Letter, Withdrawal of General Electric Company Proprietary Report NEDC-33051P, Revision 0, May 2002 and Non-Proprietary Report NEDC-33051, Revision 0, May 2002
ML031500373
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/30/2003
From: Michael Webb
NRC/NRR/DLPM/LPD4
To: Stramback G
General Electric Co
Webb M, NRR/DLPM, 415-1347
References
TAC MB5094
Download: ML031500373 (6)


Text

May 30, 2003 Mr. George B. Stramback General Electric Company Project Manager, Regulatory Services 175 Curtner Avenue San Jose, CA 95125

SUBJECT:

RIVER BEND STATION, UNIT 1 - WITHDRAWAL OF GENERAL ELECTRIC COMPANY PROPRIETARY REPORT NEDC-33051P, REVISION 0, MAY 2002, AND NON-PROPRIETARY REPORT NEDC-33051, REVISION 0, MAY 2002, (TAC NO. MB5094)

Dear Mr. Stramback:

By letter dated May 14, 2002, Entergy Operations, Inc. (EOI) submitted General Electric Company (GE) Proprietary Report NEDC-33051P, "Safety Analysis Report for River Bend Station Thermal Power Optimization," (TSAR) dated May 2002, and requested that it be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.790. A nonproprietary copy of this document, NEDC-33051, transmitted by letter dated July 9, 2002, was placed in the U.S. Nuclear Regulatory Commission (NRC) Public Electronic Reading Room.

The NRC reviewed your request and the supporting documentation in accordance with 10 CFR 2.790, and concluded that there was not sufficient justification to make a determination to withhold this information from the public. Therefore, your request was denied, as indicated by my letter to you dated October 2, 2002.

In your letter dated November 1, 2002, you requested that both versions of the TSAR submitted by EOI be withdrawn.

Pursuant to your requests, NRC has properly disposed of all internal working copies of the subject material and removed the TSARs from the Public Electronic Reading Room, as well as all NRC internal access. Also, pursuant to the requirements in 10 CFR 2.790(c), the original documents received by NRC are being returned to GE separately.

Sincerely,

/RA/

Michael K. Webb, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page

May 30, 2003 Mr. George B. Stramback General Electric Company Project Manager, Regulatory Services 175 Curtner Avenue San Jose, CA 95125

SUBJECT:

RIVER BEND STATION, UNIT 1 - WITHDRAWAL OF GENERAL ELECTRIC COMPANY PROPRIETARY REPORT NEDC-33051P, REVISION 0, MAY 2002, AND NON-PROPRIETARY REPORT NEDC-33051, REVISION 0, MAY 2002, (TAC NO. MB5094)

Dear Mr. Stramback:

By letter dated May 14, 2002, Entergy Operations, Inc. (EOI) submitted General Electric Company (GE) Proprietary Report NEDC-33051P, "Safety Analysis Report for River Bend Station Thermal Power Optimization," (TSAR) dated May 2002, and requested that it be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.790. A nonproprietary copy of this document, NEDC-33051, transmitted by letter dated July 9, 2002, was placed in the U.S. Nuclear Regulatory Commission (NRC) Public Electronic Reading Room.

The NRC reviewed your request and the supporting documentation in accordance with 10 CFR 2.790, and concluded that there was not sufficient justification to make a determination to withhold this information from the public. Therefore, your request was denied, as indicated by my letter to you dated October 2, 2002.

In your letter dated November 1, 2002, you requested that both versions of the TSAR submitted by EOI be withdrawn.

Pursuant to your requests, NRC has properly disposed of all internal working copies of the subject material and removed the TSARs from the Public Electronic Reading Room, as well as all NRC internal access. Also, pursuant to the requirements in 10 CFR 2.790(c), the original documents received by NRC are being returned to GE separately.

Sincerely,

/RA/

Michael K. Webb, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page DISTRIBUTION:

PUBLIC RidsNrrPMMWebb PDIV1 R/F RidsNrrLADJohnson RIdsNrrDlpmLpdiv (HBerkow)

MPSiemien RIdsNrrDlpmLpdiv1 (RGramm)

RidsRgn4MailCenter (AHowell)

ADAMS Accession No.: ML031500373 OFFICE DLPM/LPDIV1/PM DLPM/LPDIV1/LA DLPM/LPDIV1/SC NAME MWebb:sab DJohnson RGramm DATE 4/3/2003 4/3/03 4/4/03 OFFICIAL AGENCY RECORD

March 2002 River Bend Station cc:

Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Manager - Licensing Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775 Senior Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 Mr. Michael E. Henry, Administrator and State Liaison Officer Department of Environmental Quality P. O. Box 82135 Baton Rouge, LA 70884-2135 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 General Manager - Plant Operations Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775 Director - Nuclear Safety Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Attorney General State of Louisiana P. O. Box 94095 Baton Rouge, LA 70804-9095 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.

River Bend Station P. O. Box 220 St. Francisville, LA 70775