Tech Spec for Clinton Power Station, Unit 1, Corrected Page to Amendment 156 to License NPF-62
ML032030188
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/24/2003
From:
NRC/NRR/DLPM
To:
References
Download: ML032030188 (1)


Text

Suppression Pool Water Level 3.6.2.2 3.6 CONTAINMENT SYSTEMS 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2 Suppression pool water level shall be:

a.

18 ft 11 inches and 9 ft 5 inches,

b.

18 ft 11 inches and 20 ft 1 inches, in MODE 3 with reactor pressure less than 235 psig APPLICABILITY:

MODES 1, 2, and MODE 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Suppression pool water A.1 Restore suppression 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> level not within pool water level to limits.

within limits.

B.

Required Action and B.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

AND 8.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.2.1 Verify suppression pool water level is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> within limits.

CLINTON 3.6-31 Amendment No. 156