MONTHYEARML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement 2024-09-05
[Table view] Category:Safety Evaluation
MONTHYEARML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML22194A8172022-08-10010 August 2022 Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring System ML22194A8402022-07-15015 July 2022 Correction Letter of Relief Request No. HR-I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs ML22181A1252022-07-0505 July 2022 Issuance of Relief Request No. HR I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs ML21348A7132022-03-14014 March 2022 Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat Sink ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21181A0562021-08-17017 August 2021 Issuance of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (EPID L 2020 Lla 0210) (Non-Proprietary) ML21098A0872021-04-26026 April 2021 Issuance of Amendment No. 228 Adopt Technical Specifications Task Force TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML21050A0022021-03-12012 March 2021 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21047A3132021-03-10010 March 2021 Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary) ML20281A6132020-11-0909 November 2020 Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool Cooling ML20231A6322020-09-29029 September 2020 Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power Reactors ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20091L9992020-04-13013 April 2020 Issuance of Relief Request HC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19289A8862019-11-0707 November 2019 Issuance of Amendment No. 220 Regarding Revise Technical Specifications to Adopt TSTF-546, Revise APRM (Average Power Range Monitor) Channel Adjustment Surveillance Requirement ML19218A3052019-09-19019 September 2019 Issuance of Amendment No. 219 Regarding Revise Technical Specifications to Adopt TSFF-564, Safety Limit MCPR ML19220A1022019-09-0606 September 2019 Alternative Request VR-03 to Use ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valve for the Fourth 10-Year Inservice Test Interval ML19205A3062019-09-0606 September 2019 Issuance of Amendment No. 218 Regarding Revised Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements ML19186A2052019-08-0606 August 2019 Issuance of Amendment No. 217 Remote Shutdown System ML19136A0262019-07-11011 July 2019 Issuance of Relief Request No. HC-I3R-08, Revision 0, Use of the ASME Code ML19073A0732019-04-30030 April 2019 Issuance of Amendment No. 216 Revise Technical Specification 3/4.8.1, A.C. Sources - Operating, Action for Inoperable Diesel Generator ML19065A1562019-03-27027 March 2019 Issuance of Amendment No. 215 Inverter Allowed Outage Time Extension ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML18290A8762018-12-0606 December 2018 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4458; EPID No. L-2014-JLD-0040) ML18260A2032018-10-30030 October 2018 Issuance of Amendment No. 213 Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18096A5422018-04-24024 April 2018 Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) ML18081A0442018-04-11011 April 2018 Issuance of Amendment No. 211 Safety Limit Minimum Critical Power Ratio Change ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17324A8402017-12-14014 December 2017 Issuance of Amendment to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (CAC No. MF9502; EPID L-2017-LLA-0204) ML17317A6052017-12-13013 December 2017 Issuance of Amendment, License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-535 ML17321B1062017-11-28028 November 2017 Request to Use Later Edition of American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (CAC No. MG0124; EPID L-2017-LLR-0087) ML17291A2092017-11-0808 November 2017 Issuance of Amendment Technical Specification Change for Permanent Extension to Type a and Type C Containment Leak Rate Test Frequencies (CAC No. MF8462; EPID L-2016-JLD-0011) ML17223A4832017-08-17017 August 2017 Relief from the Requirements of the ASME Code for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations ML17216A0222017-08-0404 August 2017 Nonproprietary Issuance of Amendment Regarding Digital Power Range Neutron Monitoring System Upgrade ML17125A2662017-06-30030 June 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17164A3552017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17047A0202017-03-21021 March 2017 Issuance of Amendment to Delete Technical Specification Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML17053A1782017-03-15015 March 2017 Issuance of Amendment to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16343A0572016-12-20020 December 2016 Requests for Relief GR-01, PR-01, PR-02, VR-01, and VR-02, for the Fourth Inservice Testing Interval ML16270A0382016-10-13013 October 2016 Issuance of Amendment No. 200 Safety Limit Minimum Critical Power Ratio Change ML16256A6552016-09-30030 September 2016 Hope Creek Generating Station - Request for Relaxation of the Release Point Height Requirement of NRC Order EA-13-109,Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML16259A2042016-09-20020 September 2016 Hope Creek Generating Station - Safety Evaluation - Request to revise technical specifications - safety limit minimum critical power ratio.(TAC NO. MF7793) 2024-07-15
[Table view] |
Text
June 9, 2003 Mr. Roy A. Anderson President & Chief Nuclear Officer PSEG Nuclear LLC - X04 Post Office Box 236 Hancocks Bridge, NJ 08036
SUBJECT:
HOPE CREEK NUCLEAR GENERATING STATION - EVALUATION OF RELIEF REQUEST HC-RR-B11 (TAC NO. MB8408)
Dear Mr. Anderson:
By letter dated April 14, 2003, as supplemented on May 9 and 15, 2003, PSEG Nuclear, LLC (PSEG) submitted a request for relief from Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) under the provisions of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(a)(3)(i) for the Hope Creek Nuclear Generating Station (Hope Creek). Specifically, Relief Request HC-RR-B11 proposed an alternative examination using enhanced remote visual equipment that is capable of a 1-mil (0.001 inch) wire resolution. The visual examination will be performed on essentially 100% of the Hope Creek reactor vessel inner nozzles radii. The request for relief is for the second 10-year inservice inspection interval, which commenced on December 13, 1997.
Based on the information provided, the U.S. Nuclear Regulatory Commission (NRC) staff concludes that your proposed alternative enhanced visual inspection, as described in Relief Request HC-RR-B11, and provides an acceptable level of quality and safety. Therefore, the NRC staff authorizes you to use the proposed alternatives pursuant to 10 CFR 50.55a(a)(3)(i) for the second 10-year interval at Hope Creek.
The NRC staffs Safety Evaluation is enclosed. If you have any questions, please contact your Project Manager, George Wunder, at 301-415-1494.
Sincerely,
/RA/
James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
As stated cc w/encl: See next page
ML031600421
- SE input provided on May 16, 2003 OFFICE PDI-2/PM PDI-2/LA EMCB/SC* OGC PDI-2/SC NAME REnnis for GWunder CRaynor TChan RHoefling JBoska forJClifford DATE 5/21/03 5/23/03 05/15/03 6/2/03 6/6/03 PSEG Nuclear LLC Hope Creek Nuclear Generating Station cc:
Mr. Timothy J. OConnor Lower Alloways Creek Township Vice President - Operations c/o Mary O. Henderson, Clerk PSEG Nuclear - X15 Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Mr. John T. Carlin Radiation Protection Programs Vice President - Engineering NJ Department of Environmental PSEG Nuclear - N10 Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. David F. Garchow Brian Beam Vice President - Projects and Licensing Board of Public Utilities PSEG Nuclear - N28 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Mr. Gabor Salamon U.S. Nuclear Regulatory Commission Manager - Nuclear Safety and Licensing 475 Allendale Road PSEG Nuclear - N21 King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Nuclear Generating Station Jeffrie J. Keenan, Esquire U.S. Nuclear Regulatory Commission PSEG Nuclear - N21 Drawer 0509 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Joint Owner Affairs PECO Energy Company Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA 19348
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR RELIEF HC-RR-B11 SECOND 10-YEAR INSERVICE INSPECTION INTERVAL HOPE CREEK NUCLEAR GENERATING STATION PSEG NUCLEAR, LLC DOCKET NO. 50-354
1.0 INTRODUCTION
By letter dated April 14, 2003, as supplemented on May 9 and 15, 2003, PSEG Nuclear, LLC (PSEG or the licensee) submitted a request for relief from Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) under the provisions of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(a)(3)(i) for the Hope Creek Nuclear Generating Station (Hope Creek). Specifically, Relief Request HC-RR-B11 proposed an alternative examination using enhanced remote visual equipment that is capable of a 1-mil (0.001 inch) wire resolution. The visual examination will be performed on essentially 100% of the Hope Creek reactor pressure vessel (RPV) inner- nozzles radii. The May 9, 2003, letter superceded information provided in PSEGs April 14, 2003, request for relief. Relief Request HC-RR-B11 applies to the second 10-year inservice inspection (ISI) interval, which commenced on December 13, 1997.
2.0 BACKGROUND
The ISI of ASME Code Class 1, 2, and 3, components is to be performed in accordance with Section XI of the ASME Code and applicable addenda as required by 10 CFR 50.55a(g),
except where specific relief has been granted by the U.S. Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.55a(g)(6)(i). As stated in 10 CFR 50.55a(a)(3)(i), alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if the licensee demonstrates that: (i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that the ISI of components and system pressure tests conducted during the Enclosure
first 10-year interval, and subsequent intervals, comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. For Hope Creek, the applicable edition of Section XI of the ASME Code for the second 10-year ISI interval is the 1989 Edition, without Addenda.
3.0 EVALUATION
3.1 ASME Code Components Affected
This request covers a total of 10 RPV inner-nozzle radii. The components are from the following systems:
- Reactor vessel head vent nozzle (1)
- Main steam nozzles (4)
- Control Rod Drive (CRD) return nozzle (1)
- Reactor recirculation outlet nozzles (2)
- Spray head nozzles (2)
The specific nozzle designations are: RPV1-NIAIR, -NIBIR, -N3AIR, -N3BAIR, -N3CAIR,
-N3DAIR, -N6AIR, -N6BIR, -N7IR, and -N9A.
3.2 Code Requirements for Which Relief Is Requested The 1989 Edition of ASME Section XI, Table IWB-2500-1, Examination Category B-D, Item B3.100 requires a volumetric examination of the RPV inner-nozzle radius section. Relief is requested from the requirements to perform the volumetric examination of the inner-nozzle radii for the nozzles listed in Section 3.1.
3.3 Licensees Proposed Alternative The licensee proposes to perform a visual examination per the requirements of the approved Hope Creek ISI Non-destructive Examination (NDE) Program. The required visual coverage will be essentially 100% (greater than 90% for each nozzle) of the surface M-N as shown in Figure IWB-2500-7 (a) through (d) of the 1989 Edition of ASME Section XI, in lieu of the volumetric examinations required by Table IWB-2500-1, Examination Category B-D, Item B3.100 of ASME Section XI.
The components identified in Section 3.1 will receive enhanced visual examinations. The examinations will be performed remotely using 8x magnification video equipment. The resolution sensitivity for this remote examination will be established using a 1-mil diameter wire standard similar to that used for other reactor pressure vessel internal examinations intended to detect cracking. Crack-like surface flaws exceeding the acceptance criteria of Table IWB-3512-1 are unacceptable for continued service unless the reactor vessel meets the requirements of IWB-3142.2, IWB-3142.3 or IWB-3142.4.
3.4 Licensees Bases for Alternative (as stated):
All nozzle forgings were nondestructively examined during fabrication and have previously been examined using inservice ultrasonic techniques specific to the nozzle configuration. No indication of fabrication defects or service related cracking has been detected by these examinations.
Nozzle inner radius examinations are the only non-welded areas requiring examination on the RPV. This requirement was deterministically made early in the development of ASME Section XI, and applied to 100 percent of nozzles welded with full penetration welds. Fatigue cracking is the only applicable degradation mechanism for the nozzle inner radius region. For all nozzles other than feedwater, there is no significant thermal cycling during operation.
Therefore, from a risk perspective there is no need to perform volumetric examination on any nozzles other than feedwater and operational CRD [control rod drive] returns.
No service related cracking has ever been discovered in any of the BWR (boiling water reactor) fleet plant nozzles other than on feedwater or operational CRD returns. The six feedwater nozzle inner radius sections will continue to be examined with UT [ultrasonic testing] techniques developed and qualified with GE-NE-523-A71-0594-A, Revision 1 (the NRC has approved this report under TAC No. MA6787).
PSEG further stated that application of a visual examination alternative for the listed nozzle inner-radius regions ensures an acceptable level of quality and safety. The licensee also stated that for Table IWB-3512-1, the depth of a crack initiation is assumed to be one-half of the measured length of the crack initiation. Crack-like surface flaws found exceeding the acceptance criteria of Table IWB-3512-1 will be unacceptable for continued service unless the reactor vessel meets the requirements of IWB-3142.2, IWB-3142.3 or IWB-3142.4.
3.5 NRC Staffs Evaluation In the mid 1970s, fatigue-initiated cracking was discovered in the nozzle inner-radius section of feedwater nozzles of 18 BWR vessels. The cracks were found using visual examinations. UT failed to reveal the presence of these cracks. The shortcomings with UT prompted the NRC to issue NUREG-0619, BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking, which modified inspection requirements for these components.
In NUREG-0619, the NRC staff concluded that UT of the vessel nozzle inner-radius section involves complex geometries, long examination metal paths, and inherent UT beam spread, scatter, and attenuation. During the intervening years, improvements in UT technologies were introduced (e.g., computer modeling, tip diffraction, and phased array scanning) which improved the quality of the examination for this component. However, the area remains difficult to examine completely.
The NRC staff finds that even with vessel examinations using improved NDE technology from the outside surface, the complex geometry of the RPV nozzle inner-radius sections prevents complete UT coverage. For the RPV nozzle inner-radii, the licensee proposed to perform an
enhanced visual examination with essentially 100% coverage in lieu of UT. The enhanced aspect of the examination is to use 8x magnification video equipment to examine the inner-radii. The resolution sensitivity for this remote, in-vessel exam will be established using a 1-mil diameter wire.
The demonstration provides assurance that an examiner would recognize a crack if one were to exist. In a letter dated May 15, 2003, the licensee indicated that examination conditions, including lighting, field of view, magnification, depth of field and speed of camera movement, will be consistent with the conditions used for the demonstration of examiner competency.
The primary degradation mechanism in RPV nozzles is fatigue, which produces hairline surface indications that form networks along the circumference of the nozzle at the inner-radius section.
The licensee will be using high magnification cameras that have demonstrated resolution capability of detecting a 1-mil wire or equivalent and will be performing the examination over essentially 100% (greater than 90%) of the nozzle inner-radius surface area. Given the 1-mil resolution capability of the EVT system, it is highly unlikely that the licensee would not detect detrimental flaws. The staff has determined that the high resolution image from the camera, as demonstrated, will provide adequate assurance of structural integrity and may be used in lieu of UT for the inner-nozzle radius region.
4.0 CONCLUSION
Based on its review, the NRC staff has determined that the proposed Relief Request HC-RR-B11 submitted on April 14, 2003, as supplemented on May 9 and 15, 2003, will provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the proposed alternative for the remainder of the second 10-year ISI interval at Hope Creek. The NRC staffs authorization is limited to those components described in Section 3.1.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Z. Fu Date: June 9, 2003