ML030090575
ML030090575 | |
Person / Time | |
---|---|
Site: | Waterford ![]() |
Issue date: | 01/08/2003 |
From: | Kalyanam N NRC/NRR/DLPM/LPD4 |
To: | Entergy Operations |
References | |
TAC MB3231 | |
Download: ML030090575 (5) | |
Text
INDEX LIST OF FIGURES FIGURE PAGE 3.1-1 REQUIRED STORED BORIC ACID VOLUME AS A FUNCTION OF CO NCENTRATIO N............................................................................
3/4 1-13 3.4-1 D ELETED..........................................................................................
3/4 4-27 3.4-2 REACTOR COOLANT SYSTEM PRESSURE/TEMPERATURE LIMITATIONS FOR 0-8 EFFECTIVE FULL POWER YEARS (H EATU P)...........................................................................................
3/4 4-30 3.4-3 REACTOR COOLANT SYSTEM PRESSURE/TEMPERATURE LIMITATIONS FOR 0-8 EFFECTIVE FULL POWER YEARS (CO O LDOW N)...................................................................................
3/4 4-31 4.7-1 SAMPLING PLAN FOR SNUBBER FUNCTIONAL TEST..................
3/4 7-26 5.1-1 EXCLUSIO N AREA.............................................................................
5-2 5.1-2 LOW POPULATION ZONE.................................................................
5-3 5.1-3 SITE BOUNDARY FOR RADIOACTIVE GASEOUS AND LIQ UID EFFLUENTS............................................................................
5-4 6.2-1 OFFSITE ORGANIZATION FOR MANAGEMENT AND TECHNICAL SUPPORT........................................................................
6-3 6.2-2 PLANT OPERATIONS ORGANIZATION...............................................
6-4 AMENDMENT NO. 13,' 27,v.2 184 XIX WATERFORD - UNIT 3
INDEX LIST OF TABLES (Continued)
TABLE PAGE 3.3-9 REMOTE SHUTDOWN INSTRUMENTATION..................................
3/4 3-42 4.3-6 REMOTE SHUTDOWN INSTRUMENTATION SURVEILLANCE REQUIREMENTS..................................................
3/4 3-43 3.3-10 ACCIDENT MONITORING INSTRUMENTATION..............................
3/4 3-45 4.3-7 ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS...................................................
3/4 3-46 3.3-12 D ELETED...........................................................................................
3/4 3-56 4.3-8 D ELETED...........................................................................................
3/4 3-58 3.3-13 EXPLOSIVE GAS MONITORING INSTRUMENTATION...................................................
3/4 3-61 4.3-9 EXPLOSIVE GAS MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS.................
3/4 3-65 4.4-1 MINIMUM NUMBER OF STEAM GENERATORS TO BE INSPECTED DURING INSERVICE INSPECTION.....................................................
3/4 4-15 4.4-2 STEAM GENERATOR TUBE INSPECTION........................................
3/4 4-16 3.4-1 REACTOR COOLANT SYSTEM PRESSURE ISOLATION VALVES..
3/4 4-20 3.4-2 REACTOR COOLANT SYSTEM CHEMISTRY.....................................
3/4 4-22 4.4-3 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS SURVEILLANCE REQUIREMENTS.......................................................
3/4 4-23 4.4-4 PRIMARY COOLANT SPECIFIC ACTIVITY SAMPLE AND ANALYSIS PROGRA M...................................................................
3/4 4-25 AMENDMENT NO. 9,,68,75,06,1 184 XXI WATERFORD - UNIT 3
REACTOR COOLANT SYSTEM 314.4.7 SPECIFIC ACTIVITY LIMITING CONDITION FOR OPERATION 3.4.7 The specific activity of the primary coolant shall be limited to:
- a.
Less than or equal to 1.0 microcurie/gram DOSE EQUIVALENT 1-131, and
- b.
Less than or equal to 1 00/P microcuries/gram.
APPLICABILITY: MODES 1, 2, 3, 4, and 5.
ACTION:
MODES 1, 2, and 3*:
- a.
With the specific activity of the primary coolant greater than 1.0 microcurie/gram DOSE EQUIVALENT 1-131 for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval or exceeding 60 microcuries/gram DOSE EQUIVALENT 1-131, be in at least HOT STANDBY with Tavg less than 500°F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b.
With-the specific activity of the primary coolant greater than 10Ol/E microcuries/gram, be in at least HOT STANDBY with Tavg less than 500°F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
MODES 1, 2, 3,4, and 5:
- c.
With the specific activity of the primary coolant greater than 1.0 microcurie/gram DOSE EQUIVALENT 1-131 or greater than 100/E microcuries/gram, perform the sampling and analysis requirements of item 4 a) of Table 4.4-4 until the specific activity of the primary coolant is restored to within its limits.
SURVEILLANCE REQUIREMENTS 4.4.7 The specific activity of the primary coolant shall be determined to be within the limits by performance of the sampling and analysis program of Table 4.4-4.
- With Tavg greater than or equal to 500 0F.
AMENDMENT NO. 6 184 3/4 4-24 WATERFORD - UNIT 3
TABLE 4.4-4 PRIMARY COOLANT SPECIFIC ACTIVITY SAMPLE AND ANALYSIS PROGRAM m
0 C
z
-I
- 1.
Gross Activity Determination
- 2.
Isotopic Analysis for DOSE EQUIVALENT 1-131 Concentration
- 3.
Radiochemical for R Determination
- 4.
Isotopic Analysis for Iodine Including 1-131, 1-133, and 1-135 SAMPLE AND ANALYSIS FREQUENCY At least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 1 per 14 days 1 per 6 months*
a)
Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, whenever the specific activity exceeds 1.0 pCi/gram, DOSE EQUIVALENT 1-131 or 100/2 pCi/gram, and b)
One sample between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following a THERMAL POWER change exceeding 15 % of the RATED THERMAL POWER within a 1-hour period.
MODES IN WHICH SAMPLE AND ANALYSIS REQUIRED 1,2,3,4 1
1#,2#,3#,4#,5#
1,2,3
- Sample to be taken after a minimum of 2 EFPD and 20 days of POWER OPERATION have elapsed since reactor was last subcritical for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or longer.
- Until the specific activity of the primary coolant system is restored within its limits.
TYPE OF MEASUREMENT AND ANALYSIS IN) cii1' m
z 0
m z -H z
0 4ýb
Pages 3/4 4-26 and 3/4 4-27 have been deleted.
WATERFORD - UNIT 3 3/4 4-26 Next Page is 3/4 4-28 AMENDMENT NO. 184 I