Issue date: 09/11/2003
From: Chandu Patel
NRC/NRR/DLPM/LPD2
To: Scarola J
Carolina Power & Light Co
Patel C P, NRR/DLPM, 415-3025
References
TAC MB6226
Download: ML032541174 (6)


Text

September 11, 2003 Mr. James Scarola, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 - PARTIAL WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. MB6226)

Dear Mr. Scarola:

By letter dated August 28, 2002, you applied for an amendment to the Shearon Harris Nuclear Power Plant, Unit 1, Facility Operating License No. NPF-63. The proposed change would have included a modification to Technical Specification 6.9.1.6.2 by including Topical Report EMF-2310(P)(A), SRP [Standard Review Plan] Chapter 15 Non-LOCA [loss-of-coolant accident] Methodology for Pressurized-Water Reactors, as a reference methodology used to determine core operating limits at Shearon Harris Nuclear Power Plant, Unit 1. Subsequently, by letter dated August 28, 2003, you withdrew that portion of the amendment request.

The other portion of the amendment application, which requested approval of topical report EMF-2328(P)(A), PWR [pressurized-water reactor] Small-Break LOCA Evaluation Model, S-RELAP5-Based, as a reference in the TS, was approved and issued as Amendment No. 114 on March 28, 2003 (68 FR 18291, April 15, 2003).

The Commission has filed the enclosed Notice of Partial Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/

Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

Notice of Partial Withdrawal cc w/encl: See next page

ML032541174 OFFICE PM:PDII/S2 LA:PDII/S2 SC:PDII/S2 NAME CPatel EDunnington AHowe DATE 9/2/03 9/2/03 9/4/03 COPY Yes/No Yes/No Yes/No

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-400 NOTICE OF PARTIAL WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Carolina Power & Light Company, et al. (the licensee) to withdraw a portion of its August 28, 2002, application for proposed amendment to Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1, located in Wake and Chatham Counties, North Carolina.

The withdrawn portion of the proposed amendment would have revised Technical Specification 6.9.1.6.2 by including Topical Report EMF-2310(P)(A), SRP [Standard Review Plan] Chapter 15 Non-LOCA [loss-of-coolant accident] Methodology for Pressurized-Water Reactors, as a reference methodology used to determine core operating limits at Shearon Harris Nuclear Power Plant, Unit 1.

The other portion of the amendment application, which requested approval of topical report EMF-2328(P)(A), PWR [pressurized-water reactor] Small-Break LOCA Evaluation Model, S-RELAP5-Based, as a reference in the TS, was approved and issued as Amendment No. 114 on March 28, 2003 (68 FR 18291, April 15, 2003).

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on October 15, 2002 (67 FR 63691).

However, by letter dated August 28, 2003, the licensee withdrew the portion of the proposed change described above.

For further details with respect to this action, see the application for amendment dated August 28, 2002, and the licensee's letter dated August 28, 2003, which withdrew this portion of

the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams/html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by email to pdr@nrc.gov.

Dated at Rockville, Maryland, this 11th day of September 2003.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation

Mr. James Scarola Shearon Harris Nuclear Power Plant Carolina Power & Light Company Unit 1 cc:

Steven R. Carr Associate General Counsel - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Resident Inspector/ Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. James W. Holt Manager Performance Evaluation and Regulatory Affairs PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Benjamin C. Waldrep Plant General Manager - Harris Plant Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 3 New Hill, North Carolina 27562-0165 Mr. John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.

Washington, DC 20037-1128 Mr. Robert J. Duncan II Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, North Carolina 27602 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, North Carolina 27312 Mr. Terry C. Morton, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. John R. Caves, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165