Notice of Meeting with Nine Mile Point Nuclear Station, LLC (NMPNS) Re NRCs Annual Assessment of the Safety Performance at the Nine Mile Point Nuclear Power Plant for the Period January 1, 2002 Through December 31, 2002
ML030730571
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/14/2003
From: James Trapp
Reactor Projects Branch 1
To:
Shared Package
ML030620082 List:
References
03-015
Download: ML030730571 (4)


Text

March 14, 2003 U.S. NUCLEAR REGULATORY COMMISSION REGION I No.03-015 NOTICE OF LICENSEE MEETING Licensee:

Nine Mile Point Nuclear Station, LLC (NMPNS)

Facility:

Nine Mile Point, Units 1 and 2 Docket No.

50-220 and 50-410 Time and Date:

1:00 p.m. on April 15, 2003 Location:

Joint News Center Oswego County Airport County Route 176 Fulton, NY 13069

Purpose:

The NRC staff and NMPNS management will discuss the results of NRCs annual assessment of the safety performance at the Nine Mile Point Nuclear Power Plant for the period January 1, 2002 through December 31, 2002. An annual meeting to discuss plant performance is a requirement of NRC Inspection Manual 0305, Operating Reactor Assessment Program.

NRC Attendees:

J. Trapp, Chief, Projects Branch 1, Division of Reactor Projects, Region I G. Hunegs, Senior Resident Inspector, Nine Mile Point B. Fuller, Resident Inspector, Nine Mile Point E. Knutson, Resident Inspector, Nine Mile Point Licensee Attendees: J. Conway, Vice President Nine Mile Point L. Hopkins, Plant General Manager B. Montgomery, Manager Engineering Services M. Pearce, Manager Maintenance

2 NOTE: This meeting is open to the public for observation (Category 1 meeting in accordance with NRCs Public Meeting Policy). The NRC staff will be available at the end of the meeting to answer questions from the public. The NRC encourages public participation by observation of this annual safety performance assessment meeting and by providing questions and comments to the NRC staff following the meeting either in person or in writing. Comments can be provided to James M. Trapp, Chief, Reactor Projects Branch 1, Division of Reactor Projects (610-337-5186, E-mail JMT1@nrc.gov) or at the following address:

US Nuclear Regulatory Commission - Region I 475 Allendale Road King of Prussia, PA 19406-9866 Information relative to this annual safety performance assessment meeting and the Annual Assessment Letter can be found at website addresses:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/NMP1/nmp1_chart.html http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/NMP2/nmp2_chart.html Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known no later than two business days prior to the meeting.

/RA/

Approved by: ____________________________

James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects

3 Distribution:

J. T. Conway, Site Vice President M. J. Wallace, President, Nine Mile Point Nuclear Station, LLC M. Wetterhahn, Esquire, Winston and Strawn J. M. Petro, Jr., Esquire, Counsel, Constellation Power Source, Inc.

P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. V. Vinquist, MATS, Inc.

W. M. Flynn, President, New York State Energy Research and Development Authority Supervisor, Town of Scriba C. Adrienne Rhodes, Chairman and Executive Director, State Consumer Protection Board T. Judson, Central NY Citizens Awareness Network J. Trapp, DRP N. Perry, DRP R. Junod, DRP Regional Administrator, Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

State of New York

4 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

W. Kane, Deputy Executive Director for Reactor Programs, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation, NRR C. Grimes, Director, Division of Regulatory Improvement Programs, NRR B. Boger, Director, Division of Inspection Program Management, NRR F. Congel, Director, Office of Enforcement Deputy Director, Office of Nuclear Regulatory Research (NRR/OD)

J. Zwolinski, Director, Division of Licensing Project Management T. McGinty, RI EDO Coordinator, OEDO R. Laufer, Project Directorate I-1 (PD1/2), NRR P. Tam, NRR D. Skay, NRR, (Backup)

W. Lanning, DRS R. Crlenjak, DRS D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI G. Hunegs - Nine Mile Point R. Bores, ORA G. Matakas, ORA PMNS WEBWORK OEWEB OEMAIL DOCUMENT NAME: G:\\BRANCH1\\2003 Annual Assessment Meetings\\NMP Annual Assessment Meeting Notice.WPD. After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME NPerry/NP JTrapp/JT DATE 03/14/03 03/14/03 OFFICIAL RECORD COPY