August Exam 50-302/2003-301 Administrative Documents
ML032940431
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/29/2003
From:
NRC/RGN-II
To:
Progress Energy Florida
References
50-302/03-301 50-302/03-301
Download: ML032940431 (28)


See also: IR 05000302/2003301

Text

Administrative Documents

CRYSTAL RIVER AUGUST

EXAM 50-302/2003-301

AUGUST 25 - 29,2003

ES-201-1

K

Exam Preparation Checklist ....................

4. Exam Outline Quality Checklist

ES-201-2

ES-201-3

. . . . . . . . . . . . . . . . .

4

Exam Security Agreement .....................

Administrative Topics Outline (Final) . . . . . . . . . . . . . ES-301-1

4.

A.

4.

J7.

d 8 .

9.

46.

AI.

4 2 .

4/3.

Control Room Systems and Facility Walk-through Test Outline

(Final)

ES-301-2

Operating Test Quality Check Sheet . . . . . . . . . . . . . ES-301-3

Simulator Scenario Quality Check Sheet . . . . . . . . . . ES-301-4

ES-301-5

Transient and Event Checklist . . . . . . . . . . . . . . . . . .

Competencies Checklist ......................

....................................

ES-301-6

Written Exam Quality Check Sheet . . . . . . . . . . . . . . ES-401

Written Exam Review Worksheet . . . . . . . . . . . . . . . . ES-40 1-9

Written Exam Grading Quality Checklist . . . . . . . . . . ES-403-1

Post-Exam Check Sheet ......................

ES-501-1

ES-301

Operating Test Quality Checklist

Form ES-301-3

Facility: Crystal River Unit #3

Date of Examination: 8-25-03

Operating Test Numbe

1. GENERAL CRITERIA

a.

The operating test conforms with the previously approved outline: changes are consistent with

sampling requirements (e& 10 CFR 55.45, operational importance, safety function distribution).

There is no day-to-day repetition between this and other operating tests to be administered

during this examination.

The operating test shall not duplicate items from the appiicants'audit test(s)(see Section D.1.a).

Overlap with the written examination and between different parts of the operating test is within

acceptable limits.

It appears that the operating test will differentiate between competent and less-than-competent

applicants at the designated license level.

b.

C.

d.

e.

2. WALK-THROUGH CRITERIA

a.

Each JPM includes the following, as applicable:

' initial conditions

' initiating cues

' references and tools, including associated procedures

. reasonable and validated time limits (average time allowed for completion) and specific

designation if deemed to be time critical by the facility licensee

. specific performance criteria that include:

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b.

Repetition from operating tests used during the previous licensing examination is within

acceptable limits (30% for the waitthrough) and do not compromise test integrity.

At least 20 percent of the JPMs on each test are new or Significantly modified.

C.

3. SIMULATOR CRITERIA

a.

The associated simulator operating tests (scenario sets] have been reviewed in accordance with

Form ES-301-4 and a copy is attached.

Printed Name I

Signature

Date

a. Author

Alan Kennedv I

'?- 2 2-63

b. Facility Reviewerr)

7- a-a-03

c. NRC Chief Examiner (#]

&//~&j&QJL

</3 Ojb?

I '

-

d. NRC Supervisor

p l I c l * # r ' c p . e ~ H 4 7 e ~ M f. f

x

8 / / V / O f

NOTE:

  • The facility signature is not applicable for NRC-developed tests.
  1. I

independent NRC reviewer initial items in Column '"c;" chief examiner concurrence required.

NUREG-I 021. Draft Revision 9

24 of 27

ES-301

Simulator Scenario Quality Checklist

Form ES-301-4

QUALITATIVE ATTRIBUTES

initials

I

I

1

The in liai condii ons are real st c. In lnat some equ pmenl andlor nslr.menlat on may be 01-1

01

Sew ce, bJI it does not cue the operators inlo expected events

The scenar os consist mostly of related events

AK

AK

2.

3.

Each event desciption consists of

the point in the scenario when it is to be initiated

the malfunction(s) that are entered to initiate the event

8.

The simulator modelinq is not altered.

I AK IULl@

,

I

1 --

AK

9.

The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator

performance deficiencies have been evaluated to ensure that functional fidelity is maintained

while running the planned scenarios.

NUREG-1021, Draft Revision 9

25 of 27

ES-301

Transient and Event Checklist

Form ES-301-5

OPERATING TEST NO.: 1

Reactivity

0

5

Normal

I*

1

2/3'4/6/7/91

10

2*

SRO-U

Instrument /

Component

Major

1

8

6

6

1

1

2/3/4/5/7/9

2/3/4/5/8/9

8

7

Instructions:

(1)

(2)

Enter the operating test number and Form ES-D-I event numbers for each evolution type.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer

to Section D.5.d) but must be significant per Section C.2.a of Appendix D. * Reactivity and normal

evolutions may he replaced with additional instrument or component malfunctions on a one-for-one

basis.

Whenever practical, both instrument and component malfunctions should he included; only those

that require verifiable actions that provide insight to the applicant's competence count toward the

minimum requirement.

(3)

Author:

Alan Kennedv

NRC Reviewer:

'd

NUREG-1021, Draft Revision 9

26 of 27

L'

'V

ES-301

Competencies Checklist

Form ES-301-6

SRO

RO

BOP

Comoetencies

Interpret / Diagnose

Events

and Conditions

Comply With and

Use Procedures (1)

Operate Control

Communicate and

Demonstrate Supervisory

5/6/8

Abilitv (3)

Comply With and

2/3

Use Tech. Specs. (3)

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Onlv atmlicable to SROs.

Instructions:

Circle the applicant's license type and enter one or more event numbers that will allow the

examiners to evaluate every applicable competency for every applicant.

Author:

Alan Kennedy

NRC Reviewer:

NUREG-1021, Draft Revision 9

27 of 27

ES-401

Written Examination

Form ES-401-6

Quality Checklist

Facility:

Crystal River Unit #3

Date of Exam: 8-22-03

Exam Level: RO/SRO

rtifies that there is no duplication; or

7.

Between 50 and 60 percent of the questions on

the RO exam are written at the

comprehensionlanalysis level; the SRO exam

may exceed 60 percent if the randomly

selected WAS support the higher cognitive

levels; enter the actual RO / SRO question

distribution(s) at right

Memory W

AK

AK

8.

References/handouts provided do not give away answers

I

9.

Question content conforms with specific KIA statements in the previously

approved examination outline and is appropriate for the Tier to which they are

assigned deviations are iustified

Question psychometric quality and format meet ES, Appendix B, guidelines

The exam contains the required number of one-point, multiple choice items; the

total is correct and agrees with value on cover sheet

AK

(ijj

10.

11.

AK

i!?)

Date

a. Author

7/22/03

b. Facility Reviewer (*)

7/22/03

d. NRC Regional Supetvis

O//Y/O3

c. NRC Chief Examiner (#

7 / H / O 3

Note:

  • The facility reviewer's initials/signature are not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column "c;" chief examiner concurrence required.

NUREG-1 021. Draft Revision 9

W

0

In

L

-7

m

a

m

0

.-

L

P

m

x

m a

p

i

m

D

m

a

0

m

2

m

a,

m

c

rn

P

N

a,

-

.-

c

i

c

0

._

.-

E

,o

c

m

0

m

m

m

c

.c

0

._

2

0

9

b

U.

m

D

a,

m

C

m

_y 0

m 6

i

.- $

m

x

D

U

m

0

D

C

-

.-

m

.-

8

0

c

m

m

m

e!

E

.-

._ s e

I

2

-z

m

m

I

I

m

m

c

3

m

Y

E

c ::

.-

c

m

0

a

a

m

a,

2

._

-

5

5

6

m

c

0

Y

c

(1

x

W

m

m -

T

c

0

F

m

c

m

a

x

W

-

6 .-

c

a

x

W

m

m -

.

0

O

m

Y-

W

ES-403

Item Description

1.

2.

Clean answer sheets copied before grading

Answer key changes and question deletions justified and

documented

Applicants' scores checked for addition errors (reviewers spot

check > 25% of examinations)

Grading for all borderline cases (80 +/- 2% overall and 70 +/-

4% on the SRO-only) reviewed in detail

All other failing examinations checked to ensure that grades

are justified

Performance on missed questions checked for training

deficiencies and wording problems; evaluate validity of

questions missed by half or more of the applicants

3.

4.

5.

6.

Written Examination Grading

Quality Checklist

a

-%

%

+K

IJ IA

I)/*

Form ES-403-1

L-

Facility:

Crystal River #3

Date of Exam: 8-29-03

Exam Level: RO/SRO

I

d. NRC Supervisor (*)

  • , Ih'E ERN., 7ES / d z J 5 -

(*)

The facility reviewer's signature is not applicable for examinations graded by the NRC;

two independent NRC reviews are required.

\\.-

NUREG-1021, Draft Revision 9

6 of 5

ES-501

Post-Examination Check Sheet

Form ES-501-1

Task Description

1.

Facility written exam comments or graded exams received and

verified complete

Facility written exam comments reviewed and incorporated and

NRC grading completed, if necessary

2.

3.

4.

Operating tests graded by NRC examiners

NRC Chief examiner review of written exam and operating test

grading completed

5.

Responsible supervisor review completed

6.

7.

Management (licensing official) review completed

License and denial letters mailed

8.

Facility notified of results

9.

10.

Examination report issued (refer to NRC MC "3-0612)

Reference material returned afler final resolution of any

appeals

Date

Complete

9/03/03

N/A

9/09/03

9/09/03

9/09/03

911 0103

911 1/03

911 1/03

10/03/03

n/a

_-

Examination Preparation Checklist

Form ES-201-1

ES-201

Target dates are keyed to the examination date identified in the corporate notification letter.

They are for planning purposes and may be adjusted on a case-by-case basis in coordination

with the facility licensee.

Applies only to examinations prepared by the NRC.

[ ]

Facility:

Cwstal River

Date of Examination:

8/25 - 29/03

Examinations Developed by:

Facility / NRC (circle one)

Target

Date*

Chief

Examiners

Initials

Task Description / Reference

1. Examination administration date confirmed (C.l .a; C.2.a & b)

2. NRC examiners and facility contact assigned (C.l .d; C.2.e)

3. Facility contact briefed on security & other requirements (C.2.c)

4. Corporate notification letter sent (C.2.d)

K O D

-180

-1 20

-120

-1 20

[-go1

-75

K O D

K OD

K O D

~

15. Reference material due (C.l .e; C.3.c)]

~~

K O D

~~

6. Integrated examination outline@) due (C.1.e & f; C.3.d)

7. Examination outline(?.)

reviewed by NRC and feedback provided

to facility licensee (C.2.h; C.3.e)

K OD

K OD

-70

-45

K O D

8. Proposed examinations, supporting documentation, and

9. Preliminary license applications due (C.l .I; C.2.g; ES-202)

reference materials due (C.1 .e, f, g & h; C.3.d)

K O D

-30

K OD

-1 4

10. Final license applications due and assignment sheet prepared

11. Examination approved by NRC supervisor for facility licensee

(C.l .I; C.2.g; ES-202)

review (C.2.h; C.3.f)

K OD

-14

-14

-7

~~

12. Examinations reviewed with facility licensee (C.1.j; C.2.f & h: C.3.a)

K OD

K O D

~

13. Written examinations and operating tests approved by

NRC supervisor (C.2.i; C.3.h)

K O D

-7

14. Final applications reviewed; assignment sheet updated; waiver

letters sent (C.2.g, ES-204)

15. Proctoring/written exam administration guidelines reviewed with

facility licensee and authorization granted to give written exams

(if applicable) (C.3.k)

16. Approved scenarios, job performance measures, and questions

distributed to NRC examiners (C.3.i)

K OD

-7

-7

~

K O D

ES-201

Examination Outline Quality Checklist

Form ES-201-2

Faciiii;

crystal River Unit #3

Item

Task Description

Date of EMmlnatlOn: Auqust 2Zd and week of Auqust 25m, 2003

I

I a I b.1

c#

1.

a. Verify that the outiine(s) fit(s) the appropriate model per ES-401.

...

W

R I

b. Assess whether the outline was systematically and randomly prepared in accordance wlth

section D. 1 of ES.401 and whether all MA categories are appropriately sampled.

-

. ,~. -

I

T

E

N

c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.

d. Assess whether the justifications for deselected or rejected UJA statements are appropriate.

r4( w q Q

2.

S I

M

a. Using Form ES-301-5.

verify mat the prOposed scenario sets cover the required number of

normal evolutions, instrument and component failures, and major transients.

b. Asses whether there are enough scenario sets (and spares) to test the projected number and

mix of applicants in accordance with the expected crew composition and rotation schedule without

compromising exam Integrity: ensure each applicant can be tested using at least one new or

significantly modified scenario, that no scenarios are duplicated from the applicants' audit test(s)'.

and scenarios will not be repeated on subsequent days.

c. To the extent possible. assess whether the outline(s) conform(s) with the qualitative and

quantitative criteria specitied on Form ES-3014 and described In Appendix D.

I

a. Verifythat

f l \\ tha OlrtllnelSl containkl the muired number of control mom and In-Oiant tasks.

1

1

1

1

1

~,~~

~

~~~~~~~

~

~

~ . ,

.

~~

w

I

T

(2) no more than 30% of (he test material Is repeated from the last NRCexamination,

(3)' no tasks are duplicated from the applicants' audit test(s), and

(4) no more than 8046 of any operating test is taken directly from the licensee's exam banks.

I

I

(1) the tasks are distributed among the safety function groupings as spaciffea' in ES-301,

(2) one task is conducted in a low.powar or Shutdown conditlon,

(3) 4.6 (2 - 3 for SRO-U) of the task require the applicant to implement an aitamate path

one In-plant task tests the applicant's response to an emergency or abnormal condition, and

d. Determlna if there are enough different outlines to test me projected number and mix of

Author

~aciiity Reviewer (7

NRC Chief Examiner (#)

NRC Supervisor

ne:

  • Not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column "c:' chief examiner concurrence required.

s

..

.

... . . . p.NREGl021, Draft Rev.

.... 9

m

m

cu

0

m

cu

L

..

ES-301

Administrative Topics O u t l i ~ ~ e

Form ES-301- I

Describe activity to be performed:

KO & SliO - Print Reading - Determine criteria for start of AHF-44B

during a LOOP.

KIA - G2.1.24 RO 2.8 SRO 3.1

Multiple electrical prints and flow diagrams [New]

RO & SRO - Perform a Daily Heat Balance Comparison

KIA - G2.1.23 RO 3.9 SRO 4.0

SP-312A [Modified Bank]

SRO Only - After completing heat balance determine required TS action5

WA - G2.1.12 SRO 4.0

Facility: Crvstal River Unit 3

Date of Examination: Aupust 25. 2003

Administrative Topic

(see Note)

Conduct of Operations

Equipment Control

Radiation Control

Emergency Plan

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they arc

retaking only the administrative topics, when 5 are required.

RO & SRO - Perform a n RCS Water Inventory Balance per SP-317

KIA - G2.2.12 RO 3.0 SRO 3.4

SP-317 [Direct]

SRO Only - After completing SP-317 determine required TS actions

K/A-G2.1.12 S R 0 4 . 0

SRO Only - Determine external reporting requirements per CP-151

KIA - G2.3.1 SRO 3.0

CP-151 & NUREG-1022 [New]

RO Onlv - Complete the State of Florida Notification Message Form and

make required notifications

KIA - G2.4.43 RO 2.8

EM-202 [New, Alternate Path]

SKO Only - Determine Emergency Action Level after Simulator Scenario

  1. 2.

KIA - G2.4.41 SRO 4.1

EM-202 [New]

NUREG- 102 1, Draft Rev. 9

F:\\2003 NRC Exam\\OUTLINESiJPMs\\NRC 2K3 Combined Outline Admin lPMs (301-l).doc

ES-301

Administrative Topics Outline

Form ES-30 1- 1

I/

Facility: Crvstal River Unit 3

Date of Examination: August 25. 2003

Exam Level RO

Administrative Topic

(see Note)

Conduct of Operations

Equipment Control

Radiation Control

Emergency Plan

Operating Test No.: 1

Describe activity to be performed:

Print Reading - Determine criteria for start of AHF-44B during a LOOP.

KIA - G2.1.24 RO 2.8 SRO 3.1

Multiple electrical prints and flow diagrams [New]

Perform a Daily Heat Balance Comparison

KIA - G2.1.23 RO 3.9 SRO 4.0

SP-312A [Modified Bank]

Perform a n RCS Water Inventory Balance per SP-317

KIA - G2.2.12 RO 3.0 SRO 3.4

SP-317 [Direct]

Complete the State of Florida Notification Message Form and make

required notifications

KIA - G2.4.43 RO 2.8

EM-202 [New, Alternate Path]

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are

retaking only the administrative topics, when 5 are required.

NUREG-1021,

Draft Rev. 9

FD003 NRC Exam\\OUTLINE%.lPMs\\NRC 2K3 RO Only Outline Admin JPMs (301 -I).doc

ES-301

Administrative Topics Outline

Form ES-30 1- 1

Facility: Crvstal River Unit 3

Exam Level SRO

Operating Test No.: 1

Date of Examination: Aupust25.2003

Administrative Topic

(see Note)

Conduct of Operations

Equipment Control

Radiation Control r

Emergency Plan

Describe activity to be performed:

Print Reading - Determine criteria for start of AHF-44B during a LOOP.

KIA - G2.1.24 RO 2.8 SRO 3.1

Multiple electrical prints and flow diagrams [New]

Perform a Daily Heat Balance Comparison

KIA - G2.1.23 RO 3.9 SRO 4.0

SP-312A [Modified Bank]

After completing heat balance determine required TS actions

WA-G2.1.12 S R 0 4 . 0

Perform a n RCS Water Inventory Balance per SP-317

KIA - G2.2.12 RO 3.0 SRO 3.4

SP-317 [Direct]

After completing SP-317 determine required TS actions

WA - G2.1.12 SRO 4.0

Determine external reporting requirements per CP-151

KIA - G2.3.1 SRO 3.0

CP-151 & NUREG-1022 [New]

Determine Emergency Action Level after Simulator Scenario # 2.

KIA - G2.4.41 SRO 4.1

EM-202 [New]

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they arc

retaking only the administrative topics, when 5 are required.

NUREG- 102 1, Draft Rev. 9

FVW3 NRC Exam\\OUTLINESUPMs\\NRC 2K3 SRO Only Outline Admin JPMs (301 -I).doc

ES-301

Control RoomAn-Plant Systems Outline

Form ES-301-2

a. CRDS - Transfer control rod to auxiliary power supply

WA- 001A4.03 RO 4.0 SRO 3.7 (OP-502)

IKO/

b. ESFAS - ES "B" HPI Diverse Containment Isolation Test

WA- 013A3.01 RO 3.7 SRO 3.9 (SP-358A)

/RO. SRO-U. SRO-I1

Facility: Crvstal River Unit 3

Exam Level (circle one): RO/ SRO(1) I SRO(U)

Date of Examination: August 25. 2003

Operating Test No.: 1

Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SROU)

D, S

1

A. D, S

2

System / JPM Title

c. PZR PCS - Perform PORV Exercise Test

WA- 010A3.01 RO 3.0 SRO 3.2 (SP-379)

/no, SRO-U, SRO-I/

L, N, S

3

d. RHR - Perform a crosstie of DHR flow to the Reactor Vessel

U A - 005A1.02 RO 3.3 SRO 3.4 (OP-404)

j170, SRO-USRO-I]

L. D, S

4

e. CSS - Ensure Building Spray actuation

WA- 026A3.01 RO 4.3 SRO 4.5 (EM-225C)

(RO, SRO-.r/

A. D. S

5

f.

AC - Perform actions for loss of an ES 4160V Bus

WA-062A2.12 R03.2 SR03.6 (AP-770)

IRO. SRO-11

g. RPS - Place the RPS in Shutdown Bypass.

WA- 012A4.03 RO 3.6 SRO 3.6 (OP-202/507)

[RO. SRO-I1

h. WGDS/PRM - Perform actions for an accidental Waste Gas leak

WA- 060AA2.05 RO 3.7 SRO 4.2 (AP-250)

IRO. SRO-11

SPARE

MU - Restart a MUP Following an RCS Leak Isolation

WA- 002A2.01 RO 4.3 SRO 4.4 (AP-520)

A. M, S

6

L,

D. S

7

A, C, N.

9

S

D. S

2

i. AFW/EFW - Place EFIC Channel in Tripped condition

WA- 061A2.05 RO 3.1 SRO 3.4 (OP-450)

j. CCWS - Fill SW surge tank from the Fire Service system

WA- 008A1.04 RO 3.1 SRO 3.2 (EOP-14, Enclosure 2) /RO, SRO-U, SRO-I]

/RO, SRO-I/

NUREG- 1 02 1. Draft Rev. 9

N

4

D. R

8

W2W3 NRC Exam\\OUTLINES\\JPMs\\NRC 2K3 Combined Outline SIM-Plant JPMs (301-2) Rev I.doc

k. CRD - Manually trip reactor from outside control room

WA- 02EAl.l RO 4.0 SR03.6 (AP-990)

[RO, SRO-U, SRO-I]

A, D

1

SPARE

FS/OTSG - Transfer excess secondary inventory to FST

WA - 037AK3.07 RO 4.2 SRO 4.4 (EOP-14 Enclosure 9)

D

2,8

ES-301

Control Roomfin-Plant Systems Outline

Form ES-301-2

~~

System / JPM Title

a. CRDS - Transfer control rod to auxiliary power supply

WA- 001A4.03 RO 4.0 SRO 3.7 (OP-502)

b. ESFAS - ES "B" HPI Diverse Containment Isolation Test

WA- 013A3.01 RO 3.7 SRO 3.9 (SP-358A)

c. PZR PCS - Perform PORV Exercise Test

WA- 010A3.01 RO 3.0 SRO 3.2 (SP-379)

d. RHR - Perform a crosstie of DHR flow to the Reactor Vessel

WA- 005A1.02 R03.3 SRO 3.4 (OP-404)

e. CSS - Ensure Building Spray actuation

WA- 026A3.01 RO 4.3 SRO 4.5 (EM-225C)

f. AC - Perform actions for loss of an ES 4160V Bus

WA- 062A2.12 RO 3.2 SR03.6 (AP-770)

g. RPS - Place the RPS in Shutdown Bypass.

h. WGDS/PRM - Perform actions for anaccidental Waste Gas leak

WA- 060AA2.05 RO 3.7 SRO 4.2 (AP-250)

WA- 012A4.03 RO 3.6 SRO 3.6 (OP-202/507)

SPARE

MU - Restart a MUP Following an RCS Leak Isolation

WA- 002A2.01 RO 4.3 SRO 4.4 (AP-520)

~~~

Facility: Crvstal River Unit 3

Exam Level: RO

Operating Test No.: 1

Date of Examination: Aueust 25. 2003

Control Room Systems (8 for RO: 7 for SROI; 2 or 3 for SRO-U)

Type

Safety

Code*

Function

D. S

1

A, D, S

2

L. N, S

3

L. D. S

4

A. D, S

5

A, M. S

6

L. D, S

7

A, C, N.

9

S

D. S

2

i. AFW/EFW - Place EFIC Channel in Tripped condition

N

WA- 061A2.05 RO 3.1 SRO 3.4 (OP-450)

j. CCWS - Fill SW surge tank from the Fire Service system

WA- 008A1.04 RO 3.1 SRO 3.2 (EOP-14, Enclosure 2)

D. R

k. CRD - Manually trip reactor from outside control room

A. D

WA-02EA1.1 R04.0 SR03.6 (AP-990)

SPARE

FS/OTSG -Transfer excess secondary inventory to FST

D

WA- 037AK3.07 RO 4.2 SRO 4.4 (EOP-14 Enclosure 9)

NUREG- 1021, Draft Rev. 9

4

8

1

2.8

FD003 NRC Exam\\OUTLINESJPMs\\NRC 2K3 RO Only Outline SIM-Plant JPMs (301 -2) Rev I.doc

CS-301

Conrrol Ru~~nifl~~-Platit

Systems Outline

Form ES-301.2

3. ESFAS - ES "B" HPI Diverse Containment Isolation Test

WA- 013A3.01 RO 3.7 SRO 3.9 (SP-358A)

, PZR PCS - Perform PORV Exercise Test

WA- 010A3.01 RO 3.0 SRO 3.2 (SP-379)

3. RHR - Perform a crosstie of DHR flow to the Reactor Vessel

CSS - Ensure Building Spray actuation

WA - 005A1.02 RO 3.3 SRO 3.4 (OP-404)

3.

WA - 026A3.01 RO 4.3 SRO 4.5 (EM-225'2)

F.

AC - Perform actions for loss of an ES 4160V Bus

WA- 062A2.12 RO 3.2 SR03.6 (AP-770)

5. RPS -Place the RPS in Shutdown Bypass.

WA - 012A4.03 RO 3.6 SRO 3.6 (OP-202/507)

h. WGDS/PRM - Perform actions for anaccidental Waste Gas leak

WA- 060AA2.05 RO 3.7 SRO 4.2 (AP-250)

SPARE

MU - Restart a MUP Following an RCS Leak Isolation

WA- 002A2.01 RO 4.3 SRO 4.4 (AP-520)

Facility: Crvstal River Unit 3

Exam Level: SRO(1)

Date of Examination: August 25. 2003

Operating Test No.: 1

Zontrol Room Systems (8 for RO; 7 for SRC-I: 2 or 3 for SRO-U)

A, D, S

2

L, N, S

3

L. D, S

4

A. D, S

5

A. M, S

6

L, D. S

7

A, C, N.

9

S

D. S

2

System / JPM Title

i. AFW/EFW - Place EFIC Channel in Tripped condition

N

WA- 061A2.05 RO 3.1 SRO 3.4 (OP-450)

j. CCWS - Fill SW surge tank from the Fire Service system

WA- 008A1.04 RO 3.1 SRO 3.2 (EOP-14, Enclosure 2)

D, R

k. CRD - Manually trip reactor from outside control room

A. D

WA-02EA1.1 RO 4.0 SRO 3.6 (AP-990)

SPARE

FS/OTSG - Transfer excess secondary inventory to FST

D

WA- 037AK3.07 RO 4.2 SRO 4.4 (EOP-14 Enclosure 9)

Code*

Function

I

Type

I

Safety

4

8

1

2,8

NUREG- 1021, Draft Rev. 9

FU03 NRC Exarn\\OUTLINESUPMs\\NRC 2K3 SRO-I Only Outline SIM-Plant JPMs (301 2)

Rev I .doc

ES-301

Control Roomfin-Plant Systems Outline

Form ES-301-2

Facility: C

-

Exam Level SRO(U)

Operating Test No.: 1

Date of Examination: Aueust 25. 2003

b. ESFAS - ES " B HPI Diverse Containment Isolation Test

NA-013A3.01 R03.7 SR03.9 (SP-358A)

c. PZR PCS - Perform PORV Exercise Test

WA - 010A3.01 RO 3.0 SRO 3.2 (SP-379)

d. RHR - Perform a crosstie of DHR flow to the Reactor Vessel

WA- 005A1.02 RO 3.3 SRO 3.4 (OP-404)

SPARE

MU- Restart a MUP Following an RCS Leak Isolation

WA- 002A2.01 RO 4.3 SRO 4.4 (AP-520)

~~

~~~

Control Room Systems (8 for RO: 7 for SROI: 2 or 3 for SRO-U)

A. D, S

2

L, N, S

3

L,

D, S

4

D, S

2

System I JPM Title

II

j. CCWS - Fill SW surge tank from the Fire Service system

CRD - Manually trip reactor from outside control room

D, R

WA- 008A1.04 RO 3.1 SRO 3.2 (EOP-14. Enclosure 2)

k.

A, D

WA - 02EAl.l RO 4.0 SRO 3.6 (AP-990)

SPARE

FS/OTSG - Transfer excess secondary inventory to FST

D

Code*

Function

I

I

Safety

a

1

2. a

NUREG- 1021, Draft Rev. 9

F\\2003 NRC Exarn\\OLJTLINESlPMs\\NRC 2K3 SRO-U Only Outline SIM-Plant JPMs (301 -2) Rev 1 .doc