Letter Sequence Other |
---|
|
|
MONTHYEARML0226800292002-10-0202 October 2002 Letter, Request for Withholding Info from Public Disclosure Project stage: Other ML0230803462002-11-0101 November 2002 Request for Withholding Information from Public Disclosure River Bend Station Unit 1 Project stage: Withholding Request ML0300904782003-01-0606 January 2003 Letter Draft Safety Evaluation for Proposed 1.7 Percent Increase in Licensed Power Level Project stage: Draft Approval ML0303402942003-01-31031 January 2003 Issuance of Amendment No. 129, Increasing the Licensed Power Level by Approximately 1.7 Percent from 3,039 Megawatts (Mwt) Thermal to 3,091 Mwt Project stage: Approval ML0303501902003-01-31031 January 2003 Tech Specification Pages for River Bend Station, Unit 1, Amendment No. 129 Project stage: Other ML0307107362003-03-12012 March 2003 Change in Implementation Date of Amendment No. 129 - 1.7% Increased Power Level Project stage: Other ML0315003732003-05-30030 May 2003 Letter, Withdrawal of General Electric Company Proprietary Report NEDC-33051P, Revision 0, May 2002 and Non-Proprietary Report NEDC-33051, Revision 0, May 2002 Project stage: Withdrawal RBG-46145, Power Uprate Startup Report2003-08-0707 August 2003 Power Uprate Startup Report Project stage: Other 2003-01-06
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection ML24205A0392024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation 2024-09-24
[Table view] Category:Proprietary Information Review
MONTHYEARML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML21195A0392021-09-0202 September 2021 Request for Withholding Proprietary Information from Public Disclosure for X-Energy, LLC Regulatory Engagement Plan Update for the XE-100 Reactor ML20317A1752020-11-19019 November 2020 Request for Withholding Information from Public Disclosure ML18347B3612019-01-0202 January 2019 Request for Withholding Information from Public Disclosure, Affidavit Dated October 17, 2018, and October 16, 2018, Executed by GE-Hitachi Nuclear Energy Americas, LLC and Curtiss-Wright ML0522804282005-08-0202 August 2005 Holtec International Request for Withholding Information from Public Disclosure ML0310606172003-04-16016 April 2003 Withholding from Public Disclosure, NEDC-33051P, Revision 1, MB5094 ML0307708622003-03-18018 March 2003 GE Nuclear Energy, Withholding from Public Disclosure, River Bend Station Surveillance Capsule Flux Calculation ML0226800292002-10-0202 October 2002 Letter, Request for Withholding Info from Public Disclosure 2023-09-27
[Table view] |
Text
October 2, 2002 Mr. George B. Stramback General Electric Company Project Manager, Regulatory Services 175 Curtner Avenue San Jose, CA 95125
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RIVER BEND STATION, UNIT 1 (TAC NO. MB5094)
Dear Mr. Stramback:
By application dated May 14, 2002, Entergy Operations, Inc., requested an amendment for the River Bend Station, Unit 1 (RBS) operating license, proposing revisions to the license and Technical Specifications to allow operation at a higher power level. That request included your affidavit dated May 7, 2002, requesting that General Electric Company (GE or General Electric)
Report NEDC-33051P, Safety Analysis Report for River Bend Station Thermal Power Optimization, dated May 2002, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.790. A nonproprietary copy of this document, transmitted by letter dated July 9, 2002, has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electrics competitors without license from General Electric constitutes a competitive economic advantage over other companies;
- b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and all of the supporting information in accordance with the requirements of 10 CFR 2.790 and have concluded that you have not provided sufficient justification for us to determine that the information sought to be withheld from public disclosure contains proprietary, or confidential commercial or financial information. Specifically, NEDC-33051P contains numerous instances where information that is sought to be withheld is known to have already been disclosed to the public. As an example, GE claims that the following material (page 3-2 of NEDC-33051P) is proprietary:
The reactor vessel material surveillance program consists of three capsules. The three capsules have been in the reactor vessel since plant startup. One of these capsules was removed after 10.08 EFPY [effective full-power years] of operation, the second capsule is scheduled to be removed at 15 EFPY, and the third capsule is classified as standby.
This material is also contained in the River Bend Station, Unit 1, (RBS) Updated Safety Analysis Report (USAR), Section 5.3.1.6, Material Surveillance, which has been made public.
In a second example, GE claims that the following material (page 8-1 of NEDC-33051P) is proprietary:
Building ventilation systems control airborne radioactive gases by using devices such as High Efficiency Particulate Air (HEPA) and charcoal filters, and radiation monitors that activate isolation dampers or trip supply and exhaust fans, or by maintaining negative or positive air pressure to limit migration of gases.
The above material is contained in the RBS USAR, Section 9.4.2, "Fuel Building Ventilation System," which has been made public. There are other examples of material in the report that are claimed to be proprietary, but are well known in the industry and have been made public.
Accordingly, the NRC staff does not agree that these statements contain trade secrets or privileged or confidential commercial information in accordance with 10 CFR 2.790(b)(4)(iv).
In addition, since (1) boiling water reactor licensees, without GE assistance, have been granted small power increases similar to the update requested for RBS, with only limited information withheld from public disclosure, and (2) Regulatory Issue Summary 2002-13, Guidance on the Content of Measurement Uncertainty Recapture Power Uprate Applications, dated January 31, 2002, is publicly available, the NRC concludes that the process described in NEDC-33051P can be acquired or duplicated with relative ease and thus should not be withheld from public disclosure per 10 CFR 2.790(b)(4)(v).
Moreover, as noted in paragraph (8) of your May 7, 2002, affidavit, the remainder of NEDC-33051P (that portion of the report not delineated with bars marked in the margins) is claimed to be proprietary because it constitutes a confidential compilation of information. Since the non-proprietary version of NEDC-33051 contains inadequate information to support the proposed RBS power uprate, and because the NRC staff cannot confidently divulge any part of NEDC-33051P, the NRC staff concludes that it cannot inform the public as to the bases, if any, for approval of the proposed power uprate.
Accordingly, we have concluded that the information sought to be withheld from public disclosure does not meet the requirements of 10 CFR 2.790. Therefore, your request to withhold NEDC-33051P from public disclosure is denied. Should you decide to resubmit NEDC-33051P, we request that you limit the scope of the information that you seek to withhold from public disclosure to those pieces of information that strictly meet the requirements of 10 CFR 2.790. In addition, should you decide to resubmit NEDC-33051P, we request that the companion non-proprietary report be a simple redaction of NEDC-33051P.
Within 30 days from the date of this letter, the subject documents will be placed in the Public Document Room. If, within 30 days of the date of this letter, you request withdrawal of the
documents in accordance with 10 CFR 2.790(c), your request will be considered in light of applicable statutes and regulations, and a determination made whether the documents will be withheld from public disclosure and returned to you.
If you have any questions regarding this matter, I may be reached at 301-415-1347.
Sincerely,
/RA/
Michael K. Webb, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page
documents in accordance with 10 CFR 2.790(c), your request will be considered in light of applicable statutes and regulations, and a determination made whether the documents will be withheld from public disclosure and returned to you.
If you have any questions regarding this matter, I may be reached at 301-415-1347.
Sincerely,
/RA/
Michael K. Webb, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-458 cc: See next page DISTRIBUTION:
PUBLIC PDVI-1 Reading RidsNrrDlpmLpdiv (WRuland)
RidsNrrDlpmLpdiv1 (RGramm)
RidsNrrPMMWebb RidsNrrLADJohnson RidsRgn1MailCenter MPSiemien, OGC Adams Accession No.: ML022680029 OFFICE PDIV-1 / PM PDIV-1 / LA OGC PDIV-1 / SC NAME MWebb DJohnson MPSiemien RGramm DATE 9/26/02 9/26/02 10/1/02 10/2/02 OFFICIAL RECORD COPY
River Bend Station cc:
Winston & Strawn Entergy Operations, Inc.
1400 L Street, N.W. River Bend Station Washington, DC 20005-3502 P. O. Box 220 St. Francisville, LA 70775 Manager - Licensing Entergy Operations, Inc. Director - Nuclear Safety River Bend Station Entergy Operations, Inc.
P. O. Box 220 River Bend Station St. Francisville, LA 70775 P. O. Box 220 St. Francisville, LA 70775 Senior Resident Inspector P. O. Box 1050 Vice President - Operations Support St. Francisville, LA 70775 Entergy Operations, Inc.
P. O. Box 31995 President of West Feliciana Jackson, MS 39286-1995 Police Jury P. O. Box 1921 Attorney General St. Francisville, LA 70775 State of Louisiana P. O. Box 94095 Regional Administrator, Region IV Baton Rouge, LA 70804-9095 U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Brian Almon Arlington, TX 76011 Public Utility Commission William B. Travis Building Ms. H. Anne Plettinger P.O. Box 13326 3456 Villa Rose Drive 1701 North Congress Avenue Baton Rouge, LA 70806 Austin, Texas 78701-3326 Mr. Michael E. Henry, Administrator and State Liaison Officer Department of Environmental Quality P. O. Box 82135 Baton Rouge, LA 70884-2135 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 General Manager - Plant Operations March 2002