Oct. 31, 2003 Page of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-51625 USER INFORMATION:

Name: sACH*RO)/M EMPL#:28401 CA#:0363 Address:

Phone#:

TRANSMITTAL INFORMATION:

TO: ....... 10/31/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

-THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

207 - 207 - SITE SUPPORT MANAGER: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 10/27/2003

_ADD MANUAL TABLE OF CONTENTS DATE: 10/30/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-207 REPLACE: REV:ll REPLACE: REV:ll REMOVE: PCAF 2003-1617 REV: N/A ADD: PCAF 2003-1617 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

Tab 7 EP-PS-207-7 PAR AIRBORNE RELEASES EP ENTERED I I I

MONITOR CONDmONS:

- PLANT STATUS/PROCEDURES CONTINUE

- ONSITE RAD CONDITIONS ASSESSME

- STATUS OF RELEASE

- DOSE PROJECTIONS PA-1 AS ENEA EMERGENCY SEEN NU DECLARED?

PA-2\

YES E AVA O EOMEDEAUTO

/ ROJECTION INDICATING,\ 0-10 MILES AND ADVSE

< DOSES OF 21I REM TEDE OR EYES 0 CITIZENS TO TAKE K IN

\ 5 REM THYROID CDE AT A /ACCORDANCE WITH THE ISTANCE OF 2 2 MILES STATES EMERGENCY PLANS.

PA-5 NO OR UNKNOWN RECOMMEND EVACUATING 0-2 MILES AND SHELTERING CONTINU 2-10 MILES AND ADVISE CITIZENS TO TAKE K IN ACCORDANCE WITH THE STATES EMERGENCY PLANS. PA-i PA-4 NOTES:

1. PA-# CAN BE USED TO REFER TO PROCEDURE STEPS FOR MORE DETAILED INFORMATION ON THE ACTION TO BE TAKEN.

.2. DOSE PROJECTIONS DO NOT INCLUDE DOSE ALREADY RECEIVED.

3. TEDE - WHOLE BODY (TEDE) IS THE SUM OF EFFECTIVE DOSE EQUIVALENT RESULTING FROM EXPOSURE TO EXTERNAL SOURCES. THE COMMITTED EFFECTIVE DOSE EQUIVALENT (CEDE) FROM ALL SIGNIFICANT INHALATION PATHWAYS AND THE DOSE DUE TO GROUND DEPOSITION.
4. CDE - COMMITTED DOSE EQUIVALENT TO THE CHILD THYROID.

EP-AD-000-1 26, Revision 11, Page 1 of 6

Tab 7 EP-PS-207-7 PAR LIQUID RELEASES INDICATIONS OF A POTENTIAL UQUID RELEASE

-UNISOLABLE RADWASTE TANK RELEASE

- LEAK TO COOUNG TOWER BASIN

. -LEAK TO SPRAY POND PL-1 ENSURE CHEM/ESD TAKES AND ANALYZES SAMPLES PL-2 T.ER wIPANED RELES No .

TO THE RIVER No- NO CIN CNRU TTRIBUTABLE TOTH R MNON EC Values RADIONUCUDE (pCUmI) 4 Co-60 3E Sr-91 2E- 7 Yes Mo-99 2E6 4 lRAD PERSONNEL NOTIFYl Te-132 9E DEPIBRP THAT A RELEASE 1-131 1E' HAS OCCURRED .

1-133 7E' 1-134 4E r 1-135 3E4 Cs-134 9E7 Cs-136 6E' I TEHREQUIREMENTS (T Cs-137 1E' *LEASE POIN I

Ba-139 2EA I Ba-140 SE'6 I Ba-141 3E' I II Yes Np-239 2E' II I

I RAD PERSCNNEL NOTIFY I DANVILLE THAT A RELEASE I HAS OCCURRED I

I PL-6 I

I I CHEM/FTD EVALUATES I RELEASE s PAG PL-7*

I

1. PL# CAN BE USED TO REFER TO ES RELEASE EXCEE AD FPERSONNEL PROCEDURE STEPS FOR MORE ANY OF THE SINGLE-NUCUDE NOTIFIY DEP1BRP DETAILED INFORMATION ON THE
  • EC VALUES OR DOESHE No THAI ACTION TO BE TAKEN. TNO PAR IS SUM OF EC FRACTIONS S
2. CALLS TO DANVILLE ARE COURTESY EXCEED 0.85 REEQUIRED INFORMATION CALLS ONLY.

PLP- 0 PROTECTIVE ACTION RECOMMENDATION CALLS MUST BE MADE BY DEP/BRP.

Yes RAD PERSONNEL NOTIFY DEP/BRP FOR DOWNSTREAM USERS TO DIVERT WATER SUPPLY & ESTIMATED TIME OF ARRIVAL OF RELEASE AT DANVILLE PL9 EP-AD-000-1 26, Revision 11, Page 2 of 6

Tab7 EP-PS-207-7 PUBLIC PROTECTIVE ACTION RECOMMENDATION GUIDE AIRBORNE RELEASES 0 PA-1 MONITOR CONDITIONS FOR PAR APPLICATION The following conditions should be continuously evaluated to determine if a PAR should be implemented or changed:

  • Plant status and prognosis for changes in conditions
  • Onsite radiological conditions
  • Status of actual or potential radioactive releases
  • Offsite dose projections or actual offsite radiological conditions
  • Escalation in Emergency Classification (i.e., General)

(Go to PA-2)

O PA-2 HAS A-GENERAL EMERGENCY BEEN DECLARED?

O YES - If a GENERAL EMERGENCY has been declared, a PAR must be made within 15 minutes of the emergency declaration.-The PAR requirement is found in NUREG-0654. (Go to PA-3) o NO- If a GENERAL EMERGENCY has not been declared, continue to monitor plant status, parameter trends, and prognosis for termination or escalation of the event. (Go to PA-1) o PA-3 IS THERE A VALID DOSEEPROJECTION INDICATING DOSES OF 21 REM TEDE OR > 5 REM CDE CHILD THYROID AT A DISTANCE OF >2 MILES?

o YES - If'the projected doses at 2 miles are 1 REM TEDEorŽ5 REM CDE child thyroid, then full evacuation (0-10 miles) is recommended.' (Go to PA-5) o NO/UNKNOWN - (Go to PA-4) o PA-4 RECOMMEND EVACUATION 0-2 MILES; SHELTER 2-10 MILES AND ADVISE CITIZENS TO TAKE KI IN ACCORDANCE WITH' THE STATE'S EMERGENCY PLANS.

Limited Evacuation (0-2 miles) and sheltering is appropriate for events that are significant enough to cause a General Emergency classification and dose projections are low, unknown, or below full evacuation guidelines. A recommendation is also given to the state to advise citizens to take KI in accordance with the state's emergency plans.

O PA EVACUATE 0-10 MILES AND ADVISE CITIZENS TO TAKE K IN ACCORDANCE WITH THE STATE'S EMERGENCY PLANS.

Full evacuation of members of the general public is recommended at this point based on the emergency classification and dose projections. A recommendation is also given to the state to advise citizens to take KI in accordance with the state's emergency plans.

EP-AD-000-1 26, Revision 11, Page 3 of 6

Tab7 EP-PS-207-7 LIQUID 0 PL-1 ENTRY This section is entered when there are indications of a potential unplanned radioactive liquid release.

Indications of potential unplanned releases include:

  • an unisolable radwaste tank release

O PL-2 CHEMISTRY/ENVIRONMENTAL SAMPLING DIRECTOR (ESD)

TAKES AND ANALYZES SAMPLE (Go to PL-3)

PL-3 IS THERE AN UNPLANNED RELEASE TO THE RIVER?

O YES - An unplanned release to the river has occurred when event-related radioactive materials are released to the river that are not controlled by the release methodol6gies described in the ODCM and applicable Chemistry procedures.

(Go to PL-4) o NO- If there is no unplanned release to the river, then no notifications are required and monitoring should continue.

o PL-4 RAD PERSONNEL NOTIFY DEP/BRP THAT A RELEASE HAS OCCURRED Depending on which facility is activated, the notification to BRP will be made by the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF.

DO NOT MAKE ANY PROTECTIVE ACTION RECOMMENDATIONS AT THIS TIME.

(Go to PL-5)

EP-AD-000-1 26, Revision 11, Page 4 of 6

Tab 7 EP-PS-207-7 LIQUID (CoNT'D)

PL-5 IS RELEASE 2 TECHNICAL REQUIREMENTS: LIMITS (AT THE RELEASE POINT)?

0 YES - Releases are at or greater than Technical Requirements limits when Chemistry determines that the limits are exceeded based on methodologies described in the ODCM and applicable Chemistry procedures.

(Go to PL-6) o NO- If the release is <Technical Requirements limits, then no further notifications are required and monitoring should continue.

O PL-6 RAD PERSONNEL NOTIFY DANVILLE THAT A RELEASE HAS OCCURRED Depending on which facility is activated, the notification to Danville will be made by the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF.

DO NOT MAKE ANY PROTECTIVE ACTION RECOMMENDATIONS AT THIS TIME.

(Go to PL-7) o PL-7 CHEM/FTD EVALUATES RELEASE VERSUS PAGs The results of the sample analysis are compared to the PAGs for radionuclides in drinking water. The analysis calculates the expected concentration at Danville, taking into account the dilution afforded by the river.

PL-8 DOES RELEASE EXCEED PAGs (AT DANVILLE)?

0 YES- If a single isotope exceeds its effluent concentration (EC) value or the sum of EC fractions exceeds 0.85, then a protective action recommendation should be made for downstream water users (e.g.,

Danville) to DIVERT DRINKING WATER supply to a backup supply or terminate user intake until the release has passed.

(Go to PL-9)

O NO- If the PAGs are not exceeded, monitoring should continue and the State should be notified that no PAR for the liquid release is required.

(Go to PL-1 0)

EP-AD-000-1 26, Revision 11, Page 5 of 6

Tab 7 EP-PS-207-7 LIQUID (CoNTD) 0 PL-9 RAD PERSONNEL NOTIFY DEPIBRP OF PAR Depending on which facility is activated, the PAR notification to DEP/BRP will be made by the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF. The PAR FORM shall be used to document the PAR.

DO NOT COMMUNICATE THE PROTECTIVE ACTION RECOMMENDATION TO DANVILLE. THE DEPIBRP IS RESPONSIBLE FOR THIS COMMUNICATION AND ANY COMMUNICATION TO OTHER DRINKING WATER SUPPLIERS OR WATER USERS.

0 PL-10 RAD PERSONNEL NOTIFY DEP/BRP No PAR is required. Depending on which facility is activated, the RPC (TSC), Dose Assessment Supervisor, or Radiological Liaison at the EOF shall notify DEP/BRP that no PAR is required.

EP-AD-000-1 26, Revision 11, Page 6 of 6

Tab 8

. EP-PS-207-8 Affected Unit Control No.

r PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION E This is a Drill 0 This is an Actual Event Preparer: -

The EMERGENCY CLASSIFICATION is:

El Unusual Event 0 Alert 0 Site Area Emergency 0 General Emergency Basis: EAL #

This represents:

0 Initial Classification Escalation Reduction No Change in the Classification Status Emergency Action(s) implemented onsite:

0 None O Evacuation of non-essential personnel O Local Area Evacuation o KI to onsite personnel '

O Site Accountability 11 Other Bases:

The PROTECTIVE ACTION RECOMMENDATION is:

O No Protective Action Recommendation Required 0 Evacuate 0-2 miles and Shelter 2-10 miles and advise Divert Danville Drinking Water*

citizens to take KI in accordance with the State's 0 Relocation emergency plans . O Control of Access Cl Evacuate 0-10 miles and advise citizens to take Kl Il Contamination Controls/Decon

-in accordance with the State's emergency plans 0 Other

  • Expected arrival of release at Danville.

This represents: 0 Initial 0 Change E No Change in the Protective Action Recommendation EP-AD-000-1 10, Revision 11, Page 1 of 2

.. Tab8

  • . EP-PS-207-8 The BASIS for the Protective Action Recommendation is:

Plant Status Status of Radioactive Release: Event-related release in progress? l Yes I3No Total Site Release Rate Airborne Liquid

< Tech Requirements Limit D D Tech Requirements Limit a D NOTE: TRM Limits (gai/min): Noble Gas 1.OOE+6; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)

Based on: I Effluent Monitors Cl Field Measurements D3 Engineering Judgement Data measured in the field confirm release rate estimations: D3 Yes D3 No WA Weather Conditions: Wind Speed Wind Direction_

Dose Projections: TEDE . 1 rem or thyroid CDE > 5 rem at 2 miles o TEDE > 1 rem or thyroid CDE > 5 rem at EPB ol TEDE < 1 rem and thyroid CDE < 5 rem at EPB-Other:

Approval:_ Date/Time:

Emergency Director or Recovery Manager approval required if change in Classification or Protective Action Recommendation.

RPC or DASU approval if no change in the Classification or Protective Action Recommendation.

Transmittal: El Verbal El Electronic 0 Both Communicated To:

NAME AGENCY DATE/TIME EP-AD-000-1 10, Revision 11, Page 2 of 2

Tab 8 EP-PS-207-8 Control #

I EMERGENCY NOTIFICATION REPORT 1.. Call Status: El THIS IS A DRILL L1 THIS IS AN ACTUAL EVENT

2. This is: at Susquehanna Steam Electric Station.

(Communicators Name)

My telephone number is: Notification time is:

(Callback telephone number) (Time notification initiated)

2. EMERGENCY CLASSIFICATION:

E1 UNUSUAL EVENT I ] SITE AREA EMERGENCY E1 ALERT E ] GENERAL EMERGENCY

[: The event has been terminated.

UNIT: El ONE Declaration DATE:

Time:

El Two (Time classification! (Date classification/

El ONE& Two termination declared) termination declared)

THIS REPRESENTS AAN: El INmAL DECLARATION .

El ESCALATION IN CLASSIFICATION STATUS El No CHANGE J

4. The Emergency Action Level (EAL) Number is:__
  • For initial declaration, static update, or escalation, provide current classification EAL-number only.
  • For significant events, or when directed by the ED, RM, BRIEF NON-TECHNICAL or EOFSS, provide a brief description.

DESCRIPTION OF THE EVENT:

  • For termination, write emergency has been terminated.
5. THERE IS: E No El AN AIRBORNE NON-ROUTINE RADIOLOGICAL RELEASE IN PROGRESS El A LIQUID
6. WIND DIRECTION IS FROM: WIND SPEED IS: mph.

(Data from 10 meter meteorological tower, available on PICSY.)

7.

Conclusion:

[] THIS IS A DRILL 1 THIS IS AN ACTUAL EVENT APPROVED: Time: Date:

(ED, RM, or EOFSS) (Time form approved) (Date form approved)

EP-AD-000-310, Revision 5, Page 1 of 1

I TAB8 EOF MESSAGE SHEET. . EP-PS-207-8

. . - I hhSAISSAGE MESSAGE ORIGIN- _ MESSAGE NO.

Tlm;; DATE;~

  • PRIORTrrY....

REPLY ORZGINA7OR OF REPLY. TRAMMISSION TIME TRANSM=1D O TRANSMISSION DoTE _

'I IEP-AD-0O0-340, Revision 1, Page 1 of 1, File R36-9

TAB 8 PAR AIRBORNE RELEASES EP-PS-207-8 EP ENTERED I I

,1 MONITOR CONDITIONS:

-PLANT STATUSIPROCEDURES

- ONSMTE RAD CONDMONS

-STATUS OF REI EASE

- DOSE PROJECTIONS P" CAMIE lSE TO 1ETD5g1IN 41 OFTHE RI R A ORE DBUL 4lORS" ONTEACTION TO 3ETAKM 2 DAOSMPe <lOH DOMTEUWIDEOALMADS

2. T!E.W#. .C TSLSC FC I£oosIRTo UTD4A1.

CILE TIE SWI OP EFFCTZVC DC6E COtNVALE4T C 7E CCAfElTD CfvDOESIVAW TUDE) DFOUSE EW=

H ALAT ADSOT PATHAYS TIE DOS DM TO CROUND WOSlONT.

4. COE. C~CTTD DOSECOUVALD(TTO TIE CHMD TKlRO PAR Decision at: T Crime) (Date)

By:

PEMA notified at:

(Time)

By:

NRC notified at:

(ime)

TAB 8 PAR LIQUID RELEASES EP-PS-207 ENTRY:.

INDICATIONS OF A PaTETIAL UQUID RELEASE

-UNISOLABLE RADWASTE TANK RELEASE

- LEAK TO COOUNG TOWER BASIN

- LEAK TO SPRAY POND -

Lotpic Umit RADIONUCLIDE (uCftU Ag-110m .1E46 As-76 7.2E-7 Ba-140 1.1E6 Ce-141 3.6E 46 Co-58 1.1E' CO-60 12E4 Cr-51 72E4 Cs-134 2.4E' Cs-137 2.4E4 Fe-5 2.4P Fe-59 24E' H-3 2AE' 1-129 1.2E4 1-131 3ZE4 la-I40 72E7 Mn-54 3.6E4 Mo-99 72E4 Na-22 4.8E Nb-95 3.6E46 NI59 3.6E6.

Ni-63 6.0E 7 P-32 3.6xE7 FW-103 2.4E4 RU-10 36E 7 Sb-124 7.2E 7 Sb-125 3.6E4 Sr-89 24E 7 Sr-90 9.6E4 Tc-99M 1.1E4 Y-90 72E 7 3.6E4 zr-s 2AE6 4 RAD PERSONNEL NOTIFY DEP/BRP FOR DANVU.LETO DIVERT DRINKING WATER SUPPLY & ESTIMATED TIME OF ARRIVAL OF RELEASE AT DANVILLE PL-7 ' -

NOTES

1. PL CAN BE USED TO REFER TO SECTION 4.2 OF THE PROCEDURE FOR MORE DETAILED DIFORUATION ON THE AcnfONTO BE TAKEN.
2. CA'LS TO DANVILLE ARE COURTESY INFORMATON CALLS ONLY. PROTECTIVE ACTON RECOMMENDA71ON CALLS MUST BE MADE BY DEP/BRP.

PAR Decision at:

cime) (Date)

By:

PEMA notified at:

(Tlrme)

By: -

NRC notified at: