May 9, 2003 LICENSEE:
DUKE ENERGY COMPANY FACILITY:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3
SUBJECT:
SUMMARY
OF MAY 1, 2003, MEETING TO DISCUSS LOW PRESSURE INJECTION CROSS-CONNECT MODIFICATION On May 1, 2003, the Nuclear Regulatory Commission (NRC) met with Duke Energy Company (the licensee) to discuss the licensees March 20, 2003, amendment request that proposes to add a cross connect to the low pressure injection (LPI) system. A list of the attendees is attached. The March 20, 2003, amendment request and the handouts provided by the licensee are accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams/html. The accession number for the March 20, 2003, amendment request is ML030870303 and the accession number for the licensees handouts is ML031250106.
The proposed LPI cross-connect modification would reduce the number of time-critical operator actions outside the control room that are currently required to mitigate certain single failures during a postulated core flood line break. The licensees proposal uses leak-before-break technology to exclude of the dynamic effects of postulated pipe rupture for certains portions of piping.
As a result of concerns raised by the NRC staff during the meeting, the licensee agreed to supply the following information:
- 1. The supporting analyses that were performed to (a) ensure that there is sufficient emergency core core system flow and pump net positive suction head during the most limiting events, and (b) ensure that there is sufficient decay heat removal flow during the unit shutdown.
- 2. The size of the leak that could be detected by the radioactivity monitors.
- 3. The basis for using the proposed J-R curves in the tearing instability analysis. This request will be included in a request for additional information that will be provided to the licensee in the near future.
- 4. Some examples of precedents where the NRC approved applications that used the licensees interpretation of footnote 3 to Branch Technical Position MEB 3-1 with respect to terminal ends.
The licensee requested that the NRC complete its review in time to support installation of the LPI modification during the Fall 2003 refueling outage of Unit 1. The NRC staff stated it will try to support the licensees schedule.
/RA/
Leonard N. Olshan, Senior Project Manager, Section 1 Project Directorate II-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270 and 50-287
Attachment:
List of Attendees cc w/encl: See next page The licensee requested that the NRC complete its review in time to support installation of the LPI modification during the Fall 2003 refueling outage of Unit 1. The NRC staff stated it will try to support the licensees schedule.
/RA/
Leonard N. Olshan, Senior Project Manager, Section 1 Project Directorate II-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270 and 50-287
Attachment:
List of Attendees cc w/encl: See next page Distribution:
PUBLIC RGiardina PDII-1 Reading BLefave LOlshan JRivera OGC SSheng ACRS/ACNW BSmith JZwolinski/TMarsh RidsRgn2MailCenter SMoore JNakoski CHawes MKotzalas TChan KDesai JFair ADAMS ACCESSION NO. ML031290273 OFFICE PM:PDII-1 LA:PDII-1 SC:PDII-1 NAME LOlshan CHawes JNakoski DATE 5/9/2003 5/8/2003 5/9/2003 OFFICIAL RECORD COPY
Attachment LIST OF ATTENDEES MEETING TO DISCUSS LOW PRESSURE INJECTION CROSS-CONNECT MODIFICATION MAY 1, 2003 NRC DUKE ENERGY T. Chan D. Brewer K. Desai T. Brown J. Fair E. Burchfield R. Giardina R. Gambrell B. Lefave L. Nicholson J. Nakoski J. Patterson L. Olshan B. Shingleton J. Rivera S. Sheng
Oconee Nuclear Station cc:
Ms. Lisa F. Vaughn Legal Department (ECIIX)
Duke Energy Corporation 422 South Church Street Charlotte, North Carolina 28201-1006 Anne W. Cottingham, Esquire Winston and Strawn 1400 L Street, NW Washington, DC 20005 Manager, LIS NUS Corporation 2650 McCormick Drive, 3rd Floor Clearwater, Florida 34619-1035 Senior Resident Inspector U. S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, South Carolina 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Drive Suite 705 Rosslyn, VA 22209 Mr. L. E. Nicholson Compliance Manager Duke Energy Corporation Oconee Nuclear Site 7800 Rochester Highway Seneca, South Carolina 29672 Ms. Karen E. Long Assistant Attorney General North Carolina Department of Justice P. O. Box 629 Raleigh, North Carolina 27602 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Licensing Duke Energy Corporation 526 South Church Street Charlotte, North Carolina 28201-1006 Mr. Richard M. Fry, Director Division of Radiation Protection North Carolina Department of Environment, Health, and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, North Carolina 28210 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation P.O. Box 1439 Seneca, SC 29679