January 2, 2003 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing &

Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

INSPECTION OF SECURITY INTERIM COMPENSATORY MEASURES

Dear Mr. Young:

On August 26, 2002, the NRC staff completed its mid-cycle plant performance assessment of the Crystal River facility and provided you with an inspection plan detailing the inspections scheduled through September 30, 2003. At that time, you were advised that the NRC was in the process of finalizing a Temporary Instruction (TI) that would be used to review implementation of the Security Interim Compensatory Measures (ICMs) required by the Agencys Order issued on February 25, 2002, and you would be informed of the schedule for the TI inspection at a later date.

On September 13, 2002, TI 2515/148, Revision 1, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued. Subsequently, we conducted a pre-inspection audit utilizing Appendix A of the TI to obtain preliminary information on your implementation of the ICMs. With the completion of the audits at the Region II sites, we have developed an inspection schedule to complete the remaining portion of the TI, Appendices B and C, which will fully examine the details of implementation of the ICMs in the areas of security, operations, emergency planning, and information technology. The schedule for these inspections at Region II sites is enclosed. In addition, the TI is being conducted in lieu of the security baseline inspections in the schedule enclosed with our August 26, 2002 letter; however, additional inspections may be scheduled later in calendar year 2003.

If you have any questions regarding the conduct or schedule of TI 2515/148 inspections, please contact me at 404-562-4653.

Sincerely,

/RA/

Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-302 License No. DPR-72

Enclosure:

TI Inspection Schedule

FPC 2

cc w/encl:

Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Richard L. Warden Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)

Florida Power Corporation Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Jim Mallay Framatome Technologies Electronic Mail Distribution

FPC 3

Distribution w/encl:

J. Goshen, NRR C. Evans (Part 72 Only)

RIDSNRRDIPMLIPB PUBLIC OFFICE RII RII SIGNATURE ATB KLandis NAME A Boland L Wert DATE 01/02/03 01/02/03 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030090215.wpd

TI 2515/148 INSPECTION SCHEDULE Date (Week of)

Site Completed Catawba 01/06/03 Surry 01/13/03 Farley 01/27/03 St. Lucie 02/03/03 Browns Ferry 02/18/03 Brunswick 03/10/03 Summer 03/31/03 Turkey Point 04/07/03 Harris 04/14/03 Crystal River 05/12/03 Hatch 05/19/03 Robinson 06/16/03 Vogtle 06/23/03 Sequoyah 07/14/03 Watts Bar 08/04/03 McGuire 09/08/03 North Anna 09/15/03 Oconee