ML030070693

From kanterella
Jump to navigation Jump to search
Technical Specification Pages for Amendments 203 & 196 to Licenses NPF-35 & NPF-52, Respectively
ML030070693
Person / Time
Site: Catawba  
(NPF-035, NPF-052)
Issue date: 01/07/2003
From: Martin R
NRC/NRR/DLPM/LPD2
To:
References
Download: ML030070693 (7)


Text

. I i

ECCS-- Operating 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.2 ECCS-Operating LCO 3.5.2 APPLICABILITY:

Two ECCS trains shall be OPERABLE*.

MODES 1, 2, and 3.

gl In MODE 3, both safety injection (SI) pump flow paths may be isolated by closing the isolation valves for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to perform pressure isolation valve testing per SR 3.4.14.1.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more trains A.1 Restore train(s) to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

inoperable.

OPERABLE status.

AND At least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available.

B.

Required Action and B.1 Be In MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND B.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

  • For each Unit, the Completion Time that ECCS train 'A' can be inoperable, as specified by Required Action A.1 may be extended beyond the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> up to 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> as part of the NSWS system upgrades.

System upgrades include maintenance and modification activities associated with replacement of portions of the train 'A' NSWS piping via modification CE-71424. Upon completion of the pipe replacement and system restoration this footnote is no longer applicable.

Catawba Units I and 2 3.5.2-1 Amendment Nos. 203 & 196

=lUl I

I

Containment Spray System 3.6.6 3.6 CONTAINMENT SYSTEMS 3.6.6 Containment Spray System LCO 3.6.6 APPLICABILITY:

Ar"TI f-q Two containment spray trains shall be OPERABLE*.

MODES 1, 2, 3, and 4.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One containment spray A.1 Restore containment spray 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

train Inoperable.

train to OPERABLE status.

B.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND B.2 Be in MODE 5.

84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.6.1 Verify each containment spray manual, power operated, 31 days and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position Is in the correct position.

(continued)

TFor each Unit, the Completion Time that Containment Spray System train 'A' can be inoperable, as specified by Required Action A.1 may be extended beyond the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> up to 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> as part of the NSWS system upgrades. System upgrades include maintenance and modification activities associated with replacement of portions of the train 'A' NSWS piping via modification CE-71424. Upon completion of the pipe replacement and system restoration this footnote is no longer applicable.

Catawba Units I and 2 3.6.6-1 Amendment Nos.2 0 3 & 196 I

I

AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE*.

APPLICABILITY:

A(TI(1M

Only one AFW train, which Includes a motor driven pump, is required to be OPERABLE in MODE 4.

MODES 1,2, and 3, MODE 4 when steam generator is relied upon for heat removal.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW OPERABLE status.

pump inoperable.

AND 10 days from discovery of failure to meet the LCO B.

One AFW train B.1 Restore AFW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

inoperable in MODE 1, 2 OPERABLE status.

or 3 for reasons other AND than Condition A.

10 days* from discovery of failure to meet the LCO (continued)

TFor each Unit, the Completion Time that AFW train A' can be inoperable as specified by Required Action B.1 may be extended beyond the "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 10 days from discovery of failure to meet the LCO" up to "168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> and 10 days from discovery of failure to meet the LCO" as part of the NSWS system upgrades. System upgrades include maintenance and modification activities associated with replacement of portions of the train 'A' NSWS piping via modification CE-71424. Upon completion of the pipe replacement and system restoration this footnote is no longer applicable.

& 196 I'-

I*llq I

Catawba Units I and 2 3.7.5-1 Amendment Nos.20

CCW System 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Component Cooling Water (CCW) System LCO 3.7.7 APPLICABILITY:

Two CCW trains shall be OPERABLE*.

MODES 1, 2,3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One COW train A.1 NOTE---

inoperable.

Enter applicable Conditions and Required Actions of LCO 3.4.6,

"*RCS Loops-MODE 4,0 for residual heat removal loops made inoperable by CCW.

Restore CCW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

OPERABLE status.

B.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.

B.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • For each Unit, the Completion Time that CCW train 'A can be inoperable, as specified by Required Action A.1 may be extended beyond the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> up to 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> as part of the NSWS system upgrades.

System upgrades include maintenance and modification activities associated with replacement of portions of the train 'A' NSWS piping via modification CE-71424. Upon completion of the pipe replacement and system restoration this footnote is no longer applicable.

Amendment Nos. i203 & 196 I

I Catawba Units I and 2 3.7.7-1

NSWS 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Nuclear Service Water System (NSWS)

LCO 3.7.8 Two NSWS trains shall be OPERABLE*.

APPLICABILITY:

MODES 1,2, 3, and 4.

AC*TION*

CONDITION REQUIRED ACTION COMPLETION TIME A.

One NSWS train A.1 NOTES-inoperable.

1.

Enter applicable Conditions and Required Actions of LCO 3.8.1, UAC Sources Operating," for emergency diesel generator made inoperable by NSWS.

2.

Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops-MODE 4," for residual heat removal loops made inoperable by NSWS.

Restore NSWS train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

OPERABLE status.

(continued)

  • For each Unit, the Completion Time that NSWS train 'A' can be inoperable, as specified by Required Action A.1 may be extended beyond the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> up to 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> as part of the NSWS system upgrades.

System upgrades include maintenance and modification activities associated with replacement of portions of the train 'A' NSWS piping via modification CE-71424. Upon completion of the pipe replacement and system restoration this footnote is no longer applicable.

r-qtnwha tUnits I and 2 3.7.8-1 Amendment Nos.20 3 & 196 I

I

  • lVW*

VI UD*V W *W

  • m

AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating The following AC electrical sources shall be OPERABLE*:

a.

Two qualified circuits between the offsite transmission network and the Onsite Essential Auxiliary Power System; and

b.

Two diesel generators (DGs) capable of supplying the Onsite Essential Auxiliary Power Systems; AND The automatic load sequencers for Train A and Train B shall be OPERABLE.

APPLICABILITY:

ACTIONS MODES 1, 2, 3, and 4.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One offsite circuit A.1 Perform SR 3.8.1.1 for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.

OPERABLE offsite circuit.

AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from with no offsite power discovery of no available inoperable when offsite power to one its redundant required train concurrent with feature(s) Is inoperable.

inoperability of redundant required feature(s)

AND (continued)

"For each Unit, the Completion Time that the 'A' EDG can be Inoperable as specifed by Requirea Action

f.

may be extended beyond the "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 6 days from discovery of failure to meet the LCOM up to 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> as part of the NSWS system upgrades. System upgrades Include maintenance and modification activities associated with replacement of portions of the train 'A' NSWS piping via modification CE-71424. Upon completion of the pipe replacement and system restoration this footnote Is no longer applicable.

LCO 3.8.1 Amendment Nos.'203 & 196 I

3.8.1-1 Catawba Units 1 and 2

AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.

(continued)

B.4 Restore DG to OPERABLE 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

status.

AND 6 days* from discovery of failure to meet LCO C.

Two offsite circuits C.1 Declare required feature(s) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from inoperable.

inoperable when its discovery of redundant required Condition C feature(s) Is inoperable, concurrent with inoperability of redundant required features AND C.2 Restore one offsite circuit 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to OPERABLE status.

(continued)

  • For each Unit, the Completion Time that the 'A' EDG can be inoperable as specified by Required Action B.4 may be extended beyond the 072 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 6 days from discovery of failure to meet the LCO" up to 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> as part of the NSWS system upgrades. System upgrades Include maintenance and modification activities associated with replacement of portions of the train 'A NSWS piping via modification CE-71424. Upon completion of the pipe replacement and system restoration this footnote is no longer applicable.

Amendment Nos. 203 & 19h Catawba Units 1 and 2 3.8.1-3