

>1OTA. U OAL - . 'TAL; lAN...':.

1-6E Recirculation Fans Area 77Y NA NA 2 1 NA NA 1-61 Fuel Pooling Holding Pump Room 779-1 NA NA NA NA 2 1 1-7A H&V Fan Filter Rooms 799-l' NA NA 15 8 NA NA 1-7A HVAC Filter 1F257A High Temp. Alarm 79g-1. 7 4 NA NA NA NA 1-7A HVAC Fter I F257A DS-181 79W-i" 7 4 NA NA NA NA 1-7A HVAC Filter 1F257B High Temp. Alarm 79W-1" 7 4 NA NA NA NA 1-7A HVAC Filter I F257B DS-182 79g-1*

  • 7 4 NA NA NA NA 1-7A HVAC Filter 1F217A High Temp. Alarm 79-1" 5 3 NA NA NA NA 1-7A HVACFilter1F217ADS-183 79W-1" 5 3 NA NA NA NA 1-7A HVAC Filter 1F217B High Temp. Alarm 799-1" 5 3 NA NA NA NA 1-7A HVAC Filter 1F217B DS-184 .79-i" 5 3 NA NA NA NA Xq, g7;9. Om ' ..-.

0-51 Pump Room 685'-6" NA NA 6 3 NA NA 0-52 Pump Room 685'-6 . NA NA 6 3 NA NA

. U6 ,, Diselee aould. a*< H4T..-NFR-R I -

0-41A Diesel Generator "A' Bay 678 22 11 2 1 15 8

,___._ 710'-9V NIA N/A N/A N/A 8 4 0-41 B Diesel Generator B" Bay 6't 23 12 2 1 15 8.

710'-4r N/A N/A N/A N/A 9 5 0-41 C Diesel Generator "C" Bay 660 & 22 11 2 15 8 677'-0 710'-9 N/A N/A N/A N/A 8 4 0-41 D Diesel Generator D" Bay 660' & 22 11 2 1 15 8 677'-0" 710'9. N/A N/A N/A N/A 8 4 Geeat&'O-udi4 niesei T J -; IR ED ,rIONTW I 0-41 E Diesel Generator Rooms 656-T & 1 1 NA NA 21 l 1 675'-T& NA NA 6 3 3 2 708'.0" NA NA 4 2 NA NA SUSQUEHANNA - UNIT 1 TRM / 3.7-34 EFFECTIVE DATE 11/16/2001

Fire Detection Instrumentation PPL Rev. 1 - 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION iNSTRUMENT LOCATION - NSTRUMENT OPE .

DM"ZAIO-IPHOMELE-CTRIC

.......... . -' . . c >---

0-00 Startup Transforrner (OX103) DS-01 4 NA 10 5 NA NA NA NA 0-00 Startup Translormer (OX104) DS-015 NA 12 6 NA NA NA NA I 0-00 ESS Transformer- DS-016 OX201 NA 6 3 - NA NA NA NA OX 213 NA 6 3 NA NA NA NA 0-00 ESS Transformer - DS-017 OX203 NA 6 3 NA NA NA NA OX211 NA 6 3 NA NA NA NA SUSQUEHANNA - UNIT TRM / 3.7-34a EFFECTIVE DATE 10/05/2002

Fire Detection nstrumentation

PPL Rev. 1 B 3.7.3.8 B 3.7.3.8 Fire Detection Instrumentation BASES TRO OPERABILITY of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This-capability is required in orderto detect and locate fires in their early stages.

Prompt detection of fires will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility

-fire protection program.

The basis for the detection instrumentation included within the scope of this TRO includes both Safety Related and Safe Shutdown System protection.

Fire Detection Instrumentation associated with building elevators are listed as separate line items in Table 3.7.3.8-1 due to their specific function and their layout being in a vertical string.

ACTIONS The Actions are defined to ensure proper corrective measures and compensatory actions are taken in response to the inoperable systems or components.

In the event that a portion of the fire detection instrumentation is inoperable, establishing hourly firewatch patrols in the affected areas is required to

.provide detection capability until the inoperable instrumentation is restored to OPERABILITY.

Inaccessible Fire Detection Instrumentation can affect the compensatory actions for inoperable Fire Rated Assemblies (Ref. TRO 3.7.3.7 and B3.7.3.7).

Hourly Firewatch Patrols shall be completed once each clock hour.

Individual zones on the hourly firewatch patrol shall be toured at intervals

.(i.e., zone A and back to zone A) of sixty minutes with a margin of fifteen minutes.

A continuous Firewatch must remain in the specified area at all times and must patrol the required fire zones in the specified area at least once per fifteen minutes with a margin of five minutes.

SUSQUEHANNA - UNIT 1 TRM / B 3.7-14 EFFECTIVE DATE 08/02/1999

Fire Detection Instrumentation PPL Rev. 1 B 3.7.3.8

. A I .i ' i

.~~~~~%  !. I B 3.7.3.8 Fire Detection Instrumentation BASES ACTIONS The specified area can be as small as one fire zone or as large as a (continued) firewatch can reasonably patrol within the fifteen minute time period. The specified area is limited to two floors of the Control Structure or Reactor Buildings. The floors must be adjacent or served by an operable elevator.

Areas exist within the plant where the posting of a firewatch does not provide acceptable radiological ALARA practices. For these inaccessible areas, alternate measures should be taken to assure an adequate level of fire protection is maintained.

TRS The TRSs are defined to be performed at the specified Frequency to ensure that the Fire Detection Instrumentation is maintained OPERABLE.

The Surveillances are modified by a ****Note**** to indicate that when a detector is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 15 minutes for each detector. Upon completion of each detector test, or expiration of the 15 minute allowance, the detector must reset and alarm must clear, or the applicable Condition entered and Required Action taken. This note is based on the assumption of time to perform a detector test. Under normal conditions, it is expected that the detector would reset and alarm clear within minutes after detector test initiation. It is recognized that while the detector being tested is in the tripped condition, other alarms originating on the string of detectors being tested will be masked.

TRS 3.7.3.8.1 /TRS 3.7.3.8.2 The surveillance frequency of.12 months is based on NFPA 72-.

1996, National Fire Alarm Code.

~~~~~~~~~~~~~~~~~~~~~~~tn~h*II UU Iau utuJ SUSQUEHANNA - UNIT 1 TRM B 3.7-14a EFFECTIVE DATE 08/02/1999

-,z Z .

  • FireDetection Istrumentation PPL Rev. 1 B 3.7.3.8 0~~~~~~

B 3.7.3.8 Fire Detection Instrumentation

. I .

BASES TRS TRS 3.7.3.8.3 (continued)

Fire Detection Instrumentation that-is inaccessible during unit operation is defined as those fire detection instruments that are located within high radiation areas or where access is limited due to operating conditions, AND remote testing capability (i.e., smoke tubes) does not exist. Inaccessible Fire Detection Instruments need only be tested when the Unit is in cold shutdown for longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, unless it has been tested in the previous 12 months. Inaccessible Fire Detection Inttrumentation must then be surveilled during the cold shutdown prior to startup. Inaccessible Fire Detection Instrumentation remains OPERABLE during Unit operation even though the surveillance frequency for accessible Fire Detection Instrumentation may have been exceeded.

REFERENCES 1. FPRR Section 4.12 SUSQUEHANNA- UNIT 1 TRM / B 3.7-14b EFFECTIVE DATE 01/09/2004

/