ES-301 Administrative Topics Outline Form ES-301-1 Facility: South Texas Project Date of Examination: 8/18/03 Examination Level: RO Operating Test Number: 1 Administrative Topic (see Note)
Describe activity to be performed:
Conduct of Operations (A.1) Perform QPTR K/A 2.1.33 (3.4) Ability to recognize indications for system operating parameters which are entry level conditions for technical specifications.
Modified to include determination of TS action Conduct of Operations (A.2) Perform Instrumentation Channel Checks K/A 2.1.20 (4.3) Ability to execute procedure steps New Equipment Control (A.3) Review completed surveillance K/A 2.2.12 (3.0) Knowledge of surveillance procedures Bank Radiation Control (A4) Determine radiological requirements to enter a high radiation area K/A 2.3.10 (3.3) Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure.
Bank Emergency Plan NA NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
ES-301 Administrative Topics Outline Form ES-301-1 Facility: South Texas Project Date of Examination:
8/18/2003 Examination Level: SRO Operating Test Number: 1 Administrative Topic (see Note)
Describe activity to be performed:
Conduct of Operations (A5) Review RCS Inventory and determine Tech Spec applicability K/A 2.1.7: (4.4) Ability to evaluate plant performance and make operational judgements based on operating characteristics, reactor behavior and instrument response.
Conduct of Operations (A6) Determine Shift Staffing Requirements K/A 2.1.5 (3.4) Ability to locate and use procedures and directives related to shift staffing Equipment Control (A7) Review ESF Power Availability Results (Modified)
K/A 2.1.33 (4.0) Ability to recognize indications for system operating parameters which are entry level conditions for Tech Specs.
Radiation Control (A4) Determine radiological requirements to enter a high radiation area K/A 2.3.10 (3.3) Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure.
Emergency Plan (A8) Declare an Emergency Action Level (Modified)
K/A 2.4.41 (4.1) Knowledge of the emergency action level thresholds and classification.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: South Texas Project Date of Examination: 8/18/03 Exam Level: RO / SRO(I)
Operating Test No.: 1 Control Room Systems (8 for RO; 7 for SROI;2 or 3 for SROU)
System / JPM Title Type Code*
Safety Function
- a. (S1) Recover a Dropped Control Rod S, D I
- b. (S2) Establish RCP Seals with the PDP S, N II
- c. (S3) Manually Energize an ESF Bus S, N, A, E VI
- d. (S4) Isolate SI Accumulators S, A, D, L, E III
- e. (S5) Power Range NI Failure S, D VII
- f. (S6) Establish Supplementary Purge S, D, L VIII
- g. (C1) Determine/Establish CS Requirements C, D, A, L, E V
- h. (C2) Respond to RCB High Radiation (RO ONLY)
C, N, L IX (APE)
In-Plant Systems (3 for RO; 3 for SROI; 3 or 2 for SROU)
- i. (P1) Perform Local Channel Check and Source Check of RT-8038 P, M, R IX
- j. (P2) Place a Battery Charger in Service P, D VI
- k. (P3) Place Rod Control MG Set in Service P, D, A, L I
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA, (P)lant, (E)SF NOTE: The following are designed to be run concurrent:
S1/S3 S2/S5 S4/S6
ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: South Texas Project Date of Examination: 8/18/03 Exam Level: SRO(U)
Operating Test No.: 1 Control Room Systems (8 for RO; 7 for SROI;2 or 3 for SROU)
System / JPM Title Type Code*
Safety Function
- a. (S4) Isolate SI Accumulators S, A, D, L, E III
- b. (S6) Establish Supplementary Purge S, D, L VIII In-Plant Systems (3 for RO; 3 for SROI; 3 or 2 for SROU)
- i. (P1) Perform Local Channel Check and Source Check of RT-8038 P, M, R IX
- j. (P2) Place a Battery Charger in Service P, D VI
- k. (P3) Place Rod Control MG Set in Service P, D, A, L II
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA, (P)lant, (E)SF NOTE: The following simulator JPMs are designed to be done concurrent:
S4 and S6
Facility: South Texas Project NRC Scenario No.: 1 Op-Test No.: 1 Source:
New Bank - Significantly Modified X Bank - Initial Condition Change X See page 3 for Examiner/student assignments Initial Conditions: 100% power, BOL Turnover: Maintain current power. Shift Centrifugal Charging Pumps for upcoming maintenance.
Event No.
Malf.
No.
Event Type*
Event Description 1
(0 min)
N/A RO (N)
SRO (N)
Shift Centrifugal Charging Pumps.
2 (10 min) 03-09-02 (True)
RO (C)
SRO (C) 1B Centrifugal Charging Pump trips - after CCPs are swapped (should be within 10 min.)
3 (20 min) 08-15-03 (True)
BOP (I)
SRO (I) 1C Steam Generator controlling Feedwater flow channel fails low -
after TS are addressed for CCP failure or 10 minutes 4
(30 min) 50-BM-01 (1.0)
RO (I)
SRO (I)
VCT level transmitter LT-113 fails high - after 1C MFRV in auto or 10 min.
5 (37 min) 05-03-02 (0.1)
ALL (M) 1B Steam Generator Tube Rupture (15 min. ramp) - after LD Divert Valve is re-positioned to the VCT or 7 minutes 6
( 67 min) 05-07-02 (True)
BOP (C)
SRO (C)
Steam Generator 1B Main Steam Isolation Valve fails to close. Can be closed locally - integral to scenario. Apparent approx. 20-25 min after reactor trip 7
(67 min) 08-03-01 (True)
BOP (C)
SRO (C)
Aux Feedpump #11 trips - occurs automatically 20 min after reactor trip 8
(57 min) 01-35-02 (True)
RO (C)
SRO (C)
Intermediate Range Channel N36 failure of compensating voltage -
integral to scenario, will be apparent approx. 10-15 minutes after reactor trip
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Facility: South Texas Project NRC Scenario No.: 2 Op-Test No.: 1 Source:
New X Bank - Significantly Modified Bank - Initial Condition Change See page 3 for Examiner/student assignments Initial Conditions: 80% power at BOL, power escalation in progress following a shutdown for turbine blade inspection.
Turnover: 80% power, power escalation in progress. Currently at step 7.33 of 0POP03-ZG-0005. Boric Acid Tanks are at 7300 ppm Event No.
Malf.
No.
Event Type*
Event Description 1
(2 min) 05-17-01 (1.0)
BOP (I)
SRO (I) 1A SG PORV Pressure Transmitter PT-7411 fails high - 2 minutes after crew assumes watch 2
(11 min) 08-23-01 (True)
BOP (C)
SRO (C)
Loss of Condensate Pump 11 - after T.S. addressed for PORV or after 9 minutes 3
(22 min) 01-07-01 (True)
RO (C)
SRO (C)
Dropped Control Rod C9 - after DA Level Control returned to Auto.
or after 11 min.
4 (32 min)
NA RO (R)
BOP (R)
SRO (R)
Power Reduction due to dropped rod - crew should begin power reduction approx. 10 min following dropped rod.
5 (42 min) 50-LI-53 (True)
BOP (C)
RO (C)
SRO (C)
Second Dropped Control Rod G3, Manual Reactor-after power reduction of 2-3% (approx. 10 minutes after power reduction started).
6 (NA) 01-12-01 01-12-02 (True)
RO (C)
BOP (C)
SRO (C)
ATWS-reactor fails to trip automatically or manually. Can be tripped by opening LC breakers from the control room - integral to scenario 7
(54 min) 02-01-01 (1.0)
All (M)
RCS break develops into a LBLOCA (upon ES01 entry) - 5 min. ramp
- after ES01 entered or 12 minutes after EO00 entered.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Note: Once SI is initiated it will take approximately 23 minutes to reach the point of swapover to SI recirculation
SCENARIO OUTLINE Facility: South Texas Project NRC Scenario 3 Op-Test No.: 1 Source:
New Bank - Significantly Modified X Bank - Initial Condition Change X See page 3 for Examiner/student assignments Initial Conditions: 60% power. Power decrease is on hold to allow a SG Feedpump to be secured.
Turnover: 60% power. Power decrease is on hold to allow SG Feedpump # 12 to be secured. Maintain current power level.
Event No.
Malf. No.
Event Type*
Event Description 1
(0 min)
NA BOP (N)
SRO (N)
Secure SGFPT # 12 2
(12 min) 02-26-02 (1.0)
RO (I)
SRO (I)
Loop B T-Cold TT-420B fails high - after SUFP returned to Auto or after 12 minutes.
3 (22 min) 05-12-03 (0.0)
BOP (I)
SRO (I) 1C Steam Generator level transmitter LT-539 fails low -
after T.S. addressed for TT-420B or after 10 minutes 4
(32 min) 08-16-03 (0.0)
BOP (C)
SRO (C)
SG 1C Feedwater Regulating Valve (FCV-553) fails closed resulting in a reactor trip - after Feedwater regulating valve is returned to auto or after 10 minutes 5
(47 min) 02-12-01 (0.8) 02-04-01 (0.1)
All (M)
Pzr Steam Space Break (after entry into ES01) - at step 6 of ES01 or after 15 minutes. Note: 02-04-01 will be removed after 6 min.
6 (72 min) 10-02-01 LA10M1-D-3 RO (C)
SRO (C)
Loss of power to ESF Bus 1A, ESF DG #11 fails to load - at EO10 Step 3 or 5 minutes after entering EO10.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Facility: South Texas Project NRC Backup Scenario Op-Test No.: 1 Source:
New Bank - Significantly Modified X Bank - Initial Condition Change X See page 3 for Examiner/student assignments Initial Conditions: 40% power, shutdown in progress for turbine blade inspection. The National Weather Service has issued a Severe Weather Warning in effect until 2000 hrs.
Turnover: 40% power. Plant shutdown in progress to allow turbine blade inspection.
Plant shutdown is on hold to allow FW Booster Pump #11 to be secured. The National Weather Service has issued a Severe Weather Warning in effect until 2000 hrs.
Event No.
Malf.
No.
Event Type*
Event Description 1
(0 min)
NA BOP (N)
SRO (N)
Secure Feedwater Booster Pump #11 2
(15 min) 03-17-02 (True)
RO (C)
SRO (C)
Boric Acid Pump B trips during first boration of the power reduction
- (within approximately 5 minutes of starting power reduction).
3 (25 min) 03-06-01 (0.0)
BOP (C)
SRO (C)
Letdown Pressure Control Valve PCV-0135 fails closed - after T.S.
consulted for BA Pump or after 10 minutes 4
(35 min) 05-14-01 (0.6)
BOP (I)
SRO (I)
Steam Header Pressure Instrument PT-557 fails low - after Letdown flush started or after 10 minutes.
5 (47 min) 05-02-04 (0.5)
All (M)
Steam Break on SG 1D inside Containment (ramped over 5 min.) -
after FW-0002 exited or after 12 minutes.
6 (NA) 01-12-04A 01-12-04B 01-12-04C (True)
RO (C)
SRO (C)
Phase A Containment Isolation fails to actuate - integral to scenario
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
ES-401 PWR Examination Outline Form ES-401-2 Facility:
STP Date of Exam: 8/18/03 Tier Group RO K/A Category Points SRO-Only Points K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G*
Total K
A A2 G*
Total 1.
Emergency Abnormal Plant Evolutions 1
3 2
3 7
3 0
18 1
2 2
2 7
2 2
2 2
1 0
2 9
0 0
2 3
5 Tier Totals 5
4 5
8 3
2 27 1
2 4
5 12 2.
Plant Systems 1
2 2
2 3
2 3
3 2
3 4
2 28 0
0 2
2 4
2 3
0 1
0 2
0 1
1 2
0 0
10 0
1 1
0 2
Tier Totals 5
2 3
3 4
3 4
3 5
4 2
38 0
1 3
2 6
- 3. Generic Knowledge and Abilities Categories 1
2 3
4 10 1
2 3
4 7
2 2
2 4
2 1
2 2
Note:
1.
Ensure that at least two topics from every K/A category are sampled within each tier of the RO outline (i.e., the Tier Totals in each K/A category shall not be less than two). Refer to Section D.1.c for additional guidance regarding SRO sampling.
2.
The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
3.
Select topics from many systems and evolutions; avoid selecting more than two K/A topics from a given system or evolution unless they relate to plant-specific priorities.
4.
Systems/evolutions within each group are identified on the associated outline.
5.
The shaded areas are not applicable to the category/tier.
6.
The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. The SRO K/As must also be linked to 10 CFR 55.43 or an SRO-level learning objective.
7.
On the following pages, enter the K/A numbers, a brief description of each topic, the topics' importance ratings (IR) for the applicable license level, and the point totals for each system and category. Enter the group and tier totals for each category in the table above; summarize all the SRO-only knowledge and non-A2 ability categories in the columns labeled K and A. Use duplicate pages for RO and SRO-only exams.
8.
For Tier 3, enter the K/A numbers, descriptions, importance ratings, and point totals on Form ES-401-3.
9.
Refer to ES-401, Attachment 2, for guidance regarding the elimination of inappropriate K/A statements.
22 of 34 NUREG-1021, Draft Revision 9
ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 1 (RO)
E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G
K/A Topic(s)
IR 000007 (BW/E02&E10; CE/E02) Reactor Trip - Stabilization - Recovery / 1 0
000008 Pressurizer Vapor Space Accident / 3 1
008.AA2.01 Determine and interpret RCS Press. and Temp.
indicators and alarms as applied to...
3.9 1
000009 Small Break LOCA / 3 2
009.EK1.01 Knowledge of operational implications of Natural Circ.
and cooling, including reflux boiling as applies to...
4.2 1
000011 Large Break LOCA / 3 3
011.EA1.13 Operate and monitor SI components during...
4.1 1
000015/17 RCP Malfunctions / 4 4
015/017.AA1.21 Operate/monitor development of NC flow...
4.4 1
000022 Loss of Rx Coolant Makeup / 2 0
000025 Loss of RHR System / 4 0
000026 Loss of Component Cooling Water / 8 5
026.AK3.04 Know. of reasons for the effects onthe CCW flow header of Loss of CCW 3.5 1
000027 Pressurizer Pressure Control System Malfunction / 3 6
027.AK2.03 Interrelations between controllers and positioners and... 2.6 1
000029 ATWS / 1 0
000038 Steam Gen. Tube Rupture / 3 7
038.EA1.36 Operate/monitor cooldown of RCS to specified temp...
4.3 1
000040 (BW/E05; CE/E05; W/E12)
Steam Line Rupture - Excessive Heat Transfer / 4 8
040.AK3.04 Reasons for actions contained in EOPs for SLR 4.5 1
000054 (CE/E06) Loss of Main Feedwater / 4 9
054.AK1.02 Operational implications of effects of feedwater introduction on dry S/G...
3.6 1
000055 Station Blackout / 6 10 055.EK1.01 Op. implications of battery discharge rates on capacity 3.3 1
000056 Loss of Off-site Power / 6 11 056.AA1.09 Operate/monitor CCW pump during LOOP 3.3 1
000057 Loss of Vital AC Inst. Bus / 6 12 057.AA1.02 Operate/monitor manual control of PZR level...
3.8 1
000058 Loss of DC Power / 6 13 058.AA2.03 Determine/Interpret DC loads lost and impact on ability to operate and monitor plant systems...
3.5 1
000062 Loss of Nuclear Svc Water / 4 14 062.AA2.04 Determine/Interpret normal and upper limit values for Temp of SWS cooled components...
2.5 1
000065 Loss of Instrument Air / 8 15 065.AK3.08 Reasons for actions contained in EOP for...
3.7 1
W/E04 LOCA Outside Containment / 3 16 E04.EK2.1 Interrelations btwn LOCA outside ctmnt and: components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
3.5 1
W/E11 Loss of Emergency Coolant Recirc. / 4 17 E11.EA1.02 Operate/monitor operating behavior characteristics of the facility as relates to...
3.5 1
BW/E04; W/E05 Inadequate Heat Trans-fer - Loss of Secondary Heat Sink / 4 18 E05.EA1.1 Operate/monitor components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features...
4.1 1
K/A Category Totals:
3 2
3 7
3 0
Group Point Total:
18/7 23 of 34 NUREG-1021, Draft Revision 9
ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 2 (RO)
E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G K/A Topic(s)
IR 000001 Continuous Rod Withdrawal / 1 0
000003 Dropped Control Rod / 1 0
000005 Inoperable/Stuck Control Rod / 1 0
000024 Emergency Boration / 1 19 024.AK2.03 Interrelationship btwn Controllers/positioners... 2.6 1
000028 Pressurizer Level Malfunction / 2 0
000032 Loss of Source Range NI / 7 0
000033 Loss of Intermediate Range NI / 7 20 033.AK3.02 Reasons for guidance contained in EOP for...
3.6 1
000036 (BW/A08) Fuel Handling Accident / 8 0
000037 Steam Generator Tube Leak / 3 21 037.AA1.08 Operate/monitor charging flow indicator...
3.3 1
000051 Loss of Condenser Vacuum / 4 0
000059 Accidental Liquid RadWaste Rel. / 9 0
000060 Accidental Gaseous Radwaste Rel. / 9 0
000061 ARM System Alarms / 7 22 061.G2.3.4 Rad. Exposure limits and contamination control, including permissible levels in excess of auth...
2.5 1
000067 Plant Fire On-site / 8 0
000068 (BW/A06) Control Room Evac. / 8 0
000069 (W/E14) Loss of CTMT Integrity / 5 0
000074 (W/E06&E07) Inad. Core Cooling / 4 23 074.EK2.03 Knowledge of interrelations between AFW pump and...
4.0 1
000076 High Reactor Coolant Activity / 9 24 076.G2.4.10 Annunciator response procedures...
3.0 1
W/EO1 & E02 Rediagnosis & SI Termination / 3 25 E02.EK1.2 Normal, abnormal, and EOPs...
3.4 1
W/E13 Steam Generator Over-pressure / 4 0
W/E15 Containment Flooding / 5 26 E15.EK1.3 Op. Implications of Annunciators and conditions indicating signals, and remedial actions...
2.8 1
W/E16 High Containment Radiation / 9 0
BW/A01 Plant Runback / 1 0
BW/A02&A03 Loss of NNI-X/Y / 7 0
BW/A04 Turbine Trip / 4 0
BW/A05 Emergency Diesel Actuation / 6 0
BW/A07 Flooding / 8 0
BW/E03 Inadequate Subcooling Margin / 4 0
BW/E08; W/E03 LOCA Cooldown - Depress. / 4 0
BW/E09; CE/A13; W/E09&E10 Natural Circ. / 4 0
BW/E13&E14 EOP Rules and Enclosures 0
CE/A11; W/E08 RCS Overcooling - PTS / 4 27 E08.EK3.3 Reasons for control manipulations required to obtain desired results during abnormal and emergency...
3.7 1
CE/A16 Excess RCS Leakage / 2 0
CE/E09 Functional Recovery 0
K/A Category Point Totals:
2 2
2 1
0 2
Group Point Total:
9/5 24 of 34 NUREG-1021, Draft Revision 9
ES-401 PWR Examination Outline Form ES-401-2 Plant Systems - Tier 2/Group 1 (RO)
System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G
K/A Topic(s)
IR 003 Reactor Coolant Pump 28 003.K4.07 Design features/interlocks for minimizing RCS leakage (mechanical seals)...
3.2 1
004 Chemical and Volume Control 29 004.A4.18 Operate/Monitor emergency borate valve in the control room...
4.3 1
005 Residual Heat Removal 30 31 005.K6.03 Effects of loss of RHR HX on RHR sys...
005.A1.01 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) including: heatup and cooldown rates associated w/...
2.5 3.5 2
006 Emergency Core Cooling 32 33 006.K5.09 Thermodynamics of H2O/STM, including subcooled margin, superheat, and saturation...
006.A2.03 Predict impact of and respond appropriately to system leakage...
3.3 3.3 2
007 Pressurizer Relief/Quench Tank 34 007.K1.03 Physical connections/relationships btwn PRTS and RCS 3.0 1
008 Component Cooling Water 35 008.K3.03 Effects of Loss of CCW on RCP...
4.1 1
010 Pressurizer Pressure Control 36 010.A4.01 Operate/monitor PZR spray valve in CR...
3.7 1
012 Reactor Protection 37 38 012.K6.06 Effects of loss of Sensors/detectors...
012.A4.05 Operate/monitor channel defeat controls... 2.7 3.6 2
013 Engineered Safety Features Actuation 39 40 013.K6.01 Effects of loss of Sensors/detectors...
013.A3.01 Monitor automatic operation of Input channels and logic 2.7 3.7 2
022 Containment Cooling 41 022.K4.05 Design features/interlocks which provide for CCS after LOCA destroys ventilation ducts...
2.6 1
025 Ice Condenser 0
026 Containment Spray 42 43 026.K2.01 Power Supplies to CSS pumps 026.A3.01 Ability to monitor automatic pump starts and MOV positioning...
3.4 4.3 2
039 Main and Reheat Steam 44 039.A2.01 Predict flow paths of stm during LOCA 3.1 1
056 Condensate 45 46 056.K1.03 Connections/relationships with MFW 056.G2.2.2 Manipulate the controls btwn shutdown and design power levels 2.6 4.0 2
059 Main Feedwater 47 059.A4.01 Operate/monitor MFW turbine trip ind...
3.1 1
061 Auxiliary/Emergency Feedwater 48 061.K4.01 Knowledge of design features and/or interlocks which provide for: Water sources and priority of use...
4.1 1
062 AC Electrical Distribution 49 062.G2.4.6 Symptom based EOP mitigation strategies 3.1 1
063 DC Electrical Distribution 50 063.K3.02 Loss of DC effects on DC control power components...
3.5 1
064 Emergency Diesel Generator 51 064.A1.03 Predict/Monitor Operating voltages, currents, and temperatures...
3.2 1
073 Process Radiation Monitoring 52 073.K5.03 Relationship btwn radiation intensity and exposure limits as they apply to PRM system 2.9 1
076 Service Water 53 076.A3.02 Monitor automatic operation of SWS as relates to Emergency heat loads 3.7 1
078 Instrument Air 54 078.K2.02 Power Supplies to Emergency Air Comp.
3.3 1
103 Containment 55 103.A1.01 Predict/monitor containment pressure, temperature, and humidity 3.7 1
K/A Category Point Totals:
2 2
2 3
2 3
3 2
3 4
2 Group Point Total:
28/4 25 of 34 NUREG-1021, Draft Revision 9
ES-401 PWR Examination Outline Form ES-401-2 Plant Systems - Tier 2/Group 2 (RO)
System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G K/A Topic(s)
IR 001 Control Rod Drive 56 001.K3.01 Effects of CRDS malfunction on CVCS 2.9 1
002 Reactor Coolant 57 002.A3.01 Monitor automatic operation of Reactor Coolant Leak Detection system 3.7 1
011 Pressurizer Level Control 0
014 Rod Position Indication 0
015 Nuclear Instrumentation 0
016 Non-nuclear Instrumentation 58 016.K1.09 Connections/relationship with ESFAS 3.7 1
017 In-core Temperature Monitor 0
027 Containment Iodine Removal 0
028 Hydrogen Recombiner and Purge Control 0
029 Containment Purge 0
033 Spent Fuel Pool Cooling 0
034 Fuel Handling Equipment 0
035 Steam Generator 59 035.K5.13 Knowledge of Operational implications of effects of secondary parameters, pressure, and temperature on reactivity as applied to...
3.4 1
041 Steam Dump/Turbine Bypass Control 60 041.A2.03 Predict/respond to Loss of IAS as relates to SDS 2.8 1
045 Main Turbine Generator 0
055 Condenser Air Removal 61 055.K1.06 Connections/relationship to PRM system 2.6 1
068 Liquid Radwaste 62 068.A3.02 Monitor automatic isolation of LRS 3.6 1
071 Waste Gas Disposal 0
072 Area Radiation Monitoring 63 072.A1.01 Predict/Monitor radiation levels 3.4 1
075 Circulating Water 64 075.K1.02 Knowledge of physical connections with liquid radwaste discharge system 2.9 1
079 Station Air 0
086 Fire Protection 65 086.K5.04 Hazards to personnel as a result of fire type and methods of protection 2.9 1
K/A Category Point Totals:
3 0
1 0
2 0
1 1
2 0
0 Group Point Total:
10/2 26 of 34 NUREG-1021, Draft Revision 9
ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 1 (SRO)
E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G
K/A Topic(s)
IR 000007 (BW/E02&E10; CE/E02) Reactor Trip - Stabilization - Recovery / 1 0
000008 Pressurizer Vapor Space Accident / 3 0
000009 Small Break LOCA / 3 0
000011 Large Break LOCA / 3 0
000015/17 RCP Malfunctions / 4 0
000022 Loss of Rx Coolant Makeup / 2 0
000025 Loss of RHR System / 4 0
000026 Loss of Component Cooling Water / 8 000027 Pressurizer Pressure Control System Malfunction / 3 0
000029 ATWS / 1 77 029.EA2.01 Determine/interpret nuclear inst. as applicable to ATWS 4.7 1
000038 Steam Gen. Tube Rupture / 3 0
000040 (BW/E05; CE/E05; W/E12)
Steam Line Rupture - Excessive Heat Transfer / 4 0
000054 (CE/E06) Loss of Main Feedwater / 4 0
000055 Station Blackout / 6 78 055.EA1.05 Operate/monitor battery, when apporaching fully discharged 3.6 1
000056 Loss of Off-site Power / 6 79 056.G2.4.30 Which events should be reported to outside agencies 3.6 1
000057 Loss of Vital AC Inst. Bus / 6 80 057.G2.4.45 Prioritize/interpret annunciator alarms 3.6 1
000058 Loss of DC Power / 6 0
000062 Loss of Nuclear Svc Water / 4 76 062.AK3.02 Knowledge of auto alignment within nuclear service water resulting from ESFAS 3.9 1
000065 Loss of Instrument Air / 8 0
W/E04 LOCA Outside Containment / 3 81 E04.EA1.3 Operate/monitor desired operating results during abnormal and emergency situations 4.0 1
W/E11 Loss of Emergency Coolant Recirc. / 4 0
BW/E04; W/E05 Inadequate Heat Trans-fer - Loss of Secondary Heat Sink / 4 82 E05.EA2.1Determine/interpret facility conditions and selection of appropriate procedures during abnormal and emergency operations 4.4 1
K/A Category Totals:
0 0
1 2
2 2
Group Point Total:
18/7 23 of 34 NUREG-1021, Draft Revision 9
ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 2 (SRO)
E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G K/A Topic(s)
IR 000001 Continuous Rod Withdrawal / 1 0
000003 Dropped Control Rod / 1 0
000005 Inoperable/Stuck Control Rod / 1 83 005.AA2.03 Required actions if more than one rod stuck 4.4 1
000024 Emergency Boration / 1 0
000028 Pressurizer Level Malfunction / 2 0
000032 Loss of Source Range NI / 7 0
000033 Loss of Intermediate Range NI / 7 84 033.G2.4.11 Abnormal condition procedures 3.6 1
000036 (BW/A08) Fuel Handling Accident / 8 0
000037 Steam Generator Tube Leak / 3 85 037.AA2.12 Determine/interpret flow rate of leak 4.1 1
000051 Loss of Condenser Vacuum / 4 0
000059 Accidental Liquid RadWaste Rel. / 9 0
000060 Accidental Gaseous Radwaste Rel. / 9 0
000061 ARM System Alarms / 7 0
000067 Plant Fire On-site / 8 0
000068 (BW/A06) Control Room Evac. / 8 86 068.G2.4.11 Knowledge of abnormal condition procedures 3.6 1
000069 (W/E14) Loss of CTMT Integrity / 5 0
000074 (W/E06&E07) Inad. Core Cooling / 4 0
000076 High Reactor Coolant Activity / 9 0
W/EO1 & E02 Rediagnosis & SI Termination / 3 0
W/E13 Steam Generator Over-pressure / 4 0
W/E15 Containment Flooding / 5 0
W/E16 High Containment Radiation / 9 87 E16.G2.3.10 Procedures to reduce excessive levels of radiation and guard against personnel exposure 3.3 1
BW/A01 Plant Runback / 1 0
BW/A02&A03 Loss of NNI-X/Y / 7 0
BW/A04 Turbine Trip / 4 0
BW/A05 Emergency Diesel Actuation / 6 0
BW/A07 Flooding / 8 0
BW/E03 Inadequate Subcooling Margin / 4 0
BW/E08; W/E03 LOCA Cooldown - Depress. / 4 0
BW/E09; CE/A13; W/E09&E10 Natural Circ. / 4 0
BW/E13&E14 EOP Rules and Enclosures 0
CE/A11; W/E08 RCS Overcooling - PTS / 4 0
CE/A16 Excess RCS Leakage / 2 0
CE/E09 Functional Recovery 0
K/A Category Point Totals:
0 0
0 0
2 3
Group Point Total:
9/5 24 of 34 NUREG-1021, Draft Revision 9
ES-401 PWR Examination Outline Form ES-401-2 Plant Systems - Tier 2/Group 1 (SRO)
System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G
K/A Topic(s)
IR 003 Reactor Coolant Pump 91 003.A2.01 Predict/respond to problems with RCP seal leakoff 3.9 1
004 Chemical and Volume Control 0
005 Residual Heat Removal 0
006 Emergency Core Cooling 0
007 Pressurizer Relief/Quench Tank 0
008 Component Cooling Water 0
010 Pressurizer Pressure Control 0
012 Reactor Protection 88 012.G.2.1.32 Explain/apply all limits/precautions 3.8 1
013 Engineered Safety Features Actuation 0
022 Containment Cooling 0
025 Ice Condenser 0
026 Containment Spray 0
039 Main and Reheat Steam 0
056 Condensate 0
059 Main Feedwater 0
061 Auxiliary/Emergency Feedwater 0
062 AC Electrical Distribution 0
063 DC Electrical Distribution 89 063.A2.01 Predict/respond to grounds 3.2 1
064 Emergency Diesel Generator 90 064.G.2.1.11 TS less-than-1-hour action statements 3.8 1
073 Process Radiation Monitoring 0
076 Service Water 0
078 Instrument Air 0
103 Containment 0
K/A Category Point Totals:
0 0
0 0
0 0
0 2
0 0
2 Group Point Total:
28/4 25 of 34 NUREG-1021, Draft Revision 9
ES-401 PWR Examination Outline Form ES-401-2 Plant Systems - Tier 2/Group 2 (SRO)
System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G K/A Topic(s)
IR 001 Control Rod Drive 0
002 Reactor Coolant 0
011 Pressurizer Level Control 0
014 Rod Position Indication 0
015 Nuclear Instrumentation 0
016 Non-nuclear Instrumentation 0
017 In-core Temperature Monitor 0
027 Containment Iodine Removal 0
028 Hydrogen Recombiner and Purge Control 0
029 Containment Purge 0
033 Spent Fuel Pool Cooling 0
034 Fuel Handling Equipment 92 034.A2.01 Predict/respond to dropped fuel element 4.4 1
035 Steam Generator 0
041 Steam Dump/Turbine Bypass Control 0
045 Main Turbine Generator 0
055 Condenser Air Removal 0
068 Liquid Radwaste 0
071 Waste Gas Disposal 0
072 Area Radiation Monitoring 0
075 Circulating Water 0
079 Station Air 0
086 Fire Protection 93 086.A1.02 Predict/monitor changes in parameters associated with Fire Prot including fire water storage tank level 3.2 1
K/A Category Point Totals:
0 0
0 0
0 0
1 1
0 0
0 Group Point Total:
10/2 26 of 34 NUREG-1021, Draft Revision 9
ES-401 Generic Knowledge and Abilities Outline (Tier 3)
Form ES-401-3 Facility:
STP Date of Exam:
8/18/03 Category K/A #
Topic RO SRO-Only IR IR 1.
Conduct of Operations 2.1.27 66-Purpose and function of major system components/controls 3.2 1
2.1.32 67-Explain/apply all system limits and precautions 3.4 1
2.1.
2.1.
2.1.
2.1.
Subtotal 2.
Equipment Control 2.2.12 68-Knowledge of Surveillance Procedures 3.0 1
2.2.13 69-Tagging and clearance procedures 3.6 1
2.2.
2.2.
2.2.
2.2.
Subtotal 3.
Radiation Control 2.3.1 70-10 CFR 20 and related facility radiation control requirements 2.6 1
2.3.2 71-Facility ALARA program 2.5 1
2.3.
2.3.
2.3.
2.3.
Subtotal 4.
Emergency Procedures
/ Plan 2.4.49 72-Perform immediate actions without reference to procedure 4.0 1
2.4.1 73-EOP entry conditions and immediate action steps 4.3 1
2.4.7 74-Event based EOP mitigation strategies 3.1 1
2.4.2 75-Knowledge of set points, interlocks and automatic actions associated with EOP entry conditions 3.9 1
2.4.
2.4.
Subtotal Tier 3 Point Total 10 7
27 of 34 NUREG-1021, Draft Revision 9
ES-401 Generic Knowledge and Abilities Outline (Tier 3)
Form ES-401-3 Facility:
Date of Exam:
Category K/A #
Topic RO SRO-Only IR IR 1.
Conduct of Operations 2.1.4 94-Shift staffing requirements 3.4 1
2.1.7 95-Evaluate plant performance and make operational judgements 4.4 1
2.1.
2.1.
2.1.
2.1.
Subtotal 2.
Equipment Control 2.2.5 96-Process for making changes to facility IAW FSAR 2.7 1
2.2.
2.2.
2.2.
2.2.
2.2.
Subtotal 3.
Radiation Control 2.3.4 97-Knowledge of rad exp limits, including permissible levels in excess of those authorized 3.1 1
2.3.9 98-Process for performing containment purge 3.4 1
2.3.
2.3.
2.3.
2.3.
Subtotal 4.
Emergency Procedures
/ Plan 2.4.16 99-EOP implementation heirarchy and coordination w/ other proc.
4.0 1
2.4.27 100-Fire in the plant procedure 3.5 1
2.4.
2.4.
2.4.
2.4.
Subtotal Tier 3 Point Total 10 7
27 of 34 NUREG-1021, Draft Revision 9
NUREG-1021, Draft Revision 9 28 of 34 ES-401 Record of Rejected K/As Form ES-401-4 Tier/Group Randomly Selected K/A Reason for Rejection RO: 1 / 2 028.AK2.03 Too many K/As related to the pressurizer RO: 2 / 1 010.A1.03 Too many K/As related to the pressurizer RO: 2 / 2 011.K5.13 Too many K/As related to the pressurizer SRO: 2 / 1 010.G.2.1.32 Too many K/As related to the pressurizer RO: 2 / 1 061.K4.12 Too many K/As related to Natural Circulation RO: 2 / 1 008.K3.02 Does not apply to STP RO: 2 / 2 002.A3.02 Does not apply to STP RO: 2 / 2 075.K1.01 Does not apply to STP RO: 3 2.1.11 Does not relate to an RO written exam item from 10CFR55.41 RO: 3 2.1.19 Does not relate to an RO written exam item from 10CFR55.41 RO: 3 2.2.26 Does not relate to an RO written exam item from 10CFR55.41 RO: 3 2.2.25 Does not relate to an RO written exam item from 10CFR55.41 RO: 3 2.4.45 Does not relate to an RO written exam item from 10CFR55.41 SRO:1/2 APE068.G.2.4.1 Control room evacuation is not an EOP entry condition. Replaced with G.2.4.11, knowldge of abnormal condition procedure.
SRO:2/2 086.A2.04 Predict/respond to failure to actuate the FPS when required, resulting in fire damage. Unable to write SRO level question. Replaced with A1.02.
SRO:2/1 078.A2.01 Predict/respond to air dryer and filter malfunction. Unable to write SRO level question. Replaced with 003.A2.01.
RO: 1 / 1 038.EA1.29 Could not generate a relevant question to match the K/A.
SRO:1/1 015/017.AA2.02 Over sampled RCP malfunctions. Replaced with APE 062.AK3.02 RO: 1 / 1 022.AK3.05 Unable to generate a relevant question to match the K/A. Licensee indicated that the K/A Safety Function was of low safety significance at STP, and that there was no procedure or guidance available on that system relating to the K/A.
SRO:1/1 APE026.AA2.04 Determine/interpret normal values and upper limits for temps of components cooled by CCW. Unable to write SRO level question. Replaced with 029.EA2.01.
SRO:1/2 APE005.AA2.01 Determine/interpret stuck or inoperable control rod from in-core and ex-core NIS... Unable to write an SRO only level question. Replace with similar K/A APE004.AA2.03.
RO: 2 / 1 026.K3.02 Could not generate a relevant question to match the K/A SRO: 3/2 2.3.6 Unable to write an SRO level question. SROs have little responsibility for release permits now - this responsibility has been shifted to chemistry.
Replaced with 2.3.4.
RO: 2 / 1 064.A1.02 Could not gererate a relevant questions to match the K/A