November 19, 2003 Mr. C. S. Hinnant Senior Vice President and Chief Nuclear Officer Progress Energy, Inc.
411 Fayetteville Street Mall Raleigh, NC 27602
SUBJECT:
ORDERS MODIFYING LICENSES FOR REVISED DESIGN BASIS THREAT AND FOR TRAINING AND PHYSICAL FITNESS ENHANCEMENTS APPLICABLE TO SECURITY FORCE PERSONNEL (TAC NOS. MB9266, MB9267, MB9280, MB9296, MB9335, MB9370, MB9371, MB9384, MB9400 AND MB9439)
Dear Mr. Hinnant:
On April 29, 2003, the U.S. Nuclear Regulatory Commission (NRC or the Commission) issued Orders modifying the operating licenses for Brunswick Steam Electric Plant, Unit Nos. 1 and 2, Crystal River Nuclear Generating Plant, Unit 3, Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit 2, to: (1) require compliance with a revised design basis threat (DBT); (2) implement new security force personnel training and physical fitness requirements; and (3) prescribe compensatory measures related to fitness-for-duty enhancements applicable to security force personnel.
When it issued the Orders, the Commission recognized that you voluntarily and responsibly implemented additional security measures following the events of September 11, 2001.
However, as part of the Commissions review of the security and safeguards program, the Commission determined that enhancements to the DBT, as currently specified in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.1(a), were required. The NRC further determined that security force personnel tactical and firearms proficiency, physical fitness, and fitness-for-duty requirements needed to be enhanced. The Commission also concluded that, based on the current threat environment, these Orders were to be effective immediately.
The Orders require responses and actions within specified time frames. This letter addresses your response to the Orders pertaining to the revised DBT and the new security force personnel training and physical fitness requirements. The Commission replied to your response to the fitness-for-duty Order in separate correspondence, dated July 10, 2003.
Section III.A.1 of the Order implementing new security force personnel training and physical fitness requirements states that licensees must comply with the new requirements described in the Order, except to the extent that more stringent requirements are set forth in the licensees security plan and security training and qualifications plan.Section III.A.1 of the DBT Order requires licensees to submit revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, based on the revised DBT, to the Commission for review and approval no later than April 29, 2004. The Order requires licensees to implement the revised physical security plans, revised safeguards contingency plans, and revised security force personnel training and qualification plans no later than October 29, 2004.Section IV of both Orders noted that, in accordance with
10 CFR 2.202, licensees must submit an answer to the Orders and may request a hearing on the Orders, within thirty-five (35) days of the date of the Orders and, where good cause is shown, consideration would be given to extend the time to request a hearing.
The Orders also required licensees to notify the Commission within thirty-five (35) days if:
(1) the licensee was unable to comply with the requirements specified in the attachments to the Orders; (2) compliance with the requirements is unnecessary; (3) implementation of any of the requirements would result in a violation of the provisions of any Commission regulation of the facility license; or (4) implementation of any of the requirements described in the attachments to the Orders would adversely impact safe operation of the facility.Section III.C.1 of the security force personnel training and physical fitness Order required licensees to submit to the Commission, within thirty-five (35) days of the date of the Order, a schedule for achieving compliance with each requirement described in Attachment 2 to the Order.
By letters dated June 3, 2003, you submitted responses to the Orders for Progress Energy, Inc.
In your responses, you indicated that you consented to the DBT and security force personnel training Orders and did not request a hearing. The NRC staff has reviewed your responses, and finds that you have satisfied the thirty-five (35) day reporting requirements for both Orders.
In your response to the DBT Order, you also requested that the NRC provide clarification of five DBT-related issues described in the safeguards attachment to a letter from Mr. Colvin, President and CEO of the Nuclear Energy Institute, to Chairman Diaz dated May 16, 2003. By letter dated September 25, 2003, the NRC provided you a copy of Chairman Diazs response to Mr. Colvin, dated July 18, 2003, which clarified the five DBT-related issues.
Please contact Robert Fretz at 301-415-1324, if you have any other questions on these issues.
Sincerely,
/RA/
Ledyard B. Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-325, 50-324, 50-302, 50-400 and 50-261 cc: See next page
10 CFR 2.202, licensees must submit an answer to the Orders and may request a hearing on the Orders, within thirty-five (35) days of the date of the Orders and, where good cause is shown, consideration would be given to extend the time to request a hearing.
The Orders also required licensees to notify the Commission within thirty-five (35) days if:
(1) the licensee was unable to comply with the requirements specified in the attachments to the Orders; (2) compliance with the requirements is unnecessary; (3) implementation of any of the requirements would result in a violation of the provisions of any Commission regulation of the facility license; or (4) implementation of any of the requirements described in the attachments to the Orders would adversely impact safe operation of the facility.Section III.C.1 of the security force personnel training and physical fitness Order required licensees to submit to the Commission, within thirty-five (35) days of the date of the Order, a schedule for achieving compliance with each requirement described in Attachment 2 to the Order.
By letters dated June 3, 2003, you submitted responses to the Orders for Progress Energy, Inc.
In your responses, you indicated that you consented to the DBT and security force personnel training Orders and did not request a hearing. The NRC staff has reviewed your responses, and finds that you have satisfied the thirty-five (35) day reporting requirements for both Orders.
In your response to the DBT Order, you also requested that the NRC provide clarification of five DBT-related issues described in the safeguards attachment to a letter from Mr. Colvin, President and CEO of the Nuclear Energy Institute, to Chairman Diaz dated May 16, 2003. By letter dated September 25, 2003, the NRC provided you a copy of Chairman Diazs response to Mr. Colvin, dated July 18, 2003, which clarified the five DBT-related issues.
Please contact Robert Fretz at 301-415-1324, if you have any other questions on these issues.
Sincerely,
/RA/
Ledyard B. Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-325, 50-324, 50-302, 50-400 and 50-261 cc: See next page DISTRIBUTION:
PUBLIC TMarsh DLPM Project Directors LPlisco, Region II OGC CHolden DLPM Section Chiefs PD Reading Files ACRS JClifford DLPM Project Managers GTracy, NSIR RFretz VNerses DLPM Licensing Assistants JPeralta, NSIR ADAMS Accession Number: ML032970151
- See previous concurrence OFFICE PDI-2/LPM PDI-2/LA PDI-2/SC*
NSIR/DNS*
PDI/D*
DLPM/D NAME RFretz CRaynor JClifford GTracy CHolden LMarsh DATE 11/13/03 11/13/03 10/30/03 11/03/03 11/07/03 11/14/03 OFFICIAL RECORD COPY
Brunswick Steam Electric Plant, Units 1 and 2 Carolina Power & Light Company cc:
Steven R. Carr Associate General Counsel - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. David R. Sandifer, Chairperson Brunswick County Board of Commissioners Post Office Box 249 Bolivia, North Carolina 28422 Resident Inspector U. S. Nuclear Regulatory Commission 8470 River Road Southport, North Carolina 28461 Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street NW.
Washington, DC 20037-1128 Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Dr.
Raleigh, North Carolina 27609-7721 Mr. W. C. Noll Plant Manager Carolina Power & Light Company Brunswick Steam Electric Plant Post Office Box 10429 Southport, North Carolina 28461 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Mr. Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Mr. C. J. Gannon Director - Site Operations Carolina Power & Light Company Brunswick Steam Electric Plant Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. Norman R. Holden, Mayor City of Southport 201 East Moore Street Southport, North Carolina 28461 Mr. Dan E. Summers Emergency Management Coordinator New Hanover County Department of Emergency Management Post Office Box 1525 Wilmington, North Carolina 28402 Mr. James W. Holt, Manager Performance Evaluation and Regulatory Affairs PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Edward T. ONeil Manager - Support Services Carolina Power & Light Company Brunswick Steam Electric Plant Post Office Box 10249 Southport, North Carolina 28461 Mr. J. S. Keenan, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429
Crystal River Nuclear Plant Unit 3 Florida Power Corporation cc:
Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042 Mr. Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Steven R. Carr Associate General Counsel - Legal Dept.
Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Donald L. Taylor Manager Support Services Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. Richard L. Warden Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing
& Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708
Shearon Harris Nuclear Power Plant Unit 1 Carolina Power & Light Company cc:
Steven R. Carr Associate General Counsel - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Resident Inspector/ Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. James W. Holt Manager Performance Evaluation and Regulatory Affairs PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Benjamin C. Waldrep Plant General Manager - Harris Plant Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 3 New Hill, North Carolina 27562-0165 Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.
Washington, DC 20037-1128 Mr. Robert J. Duncan II Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, North Carolina 27602 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, North Carolina 27312 Mr. Terry C. Morton, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. John R. Caves, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. James Scarola, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165
H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company cc:
Steven R. Carr Associate General Counsel - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 U. S. Nuclear Regulatory Commission Resident Inspectors Office H. B. Robinson Steam Electric Plant 2112 Old Camden Road Hartsville, South Carolina 29550 Mr. T. P. Cleary Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Chris L. Burton Director of Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 J. F. Lucas Manager - Support Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. C. T. Baucom Supervisor, Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550 Ms. Beverly Hall, Section Chief N.C. Department of Environment and Natural Resources Division of Radiation Protection 3825 Barrett Dr.
Raleigh, North Carolina 27609-7721 Mr. Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Mr. Henry H. Porter, Assistant Director South Carolina Department of Health Bureau of Land & Waste Management 2600 Bull Street Columbia, South Carolina 29201 Mr. James W. Holt Manager Performance Evaluation and Regulatory Affairs PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts, & Trowbridge 2300 N Street NW.
Washington, DC 20037-1128 Mr. J. W. Moyer, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550-0790