Category:Letter
MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03
[Table view] Category:License-Operator
MONTHYEARIR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 NLS2017037, 2017-03 Post Exam Comments & Analysis2017-03-24024 March 2017 2017-03 Post Exam Comments & Analysis ML17122A0872017-03-16016 March 2017 2017-03 Final Written Exam ML17122A0852017-03-16016 March 2017 2017-03 Final Operating Test ML17122A0842017-03-16016 March 2017 2017-03 Proposed Written Exam ML17122A0862017-03-16016 March 2017 2017-03 Final Outlines 2023-09-01
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 NLS2017037, 2017-03 Post Exam Comments & Analysis2017-03-24024 March 2017 2017-03 Post Exam Comments & Analysis ML17122A0872017-03-16016 March 2017 2017-03 Final Written Exam ML17122A0842017-03-16016 March 2017 2017-03 Proposed Written Exam ML17122A0852017-03-16016 March 2017 2017-03 Final Operating Test ML17122A0812017-03-16016 March 2017 2017-03 Proposed Outline Comments ML17122A0832017-03-16016 March 2017 2017-03 Proposed Written Exam Comments 2023-09-01
[Table view] |
Text
N Nebraska Public Power District Always there when you need us NLS2003075 June 27, 2003 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011
Subject:
Post Examination Comments The purpose of this letter is to transmit post-examination comments resulting from the Senior Reactor Operator and Reactor Operator initial licensing examinations which were administered at Cooper Nuclear Station (CNS) June 13, 2003.
Per NUREG- 1021 Revision 8, Supplement 1, a post examination analysis was performed by CNS and two comments on the examination are enclosed for your consideration. Feedback from the applicants is included in these comments.
Should you have any questions or require additional information, please contact Lisa Edwards, Nuclear Training Manager, at (402) 825-5402.
Respectfully, T. J. Palmisano Site Vice-President
/jr Enclosures cc: G. E. Werner Chief Examiner USNRC - Region IV COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com
Original Exam Question: 13 (RO and SRO Exams)
The plant was operating at power with the "A" Core Spray subsystem in full flow test at 5000 gprn.
An accident occurs that results in increasing drywell pressure and lowering reactor water level and lowering reactor pressure. The following plant conditions exist:
- Drywell pressure I I psig (rising)
> Reactor water level -21 " (wide range, lowering)
> Reactor pressure 375 psig (lowering)
What is the pressure response of the A Core Spray system at this time?
Core Spray system pressure ...
- a. remains the same.
- b. increases to pump shut-off head.
- c. decreases to just above reactor pressure.
- d. increases to iust below pump shutoff head.
Original Exam Answer: Answer: d.
- a. Core Spray pressure would not remain the same because system flow rate would become significantly reduced when the initiation signal occurred and the test line isolated.
- b. Core Spray system pressure would be below shut-off head because of the flow that exists through the minimum flow valve.
- c. Core Spray pressure increases.
Question/Answer Problem Statement:
Given the facts that the test valve (CS-MO-26A) has a fast stroke time (approx. 5 seconds) and the minimum flow valve (CS-MO-5A) has a relatively long stroke time (29.1 to 39.3 seconds),
Core Spray pump discharge pressure will increase to pump shut-off head for a brief time during this transient. Because the question does not stipulate any time factor (other than "at this time") to be considered in determining the correct response, the examinee may evaluate the entire transient and decide that the best answer is the one that describes that period of time, albeit brief, when Core Spray pump discharge pressure is greatest. That period of time would exist when the full flow test valve, CS-MO-26A, has closed, but before the system minimum flow valve, CS-MO-5A, has started to open.
The conditions of the test item were replicated in the CNS simulator. Core Spray Pump A discharge pressure increased to shutoff head before stabilizing at a slightly lower value.
References:
CNS Procedure 2.2.9, Core Spray System CNS Procedure 6.1CS.201, CS Motor Operated Valve Operability Test (IST) (Div I)
Engineering Calculation Number NEDC 03-025 I Recommend Resolution: Also accept choice b.
Original Exam Question: 21 (RO and SRO Exams)
Given the following:
- The plant is operating at 100% power at Beginning of Life (BOL)
> A loss of off-site power occurs
> All control rods fully inserted
> Pressure rises to 1090 psig, THEN lowers to 875 psig
> 20 minutes later, pressure is cycling between 1015 and 875 psig What is the status of Low Low Set (LLS) and why?
(NOTE: NO operator action is taken.)
- a. LLS is controlling pressure. LLS logic has no AC powered inputs or components.
- b. LLS is controlling pressure. With RPS power unavailable, the LLS logic can arm irrespective of reactor pressure.
- c. LLS is NOT controlling pressure. With RPS power unavailable, the SRVs must operate on mechanical relief setpoint to control pressure.
- d. LLS is NOT controlling pressure. A fault must exist in the LLS logic as all conditions are present for LLS to automatically control pressure.
Original Exam Answer: Answer: b.
- a. LLS logic is armed by RPS high pressure signal.
- c. LLS logic will arm on high pressure with no RPS power available.
- d. LLS is controlling pressure.
Question/Answer Problem Statement:
In choice "a", the LLS logic has no AC powered inputs because the associated RPS AC power supplies are deenergized following a loss of off-site power. When off-site power is lost, the emergency buses (41 60vac I F and I G) will be deenergized for a period of at least 10 seconds.
This is due to the fact the the Startup Transformer (preferred backup to the Normal Transformer) and the Emergency Transformer (which connects to both emergency buses within I second if the Startup Transformer breakers fail to "fast transfer" following a loss of the Normal Transformer) will both be deenergized under conditions of a loss of off-site power.
Undervoltage on the emergency buses will cause the diesel generators to start, but their output breakers will not close until the associated emergency buses have been deenergized for a minimum of 10 seconds, as a result of a time delay relay function. During this 10 second (or more) time frame, the RPS motor generator sets will trip on undervoltage. There is no automatic power supply transfer feature associated with the RPS buses. As a result of this event sequence, there is no AC power supply currently providing power to the Reactor Protection System, including the 5A-K27A/B relays, which provide the high Reactor pressure input signal to the Low Low Set logic. Therefore, at this point in time and due to the unavailability of R-PS power, "LLS has no AC powered inputs or components".
Choice "a" is correct as stated
References:
CNS Procedure 2.2. 1, Nuclear Pressure Relief System CNS drawing 944E689, Low Low Set CNS drawing 791E256, sheets 9 and 10, Reactor Protection System Recommnend Resolution: Also accept choice a.
Recommend Resolution: Also accept choice a.
ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2003075 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE NONE i
i i
i 4
I.
PROCEDURE 0.42 REVISION 12 PAGE 14 OF 16