MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] Category:Manual
MONTHYEARL-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML22263A4172022-09-20020 September 2022 Enclosure E - DBNPS Unit 1, Technical Requirements Manual, Rev. 23 ML20302A3022020-09-25025 September 2020 1 to Technical Requirements Manual L-20-093, Offsite Dose Calculation Manual, Revision 372019-11-0404 November 2019 Offsite Dose Calculation Manual, Revision 37 L-19-177, Summary of Changes to the Firstenergy Nuclear Operating Company Quality Assurance Program Manual for Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant2019-10-0808 October 2019 Summary of Changes to the Firstenergy Nuclear Operating Company Quality Assurance Program Manual for Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML20142A4012019-02-13013 February 2019 Offsite Dose Calculation Manual, Revision 36 L-17-170, Submittal of 2017 Emergency Preparedness Evaluated Exercise Manual2017-05-15015 May 2017 Submittal of 2017 Emergency Preparedness Evaluated Exercise Manual L-18-092, Offsite Dose Calculation Manual, Revision 332017-03-0909 March 2017 Offsite Dose Calculation Manual, Revision 33 ML17039A6772016-11-21021 November 2016 Quality Assurance Program Manual, Rev 20 ML16208A0692016-07-15015 July 2016 Delinquent Transmittal Report ML18149A2822016-03-29029 March 2016 Offsite Dose Calculation Manual, Revision 32 L-16-134, Offsite Dose Calculation Manual, Revision 312015-06-30030 June 2015 Offsite Dose Calculation Manual, Revision 31 ML16147A0092015-01-14014 January 2015 Offsite Dose Calculation Manual, Revision 30 ML14342A6832014-11-21021 November 2014 Technical Requirements Manual, Revision 14 L-14-135, Offsite Dose Calculation Model, Revision 272013-02-27027 February 2013 Offsite Dose Calculation Model, Revision 27 ML12138A0672012-05-14014 May 2012 FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 4 L-12-152, Offsite Dose Calculation Manual, Revision 262011-11-0202 November 2011 Offsite Dose Calculation Manual, Revision 26 L-11-150, Offsite Dose Calculation Manual, Rev. 242011-03-11011 March 2011 Offsite Dose Calculation Manual, Rev. 24 ML12174A0962011-02-22022 February 2011 Offsite Dose Calculation Manual, Revision 25 ML1014105112009-06-11011 June 2009 Offsite Dose Calculation Manual, Revision 23 L-09-111, Offsite Dose Calculation Manual, Revision 222008-09-0303 September 2008 Offsite Dose Calculation Manual, Revision 22 ML0612304032005-12-22022 December 2005 Offsite Dose Calculation Manual Revision 20.0 ML0533903582005-11-30030 November 2005 Information Request for an NRC Biennial Permanent Modifications and 10CFR 50.59 (MOD/50.59) Baseline Inspection ML0530704352005-11-0808 November 2005 Control Rod Drive Mechanism Instruction Manual ML0512502282004-12-22022 December 2004 Offsite Dose Calculation Manual, Revision 19.0 ML0424504162004-08-0404 August 2004 Submittal of Organizational Safety Culture and Safety Conscious Work Environment Independent Assessment Plan for the Davis-Besse Nuclear Power Station ML0411004492004-02-25025 February 2004 IMC 0350 Restart Checklist, Revision 3 ML0411004202004-02-20020 February 2004 0350 Panel Discussion Topics (Open Restart Checklist Items (1) ML0411004082004-02-19019 February 2004 IMC 0350 Panel Process Plan ML0512502232004-01-23023 January 2004 Offsite Dose Calculation Manual, Revision 18.0 ML0323805272003-07-30030 July 2003 Submittal of Revision 5 of Nuclear Operating Business Practice, Restart Readiness Review Extended Plant Outage (DBBP-VP-0002) ML0318304952003-07-0202 July 2003 Letter Dated 07/01/2003 to L. Myers, Firstenergy Nuclear Operating Company Transmittal of Davis-Besse Oversight Panel Restart Checklist, Revision 3 ML0314702122003-04-30030 April 2003 Annual Radiological Environmental Operating Report, January 1, 2002 Through December 31, 2002, Pages 68 Through 81 ML0314702092003-04-30030 April 2003 Annual Radiological Environmental Operating Report, January 1, 2002 Through December 31, 2002, Pages 60 Through 67 ML0314702072003-04-30030 April 2003 Annual Radiological Environmental Operating Report, January 1, 2002 Through December 31, 2002, Pages 46 Through 59 ML0314305042003-04-30030 April 2003 Annual Radiological Environmental Operating Report, Radioactive Effluent Release Report, January 1 Through December 31, 2002 ML0310007392003-04-0606 April 2003 Transmittal of Rev 6 of DB Return to Service Plan, Rev 5 of the DB Restart Action Plan, Rev 5 of DB Prog Compliance Plan, and Rev 3 of the Nuc Operating Business Practice, Restart Readiness Rev Extended Plant Outage (DBBP-VP-0002)/Letter ML0310702912003-04-0606 April 2003 Letter Davis-Besse 2003 Emergency Preparedness Exercise Manual 2023-08-31
[Table view] |
Text
July 2, 2003 Mr. Lew Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE OVERSIGHT PANEL RESTART CHECKLIST, REVISION 3
Dear Mr. Myers:
By our letter dated April 29, 2002, we informed you of our planned actions to provide focused and coordinated regulatory oversight of the Davis-Besse Nuclear Power Station as a result of the reactor pressure vessel head degradation discovered on March 6, 2002. We enhanced NRC monitoring of corrective actions at Davis-Besse, as described in NRC Inspection Manual Chapter (IMC) 0350, Oversight of Operating Reactor Facilities in a Shutdown Condition with Performance Problems. NRC Region III Manager, John A. Grobe, was assigned as the Chairman of the NRCs Davis-Besse Oversight Panel.
The Oversight Panel for Davis-Besse was implemented to enhance the agencys strategic goals of maintaining safety, enhancing public confidence, increasing efficiency and effectiveness, and minimizing unnecessary regulatory burden by coordinating and focusing agency resources. In accordance with IMC 0350, the Davis-Besse Oversight Panel developed a Restart Checklist, which is a listing of issues requiring resolution before the Oversight Panel could consider a recommendation for facility restart. The Restart Checklist was issued on August 16, 2002. The Restart Checklist was subsequently revised on October 30, 2002, adding issues concerning the containment sump modification and the radiation protection program and January 28, 2003, adding an issue concerning the processes for ensuring completeness and accuracy of required records and submittals to the NRC.
The Davis Besse Oversight Panel has the responsibility to modify the Restart Checklist to address issues of significance that emerge during its ongoing oversight. Accordingly, the Oversight Panel is adding two issues identified as Item 2.e, High Pressure Injection Pump Internal Clearance Debris Resolution, and 6.g, Request to Relocate High Pressure Injection and Low Pressure Injection Subsystems Flow Balance Testing from Technical Specifications 4.5.2.h to Updated Safety Analysis Report Technical Requirements Manual, to the attached Restart Checklist. The first issue is being added because a preliminary significance determination of the issues documented in LER 50-346/2003-002 indicates a finding of greater than very low significance resulting in the need for further evaluation to determine the significance. The details of this significance determination will be documented in IR 50-346/2003-015. The second issue is being added, based on your submittal dated May 21, 2003 and your request for approval of this license amendment prior to restart.
This Checklist will continue to be reevaluated and revised, if necessary, by the Davis-Besse Oversight Panel, based on the results of NRC inspections and your continuing implementation of recovery activities.
L. Myers IMC 0350 directs the suspension of the Reactor Oversight Process (ROP) with the initiation of the Oversight Panel. The inspection program for Davis-Besse will be directed by the oversight panel utilizing existing inspection procedures to the maximum extent practicable and the Panel will use the significance determination process and action matrix as guidance for determining agency response to identified performance problems. You should continue to monitor and submit appropriate performance indicators consistent with the facility configuration. The NRCs inspections will be focused on resolving the issues contained in the Restart Checklist and scheduled consistent with your completion of work in each area.
If you have questions regarding the NRC actions discussed above, please contact John A.
Grobe at 630/829-9637 or Christine A. Lipa at 630/829-9619.
Sincerely,
/RA/
J. E. Dyer Regional Administrator Docket No. 50-346 License No. NPF-3
Enclosure:
Restart Checklist, Revision 3 See Attached Distribution
L. Myers IMC 0350 directs the suspension of the Reactor Oversight Process (ROP) with the initiation of the Oversight Panel. The inspection program for Davis-Besse will be directed by the oversight panel utilizing existing inspection procedures to the maximum extent practicable and the Panel will use the significance determination process and action matrix as guidance for determining agency response to identified performance problems. You should continue to monitor and submit appropriate performance indicators consistent with the facility configuration. The NRCs inspections will be focused on resolving the issues contained in the Restart Checklist and scheduled consistent with your completion of work in each area.
If you have questions regarding the NRC actions discussed above, please contact John A.
Grobe at 630/829-9637 or Christine A. Lipa at 630/829-9619.
Sincerely, J. E. Dyer Regional Administrator Docket No. 50-346 License No. NPF-3
Enclosure:
Restart Checklist, Revision 3 See Attached Distribution DOCUMENT NAME: C:\ORPCheckout\FileNET\ML031830495.WPD To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII NRR RIII NRR RIII NAME CLipa/klg WRuland/per JGrobe /RA JDyer email Borchardt JGrobe/ acting for/SCollins/
per email CLipa/
DATE 06/26/03 06/27/03 06/27/03 07/01/03 07/02 /03 OFFICIAL RECORD COPY
L. Myers cc w/encl: The Honorable Dennis Kucinich B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio D. Lochbaum, Union Of Concerned Scientists S. Arndt, President, Ottawa County Board of Commissioners C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Ottawa County Emergency Management Agency H. Barlos, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Lucas County Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable John Weber The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown The Honorable Joe Ihnat, Jr.
INPO
L. Myers ADAMS Distribution:
AJM DFT H. Nieh (HKN), OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1
U. S. Nuclear Regulatory Commission Manual Chapter 0350 Oversight Panel Davis-Besse Restart Checklist, Revision 3 Item Number/ Description Cornerstone*
- 1. Adequacy of Root Cause Determinations 1.a Penetration Cracking and Reactor Pressure Vessel Corrosion IE 1.b Organizational, Programmatic and Human Performance Issues IE
- 2. Adequacy of Safety Significant Structures, Systems, and Components 2.a Reactor Pressure Vessel Head Replacement IE 2.b Containment Vessel Restoration Following Reactor Pressure BI Vessel Head Replacement 2.c Structures, Systems, and Components Inside Containment IE, MS, BI 2.c.1 Emergency Core Cooling System and Containment Spray MS, BI System Sump 2.d Extent-of-Condition of Boric Acid in Systems Outside IE, MS, BI Containment 2.e High Pressure Injection Pump Internal Clearance/Debris MS, BI Resolution
- 3. Adequacy of Safety Significant Programs 3.a Corrective Action Program ALL 3.b Operating Experience Program ALL 3.c Quality Audits and Self-Assessments of Programs ALL 3.d Boric Acid Corrosion Management Program IE, MS, BI
3.e Reactor Coolant System Unidentified Leakage Monitoring IE, MS, BI Program 3.f In-Service Inspection Program IE, MS, BI 3.g Modification Control Program ALL 3.h Radiation Protection Program ORS, PRS 3.i Process for Ensuring Completeness and Accuracy of Required ALL Records and Submittals to the NRC
- 4. Adequacy of Organizational Effectiveness and Human Performance 4.a Adequacy of Corrective Action Plan ALL 4.b Effectiveness of Corrective Actions ALL
- 5. Readiness for Restart 5.a Review of Licensees Restart Action Plan ALL 5.b Systems Readiness for Restart IE, MS 5.c Operations Readiness for Restart IE 5.d Test Program Development and Implementation IE, MS, BI
- 6. Licensing Issue Resolution 6.a Verification that Relief Requests A8 and A12 regarding the IE, BI Shell to Flange Weld (previously submitted by letter dated September 19, 2000) is not Impacted by the Midland RPV Head 6.b American Society of Mechanical Engineers (ASME) Code Relief IE, BI Request for Failure to Maintain Original Radiographic Tests of the Midland Head to Flange Weld (Planned Relief Request A26)
6.c ASME Code Relief Request for Inability to Radiographically Test IE, BI 100% of the Midland Reactor Pressure Vessel Head to Flange Weld (Planned Relief Request A27) 6.d Resubmit Relief Request A2 (previously submitted by letter dated IE, BI September 19, 2000) for ASME Code for Inability to Perform 100% volumetric and surface examination of Head to Flange Weld 6.e Reconciliation Letter that Demonstrates How the New Reactor IE, BI Pressure Vessel Head Correlates With the ASME Code and QA Index for Section III and Section XI - Commitments 6.f Verification Letter of Technical Specification IE, BI Pressure/Temperature Curves for New Vessel Head -
Commitment 6.g Request to relocate High Pressure Injection and Low Pressure MS, BI Injection Subsystems Flow Balance Testing fromTechnical Specifications 4.5.2.h to Updated Safety Analysis Report Technical Requirements Manual
- 7. Confirmatory Action Letter Resolution 7.a Verification that Confirmatory Action Letter Items are Resolved, ALL Including a Public Meeting to Discuss Readiness for Restart
IE - Initiating Events MS - Mitigating Systems BI - Barrier Integrity EP- Emergency Preparedness ORS - Occupational Radiation Safety PRS - Public Radiation Safety PP - Physical Protection ALL - Affects all cornerstones