MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2004-1797 Jan. 13, 2004 Page 1
of 1 USER NFORMATION:
- ROS MPL#:28401 CA#: 0363 Addres SA2 Pho T M: 254-TRANSMITTAL INFORMATION:
TO:
01/13/2004 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
\\JHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM1 -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/13/2003 ADD MANUAL TABLE OF CONTENTS DATE: 01/12/2004 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT 3.7.3.8 REMOVE:
REV:0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT B3.7.3.8 REMOVE:
REV:0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT LOES REMOVE:
REV:3 ADD:
REV: 4 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS,
- LECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND
'-ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
t-1
S z
.SUSQUEHANNA STEAM ELECTRIC STATION PPL-Rev. 4 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC 1.0 2.0 3.0 3.1 3.2 3.3 TABLE OF CONTENTS USE AND APPLICATION Pages TRM / 1.0-1 through TRM /1.0-3 PLANT PROGRAMS Pages 2.0-1 through 2.0-2 Page TRM / 2.0-3 Page TRM /2.0-4 Page TRM / 2.0-5 Pages TRM / 2.0-6 and TRM 12.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9, Pages TRM /2.0-10 and TRM /2.0-11 Page TRM / 2.0-12 PageTRM/2.0-13 APPLICABILITY
\\-X Pages TRM / 3.0-1 and TRM,/3 Pages TRM /3.0-3 t_.-AJ A
Page TRM /3.0-4<>),
REACTIVITY CONTROL SYSTEMS Pages 3.1-1,hrough 3.1`6 Pages TRM,3.1-7arid TRM / 3.1-8 Pages TRM 31-9 and TRM / 3.1-9a Page TRM/
-3:1
-10 CORE OPERATING LIMITS REPORT
-7KPage.TRM / 3.2-1 (s1 Pag'es TRM / 3.2-2 through TRM / 3.2-37 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM/3.3-4 Pages 3.3-5 through 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Pages TRM / 3.3-10 and TRM / 3.3-11 Page TRM / 3.3-12 Pages TRM / 3.3-13 and TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 10/04/2002 08/31/1998 08/01/2001 06/25/2002 04/02/1999 10/22/2003 03/29/2000 09/04/2002 04/02/1999 10/22/2003 06/16/2000 04/08/ 999 03/15/2002 04/08/1999 08/31/1998 06/05/2002 02/18/1999 02/18/1999 07/07/1999 11/01/2003 07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 03/30/2001 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/22/2003 SUSQUEHANNA - UNIT 1.
TRM / LOES-1 EFFECTIVE DATE 01/09/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.3-22 Pages TRM 1 3.3-23 through TRM / 3.3-25 Page TRM 1 3.3-26 08131/1998
.05116/2003 10122/2003 3.4 REACTOR COOLANT SYSTEM
. Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 10123/1998
.08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 08/31/1998 04/17/2000 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-3 Page TRM 13.6-4 Page 3.6-5 Pages TRM I 3.6-6 through TRM / 3.6-8 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Pages TRM 1 3.7-4 through TRM / 3.7-10 Page TRM /3.7-11 Pages TRM /3.7-12 through TRM 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-32 Page TRM / 3.7-33 Page TRM /3.7-34 Page TRM / 3.7-34a Pages TRM / 3.7-35 through TRM / 3.7-37 Pages 3.7-38 through 3.7-40 Pages TRM /3.7-41 and TRM i 3.7-41 a Pages 3.7-42 and 3.7-43 Pages 3.7-44 through 3.7-48 Page TRM /3.7-49 Pages TRM / 3.7-50 and TRM / 3.7-51 Pages TRM / 3.7-52 and TRM 13.7-53 Page TRM 1 3.7-54 08/31/1998 08/02/1999 12/29/1999 08/02/1999 11/1612001 01/09/2004 11/16/2001 10/05/2002 02/01/1999 08131/1998
.08/1112000 08131/1998 10/113/1998 03/08/2003 03/09/2001 04/1512003 07129/1999 3.8 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Page 3.8-3 Page TRM 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-9 04/02/2002 08131/1998 1213112002 04/0212002 08131/1998 SUSQUEHANNA - UNIT 1 TRM LOES-2 EFFECTIVE DATE 01/09/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.8-10 Page TRM I 3.8-11 Page TRM / 3.8-11 a Pages 3.8-12 through 3.8-14 Pages TRM 3.8-15 through TRM /3.8-17 Page 3.8-18 Page TRM / 3.8-19
'Page 3.8-20 Pages TRM / 3.8-21 through TRM /3.8-23 Pages 3.8-24 and 3.8-25 07/19/2001 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/31/1998 04/02/2002 08/31/1998
- 06/06/1999 08/31/1998 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 Page TRM 3.10-6 Page TRM / 3.10-7 08/31/1998 03/08/2003 06/05/2002 04/07/2000 Corrected 04/17/2002 Page TRM / 3.10-8 3.11 3.12 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 through 3.11-21 Pages TRM / 3.11-22 through TRM /3;11-24 Pages 3.11-25 through 3.11-32 Pages 3.11-33 through 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 09/01/1998 08/31/1998 04/02/2002 09/01/1998 08/31/1998 02/05/1999 08/31/1998 4.0 SUSQUEHANNA - UNIT 1 TRM LOES-3 EFFECTIVE DATE 01/09/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
I *.v..
Section Title Effective Date B3.0 B3.1 B 3.2 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM /B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 03/15/2002 07/13/1999 08/31/1998
-07/13/1999 02/18/1999 08/31/1998 B3.3 B 3.4 B 3.5 INSTRUMENTATION BASES Page TRM / B 3.3-1
'Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9 Pages B 3.3-10 through B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM / B 3.3-16 PageTRM/B3.3-17 Pages TRM / B3.3-18 and TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B.3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 04/0712000 08/31/1998 12/2912000 03/21/2003 03/30/2001 08/31/1998 10/22/2003 06/25/2002 06/14/2002 06/14/2002 10/22/2003 04/07/2000 05/16/2003 1 0/22/2003 05/16/2003 08/31/1998 10/15/1999 08/31/1998 08/31/1998 B3.6 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 07/26/2001 02101/1999 08/31/1998 09/23/1999 01/07/2002 SUSQUEHANNA - UNIT 1
. TRM /.LOES4 EFFECTIVE DATE 01/09/2004
SUSQUEHANNA STEAM ELECTRIC STATION-PPL Rev. 4 LIST OF EFFECTIVE SEC77ONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B3.7 Pages TRM / B 3.6-6 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 through TRM / B 3.7-7 Page TRM / B 3.7-7a Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM / B 3.7-1 Oa Pages TRM / B 3.7-11 and TRM / B 3.7-1 Ia Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM/B 3.7-21 through TRM/B 3.7-21a Pages TRM/B 3.7-22 and TRM/B 3.7-23 Pages B 3.7-24 through B 3.7-30 Pages TRM / B 3.7-31 and TRM / B 3.7-32 Page TRM / B 3.7-33 Pages TRM / B 3.7-34 and TRM / B 3.7-35 12/31/2002 08/31/1998 08/02/1999 08/02/1999 08/02/1999 08/02/1999
- 08/02/1999 08/02/1999 08/02/1999 01/09/2004 02/01/1999 08/31/1998 05/11/2001 04/07/2000 08/31/1998 03/09/2001 04/15/2003 07/05/2000 B3.8 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 Page TRM / B 3.8-2a PageTRM/B3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-17 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 04/02/2002 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / B 3.10-7 08/31/1998 03/08/2003 08/23/1999 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 PageTRM/B3.11-10*
Pages TRM/B 3.11-11 and TRM/B 3.11 -11a 08/30/1998 02/01/1999 04/07/2000 SUSQUEHANNA - UNIT TRM / LOES-5 EFFECTIVE DATE 01/09/2004
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 4 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRMIB 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Page TRM / B 3.11-22 Page TRM / B 3.11-23 Page TRM / B 3.11-23a Page TRM / B 3.11-24 Page TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM /B 3.12-3 02/01/1999 11/01/1999 02/01/1999 08/30199a 04/02/2002 04/02/2002 04/02/2002 09/2612003 04/0212002 04/02/2002 0321/2003 04/15/2003 08/30/1998 02/12/1999 02/05/1999 Adept\\TRMI text LOES 1/5104 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 01/09/2004
Fire Detection Instrumentation 3.7.3.8 PPL Rev. I 3.7.3 Fire Protection 3.7.3.8 Fire Detection Instrumentation TRO 3.7.3.8 The fire detection instrumentation for each fire detection zone shown in Table 3.7.3.8-1 shall be OPERABLE.
APPLICABILITY:
Whenever equipment protected by the fire detection instrument is required to be OPERABLE.
ACTIONS NOTE
- 1. Separate condition entry is allowed for each instrument.
CONDITION REQUIRED ACTION COMPLETION TIME A. The number of OPERABLE A.
Establish an hourly fire 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire detection watch patrol instruments less than the Minimum AND Instruments Operable requirement of Table A.2.1 Inspect the accessible Once per hour
-3.7.3.8-1 zone(s) with inoperable instrument(s)
OR A.2.2 Inspect the affected Once per hour area surrounding any inaccessible zones SUSQUEHANNA - UNIT 1 TRM / 3.7-26 AEFFECTIVE DATE 8/02/1999
Fire Detection Instrumentation PPL Rev. 1 3.7.3.8 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY
-NOTE--
When a detector is placed in an inoperable status solely N/A for performance of required Surveillances, entry into associated Conditions and required Actions may be delayed for up to 15 minutes.
TRS 3.7.3.8.1 Perform CHANNEL FUNCTIONAL TEST on 12 months accessible fire detection instruments.
TRS 3.7.3.8.2 Verify that the supervised circuits 12 months supervision associated with the detector alarms of each of the fire detection instruments listed in Table 3.7.3.8-1 are OPERABLE.
TRS 3.7.3.8.3 Perform CHANNEL FUNCTIONAL TEST on Prior to inaccessible fire detection instruments.
startup from each COLD SHUTDOWN exceeding 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> unless performed in the previous 12 months I'
SUSQUEHANNA - UNIT 1 TRM / 3.7-27 EFFECTIVE DATE 8/02/1999 L-
Fire Detection Instrumentation 3.7.3.8
-PPL Rev. 1 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION
.,.NSTRUMENT,,L.T IO 0
-J'.,.?'NT.UElPERABLE.--_
A; Xt8 OR;ARE~~~~~~~~~~~~~A TAt PHICYTO EL MIH WlOTj 0-21A Common Equipment-Room Elevator Lobby 656' NA NA 1
1 NA NA Chem Lab OF135 High Temp. Alarm 687'-10' 2
1 NA NA
-NA NA Chem Lab DS-021 687'-0r 2
1 NA NA NA NA Chem Lab OF1 38 High Temp. Alarm 68T-10r 2
1 NA NA NA
'NA Chem Lab DS2 68T-101, 2
1 NA NA NA NA 0-22A Chem Lab OF1 41 High Te'mp. Alarm 68T-10" 2
1 NA NA NA NA Chem Lab DS-023 68T-1 (r 2
1 NA NA NA NA Chem Lab OF144 High Temp. Alarm 68T-10' 2
1 NA NA NA NA Chem Lab DS-024
,68T-10"'
2 1
NA NA NA NA 0-22A Above CeffingfFifter Area '687Tr NA NA 10 5
NA NA 0-22A Elevator Lobby 676' NA NA I
I
-NA NA D-23 Egress Corridor to South Stairwell 686'ST NA NA 1
1 NA NA 0-24B Corridor 698'-0' NA NA 5
3 NA NA 0-24B Corridor (Under Floor) 69T-V 2
1 NA NA NA NA 0-24B Corrdor (Above Ceiling) 698' 4
2 NA NA NA NA 0-24B Corridor Elevator Lobby 699gV NA NA 1
1 NA NA 0-24C UPS Panel Room U-1 698'r 4
2 2
1 NA NA U-1 Lower Relay Room 1 U704 69T-0" I11 6
6 3
NA NA PGCC Halon Panel Division II 1U705 69TV 1 1 6
6 3
NA NA 0-24D 1 U706 69TVr 11 6
6 3
NA NA I U731 69Tr I10 5
6 3
NA NA 1 U732 69TT I11 6
6 3
NA NA 0-24D U-1 Lower Relay Room 698'tr 4
2 4
2 NA NA 0-24E Computer Room 698'-0' NA NA 6
3 NA NA 02E Computer Room (Above Ceiling) 698:
12 6
4 2
NA NA I
Computer Room PGCC Underfloor 0-24E 1 U720 I U722 I U724 1U726 697:-
697:0O 697'-0" 6sr-or NA' NA NA NA NA NA NA NA 4
4 2
NA NA NA NA NA NA NA NA I
SUSQUEHANNA - UNIT 1 TRM I 3.7-28 EFFECTIVE DATE 11/1612001
Fire Detection Instrumentation 3.7.3.8 PPL Rev. I TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION 5iliUMENT.LOCATION INSTRMENTpEkAL
'E FI.....
t-
'l...x IOHOZA NC:
ZONE -
~ROOMOR AREA.
TOTALS
- -IN.
TOTAL.
MNiTOTAL;
-IAIN.9.:
Computer Room 2U721 697'-0" NA NA 4
2 NA NA PGCC Underfloor 2U723 6974r
.NA
- .NA 4
2 NA NA 0-24E 2U725 6974r NA NA 4
2 NA NA 2U727~~~~~~~W 697'-0 NA NA 4
2 NA NA 0-24F Computer Maintenance Rm and Office 698'4r NA NA 6
3 NA NA 0-24F Comp Maint Rm & Office (Below Floor) 69r7r 2
1 NA NA NA NA 0-24F Comp Maint Rm & Office (Above Ceiling) 698' 2
1 NA NA NA NA 0-24J South Cable Chase 698O'r 1
1 NA NA NA NA 0-24L Center Cable Chase 698'4r I
I NA NA NA NA 0-24M North Cable Chase 698-'
I I
NA NA NA NA 0-25A U-2 Lower Cable Spreading Room 71 4-r 20 10 6
3 NA NA 0-25B South Cable Chase 714'-0 1
1 NA NA NA NA 0-25C Center Cable Chase 714-r 1
1 NA NA NA NA 0-25D North Cable Chase 714'-0 1
1 NA NA NA NA 0-25E U-1 Lower Cable Spreading Room 714-0' 26 13 5
3 NA NA 0-25E U-1 Lower Cable Spreading Room Elevator 71 4*-
NA NA I
I NA NA Lobby 0-26A Copy Room 729'-1 NA NA 1
1 NA NA 0-26B South Cable Chase 729'-1' NA NA 1
1 NA NA 0-26C Center Cable Chase 729' NA NA 1
1 NA NA
-26D North Cable Chase 729' NA NA I
I NA NA 0-26E Locker Room 729 NA NA I
I NA NA 0-26F Vestibule Elevator Lobby 729'-
NA NA 1 -
NA NA 0-26F Vestibule (Under Floor) 728-1 NA NA I
I NA NA 0-26G Shift Office 729'-1 NA NA I
1 NA NA 0-26G Shift Office (Under Floor) 728-1" NA NA 2
1 NA NA 0-26H Control Room (Under Floor Unit 1) 728'-1*
NA NA 15 8
NA NA 0-26H Control Room (Under Floor Unit 2) 728-1' NA NA 1 2 6
NA NA 0-26H Control Room 729-NA NA 10 5
NA NA 0-26H Control Room (Above Ceiling) 729-1" NA NA 9
5 NA NA 0-261 Operational Support Center 729'-1 NA NA I
I NA NA SUSQUEHANNA - UNIT 1 TRM / 3.7-29 EFFECTIVE DATE 11/16/2001
Fire Detection Instrumentation 3.7.3.8 PPL Rev. 1 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION
/
- NS1RUMENT LO N
NSTRUMENT OPER BL E
F,,,,
HEATi~;
J h;
ai gW,,S,,, i<; ?>>
- Ti;
{i
'ONIATO.
POTO
's'ELECC OEX ROOM OR AREA 3.: ; 2>:
EL V.
TOTAL ; lMIN. :. TOTAL l 'lAIR.
TOTAL,,ll 0-261 Operational Support Center (Under Floor) 728'-1 NA NA 2
1 NA NA 0-26J Vestibule (Under Floor) 728-1 NA NA 1
1 NA NA 0-26J Vestibule 729-1" NA NA 1
I NA NA 0-26K Technical Support Center 741-1' NA NA 10 5
NA NA 0-26K Technical Support Center Elevator Lobby 741-1" NA NA I
1 NA NA 0-26K Technical Support Center (Above Celing) 741-1" NA NA 5
3 NA NA 0-26L Conference Room 741'-1 NA NA 6
3 NA NA 0-26L Conference Room (Above Ceiling) 741:1' NA NA 2
1 NA NA 0-26M U-1 TSC Soffit 729'-1 NA NA 2
1 NA NA 0-26M U-1 TSC Soffit 741:1-NA NA 2
1 NA NA 0-26N U-1 Control Room Soffit 741 NA NA 2
1 NA NA 0-26P U-2 Control Room Soffit 741 -1' NA NA 2
1 NA NA 0-26R U-2 TSC Soffit 729'.1-NA NA 2
1 NA NA 0-26R U-2TSC Soffit 741'-I' NA NA 2
1 NA NA 0-26S South Cable Chase 741'.
I I
NA NA NA NA 0-26T Center Cable Chase 741 '-1' 1
1 NA NA NA NA 0-26V North Cable Chase 74-1 1
1 NA NA NA NA 0-27B U-2 Upper Cable Spreading Room 753'-0 24 12 5
3 NA NA 0-27B U-2 Upper Cable Spreading Room 753-0 4
2 NA NA NA NA (Under Floor)__
0-27C U-1 Upper Cable Spreading Room 753-'
23 12 7
4 NA NA 0-27C U-1 Upper Cable Spreading Room Elevator 753-O' NA,
NA 1
1 NA NA 0 2 C Lobby__
0-27C U-1 Upper Cable Spreading Room 753 4
2 NA NA NA NA
-2C (Under Floor) 75____4_
NA__
NANANA 0-27D Electrician's Office 754' 2
1 1
1 NA NA 0-27E U-1 Upper Relay Room 754'-0 4
2 2
1 NA NA SUSQUEHANNA - UNIT
.TRM 37-30 EFFECTIVE DATE 11/16/2001
Fire Detection Instrumentation 3.7.3.8 PPL Rev. 1 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTAT1ON
.INSTR.UM~ENT L
ATO NSTRUMEN OPERBLE';
FIR.0E RARAELV TOA
.. o-nw INA PHoTO EETI m~~~~~~~~~~~~~~~~~AN TOTAL
-IDNl-:tlLh TOTAV,lIIIN."-
U-1 Upper Relay Room I U700 753-C 11 6
6 3
NA NA PGCC Halon Panel Division 1 U701 753:a0 11 6
6 3
NA NA 0-27E 1 U702 753'-0C 11 6
6 3 >
NA NA 1U703 753'-0 11 6
6 3
NA NA 1 U730 753'-0 11 6
6 3
NA NA 0-27F South Cable Chase 754'-O' 1
1 NA
.NA NA NA 0-27G Center Cable Chase 7544O 1
1 NA NA NA NA 0-27H North Cable Chase 754-O" 1
1 NA NA NA NA 28A-1 Equipment Room 771'-0' NA NA 1
1 NA NA 0-28A-11 Equipment Room 771'-0 NA NA 3
2 NA NA 0-28B-I Equipment Room 771'-0 NA NA 1
1 NA NA 0-28B-Il Equipment Room 771'-0' NA NA 2
1 NA NA 0-28B-11 Equipment Room Elevator Lobby 77-0" l
NA NA I
1 NA NA 0-28C Battery Room 771'-01 NA NA 1
1 NA NA 0-28D Battery Room 771'-0 NA NA 1
1-NA NA 0-28E Battery Room 771'4V NA NA 1
1 NA NA 0-28F Battery Room 771'4O' NA NA 1
1 NA NA 0-28G Battery Room 771'-0 NA NA 1
1 NA NA 0-28H Repair Shop 771' NA NA 2
1 NA NA 0-281 Battery Room 771'4O NA NA 1
1 NA NA 0-28J Battery Room 771' NA NA 1
1 NA NA 0-28K Battery Room 771'-0 NA NA 1
1 NA NA 0-28L Battery Room 771' NA NA 1
1 NA NA 0-28M Battery Room
.771' NA NA 1
1 NA NA 0-28N Battery Room 771-O' NA NA 1
1 NA NA 0-28P South Cable Chase 771' 1
1 NA NA NA NA 0-280 Center Cable Chase 771'-0 I
I NA NA NA NA 0-28R North Cable Chase 771'O' I
I NA NA NA NA 0-28T Battery Room 7714' NA NA I
I NA NA 0-29A Elevator Vestibule 783'-0 NA NA I
I NA NA 0-29B H&V Equipment Room 783'-0 I
NA NA 10 5
NA NA SUSQUEHANNA - UNIT 1 TRIM / 3.7-31 EFFECTIVE DATE 11/16/2001
Fire Detection Instrumentation PPL Rev. 1 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION t si,NSTRUMENT LOCATION iNSTRUMENT OPERABLE
- .FIrE
.~..
<e
<X mHEAT ZTI
-PHOTO ELECR:4ioc 7ZONE OM OR AREA E
T TOTAL M
IN l
ToTAL g1IN 0-30A HVAC Equipment Room 806'-O NA NA 19 10 NA NA O-30A Freight Elevator Lobby 806-'
NA NA 1
1
-NA NA 0-30A CREOASS OF125A High Temp. Alarm 806'-0' 7
4 NA NA NA NA 0-30A CREOASS DS-091 806'O 7
4 NA NA NA NA D-30A CREOASS OF125B High Temp. Alarm 806-'
7 4
NA NA
- NA NA 0-30A CREOASS DS-092 80694 7
4 NA NA NA NA 0-30A SGTS - OF169A High Temp. Alarm 806'-(
I I
NA NA NA NA 0-3A SGTS-DS-093 806-O 1
1 NA NA NA NA 0-30A SGTS - OFI 69B High Temp. Alarm 806 1
1 NA NA NA NA 0-30A_
SGTS-DS-094 806'-O 1
1 NA NA NA NA eactor~ilding
~
K O-6G Surge Tanr Vault 779-4r NA NA 2
1 NA NA O-BA Refueling Floor 818'-1' NA NA NA NA 60 30 0-8A Refueling Floor Elevators 8186-1 NA NA 2
1 NA NA 1-1A Core Spray Pump Room 645' NA NA 7
4 NA NA 1-118 Core Spray Pump Room 645'-0 NA NA 5
3 NA NA 1-1 B Elevator Lobby 645-'
NA NA 1
1 NA NA 1-IC HPCI Pump Room 645'-0 2
1 NA NA 7
4 1-D RCIC Pump Room 645'-0 2
1 NA NA 5
3 1-1E RHR Pump Room 645'-
NA NA NA NA 13 7
1-IF RHR Pump Room 645'4O NA NA NA NA 15 8
1-1G Sump Room 645' NA NA 2
1 NA NA 1-11 NW Stairway and Elevator Vestibule 676' NA NA 1
1 NA NA 1-2A Access Area 670' NA NA 7
4 NA NA 1-2B Access Area 670'-0' NA NA 9
5 NA NA 1-2B Access Area Elevator Lobby 670'-
NA NA I
I NA NA 1-2D Remote Shutdown Panel Room 670' NA NA 2
1 NA NA 1-3A Access Area 683'0' NA
'NA 9
5 NA NA 1-3B-N Equipment Removal Area - North 6830 NA NA 8
4 NA NA 1-3B-N Equipment Removal Area Elevator Lobby 683-0 NA NA I
I NA NA SUSQUEHANNA - UNIT TRM 37-32 UTEFFECTIVE DATE 11/16/2001
PPL Rev. 1 Fire Detection Instrumentation 3.7.3.8 0
TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION D
m
's INSTRUMENT LQCATION TNSTRUMENT OPERBL FIRE HEAT
-. 2~~~~~~~~~~~~~~.
ELECTRIC~`t' z2 RM OR ARE AELF.
TOTAI' JlNR ITOTAL
- MIN*- TOTAL MN.
1-3B-S Equipment Removal Area - South 683' NA NA 1
1 NA NA 1 -3B-W Equipment Removal Area - Wraparound 683!-0 NA NA 2
1 NA NA 1-3C-N Equipment Access Area - North 683-0 NA NA NA NA 4
2 1-3C-S Equipment Access Area - South 683-"
NA NA NA NA 4
2 1-3C-W Equipment Access Area - Wraparound 683!-0 NA
'NA NA NA 5
3 1-4A-N Containment Access Area - North 719-NA NA 11 6
4 2
1-4A-N Containment Access Area Elevator Lobby 71 gr-O NA NA 1
1 NA NA 1-4A-S Containment Access Area - South 71 G9-NA NA 10 5
NA NA 1-4A-W Containment Access Area -Wraparound 71 9r-0 NA NA 6
3 NA NA 14B Pipe Pehetration Room 719'-1 NA NA 1
1 NA NA 1-4C SwitchgearRoom 719' NA
-NA 2
1 NA NA 14D Switchgear Room 719' NA NA 2
1 NA NA 14G Main Steam Pipeway 719'-1 NA NA NA NA 4
2 1-4G Exhaust Fan Room 719-1" NA NA NA NA 2
1 1-BA-N General Access Area - North 74-1".
NA NA 5
3 1
1 1-5A-N General Access Area Elevator Lobby 74-1" NA NA 1
1 NA NA 1-BA-S SLC Chiller Area - South 74g-1.
NA NA 15 8
7 4
1-5A-W Access Corridor-Wraparound 749 NA NA 7
4 NA NA 1-SB Valve Access Area 761'-10" NA NA NA NA 2
1 1-51 RWCU Pumps& Heat Exchangers 749' NA NA NA NA 10 5
1-5E Penetration Room 749-1 NA NA NA NA 2
1 1-SF Load Center Room 749'-
NA NA 2
1 NA NA 1-5G Load Center Room 749-1 NA NA 2
1 NA NA 1-SH Instrument Repair Shop/Sample Station 749-NA NA 1
1 NA NA 1-6A Access Area 779'-V NA NA 9
5 NA NA 1-6A Access Area Elevator Lobby 779'-
NA NA 1
1 NA NA 1-6B Load Center Room 779'-P NA NA 4
2 NA NA 1-6C Electrical Equipment Room 779-V NA NA 2
1 NA NA 1-61 H&V Equipment Room 779'-r NA NA 12 6
NA NA I,
SUSQUEHANNA - UNIT TRM / 3.7-33 EFFECTIVE DATE 01/09/2004
PPL Rev. 1 Fire Detection Instrumentation 3.7.3.8 0
TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION 1~~NSTRUMENT LOCATION
-mNTUM P
~~~~~~wMU "E~~~t.."L60A...
IO...
INSTRUMENT OPERABLE~
nW::.
iONIZATION
.. PHoToELECTRC ZOE O
RJ.m!~~.A E
>1OTA.
7Jl U OAL
'TAL; lAN...':.
1 -6E Recirculation Fans Area 77Y NA NA 2
1 NA NA 1-61 Fuel Pooling Holding Pump Room 779-1 NA NA NA NA 2
1 1-7A H&V Fan Filter Rooms 799-l' NA NA 15 8
NA NA 1-7A HVAC Filter 1 F257A High Temp. Alarm 79g-1.
7 4
NA NA NA NA 1-7A HVAC Fter I F257A DS-181 79W-i" 7
4 NA NA NA NA 1-7A HVAC Filter 1 F257B High Temp. Alarm 79W-1" 7
4 NA NA NA NA 1-7A HVAC Filter I F257B DS-182 79g-1*
- 7 4
NA NA NA NA 1-7A HVAC Filter 1 F217A High Temp. Alarm 79-1" 5
3 NA NA NA NA 1-7A HVACFilter1F217ADS-183 79W-1" 5
3 NA NA NA NA 1-7A HVAC Filter 1 F217B High Temp. Alarm 799-1" 5
3 NA NA NA NA 1-7A HVAC Filter 1 F217B DS-184
.79-i" 5
3 NA NA NA NA Xq, g7;9.
Om 0-51 Pump Room 685'-6" NA NA 6
3 NA NA 0-52 Pump Room 685'-6
. NA NA 6
3 NA NA
. U6 Diselee aould.
a*<
H4T..-NFR-R 0-41A Diesel Generator "A' Bay 678 22 11 2
1 15 8
710'-9V NIA N/A N/A N/A 8
4 0-41 B Diesel Generator B" Bay 6't 23 12 2
1 15 8.
710'-4r N/A N/A N/A N/A 9
5 0-41 C Diesel Generator "C" Bay 660 &
22 11 2
15 8
677'-0 710'-9 N/A N/A N/A N/A 8
4 0-41 D Diesel Generator D" Bay 660' &
22 11 2
1 15 8
677'-0" 710'9.
N/A N/A N/A N/A 8
4 niesei Geeat&'O-udi4 J
T IR ED,rIONTW 0-41 E Diesel Generator Rooms 656-T &
1 1
NA NA 21 l
1 675'-T&
NA NA 6
3 3
2 708'.0" NA NA 4
2 NA NA I -
I SUSQUEHANNA - UNIT 1 TRM / 3.7-34 EFFECTIVE DATE 11/16/2001
Fire Detection Instrumentation PPL Rev. 1 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION iNSTRUMENT LOCATION NSTRUMENT OPE DM"ZAIO -IPHOMELE-CTRIC c > ---
0-00 Startup Transforrner (OX103) DS-01 4 NA 10 5
NA NA NA NA 0-00 Startup Translormer (OX104) DS-015 NA 12 6
NA NA NA NA 0-00 ESS Transformer-DS-016 OX201 NA 6
3 -
NA NA NA NA OX 213 NA 6
3 NA NA NA NA 0-00 ESS Transformer - DS-017 OX203 NA 6
3 NA NA NA NA OX211 NA 6
3 NA NA NA NA I
SUSQUEHANNA - UNIT TRM / 3.7-34a EFFECTIVE DATE 10/05/2002
Fire Detection nstrumentation
- PPL Rev. 1 B 3.7.3.8 B 3.7.3.8 Fire Detection Instrumentation BASES TRO OPERABILITY of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This-capability is required in orderto detect and locate fires in their early stages.
Prompt detection of fires will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility
-fire protection program.
The basis for the detection instrumentation included within the scope of this TRO includes both Safety Related and Safe Shutdown System protection.
Fire Detection Instrumentation associated with building elevators are listed as separate line items in Table 3.7.3.8-1 due to their specific function and their layout being in a vertical string.
ACTIONS The Actions are defined to ensure proper corrective measures and compensatory actions are taken in response to the inoperable systems or components.
In the event that a portion of the fire detection instrumentation is inoperable, establishing hourly firewatch patrols in the affected areas is required to
.provide detection capability until the inoperable instrumentation is restored to OPERABILITY.
Inaccessible Fire Detection Instrumentation can affect the compensatory actions for inoperable Fire Rated Assemblies (Ref. TRO 3.7.3.7 and B3.7.3.7).
Hourly Firewatch Patrols shall be completed once each clock hour.
Individual zones on the hourly firewatch patrol shall be toured at intervals
.(i.e., zone A and back to zone A) of sixty minutes with a margin of fifteen minutes.
A continuous Firewatch must remain in the specified area at all times and must patrol the required fire zones in the specified area at least once per fifteen minutes with a margin of five minutes.
SUSQUEHANNA - UNIT 1 TRM / B 3.7-14 EFFECTIVE DATE 08/02/1999
PPL Rev. 1
. AI.i '
i
.~~~~~%
I Fire Detection Instrumentation B 3.7.3.8 B 3.7.3.8 Fire Detection Instrumentation BASES ACTIONS The specified area can be as small as one fire zone or as large as a (continued) firewatch can reasonably patrol within the fifteen minute time period. The specified area is limited to two floors of the Control Structure or Reactor Buildings. The floors must be adjacent or served by an operable elevator.
Areas exist within the plant where the posting of a firewatch does not provide acceptable radiological ALARA practices. For these inaccessible areas, alternate measures should be taken to assure an adequate level of fire protection is maintained.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the Fire Detection Instrumentation is maintained OPERABLE.
The Surveillances are modified by a ****Note**** to indicate that when a detector is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 15 minutes for each detector. Upon completion of each detector test, or expiration of the 15 minute allowance, the detector must reset and alarm must clear, or the applicable Condition entered and Required Action taken. This note is based on the assumption of time to perform a detector test. Under normal conditions, it is expected that the detector would reset and alarm clear within minutes after detector test initiation. It is recognized that while the detector being tested is in the tripped condition, other alarms originating on the string of detectors being tested will be masked.
TRS 3.7.3.8.1 /TRS 3.7.3.8.2 The surveillance frequency of.12 months is based on NFPA 72-.
1996, National Fire Alarm Code.
- ~~~~~~~~~~~~~~~~~~~~~~~tn~h*II UU Iau utuJ SUSQUEHANNA - UNIT 1 TRM B 3.7-14a EFFECTIVE DATE 08/02/1999
-,z Z.
PPL Rev. 1
- Fire Detection Istrumentation B 3.7.3.8 0~~~~~~
B 3.7.3.8 Fire Detection Instrumentation I
BASES TRS (continued)
TRS 3.7.3.8.3 Fire Detection Instrumentation that-is inaccessible during unit operation is defined as those fire detection instruments that are located within high radiation areas or where access is limited due to operating conditions, AND remote testing capability (i.e., smoke tubes) does not exist. Inaccessible Fire Detection Instruments need only be tested when the Unit is in cold shutdown for longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, unless it has been tested in the previous 12 months. Inaccessible Fire Detection Inttrumentation must then be surveilled during the cold shutdown prior to startup. Inaccessible Fire Detection Instrumentation remains OPERABLE during Unit operation even though the surveillance frequency for accessible Fire Detection Instrumentation may have been exceeded.
REFERENCES
- 1. FPRR Section 4.12 SUSQUEHANNA-UNIT 1 TRM / B 3.7-14b EFFECTIVE DATE 01/09/2004
/