ESFAS Instrumentation 3.3.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME R.

Two or more Nuclear R.1 Align the Nuclear Service 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Service Water Suction Water System for Standby Transfer-Low Pit Level Nuclear Service Water channels in one or more Pond recirculation.

pits inoperable.

OR R.2.1 Be in MODE 3.

10hours AND R.2.2 Be In MODE 5.

40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> I

II iI-i t5A z

.I Catawba Units 1 and 2 3.3.2-8 Amendment 14os. 181 (Unit 1) 173 (Unit 2)

ESFAS Instrumentation 3.3.2 SURVEILLANCE REQUIREMENTS NOTE---------------------------------------

Refer to Table 3.3.2-1 to determine which SRs apply for each ESFAS Function.

SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.2.2 Perform ACTUATION LOGIC TEST.

31 days on a STAGGERED TEST BASIS SR 3.3.2.3 NOTE-------------------------------

Final actuation of pumps or valves not required.

Perform TADOT.

31 days SR 3.3.2.4 Perform MASTER RELAY TEST.

31 days on a STAGGERED TEST BASIS SR 3.3.2.5 Perform COT.

92 days SR 3.3.2.6 Perform SLAVE RELAY TEST.

92 days SR 3.3.2.7 Perform COT.

31 days (continued)

Catawba Units 1 and 2 3.3.2-9 Amendment Nos. 173/165

ESFAS Instrumentation 3.3.2 SURVEILLANCE FREQUENCY SR 3.3.2.8 Verification of setpoint not required for manual Initiation functions.

Perform TADOT.

18 months SR 3.3.2.9 NOTE------

This Surveillance shall include verification that the time constants are adjusted to the prescribed values.

Perform CHANNEL CALIBRATION.

18 months SR 3.3.2.1 0 Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after SG pressure is > 600 psig.

Verify ESFAS RESPONSE TIMES are within limit.

18 months on a STAGGERED TEST BASIS SR 3.3.2.11 Perform COT.

18 months SR 3.3.2.12 Perform ACTUATION LOGIC TEST.

18 months Catawba Units 1 and 2 3.3.2-10 Amendment Nos. 208/202

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 1 of 5)

Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REOUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDMONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT

1.

Safety Injection(b)

a.

Manual Initiation

b.

Automatic Actuation Logic and Actuation Relays

c.

Containment Pressure - High I

1,2,3.4 1.2,3.4 1.2,3 2

2 trains 3

B SR 3.3.2.8 C

SR 3.3.2.2 SR 3.3.2.4 SR 3.3.2.6 D

SR 3.3.2.1 SR 3.3.2.5 SR 3.3.2.9 SR 3.3.2.10 NA NA S 1.4 psig NA NA 1.2 psig

d.

Pressurizer Pressure - Low 4

D SR 3.3.2.1 SR 3.3.2.5 SR 3.3.2.9 SR 3.3.2.10 aT1839 psig 1845 psig

2.

Containment Spray

a.

Manual Initiation

b.

Automatic Actuation Logic and Actuation Relays

c.

Containment Pressure -

High High 1,2.3,4 1,2,3,4 1,2.3 I per train.

2 trains 2 trains 4

B SR 3.3.2.8 C

SR 3.3.2.2 SR 3.3.2.4 SR 3.3.2.6 E

SR 3.3.2.1 SR 3.3.2.5 SR 3.3.2.9 SR 3.3.2.10 NA NA S 3.2 pslg NA NA 3.0 psig

3.

Containment Isolation(b)

I

a.

Phase A Isolation (1) Manual Initiation (2) Automatic Actuation Logic and Actuation Relays (3) Safety Injection 1 23,4 1t2,3,4 2

2 trains B

SR 3.3.2.8 C

SR 3.3.2.2 SR 3.3.2.4 SR 3.3.2.6 NA NA NA NA Refer to Function I (Safety Injection) for all Initiation functions and requirements.

(continued)

(a) Above the P-11 (Pressurizer Pressure) Interlock.

(b)The requirements of this Function are not applicable to Containment Purge Ventilation System and Hydrogen Purge System components, since the system containment Isolation valves are sealed closed In MODES 1, 2, 3, and 4.

I Catawba Units 1 and 2 3.3.2-1 1 Amendment Nos. 196/189

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 2 of 5)

Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWA.LLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT

3.

Containment Isolation (continued)

b.

Phase B Isolation I

(1) Manual Initiation (2) Automatic Actuation Logic and Actuation Relays (3) Containment Pressure -

High High 1,2,3,4 1,2.3.4 1 per train, 2 trains 2 trains B

SR 3.3.2.8 C

SR 3.3.22 SR 3.3.2.4 SR 3.3.2.6 NA NA NA NA 12.3 4

E SR 3.3.2.1 SR 3.3.2.5 SR 3.3.2.9 SR 3.3.2.10

< 3.2 psig 3.0 psig I

4.

Steam Line Isolation

a.

Manual Initiation I

(1) System 12(b).3(b) 2 trains 1,2(M),3(b) 1 per line F

SR 3.32.8 G

SR 3.32.8 NA NA NA NA (2) Individual

b.

Automatic Actuation Logic and Actuation Relays

c.

Containment Pressure - High High 1.2 (b),3(b)

  • 2(b),3(b) 2 trains 4

H SR 3.32.2 SR 3.32.4 SR 3.32.6 E

SR 3.32.1 SR 3.3.2.5 SR 3.32.9 SR 3.32.10 NA S3.2 psig NA 3.0 psig I

d.

Steam Line Pressure (1) LOW 11,2 (b), 3(a)(b) 3 per steam line D

SR 3.3.2.1 SR 3.3.2.5 SR 3.3.2.9 SR 3.32.10

? 744 psig 775 psig I

(continued)

(a)Above the P-I (Pressurizer Pressure) interlock.

(b) Except when all MSIVs are closed and de-activated.

Catawba Units 1 and 2 3.3.2-12 Amendment Nos. 179 (Unit 1 )

171 (Unit 2)

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 5)

Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER NOMINAL SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT

4. Steam Line Isolation (continued)

(2) Negative 3(b)(c) 3 per steam D

SR 3.3.2.1 t 122.8 (d) 100(d) psi Rate - High line SR 3.3.2.5 psi SR 3.3.2.9 SR 3.3.2.10

5.

Turbine Trip and Feedwater Isolation

a.

Turbine Trip (1) Automatic 1,2 2 trains I

SR 3.3.2.2 NA NA Actuation SR 3.3.2.4 Logic and SR 3.3.2.6 Actuation Relays (2)

SG Water 1,2 4 per SG J

SR 3.3.2.1 S 85.6%

83.9%

Level-SR 3.3.2.2 (Unit 1)

(Unit 1)

High-High SR 3.324

< 78.9%

77.1%

(P-14)

SR 3.32.6 (Unit 2)

(Unit 2)

SR 3.3.2.6 SR 3.3.2.9 SR 3.3.2.10 (3) Safety Refer to Function 1 (Safety Injection) for all Initiation functions and requirements. See Injection Item 5.a.(1) for Applicable MODES.

b.

Feedwater Isolation (1) Automatic 1 2(e) 3 (e) 2 trains H

SR 3.3.2.2 NA NA Actuation SR 3.3.2.4 Logic and SR 3.3.2.6 Actuation Relays (continued)

I (b) Except when all MSIVs are closed and de-activated.

(c) Trip function automatically blocked above P-11 (Pressurizer Pressure) Interlock and may be blocked below P-11 when Steam Line Isolation Steam Une Pressure - Low Is not blocked.

(d) Time constant utilized in the raleflag controller Is a 50 seconds.

(e) Except when all MFIVs, MFCVs, and associated bypass valves are closed and de-activated or Isolated by a closed manual valve.

Catawba Units I and 2 3.3.2-1 3 Amendment Nos. 208/202