May 9, 2003 LICENSEE: DUKE ENERGY COMPANY FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3

SUBJECT:

SUMMARY

OF MAY 1, 2003, MEETING TO DISCUSS LOW PRESSURE INJECTION CROSS-CONNECT MODIFICATION On May 1, 2003, the Nuclear Regulatory Commission (NRC) met with Duke Energy Company (the licensee) to discuss the licensees March 20, 2003, amendment request that proposes to add a cross connect to the low pressure injection (LPI) system. A list of the attendees is attached. The March 20, 2003, amendment request and the handouts provided by the licensee are accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams/html. The accession number for the March 20, 2003, amendment request is ML030870303 and the accession number for the licensees handouts is ML031250106.

The proposed LPI cross-connect modification would reduce the number of time-critical operator actions outside the control room that are currently required to mitigate certain single failures during a postulated core flood line break. The licensees proposal uses leak-before-break technology to exclude of the dynamic effects of postulated pipe rupture for certains portions of piping.

As a result of concerns raised by the NRC staff during the meeting, the licensee agreed to supply the following information:

1. The supporting analyses that were performed to (a) ensure that there is sufficient emergency core core system flow and pump net positive suction head during the most limiting events, and (b) ensure that there is sufficient decay heat removal flow during the unit shutdown.
2. The size of the leak that could be detected by the radioactivity monitors.
3. The basis for using the proposed J-R curves in the tearing instability analysis. This request will be included in a request for additional information that will be provided to the licensee in the near future.
4. Some examples of precedents where the NRC approved applications that used the licensees interpretation of footnote 3 to Branch Technical Position MEB 3-1 with respect to terminal ends.

The licensee requested that the NRC complete its review in time to support installation of the LPI modification during the Fall 2003 refueling outage of Unit 1. The NRC staff stated it will try to support the licensees schedule.

/RA/

Leonard N. Olshan, Senior Project Manager, Section 1 Project Directorate II-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270 and 50-287

Attachment:

List of Attendees cc w/encl: See next page

The licensee requested that the NRC complete its review in time to support installation of the LPI modification during the Fall 2003 refueling outage of Unit 1. The NRC staff stated it will try to support the licensees schedule.

/RA/

Leonard N. Olshan, Senior Project Manager, Section 1 Project Directorate II-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270 and 50-287

Attachment:

List of Attendees cc w/encl: See next page Distribution:

PUBLIC RGiardina PDII-1 Reading BLefave LOlshan JRivera OGC SSheng ACRS/ACNW BSmith JZwolinski/TMarsh RidsRgn2MailCenter SMoore JNakoski CHawes MKotzalas TChan KDesai JFair ADAMS ACCESSION NO. ML031290273 OFFICE PM:PDII-1 LA:PDII-1 SC:PDII-1 NAME LOlshan CHawes JNakoski DATE 5/9/2003 5/8/2003 5/9/2003 OFFICIAL RECORD COPY

LIST OF ATTENDEES MEETING TO DISCUSS LOW PRESSURE INJECTION CROSS-CONNECT MODIFICATION MAY 1, 2003 NRC DUKE ENERGY T. Chan D. Brewer K. Desai T. Brown J. Fair E. Burchfield R. Giardina R. Gambrell B. Lefave L. Nicholson J. Nakoski J. Patterson L. Olshan B. Shingleton J. Rivera S. Sheng Attachment

Oconee Nuclear Station cc:

Ms. Lisa F. Vaughn Mr. L. E. Nicholson Legal Department (ECIIX) Compliance Manager Duke Energy Corporation Duke Energy Corporation 422 South Church Street Oconee Nuclear Site Charlotte, North Carolina 28201-1006 7800 Rochester Highway Seneca, South Carolina 29672 Anne W. Cottingham, Esquire Winston and Strawn Ms. Karen E. Long 1400 L Street, NW Assistant Attorney General Washington, DC 20005 North Carolina Department of Justice Manager, LIS P. O. Box 629 NUS Corporation Raleigh, North Carolina 27602 2650 McCormick Drive, 3rd Floor Clearwater, Florida 34619-1035 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Senior Resident Inspector Licensing U. S. Nuclear Regulatory Duke Energy Corporation Commission 526 South Church Street 7812B Rochester Highway Charlotte, North Carolina 28201-1006 Seneca, South Carolina 29672 Mr. Richard M. Fry, Director Mr. Henry Porter, Director Division of Radiation Protection Division of Radioactive Waste Management North Carolina Department of Bureau of Land and Waste Management Environment, Health, and Department of Health and Environmental Natural Resources Control 3825 Barrett Drive 2600 Bull Street Raleigh, North Carolina 27609-7721 Columbia, South Carolina 29201-1708 Mr. Peter R. Harden, IV Mr. Michael A. Schoppman VP-Customer Relations and Sales Framatome ANP Westinghouse Electric Company 1911 North Ft. Myer Drive 6000 Fairview Road Suite 705 12th Floor Rosslyn, VA 22209 Charlotte, North Carolina 28210 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation P.O. Box 1439 Seneca, SC 29679