ML030970753
| ML030970753 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 03/26/2003 |
| From: | Jamil D Duke Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML030970753 (3) | |
Text
Duke
- rPower.
A DAk Eo C.G. y Duke Power McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-9340 (704) 8754000 D. M. Jamnil Vice President, McGuire Nuclear Generation Departmnent (704) 875-5333 OFFICE (704) 875-4809 FAX March 26, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Commitment Change Annual Report Attached is a summary report of McGuire commitment changes for this reporting period.
Changes were made per the guidance defined in NEI 99-04, "Guidelines for Managing NRC Commitments."
If there are any questions, please contact Kay L. Crane at (704) 875-4306.
D. M. Jamil mo
U. S. Nuclear Regulatory Commission March 26, 2003 Page 2 xc:
L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 R. E. Martin (addressee only)
NRC Senior Project Manager (MNS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 S. M. Shaeffer NRC Senior Resident Inspector McGuire Nuclear Station
McGuire Nuclear Station NRC Commitment Changes Per NEI-99-04 Commitment:
By letter dated August 17, 1994, McGuire submitted supplemental information to the NRC in response to Violation 369, 370/94-08-01, "Nonconservative unidentified reactor coolant leakage calculation."Section IX, "Upgrades to NRC Leakage Calculation Program" stated in part: "NC leakage calculations are currently being performed once every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />" and "The NC system engineer monitors the leakage values and related system parameters daily to determine current NC leakage status and on-going trends."
Revised Commitment:
This commitment was made prior to steam generator replacements. License amendment 175/157 dated May 5, 1997 revised the Technical Specifications to replace the Westinghouse Model "D" type preheat steam generators with feedring steam generators designed by Babcock and Wilcox.
McGuire is performing leakage calculations in accordance with Technical Specification Surveillance Requirement (SR) 3.4.13.1 which states, "Verify RCS Operational LEAKAGE is within limits by performance of RCS water inventory balance" on a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> frequency.