December 16, 2003 Mr. William K. Sherman Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620-2601

Dear Mr. Sherman:

I am responding to your letter dated August 8, 2003, to the U.S. Nuclear Regulatory Commission (NRC), expressing concerns over a proposed modification to the Vermont Yankee Nuclear Power Station (VYNPS) design bases. Your concerns focused specifically on the licensees analysis of no significant hazards consideration (NSHC) in their July 31, 2003, application.

This amendment requested a revision to the design basis of the VYNPS to support the application of an alternate source term methodology. You requested assistance from the NRC in understanding issues regarding the licensees NSHC determination. You also asked for information on the review criteria the NRC staff uses, and acceptability of the licensees amendment request for alternate leakage treatment pathway for main steam isolation valve leakage, and the standby liquid control system credit.

The NRC staffs response to your questions is enclosed. We have provided information on NSHC determinations, as we discussed with you in our telephone conference on August 21, 2003. We are also providing background and review criteria for technical issues raised in your letter. The NRC staff will document whether or not the licensees proposed amendment is acceptable in our safety evaluation (SE) for the requested amendment. I trust that this information will address your concerns.

Sincerely,

/RA/

Richard B. Ennis, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosure:

As stated cc w/encl: See next page

Vermont Yankee Nuclear Power Station cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. David R. Lewis Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, DC 20037-1128 Ms. Christine S. Salembier, Commissioner Vermont Department of Public Service 112 State Street Montpelier, VT 05620-2601 Mr. Michael H. Dworkin, Chairman Public Service Board State of Vermont 112 State Street Montpelier, VT 05620-2701 Chairman, Board of Selectmen Town of Vernon P.O. Box 116 Vernon, VT 05354-0116 Mr. Michael Hamer Operating Experience Coordinator Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354 G. Dana Bisbee, Esq.

Deputy Attorney General 33 Capitol Street Concord, NH 03301-6937 Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108 Ms. Deborah B. Katz Box 83 Shelburne Falls, MA 01370 Mr. Raymond N. McCandless Vermont Department of Health Division of Occupational and Radiological Health 108 Cherry Street Burlington, VT 05402 Manager, Licensing Entergy Nuclear Vermont Yankee, LLC P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Resident Inspector Vermont Yankee Nuclear Power Station U. S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354 Director, Massachusetts Emergency Management Agency ATTN: James Muckerheide 400 Worcester Rd.

Framingham, MA 01702-5399 Jonathan M. Block, Esq.

Main Street P.O. Box 566 Putney, VT 05346-0566 Mr. John Kelly Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Gary Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213

Vermont Yankee Nuclear Power Station cc:

Mr. John Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Dan Pace Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Randall Edington Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Jay K. Thayer Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Mr. Ken L. Graesser BWR SRC Consultant 38832 N. Ashley Drive Lake Villa, IL 60046 Mr. Jim Sniezek BWR SRC Consultant 14601 Layhill Road Silver Spring, MD 20906 Mr. Ron Toole BWR SRC Consultant 605 West Horner Street Ebensburg, PA 15931 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue, Mail Stop L-ENT-15E New Orleans, LA 70113 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Raymond Shadis New England Coalition Post Office Box 98 Edgecomb, ME 04556 Mr. James P. Matteau Executive Director Windham Regional Commission 139 Main Street, Suite 505 Brattleboro, VT 05301

December 16, 2003 Mr. William K. Sherman Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620-2601

Dear Mr. Sherman:

I am responding to your letter dated August 8, 2003, to the U.S. Nuclear Regulatory Commission (NRC), expressing concerns over a proposed modification to the Vermont Yankee Nuclear Power Station (VYNPS) design bases. Your concerns focused specifically on the licensees analysis of no significant hazards consideration (NSHC) in their July 31, 2003, application.

This amendment requested a revision to the design basis of the VYNPS to support the application of an alternate source term methodology. You requested assistance from the NRC in understanding issues regarding the licensees NSHC determination. You also asked for information on the review criteria the NRC staff uses, and acceptability of the licensees amendment request for alternate leakage treatment pathway for main steam isolation valve leakage, and the standby liquid control system credit.

The NRC staffs response to your questions is enclosed. We have provided information on NSHC determinations, as we discussed with you in our telephone conference on August 21, 2003. We are also providing background and review criteria for technical issues raised in your letter. The NRC staff will document whether or not the licensees proposed amendment is acceptable in our safety evaluation (SE) for the requested amendment. I trust that this information will address your concerns.

Sincerely,

/RA/

Richard B. Ennis, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC REnnis OGC CAnderson, RGN-I PDI-2 R/F CRaynor TMarsh NRR Mail Room (YT#020030141)

BSheron LCox RBorchardt CHolden RDennig JCraig DRoberts MHart MCase Accession Numbers: Package: ML033000331, Incoming: ML032340732, Response: ML033000329

  • See previous concurrence OFFICE PDI-2/PM*

PDI-2/PM PDI-2/LA SPSC/SC*

OGC*

PDI-2/SC(A)

NAME SWall REnnis CRaynor RDennig STurk DRoberts DATE 12/10/03 12/15/03 12/15/03 12/10/03 12/04/03 12/15/03 OFFICIAL RECORD COPY

Enclosure Responses to Questions from Vermont Department of Public Service Proposed Alternative Source Term Amendment for Vermont Yankee Nuclear Power Station Question 1 (a):

Does the agency have criteria or guidance for how to interpret the word significant in 10 C.F.R. §50.92(c)(1)?

Answer:

The U.S. Nuclear Regulatory Commission (NRC) staff would like to point out that, as discussed in the Federal Register (FR) notice, Final Procedures and Standards on No Significant Hazards Consideration, dated March 6, 1986 (51 FR 7744), the no significant hazards consideration (NSHC) is a procedural standard and not a safety standard. Any conclusion the NRC staff may reach in determining whether or not a proposed change involves a significant hazards consideration is only used to determine whether a hearing, if one is requested, would be held before issuance of the associated amendment, if granted, or whether it could be held after issuance. As such, the staff does not apply the NSHC criteria in making its safety finding of adequate protection of the public health and safety. The staff makes its safety finding based on whether or not a proposed change meets applicable design and operational requirements.

The NRC has issued Regulatory Issue Summary (RIS) 2001-22, Attributes of a Proposed No Significant Hazards Consideration Determination, dated November 20, 2001, which is available electronically at the NRCs website in the Agencywide Documents Access and Management System (ADAMS) under accession number ML011860215. This RIS provides guidance on preparing an NSHC analysis for a license amendment request. The NRC staff, in Attachment 1 to the RIS, discussed criteria for how to determine if a proposed change is significant. The RIS states that if a value of probability or consequence of an event continues to meet the current licensing basis or applicable ranges of values in guidance, the change would generally not be considered significant.

Question 1 (b):

How can we know whether the proposed MSIV [main steam isolation valve]

leakage change is significant when we havent been presented with a comparable before and after design basis accident calculation for comparison?

Answer:

Whether a change involves a significant increase in the probability or consequences of an accident previously evaluated is determined on a case-by-case basis. The significance determination should include a comparison of the probability or consequences of an accident before the change to that after the change. As discussed above, however, the NRC staff generally considers that if the probability or consequences of an event related to a proposed change remains within those in applicable guidance, then the change is not considered significant. As such, the staff considers that detailed comparison of calculation or analytical results is not necessary to reach the NSHC finding.

Question 2 (a):

We believe that the definition of Engineered Safety Feature (ESF) is: a feature provided to mitigate the consequences of design basis or loss-of-coolant accidents (see SRP 6.1.1). Since Entergy [Entergy Nuclear Vermont Yankee, LLC,] is claiming credit for the alternate leakage treatment pathway to mitigate the radiological consequences of design-basis accidents, it appears the alternate leakage treatment pathway meets the definition of an ESF. Is that a correct interpretation?

Answer:

Appendix A to Title 10 of the Code of Federal Regulations (10 CFR), Part 100 requires structures, systems and components necessary to assure the capability of the plant to mitigate the consequences of design-basis accidents to be designed to remain functional during and after a safe shutdown earthquake (SSE). Appendix F of the VYNPS Updated Final Safety Analysis Report specifies that ESF components are to function following a design basis loss-of-coolant accident (LOCA) and are to withstand the most severe forces and environmental effects resulting from the accident. Appendix A of Regulatory Guide (RG) 1.183, Alternative Radiological Source Terms for Evaluating Design-Basis Accidents at Nuclear Power Reactors(ADAMS accession number ML003716792), allows credit for the components and piping systems used in the release path if they are capable of performing their safety functions during and following an SSE.

Entergy proposed to use the alternate leakage treatment (ALT) method presented in the General Electric (GE) licensing topical report NEDC-31858P-A, Revision 2, BWROG [Boiling Water Reactor Owners Group] Report for Increasing MSIV Leakage Limits and Elimination of Leakage Control Systems, to assure that the ALT pathway for MSIV leakage is suitable for its intended safety function. The NRC staffs safety evaluation (SE) approving NEDC-31858P-A, Revision 2, is dated March 3, 1999 (ADAMS accession number ML010640286).

The MSIV leakage ALT pathway will be required to prevent a direct release of fission products that could leak through the closed MSIVs after a LOCA.

Based on the criteria cited above, the piping and components of the MSIV leakage ALT pathway will be evaluated as ESFs.

Question 2 (b):

While it is clear that the alternate leakage treatment pathway was not designated as an ESF in the original design basis, is it appropriate to employ Section C.5.1.4 of Regulatory Guide 1.183 in the review of the alternate leakage treatment pathway?

Answer:

Inasmuch as the proposed ALT relates to implementation of an alternate source term (AST), RG 1.183 would be applied. Section C.5.1.4, Applicability of Prior Licensing Basis, of RG 1.183, notes that prior design bases that are unrelated to the use of the AST, or are unaffected by the AST, may continue as the facilitys design basis. Additionally, Section C.5.1.4 indicates that characteristics of the AST may be incompatible with analysis assumptions and methods currently reflected in the facilitys design-basis analysis.

Independent of the ALT pathway designation, Section C.5.1.4 is applicable to general considerations employed during review of the AST. Specifically, if the NRC staff finds that new or unreviewed issues are created by the implementation of the AST, review of staff positions relied upon in approving the initial issuance of the license may be warranted.

Question 2 (c):

Standard Review Plan [SRP] (NUREG-0800) 6.7, July 1981, Rev. 2, is titled, Main Steam Isolation Valve Leakage Control System (BWR). Is this the latest revision of SRP 6.7?

Answer:

Revision 2 is the latest revision in use. The NRC staff developed a draft Revision 3, dated April 1996, which discusses the alternate leakage treatment pathway. However, Revision 3 has not been finalized.

Question 2 (d):

It appears that SRP 6.7 should be applicable to the review of the proposed alternate leakage treatment pathway. Is that a correct interpretation?

Answer:

SRP 6.7 allows a licensee to propose alternative methods to comply with specific regulations. The NRC staffs SE for NEDC-31858P-A, Revision 2, indicated that the BWROG report is acceptable for direct reference by plant-specific submittals on MSIV leakage issues. The staff also indicated that use of NEDC-31858P-A, Revision 2, is subject to the conditions and limitations stated in the staffs SE. Entergy proposed to use the ALT method presented in the BWROG report as an alternative to SRP 6.7. The acceptability of this proposal will be addressed in our final SE.

Question 2 (e):

Entergy claims credit for the seismic adequacy of the alternate leakage treatment pathway in the Safety Assessment. According to SRP 6.7, the acceptance criteria for seismic adequacy is based on meeting position C.1 of Regulatory Guide 1.29. Is this a correct interpretation, and if so, does the alternate leakage treatment pathway proposed by Entergy meet the requirements of position C.1 of Regulatory Guide 1.29?

Answer:

As discussed in the answer to question 2.(d), in lieu of the guidance in SRP 6.7, the NRC staff will base its review on the approved GE licensing topical report, NEDC-31858P-A, Revision 2. The staffs review of the amendment request is not complete at this time; therefore, it is premature to make a determination if applicable acceptance criteria are met. We will address the adequacy of the licensees request in our final SE.

Question 2 (f):

Position C.1 of Regulatory Guide 1.29 states, in part, The pertinent quality assurance requirements of Appendix B to 10 CFR Part 50 should be applied to activities affecting the safety-related functions. Is it a correct interpretation that the alternate leakage treatment pathway must meet the requirements of Appendix B to 10 CFR Part 50, and if so, is this requirement met?

Answer:

Position C.1 of RG 1.29 provides acceptance criteria for SRP 6.7. As discussed above, in lieu of the guidance in SRP 6.7, the NRC staff will base its review on the approved GE licensing topical report, NEDC-31858P-A, Revision 2. Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to 10 CFR Part 50 establishes quality assurance requirements that are applicable to all activities affecting the safety-related functions of structures, systems and components, including the ALT pathway. Moreover, the BWROG report specifies that licensees should provide assurance for the reliability of the ALT pathway. The NRC staffs review of the amendment request is not complete at this time; therefore, it is premature to make a determination if applicable requirements are met. We will address the adequacy of the licensees request in our final SE.

Question 3 (a):

Regulatory Guide 1.183, Section C.5.1.2 states, in part: The single active component failure that results in the most limiting radiological consequences should be assumed. Does this section apply to Entergy proposed crediting of the SLC [standby liquid control] system to maintain suppression pool pH?

Answer:

The SLC system will be reviewed against the guidance in Section C.5.1.2, Credit for Engineered Safeguard Features, of RG 1.183 as part of the plant design. Safety systems meant to control fission products released to the environment following postulated accidents should have suitable redundancy and reliability to assure that their safety functions can be accomplished. The NRC staff is currently evaluating the use of the SLC system for pH control.

Question 3 (b):

Is it correct that the single failure referred to above is interpreted as a non-mechanistic failure of [t]he single active component failure that results in the most limiting radiological consequences?

Answer:

It is unclear as to what single failure this question refers. As indicated in the answer to question 3(a), the NRC staff is currently evaluating the use of the SLC system. Specific interpretation and application of Section C.5.1.2 of RG 1.183 is currently being evaluated by the NRC staff on a generic basis. The staff will determine whether, and to what extent, the SLC system is subject to this guidance. General guidance on single failure is provided in SECY-77-439, Single-Failure Criterion, dated August 17, 1977, and RG 1.53, Application of the Single-Failure Criterion to Nuclear Power Plants Protection Systems (ADAMS accession number ML003740182).

SECY-77-439 provides definitions for active and passive failures in fluid systems, but also notes there are challenges in the application of the single-failure criterion to fluid systems. We will address the adequacy of the licensees request in our final SE.

Question 3 (c):

In the Safety Assessment, at pp. 3-4, Entergy identifies a single failure of the control room keylocked-switch and associated logic which could defeat the function of the SLC system. It proceeds to dismiss this single failure based on low failure rates. Is dismissal of the single failure based on low failure rates an acceptable method of meeting the single-failure criteria identified by Regulatory Guide 1.183, section C.5.1.2, and if so, what is the agencys basis for accepting this methodology?

Answer:

The Institute of Electrical and Electronical Engineers Standard 603-1991, Criteria for Safety Systems for Nuclear Power Generating Stations, which the NRC endorsed in RG 1.53, indicates that the performance of a probabilistic assessment of safety systems may be used to demonstrate that certain postulated failures need not be considered in the application of the single-failure criterion. A probabilistic assessment cannot be used in lieu of the single-failure analysis. However, reliability analysis, probability assessment, operating experience, and engineering judgment, or a combination thereof, may be used to establish a basis for excluding a particular failure from the single-failure analysis.

The NRC staffs review of the amendment request is not complete at this time; therefore, it is premature to make a determination if the low failure rates presented by Entergy provide an acceptable basis for exclusion of any failure from the single-failure analysis. We will address the adequacy of the licensees request in our final SE.