FINAL AS-ADMINISTERED SCENARIOS FOR THE CLINTON INITIAL EXAMINATION - JULY/AUG 2002

n Number:

Scenario Outline

.Formn ES-D-I Appendix D Appendix D Scenario Outline Form ES-D-1 Facility: Clinton Power Station Scenario No.: One Operating Test Examiners:

Operators:

Initial Conditions:

12% power, Drywell pressure is high, A OG hydrogen analyzer is out of service Turnover:

Run a mixer to reduce Drywell pressure - first priority 12% power-Continue with the startup per CPS 3004.01 by pulling rods.

No.: NRC0101-1 s=s Event Malf. No.

Event Event No.

Type*

Description I

NA BOP-N Reduce Drywell pressure 2

NA RO-R Pull rods to raise power 3

LS02 RO-I Rod PIP probe fails 4

Override BOP-C WS seal water pump trip NW D.__

m 5

Override BOP-I OG recombiner level controller failure 6

RR02A RO-C RR pump trip 7

RHI I M

Suppression pool leak RHR A pump room with cross leakage into LPCS room HP15 8

HP130 HP13 1 M

All SRVs fail to respond to initiation of ADS

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NRC SUBMITTAL COPY

=-

t

. -1

=-a

=_

Page 1 of 2

A~pnd'x Scenario Outline om SDI

-~cnroNo:One Operating Test N4o.: NRC0101-1 Naraiv Smmary

~ven4

~tDescription I ~Dywef prssure is high requiring the BOP to run a mixing compressor to rdc rwl

>Caipreia sur& Oeainal Requirement Manual action 3.5.2 for the test, Prepsvt'i nee

2. Pogrss'ith he tarup by pulling rods to raise power cator fails rsliga rod block. Remove terod bq_'ys n

pcston and evaluate Technical S'ecification action 3.1.3 with no action'-req ired du to the o 'er position indication being functional.

'i

~~ 4.

~~!~~e WS seal ~~water pump will trip on overcurrent resulting in ls fsa ae n oo ~

ceolngto he WS pumps. The BOP will start the standby pump to restore p,'-utpI 'sealwate

~' '5.The 0 recobiner condenser level controller fails requiring BOP to nianuialy COXiro to 0 resor leelinto the band to prevent failure of recombination.

6. ~cifc~atin pump trips requiring action per the abnormnal coolant flow 6f-A oiii

~proed`

e *Technical Specification 3.4.1 for single loop requiemnspe' l4

7. &.

Supresionpool starts leaking into the RHR A room causing floodiiigieuig nryt theFlodig ff-Normal and EOP-8. The door between LPCS and kid-il ek alm itsroo toflood as well. The suppression pool leak will cause suppressionb3Veltorp beow 15 1 require emergency depressurization. To anticipate blowv w,

O-Malw

~&rpiad~rssurization and may be peformed.-

9.Wen eegnydepressurization is initiated the breakers for the solenoidswiltrj rsltn in kV aiuretorespond. This will require emergency depressurizatioi'n leiit en

.6 1 (af deressurization)

~

  • Manally cramthe reactor prior to emergency depressurization

~...~

4 ~ Emegei~y Dpresurize once determine cannot hold suppression pollvla& 5I Page I

of.

-'4D2 Dynami-c Simulator Scenario One EXAM DATE: 7"/29202 I'-10 Sh U tunvrInformation v,.

X'

~ Dayof wek And shift oda Day Shift.

y.

'>X?.*

~. Weater conitions h.>

+

T-$tORMSconditions expected over thenet2hor pwr level)/conditions

~.A 4 23 lbmhrCORE FLOW 4RP nrfi~i5

.X.X~

~

X.

  • 4 C~s/CFin service
  • T is 44 ThemalriveiutilProbles/Power bevoluostions
2.

i p*.ssbl

~ ~~f.XAAA~

Exi~n~gC~sdate of next surveillance

.X)'i~A.XA

'A

~ ~

~

~

o aor maintenance

~

'~~,~

INV{I.be taken out of or returned to A

~

.A-X,

'A".

'A~

se~ve tb~ sift/maintenanc'e on major plant.AA%.

  • OG hdrogenAnalyzer A is out of service

.>*Rcmie yasvv CO6L 7i~

for &i aintenance.

obevrylmmntneei

  • AuiliarySteam is being provided by an

,AAAAA

~.,

~IcoeBoiler.

G&~dhi~,evolutions, problems, etc.

.AA..>..

nln Safety is Green I.Dywl pressure is high, requiring burping

~

A..AA

'businthe Division 2 compressor as a first

  • V

/ sna its end of life, imoitoring A

X A.~

o One EXAM DATE: 7/29/2002

.I54Oerator Actions 1~vento (s)

ILT0101-Page I

o l

  • .44

44

.44

.. 44

4 A

.44 44

4.4 4

"4,

.4. 44 4

<.4

.4

'.4.4.,-

.44.4

.4 444 4

4.4

.4:-

4.4.444

,x.

4 5

.44-4 4 >4 4 4 4.

4 4.4 Descij~tio presure t.44 cery

=-

Int onowing Applcan'turniosverBehvio e

Pitio 16.01, OntaimentnCombustibleGas Conr ostep 83:

I VEhVYOPEN:

1.ISX088B, SSW CNMT Outbd Isol Vlv 1 SX089B, SSW CNMT Inbd Iso! Vlv I ISX06B, SSW CNMT Inbd Isol Vl X

-A I SX097B, W CNMT Outbd Isol Vlv Places MOV Test Prep Switches into TEST 2 Strt CGS Hydrogen Crnpr lB3. IHG02CB.

  • eord str time lAW CPS 9094.01 DOO I 3

VerIfy 1HG009B, CGCS Cmpr I B Suct Vtv opens.

4 VerifyoI

rX095B, SSW aGCS Rm Cir Coil OutIt Vav opens.

SEUTNGDRY WELL BURPING Sto CGCS Hydrogen Cmpr I B, I1HG02CB.

.. *Record stop time lAW CPS 9094.01lDOO I 2 Veify1HGO9AB),CGCS CmnprlB Suct Vlv shuts.

3 Sht/vrifyshu I X095B, SSW CGCS Rnm Cir Coil Outit Vlv.-

  • Pace MO Tet PepSwitches into NORMAL RO Montor reactor to ensure operations remain within established bands

-..4 onitors control room panels and notifies the SRO of any unusual or uepce SRO irct acetions lise above.

erations are conducted within the bounds of Tech Specs pe sstandards and approved procedures.

Applies ACTION 3'5__

4.44.4

.4 -

44444

4

.54.,

- 4.4

.44.4.4.4'

'4Ž

.5$

  • 4445.44444 4.45 4.4

.444 Terminus: DVW bi--n com leted

.

NU~kS:

-Ž...

.4.4

4.4444, 4

1

.44 I

44 4

4.45444.44 I

.4.4 44 4'

44

'44.44 4444 44.4 4..

4, 4

4

.44 4.44 4.44.4.44 I

.4

.4.44444.4'4

.4 4 4

.4

..4

.4.4 4.44 '

4

.4

.4

.44.44.4,.

4 4

.4 4

5.4.4 4

4

.4

.4

.4.4 4.4

.4

.4

S r

~

.~: tr"t~

4.

,~, ~.::..~:,

.>.--.s.. :; :..

g

..veee----:=...: :-;. -.:.

e :. -:

.4 4

I 444



44



4.4.4

.4 4.4.4 4

4 4 4 4.4 4.44 44

.4 4

4

.4.4

.444

.4 4.

.4 4

.4 4

4 4

45 44 4

4 4

44

.4.4

4 4

4...444.4.,

.444 44

.4 4.4

.4

,. 4.4 444

,4.4 44 44445

.4

.4 4..4.4.4.4 A

4.4 4

4 44 4

4

.4.4.4

.4 4

.4 4 4 44 4

444 444 4

.4 44, 4

.4 4

44 4 4 4.4.4

.4

.4 4.4 2

D 2 yi~aiiicSimuatorScenrio ne EAM DTE.7/29/200 Loo EventNo.(s:

2

..,...~

~.

Pa~ge Io AnO;

:0R go:0SRO A::W Deconio:1 uctcist~~ th bo.44fT 4444 4

p4

-e.'

j an t

A o

or X

-4

.4>.4 4.,.444

Per, S

0Sd R,0 Conro Rod:

Se u

n e'i 444'44..44.444 444 fE:'SS_

Q

==

g

=4

_:.4

't gl

~

1~t riepe o~:4...

.4,..

4

=

W =

e 4

i.

-?

'N

4.

X One EXAM DATE: 7/29/2002 Operator Actions A

.. "Neat i

ti D

g r after Rod 28-29 is withdrawn, oi Iues:r 0

Block alarm, Data Fault light ie Pos it io Applicant's Actioi R

Per e sCPS 5006-2H, Rod Out Block:

Determine the rod that has a data fault Kz Per PS' 3304.02, Rod Control and Informatior

~~

,-Step-8.2.2 todetermine which rod

'`],~Step 82.4 to Enter Sub Position

- 7 'N erify/select INDIVID DRIVE 6Depress the SUBST POSITION push-t 1);". No other gang member of the rod F psentl usig substitute data 2

Data from the other channel is not RAW DATA is not selected Select th o

ihthe defective reed s-Es ure that the rod is at the position at

',0 2,

0.

Depres teETSBSpu-bto

N A

ii.

BOP Moitors reactor to ensure operations rema

  • Monitos control room panels and notifies I E

a actions per Tech. Spec. 3.1.3, no Aindication

~ nacsShift Manager and recomnmends n

"' TermiusRdpoiini bttte T

d NOTE :

-~

-~

"4 ILT1O-1:5-%=

.N

....... 3 ow -$.'r'.:.t i ---.-

i the next Rod, 20-3 is or Behavior i System button Verify:

having the defective substitute data witch which the defective located in the PATT1

, depressing the SUI in within established the SRO of any unus action required due otifications IAW OF Peed io IS' ree -s. t,5:ixt t

'70 UN.

.-0.f0W 3ST P

red swtc isl to a bal

)

M

'i' N

reed,'.

swtheit ER c6' tkbt'i£:

N.. N

-'.""N" N

-'N'

1) 2 Dynamic Simulator Scenario One EXAM DATE 7/29/2002 ILTOlOl 

.

V Operator Actions 7

De EXAM DATE: 7/29/2002 Operator Actions ILT0101-1:l 4

.b...

NNA

'A AAA

AA AAA-X*A AAAŽ.A

'A As.

A

-A WA AA AAAAA.

A A' N

A A<A.AA

'A

_7~~~~~~~~_

0 1-.;__;_'

I Page if 1

A 6.'AA.

J~;

rI o

l troller failure S~~t__A-A Iniiaton:fte WSprolemha~bee addressed, on the signal of lead examiner Poiflo Applicant's Actions or Behavior BOP Per' CPS 5130-4C, Condenser Stage Water Level D005-BHigh,:

.Openi drain valve 1N66-FO I 6B by placing 1 N66-R621IB, RECOMB COND, N

1

466-D005B LEVEL CONTROL in MANUAL, and then open IN66 FO163 2

O

.pe ndranvalve IN66-FO I 6B by taking HS-IN66-AS016B to the open pitio tn control level with FO I 7B manually.

3 Veify2ndstage steam flow at 1 00% on I1N66-R625.

4 Observe:condensate flow is not excessive by checking indicator, CO

.DOO5 CONDFLOW, 1N66-R617-2.

.RO M

to ensure operations remain within established bands I

M room panels and notifies the SRO of any unusual or SRO *;

Directsactions listed above.

  • En soperatis are conducted within the bounds of Tech Specs and 1 O ro 0m 0 ;

Sstandards and approved procedures.

Conat S Manager and recommends notifications IAW OP-AA-101 Talarm clear, SRO has directed actions accordingly.

A*AA A--A

.§AN AAAA A.A'*'A ANAAA L't'.rfl'r 1N0i;,

A A

AA AA A

A, A

AAAA-A-AA-A X'AA

~

"AA-A

.A -

A A A

A A A5

"-X~

A AAAA-AA AA

.AA7

<AAA-A A

A A

N eA 6

2 Dario One EXAM DATE: 7/29/2002 Operator Actions n:

o of OG problem, on the signal of lead ex t:.4.'

4' Cues aniicac 0~3 lred i

Posito

.Applicant's Actior RO

.PerCPS5003-3 C, Recirc MG A Protective Re:

Plroceetto CPS 4008.01, Abnormal Reactc Monitors reactor to ensure operations rema Peir CPS 4008.01, Abnormal Reactor Coolant F Shut associated IB33-F067A Discharge VI

  • Mntor for:
  • estricted Zone being entered

'Core instabilities F

-or an anticipated RR loop/pump recoi

- )Re-open idle loop's 11B33-F067A, I

  • is shut.

0Per CPS 3302.01, REACTOR RECIR(

'S "sshutdown Open the Recirc Pump A Motor Bk

]BOP ispatches a field operator to the LFMG Notify the Reactor Engineer Demand an official 3D Monicore Case Verify thermal limits are acceptable

-g Monitors control room panels and notifies t conitions SRO

<Direct actions above Enter C

PS 4008.01, Abnormal Reactor Coo

  • , CProceeding to single loop operation "4.'.'
  • ,Apply Single loop requirements per LC ers PS 3005.01, UNIT POERCHA 8.4 Single Recirculation Loop Operatio
  • riters CPS. 3302.01, REACTOR RECIRCi
  • 82.1 P.R Loop shutdown

.2.6, Idle P.R Loop - Restart

  • &Cntacts Shift Manager and recommends fl(

T I'

dt c

s for single loop completed and Single h 4:~~"

'.4..".'

TLTO1O1-1

4. '4-'.-

.0; aminer is or Behavior lay Trip:

or Coolant Flow

-in within establish Flow:

v very/restart

)ischarge Vlv - 5 CULATION (RR),

kr3A the SRO of any umn

,lant Flow:

O 3.4.1.B

.IGES, n

JLATION (RR),

Atifications IAW 0 lop requirements p Pa~

I $'4 edbads.'""

.4'g 4;.'

4.

'..4:

i

  • 4. 4.

N T-N E-.

I :'..7

.~.

,,~

~

4.

,...,~

-i-I......

F 

I

-.-..

.-4 7

NA I)  Dynamic Simulator Scenairi'o One EXAM DATE: 7/2912002 ILThO1 1 A.

.*

A.

  • A'

A.A*

-Q.A I

A

AAA A

N*

A

.AA A.-

N-...A.NA =1 A

'A>

AA AN



A>Q*/*A..NAA A A; A A N..A

'A... A A



ANA

A A.

A NA A....A.NAAANA.?<'AA

AANAA

A.

A.>..

)A A

.A-AA N..

.AAN.

A

A

N

'A A

A.A.AC.

AAA..VAAA'.A A AN *NA.AAAN

.A.NA N'.'

AA.NA.,,.,A.A*Ž*NA

AN.AANAA.AN

  • .A...

A.:>'

A A

A A..A.. A;NNA.A AAA A-ANAN*\\

A N'AA.A



A.A

AAAANAA A.AAN.A A

A' A .

A. A* A A'ANN AAAA..ANA:

  • A

A'...

A A.

AAAAAAAAAAAA A.

A.

YANAA AAA A..AAAAAA.

A A

....

A

A A AAA

A.AANA.AAAA. AA.>A.

NA/A A

A AA.AA

A

'A.

A. A PAN A-A AAAA P

A

  • A NAAN A.

A /

A NA A

A NA A

A A

AAN

A

A A

A

A AAA\\

A.AA.A A A'.

A AA AAA NA A

A A

AAAAA A AAAA AAA AA A.A

.

A A

NA' A

A

.. AA A A

A A A

A

AA N

A A.

'A A

NA A.

AAAA A

A A A A A

A

A.A A. A A

A AA A

A A.

A A

AA A

N A

A'.fA A

AA A

A A.

A A. A 'A AAA A

A A

A.

A A.

A A

A A

A.

A A

A'.

N NA.

A A'

A N

AN A

'N' A

AAA A" A AAA.AAAAA AN A

A A A.

AN' NAAA NAN ANNA A

AN N>

A A

-A A.

ANNA AANA.AA*A*NN N N A

N N

NA 'A.Z'A..

A.

A A.AA.AA.AA

.A. A A AN N A 'AA A

A. A A

N AA'AN AA.;.fl.>.

AA'A A

NA A.AAA.AA N AA AAA.

A N N"

A A.

A NNA AAAAAA*A.AAA.AAA A.NAAA.A..AA N



'AA

N AN NA.AA A'

A A

A.AA N"

A A

A NA

AAANAA.A A

A A A A A.

A AN N AAAN'N A

A AAN A'> A AAAA A

A. A A A A'

AA AA AA..,AAANAN.AA.AA.

ANAAANA'A A

AN A A AA

.AA.*,A.A.AAAAAA$

AA..A..N

...AAA.NAA..A.A.A.A.AA NAN/A..

AN".AAAA.ANANNNANAA.

'A*AA*

NAAA. AA.,AAAAA,.

AA.

AAA..

A.

NAAA'AA.A.AAA A.A.A'AA..

A.

'AN A A AAA'AA.NANAA'A A>>

A AN N

A N

A N

A. A.A.'

A

'A A

..NAj A

A.

A A A.

A.

A.

A A A

NA NANANA.

A N

A A"

A' N

A' A A'

AN>'

A A

A A..

AAAA'AAANAAANA.

A' A

ANN A

A

AN A

A A A

A A..AAA A A.

A A

A AAAA.NA.N A

A

A.A\\.

A' N

A.'

AA A

A A.

A.

A N AANA. A A.

N A A..

A.

A A N A.

A A A.'

NA NAAAA A A A A A A. A A AN A

A A.

A. -A N A

AAA.AA

>NAAAN NAA.AAAANA'A A

A

A A.

AAA.

A A.

NAN A.

A.

N A.AAA NA..AA.NA.A.A.

A

'

-A A A.

AA AN A

A'.

AN AN.AN

  • AAAA A NA' A

A. A A.

A.

A N.

-A A.

A N N

A.

A A

A A A.

A N A A

A.'A

'NA N

NA A.

N A

A.

A A.A..

A A

A A

A A

..A A

AN AN AAA.ANAAA.A.AANA A.

N AAAAAAA

'AN A

AA A.ANA,.A,AAA...*AA A

A' >N A '

A.

A.

A A. A A.

NAAA A A N N ANAAA A NA.

AA.N-

  • A'NAŽ"

A'.)>

NNA*AAAANAA A..NAANNAA A

'AA A.

'AN A A A.

A A

A A AA A' A AA

N A.

A A

A A NA.

A A.

-A AAA.NA N

A N NAp> NA A

A A A N A

N N A. A.

A N A

NA 'AN NANANA.A AN.

p N A'

A. A.

.

A A

NAAAA.

.tN A. A N

A A.N N A A. A N.

A..> AAAAAA A.

N N

A A NA A.

A

-A A

A N

AA PAN A

NA AA.

A A.A N

'A A.

N... A A A A A.

N A. A A

\\'

A A

A A A A

N

'AA NA A

A 'A.A AAA.A.

N.

A A A A.

'

N N

AA A>

AA N

A.

ANA NN AN N A A A.

A A A A'

A..N NA.

-N A

A A

A A A

A

8

. Dynamic Simulator Scenario One EXAM DATE: 7/29/2002 ILT0101-1 Operator Actions etNo.(s):

,8 Page I

on: Suppression pool.leak RHR A pump room with cross leakage into LPCS room, All SRVs fail pond to initiation of ADS tiation: Reactor Recirculation pump trip has been addressed, on the signal of lead examiner Annunciator High-High Level Floor/Equipment Drain Sump-Aux Building, 5013-5D, and SPDS

.on~dar Containment Hi Level alarms. ADS SRVs fail to respond to the initiation of ADS We Position Applicant's Actions or Behavior RO

1. Riport EOP-8 entry and high level condition in the RHR A pump room
2. Monitors and reports the suppression pool downward level trend
3.

eorts high level condition in the LPCS pump room

4. Performs EOP actions as directed by SRO:

Initiate a manual reactor scram per CPS 4100.0 1, Reactor Scram:

r --- al ask

  • , Place mode switch in Shutdown Check and report power 1% and trending down Start MDRFP
  • .Operate FW to control level 3 to 8 A Check rods, reports shutdown criteria is met Report level and pressure are following expected trends Stabilize pressure <1065 psig a

c lea Coordinates with BOP operator to monitor and control RPV level andp

  • .iRapidly de-pressurizes the RPV using Bypass Valves Subsequent Scram actions:

c :' Insert IRMs and SRMs

5. Upon direction of the SRO to reduce RPV pressure:

X _

  • Open all Bypass valves
6. Monitors reactor to ensure operations remain within established bands Monitors control room panels and notifies the SRO of any unusual or unexpected conditns-.

Cdordinates with BOP to monitor and control RPV level and press.

'* 'R may Initiate ADS BOP

1. Makes plant announcement for reactor scram
2. Reorts secondary containment high water level to SRO.
3. Islate flooding by closing IE12-FO04A, F047A and FO03A
4. Initiate suppression pool makeup I... I

. 9

y m

SOne EXAM DATE: 7/29/2002 i

EvetN(s Te Posit_

Applicant's Actions or Behavior BOP Per&forisEOP actions as directed by SRO Z, veri es operation of area coolers Q0 Verniefis operation of VF Fuel building vent.

4 vacuates affected areas of Secondary Containment

~:. 5.rDecf startp of condenser vacuum puMP Mo0nitors area temperatures, levels and radiation levels 1; itiate Suppression Pool Makeup O

ums Upper Containmet pools

ipots SRVs failed to stay open

-r #sr r k birects field operators to diagnose and restore power to they Upo irection of the SRO to reduce RPV pressure:

  • pen MSL drains Utili zeRCIC and RCIC drains line
  • Open the RPV head vent Coordinatees with RO to monitor and control RPV level and pes SR Enrs top-8,Secondary Containment Control, and directs and veri t

O peratVF.

2 Oipera e area coolers 3

fold floor drain sump levels below max. normal 4 Islatealldischarges into the affected area except systems nee a.OPActions b ieFighting 5

Directs the closing of 1E12-F004A, RHR A Suppression Pool Su heat exhan=ger isolations IE12-F047A and F003A for isolat

6. Monto area temperatures, levels and radiation levels Enters a initiates actions per CPS No. 4304.01, Flooding,:

1 Dispatch area operators to locate and isolate source of floo RW and RP of flooding source and magnitude 3 CeckRHR A Pump Room integ~rity 0

2,"

.T-l

- -l

1.

.' -,.-,.r:.

Vs

,*'~5 7

V 10

nlaio One EXAM DATE: 7/29/2002 ILT

=l0 I

8

.Pageo 3

'of' 3 Applicant's Actions or Behavior, additional actions:

q.kiification of Radiation Protection (RP) Departmen Nicate affected areas of Secondary Containment 1'N'N.

,OP-6 on Low Suppression Pool Level t

K.

and verifies performance of appropriate actions per E tart H 20 2 monitors t

makeup to pool per system operating procedure Xetermine source of leakage, attempts to isolate the lea kge iignoses the leak may not be stopped prior to 151 1 in Suppeso,'o Direct dumping the upper pools iiid verifies performance of appropriate actions per ule Switch to SHUTDOWN toncieria verified tScram, CPS No. 4100.01 ify needed automatic actions:

L ions WCS start trOl RPV Water Level between Level 3 and Level 8 N'

)ilit:e RPV pressure below 1065 psig X4akes decision to anticipate blowdown, orders rapid de-pressunzationof RPV sin ByasValvesN to EOP-3, Blowdown, when it is determined upp tlimaitaied reaer hen15' 1" Diretsteinitiationa of ADS and verification of.7 AD SR's-ope I ternate RPV Depressurization actions listed a He pei 10 psig per CPS 4411.09, RPV PRESSURE O

r otro in required band O

applied with RPV pressure rapidly dropping to less e 50 p

)late the suppression pool leak miner

.1i

N N

ZN

'-N--

.. 

D-2, Dynamic Simu1aor Scenario One EXAM DATE: 7/29/2002 7

N -





3/4

-.

N.

V'N" 3/4-



>N...

N.'

N."

N.

'N



-'N.'...

NN.N'N



N'

'.

N

'N

N N

-N'N-'.rN.N.--

N. -N

'N N

*NNN.

N N-..

N.

N.

N N'

N v*.

N'

-.- -

N.'

N N

N-N.' N

-

'.N

,N-N N)

N N.N. 'N N

  • '

N -



'N N

'N N

'N N

.-

N N

"N' N.

N

'N N

N N

N -

N

'N -

N N

N N

'N.,

.

N' N-'

NN.'N.N.N..N.NN.'N.NN.PNNN

.N.'..-'N N-..'.

NN"

N.NNN"'."A

.N.

N."'N.".N'N.'

'N.N.

N'N.<

N.' N.N.'N.'N N

N N

'N

N'-'

N.

""N''N-" NN'.N,'".

N.

. N.

'N N N. N N N

'N'"

N.

N.

'N N..

N N.

N N

N N.



N.

N' N

N N

N N

N N N

N'

'N N.

N N'N

'N

'N N'

N..

N N.NN. N.'

N.

N "Np N' N N

N. - -

N' N N N N.

N N.

N N N

'N N

N N

N N

N.

N' N.

N N

N N.

'N N.

N N.,N.N'

'N N.

N N

N.

N N.

"N N

'NNN.

N -

N N.

N 'N N.

N N N

N

'N N. N. N N N

-'-N.,

N.

N

'N-N.

N' N

NNN"N-'N N

N' N

N.

N.

N 'N N N 'N N.

N N.

'N)

NN N N - 'N N. N. N' N

N. -

N N. N N N N.

NN. N.

N' N.

N N

N N.N.

'N

-N' N. N.

N N.

N 'NNNN' N.

N N'

'N '

N N N N. N N

N N.

N. N.

N.

N N.-'

N.

N'N.

N.

N.N. -

N N.

'N N.

N.

N. N. N.

N N N N

N N.

N

'N N.

'N N. N N N N

N N

'N

.N'N N

12

'IB21-F3'03 ro JDp, en

icimulator Scenario One EXAM DATE: 7/29/2062 and Role Play yV I Rdce Dwelpressure Containment pressure on ATM is.02 psig.:

I ds To raise power to 16%

a No trggers b

oll la As RE state to stay in single notch drive until r pem_ sle.

Respond to MCR request to support the st fails te trigger 1 During reactivity change after Rod 28 b: Remve malfunction for the Rod Block annunciator once fl c Play - There are Data Fault and Data Error lights n R kt~DC~rRACC#2 d

lePy IC appears to be an open position switch.

4 Sseal aerpump trip oe trigger 4 on the signal of lead examiner

b.

Ro play - pump tripped on overcurrent, Filtered Watered

'C nd WS pump seal water flows are normal 5 Grecobnrlevel controller failure

a.

OR MODE on the signal of lead examiner a etB OG RecombinerCOnd N66-DOO5B level clitro

c. Roe ply -

Ied operator ations locally that would explain failure.

iected to locally throttle IN66-FOI 7B to control lege o theroom(this would take longer then is allowedf a Reote riggr 2on the signal of lead examiner t

K I OA protective relay (86G) is tripped. A t'h~ pwerlevel c

Wis directed to run a 3D - Respond not operatingi e

ele Play continues onto the next page 14

1)2Dniyi SimuiilatoScnroOe EXA DATE: 7/29/2002 Itlt aRmttrigge ontesgal of lead 9xmpr*6K~

Rle pla as persotilintefield j-.

> 1 h ekIs Iarg adappears, tobe -on teR4 upA~do iigbttiro sfodn ~

-:ad unable to 'g-closertto eterfnine.

Whenisoad of the leak is Attemp ed Ih 12F

~~EOKRIRAS uto vle1id n 1fnsii'ilnbeiti&islte th noi Iek A

ou -are unal to e otesicii iiau~

solation-alWe or the maiiual hand'eel for'lE2 4--

to dtedto itatione f AD h L S' o

a.

'CnItionai trigger are atutomatic onASAtato ten drop off.

R6 ole; Play-a prsonel in the field-

"5'..

7 2

-25VDC-M kt1 NN

-m-i L LXXXmT O1O i,,,

U00 0'

V...

U-X.

S

+

STE 1 Intuco Actonsl Aled Activ

A' 000: 1~~~ALE S

TIMS 1E T1::'

IM ON OF P' OGAIH2"na Ma VR fleIIrnitial

~c G' A2 ZERO Prg OVR Fle-ta X 1 gg NFIWWS;1XXffi-fVWl L0igh

,P A

t-i RL O

R FL initial 50103-IFR. pnCr AL 4h inita 7B 'A'E,OFOit MALF 2f Inia 51HI3I0-iC ChrolM L

fnitial Ad Ver Differental

D2 1Dynam-ic Slinulato S66cenario'One EXAM DATE: 7/29/2002.

L~O

<SEP 3 RodPIP robe tai s om remot1 INTUCIN TYPE DEMAND RAMP D)E-LA Y IE TIMECNDOT VALUE TIME TI X N

Sub 7o OVER FALSE X

L m

LS02 -

0I FAIL TRUE m

STP4kRod PI;P-0probbe-faP

'I cylic

.MON TPEDEMAND RAMP DL TE T

D VALUE TIME 1M N

U S

Sub Potn PB lI l

O TRUE M'

TRLICTON TYEDEMAND RAMP DEA JIME tM ODNT VALUE TIME T

O 07FF Su;:

,po8siton PB IGH OE FALSE CYL INSTRUTION TYPE DEMAND RAMP DELAY TM I~

ODNT

-~~

NN -~

VALUE TIME TM N

O4 RR2AJR Pp Ktrip AL TRUE L'-N-

'StE 7 O retmbm levl cotine failure Using OPERATR INSTUCTIN--YE DEMAND RAMP DELAY T

N N

~VALUE TIME TM

'N17

D:3.v~-2 Dyaic Simulator Scenario One EXAM AE 72/02V LOOI' STP8, WS seal water pump trip on remt :7

'I INTRUCTION TYPE DEMAND RAMP".EX IE

'tM~ciqi NOTE VAIMB TME IME ON OF All_ A08_501_ 2, -

OVER TRU 4

4 PSWSeal Pp A 2

OWOPA R"'"

AlA08_SOl_4,-

REM DELETE 00 4

PW'Seal Pp A 33.

OWS 1PA I

d-E, Low Flow MALF 2

~

01 Ps W Pp'A Brg Seal Water 5041-'2ELow Flow MALF 20154~,

,3 P

_P0 IA Brg Seal

~3. Olf-E, Low Flow MALF 23305

.4 4

P~W PplBrgSeal 3:

Water-~3 50)41 -M Low Flow MALF 6'

~J

~1 PSW-P 1ABrg Seal

\\33

504 b2E, Low Flow MALF 0':03 4

< rSW PlB Brg Seal 3,~

7'

333, 31 04:1-E Lw Flow MALF 0084.

'3

.3 3

3.3 P W p lCBrg Seal

'3'~3 3

CONDITON: B - Start of the seal water pup

33.

'3

D""2 DnmcSimulator Scenario One EXAM DATE:- 7/29/202LTOO1 STEP9, Sppresion pooi leak RHR A pump room with cross leagemoPSrmoneot5 CT INION TYPE DEMAND RAMP DE E

TIME CON NOTE VALUE TIME TM N

OF 1, RHASu3 pool leak MALF 10%

10:00 l

7i X Xg j0tla RI4Al,1lS'up pool leak MALF 100%

93 Sup pool leak MALF 10%

3:00

"-*W.*-

4 Red light Over False 00:1 7

le12F04A Green Light OVER False 0

C 7

DlMVOL Loss of Pwr OE Tre015C 7'

A 0 G OOS MALF 2

001 t

C 7

s pump brkr REM TRUE pend C - I E12FO04A sws to closed S~E,All SRVs fail to respond to initiation of ADS on conditio,

"'N:TRCTION TYPE DEMAND RAMP DELAY C

-VALUE TIM TIE O

OF 30, 'De-nergize all SRV REM TRUE 0 0 D

HP13fDe-ezerize all SRV REM TRUE 0 0 D

8 Cdition D upon initiation of ADS

-9

UAEA*

tA;>.r.*<.

,

UUUWU

  • UUs

*

Nucleaif'

-



CLINTON POWEk.STATION



''

C

CC.C*,,C\\

N(ANC 7' CCC4CC4.'CCC NZ'CCNC".C'N.

..i.U..<.

NRC Simulator Dynamic #2



NC4A-'C' C N.,



  • C

'CCC.

C..C.,

'N

.. C.'C'.C. CC CC3;'C

.C..CC.

.NA'.4



.CC

4

,NCCC NC'.

C.C 4CC.,

'.N--..C

,;<-y.S'<,t1/4 C.C..C.

,C-CC*CKCC.

CCN'CCC-'

4C'CCCC

N.5..

C'.

N.C'."$C Revision Number 01 C..' 

N

C4CNC'



CC

.AC',,.

Exam Date

-C--AC.

CCC VCC.pA.... :

C4'.'C C>-' Cs CNC...'54.4C.N.C2CCC,

'5CC ACCCC

C'..

<AC

<C'.CCC4C TMCC

'"C'CC'.C.

-

>'>2.j

'N'>-C

<CCC'. <C....

CCCC, C4.*'C.





C4C4CjCC'CCC.N CAC.CNCACC4 ANN.



CC'..

4.'A5C

&CC5.

.Cv..

.3CCNC.CC

'C-"'..

Developed By B Price

-<

.

-. CC 2115102.

Instructor



A..<CC.

CCCCC CCNCCC'C.C.C.C

.zCNCC*CCC.C

' NC- 

CCC.

C CC, C.,.-....C.C.C...C

..CN'

SN'...

CC 55

' NC'C'C CC C5C '<<<CCC C'.A,.C<C

<'CC.-

.,C-C





CCCC<C C..

...CtC

.C '...., ...

.' -.

Validated By p tCjBrien

_______ C-CC

<C<'CN<<

A*.*C

  • C5CN CCC C S.C C 4 '*'..C.C.CC5.

'C.NC<CN5CCC-N 7/6J.-'.

<CCC SNCCCC<.N

  • CC SME or Instructor

-' <i)ate NC

..-;.'C-,,,,..

C .

4*'.C.C N -.5 CC>CCCCCC-

"C,. C

' ŽCCC>CO C CN AC CCCC-.CC-C.

CC.,CNCCCC.N 4.CC4 - C 

.CC.C CC'C.C>..

'C.,5.

A

.-C..--

  • <.,.CC'.....

NCjNC44 4'*4'.

.5.CCC.CCC 1/6Ai2

-.C..

Review By P OBrien



C 'C.

Operations Repiesentative Date CCCC2*2>CC-

CC

' "

C.5.CCCC..

..CCC.

.C,..,..

CCC..5'..

CC.C.CC.CC.CC.CC.CCC C '4.SkC

-C.'.CC C

CCCC C -,

CCC Approvedy

_____________ C C 5 CCC.,.

18J02-<--<-<'..-

.C.

B. Price

..C.C..'

. 4-..

A4..C.

CC CCC-C-CA.

CCC-CAN raining LJepartment C Date C.

4 "C4

..CC CCCC'

.AC.C

-C. -. C-N-Cv.

,..C'4C<

CxCC$C>CC\\C

C.'"

C

.'..C CC C-4

.4,

.C.CC'

'CC

,C  CC4C N...

C...C**C'CC'CCCNC.4

'<"'CCC.

.,'CCC.

-'C-CCCC5.< CCC "CC-C-.

,-'C'N

..4N'...... CCCC.CCCCC<

..CCC, CC

- '"Ct C,.-...C CC ACC

..C

.CQ CC C C -

"'C

.>,, C. C..C

'C', 4-' NSCNC...CC' C

'.<<C C

.C,,

C..

CCC C

.'CCCCCSCCC..

'AN C C C.,.*CCCC.CCN

....,

CC

'C' C' NC CC <<'CC

'Cs). 'C NCN C-C -

CCC 4

C C.. C C C CCC CCC C

CC C

'<N.-

Facility CliFton Power Station

  • ~

ExAminert':

Coonditions: 90% power, C jTufi -idve' i I -

ed

.t1 reduce power to 85° 2

Shift Drywell Cooling sy!

A Event Malf. No.

Event

[ No j

]Type*

1 NA BOP-h 2

NA RO-R 3

FWOIA RO-C 4

OVERRI BOP-C 5

YVCUF RO-C O v OERRI BOP-I MCO1 M

PI M

9 Override M

10Va RLH02A M

CSU'0'bTACOPY A,,'

r; L A

-~ -.............

ScenarirOtin i

o-A O

u tlo i

neSD A

AA.>A.A.

A\\_,:.

9e

.A.:.i<'^..-ezS

.a..;

irz ti.

Scenario No.: Two

)G hydrogen analyzer A is out o i% power TG - CV testing.

stems to support scheduled a(

N Shift Drywell Cooling:

Reduce power with floi Condensate pump trips GSE compressor high r RWCU filter demineral HPCS suppression pool Loss of vacuum group Failure to scram SLC failure RHR pump trip instrument, (C)omponent, Page 1 of 2 Operating eTN f s Description A.-AAA YStems

.A.

.. A.m notor tem erature I level instrument

-fai hg I isolati

.,A A -0 A.A.

A.'A

App i D Scenario Outline FD ScE No.:sTwo Operating Test No.: NRCo101-2 Summary Evet Filter dDescription q

i f

The Drywel cooling system will be shifted from the aB" train to the "A train supitof scheduled activities alarm is a

2. P~ower will be reduced with RR flow to support surveillance testing echna.l SD p p trips requiring the startup of a standby pump.

~

4. "GS m

c pressor high motor temperature alarm, indicative of a degraded to equires starting a standby compressor and shutdown of the running come r

.The A

ytWCU Filter degrades resulting in RPV water quality diminishing Re the flltr to be removed from service for backwash and precoating..

te

. Ar suppression pool high level alarm is activated resulting in the discovery of the failure of both high suppression pool evel trip units (one high and one low).T s

wlequire Technical Specification 3.3.5.1 action D.lI that requires the shift of the IconS suction to the suppression poo.

7. Alos ofvacuum will result in a loss of the condenser as a heat sink due toaGro~up1 9 isolato'n.

rods fail to insert on a scram resulting in the reactor staying at power. This wil eulinSRV operation for pressur coto dighao the suppressio ol'"..\\.-77

~ ~. Te SLCsystem failures will result in no sodium pentaborate being injected. Ti

'~41 equrethe crew to insert rods to shutdown the reactor and direct alternate ~boron injection tone performed.

10 Whn RHRis started in suppression pool cooling one pump will trip limiting the nof suppression pool cooling and resulting in the elevatedsuppression tempe0ratureexceeding the Boron Injection Temperature, requiring loweringRP

.'"'A' -

'- 6.

A,

~~' Citicl taks:

77

7.

'7.

X'

  • Inertconrolrods to shutdown the reactor A

Dircts lterate boron injection

  • Whe Born injection Temperature limit is exceeded lower RPV level by teruatig and revntig injection.

7 ConroltheRPV level between - 162" and the prescribed lowered level.

Page2 of 2

,'-='A 7:--

it>

'A

.7

-A ;

7 : 7 X.

D 2 Dnami Simlator Scenario twoEXMAT7/920 LO12 Shit Trnoer nfrmation

=

01)yfw and shift

  • "A
  • Tday'Dy Shift Weati4codtons

.2.

~

17-STOR MS conditions expected v rt e n x 4 h u s.

A

  • 89.6%

Powe/o0 FCL A2stp4@1 4 8.'~lb/hCORE FLOW j

.,4....

Thema tiitProblems/Power Eouin

,.k..

N'ee toredce power with flow to 85%pwf z ~xising LCs, date of next surveilace' None eMCR anayzr

'i ot f

  • TG CotroCoVl~etsing, PSytm 901.7 stob A..

thisoutide th esMC which is h,.

~.'

-A,.,

4

'-a--

a, a

a-",

V.--,

'a-a a-a--.-'

a-

<a a.--

io two EXAM DATE: 7/29/2002 Operator Actions Evn No.(s) 1.

Page 17 o systems Cues:

i..recti..

_.ft Tim P

Applicant's Actions or Behavior BOP CPS 332001 Drywell Cooling, step 8.1.2:

Directs local operations Open 1VPlOY OpenI1VP12Y 2 lStarts the idle Drywell Cooling Fans:

VO1CA ted anunciator 5050-6K, Running VP fans A & B 7-IVPO1CC b xpected annunciator 5052-6K, Running VP fans C & D Directslocally shut the idlelIVPOOIA, Chill Water PuIn icagW

~v n

.eopen upon pump start 3 Start IDLE Chill Water Pump, I VP03PA and Veriyten diilfo ih energizes '

4 ranferSupplemental Drywell Cooln Coil Units:

Su't Supplemental Drywell Cooling Coil Units SuppyadItrnslV~e IVP090B/91B.

  • Op'e-n Supplemental Drywell Cooling Coil UnitsSupyadRtrIslVve 1VP9OAI9 1A.

6 Decf';ts local operations:

  • start Drywell Chiller IVP04CA tirect field operator to performn local shutdown action 7 StopChill Water Pump, I VP03 PB.

8 S:Q-9top Drywell Cooling Fans I VPO ICB and/or I VPO1C 9 Annuniciator s 5 050-6K, Running VP fans A & B and55 K hnig Pfn T

C& clears a RO Monitor~s-reactor to ensure operations remain within estbihdbns~a Montors ontro room panels and notifies the SRO of n nsa ruepce SRO ~

irects, the shift of VP tains.

Eisuirdes operations are conducted within the bounds of Tc pc n

A

-6b~erfalions standards and approved procedures.

Terminfisii VP trissitd

-"-a..

-a-a a

a.-- a; 2

a a

'-a

A' A

D 2, Dynamic Siiiiulator Sceiario tw4

Xii 

, ILTOI7O1 2

4 A

A

A A

.',,

A' V

A-V

/

A

-A A*

NOThS

.'

A A

'

't

A A-A A

A.' A..

A A.'A-.'

A-A

'A' 

A AA.

A A

A.

A A-A- "

'A'

'A A

'A AAA-.'AAAAA

  • 'A'A'AA AAA/AA-..

A-AA

'AAA

'A-'

-

A a

'A-A

'A'.

A

'A

.A.A..AA- 



AAAAAAAAAAA

'A A

<A-.A.A.A AA'.

A'

'AL"'

'A-A A.

"A A

A

A A-A A A.'

A A-A A

A-A A

'A A

A-.'

'.'*'T.-*,,A' A'

.'A.'ZA'

'A

.'



'A' A

A A."

A A

A A

-'

A A

A A AA.AA-A-A AA A-

'A

.'

A A.'

A.

AA-A.'

A

'A-A AA A-A A'.

A.

A A-A "A

A A'

A' A

A' A A-A-A.'

AA-A

,AAA-AAAAA.A.>A A'

A-A.

A A A A

AA A

A A.'

A A.'

A A'

A

AA"A A

A A A A

A AAaAAAA A

AAA-AAA

"'A' A

A'.

AA'A "A-A'.

A A

A A

A A

A A-A A A A A A.

A A

AA A. A A A A.

A A

A" A

A-A-

A' A-A A.

A-A-A A 'A.

A A

A

.A A-A A

A A-A A A A

A A' A A A A. "

A A A A A

A A"

A A A

A A-AA AA.>CAA >AA'AA" AAA. AAAAAA *AA AA

./AAAAAAA"AA-A-A-A-A- A.A A A

/AA A

- A A

'A-"AA'A-'

A A '*A.A..A..

AA A

A A A

A-A A

A-AAA

.AA-'

A "A

.A-AAA-<AA-AA' A

A-A AMA-A-

A-' A-AA''

A' AAA'A AA.A-A A

A

AA.'A' A

A-A' A.'

A A

A/A' A A-A AA AV.,"A A

<"A

'A



AA A-A A-A A

A AAA' AAA A

A" AAA-A AAAA-AAA A-

'A-A-A A-

"A

'A A AA-A-AAAA

AA A'

A A

A A-A A

.A-AA4AAAA-'AAAA A

A-

"Arc A AA-.A.AAA AAAA" "A-

A A-A A-A A

'A AA A-A-

'A

.'

A-A.'

AAA-A-AA

A A-A A A A A A A A

A A

A A A A A A

'

A A

A-A-

AA.

A AA

A.'

A A

A A

A A AA A-AVA-

A A

AL A-A A A-A A

A

.' A A-A' A A A

A A A A A

A

'A A

A A

A A

AA A

3 A

A

-u eAs.

irc D 2 Dnaniz Shn1~ito Scenrio

'iv6 XAM ATgE: 7/9/00 LT1O powe____________

my pik' 9b

&Opteratobr Ations-h AA.A Decito eI an IpDewwih lo

.A--.-

Pe CP',S3R 00501 Uni Powe ChneXtp82 RO

'euepwrwt

fox-BO H

oiisCeitr n

Po ee rdcin~

-2" diecIsO Pre an ottet oios

-.2 Moisratr oesr prain eanwiti s~~se ad oito, oiAro aesadntfe h SR of an urWlornxee codtin A

V SRO

  • Dr:sp:
teucion..

Temiu: _Cea~

0Xn epo~fo hag npwe ee m

A-,A..

'ALz2A.A-A

yam o

two EveaitNo()

.g.P..-

S Dgescription: Cndensatfe pump trips

~-N/N--

EXAM DATE: 7/29/20022 Operator Actions;

.,.,.Page

.ifiN NNN't.N N' N.N-N..

. A, InitiAtioni: Follow'ing poWr 'reduction on the signal of lead examiner

"'N"-

0..

ato g, CD Pump trip light -

Time POSltion Applicant's Actionsor'

'RO Per.CPS 3104.01, CD/CB step 8.6.3:

X Stat the standby CD Pump if available BOP isachfil Operators to investigate pup aripandsup~portt pumstr t

a : ih:

an s', ::-

Mon'itors' reactor to ensure operations remain within estbise bad Moitos cnrol room panels and notifies th S"ofay nsu'aloruepcd

______conditont s

SRO

"" any N'--ne SRO Enters CPS 4002.01, Abnormal RPV Level/Loss f Fedwater at ower and directs the above actions N'

-`G n

sShift Manager and recommends noi o

t

-NN--

t N.

NN

NN\\ N N

N:'

N

NN N"

iN II N

N-;,.

N N

NN AN N.

N NN Nt N

N N'

N-

'N A-N D~~~

N.

.e NNNNNNNN.*.

N; N

N

' N NT N

N N

D 2 DnamicSimuator cenaiotwo Descrpto GSE coPressr high m01tor S~zkt.44--.:-

p X

eI 4-..-

I1-:

sedsfield ope A

P~BOP Per 0CPS50I9-2C,:

-4

0 0g--

d.

ge

)iUUW1 r

' RO Monitors act

'SRO:&Drcs cin

  • EnfgorsOS' CotcsShift te igI ra 32 E 1]

or rol slii ex M

St EXAM DATE: 7/29/2002 2

Operator Actions

?age 1

!mperature ial of lead examiner :

Applicant's A

,rie,,

igh Temp STM Packing Eich BlowIer BI OA 1&2 tor to investigate B I B

14 to ensure operatia in etabl room panels and notifies hi R fayxusa ruepce sted above.

4 pectations and standards.

anager and recommends noti iutdown

,,,,an,' -,,'`4

?

X 4ff 44444 w-6 4

4 4

4 4

4 4

44 4 4.

4.4 4

44

4.

4 4'.

44 444 4

'4

'.'

44444 44 44 j

4 44444 4 4 4 4

4

/4 44 4

4 4 4 4 4

4 4

444 4

4 4

S io two

~E vent iNio.(s) 5 X

-y DesCription RWevfilter, e aizer cl Inito:lo ing 9AS'prblemn is ad(

Cues: Annunciatoi 5 00-2 a

ing, A I ROc

_PerPS 5000-2B, I Remov'e F/D fr(

k ier CPS 40 Per CPS3303.01, R

1. Establish comri PO 2 fP i02.

Th~rottle IG33-l B1OP irtfied ope

  • oritors reacto
  • onitors contrc ditions SOdferCPS 40 1..

tShift Teriub A /Dremo ed: fibm service-.

EXAM DATE: 7/29/2002 Operator Actions ILTOIO1 2 Nt-N NNN'N NNNN<

Page 1 'Nb#'NYN onductivity goes up dressed, on the signal of lead examiner F/D conductivity trending up Applicant's Actions or Behavior F-D CNDT HI-LO, OA 4:

mi service 0.02, Plant Chemistry

.WCU step 8.1.3:

iunications between the MCR and the operator at ioc panel l U'-6' F044, RWCU Filter/Demin Bypass 300 pm rator to backwash and precoat F/D and restore to serv

  • r to ensure operations remain within estblbed bad§

)l room panels and notifies the SRO of any unu ounexpecte 1.02, Plant Chemistry, table I and directs the ab Aanager and recommends notifications.

N for backwash and precoating

3/4N N

NW NNN-NNNN N-N.NNNNNNN-N N-N-N 3/4 N

N N;,

N \\Nj N N- -N-N

..N

.,N-NNN-NNNNS

.NANS.

N N N* N N-I.NNN

.. N..

N

~

7

J Event Nos) 6 Description PCS isuppression pool level EXAM DATE: 7/29/2002 Operator Actions ILT0101-2 P

I instrument fails high 5$'

1-.

55 7

ni iation:

ih Ater D

WCU filter demineralizer problem has been addressed, on the signal of lead examiner Ces Atiunciator 52 alarming Tijqq tn Applicant's Actions or Behavior BOP Per CPS 5062-3E, SP Water Level High:

1 Oybsemres HPCS suction source doesn't shift to the suppression pool 2 Vrfies a suction path exists 3

nv s s ATMs I E22-N655C & G at back panel Per C S 3309.01, HPCS, STEP 8.1.7.1 shifts suction to the suppression pool:

I Shut/ erify shut:

1 1F22-FO 10, HPCS First Test Vlv To Storage Tank.

2) 1E22-F01 1, HPCS Second Test Vlv To Storage Tank.

2 Open lE22-F015, HPCS Suppr Pool Suction Valve.

. Ve rify lE22-F00I, HPCS Storage Tank Suction Valve shuts.

R i-eports suppression pool level is inthe normal band X

Monittors reactor to ensure operations remain within established bands Monitors control room panels and notifies the SRO of any unusual or unexpected S;O Directs actions listed above.

E Iv alates EOP-6 entry condition and may initially enter. Determines alarm not va for EOP-6.

Declares HPCS Inoperable and enters LCO 3.5.1 Action B. 1 directs that RCIC is verified Operable and B.2 restore in 14 days.

Complies with action statement(s) for T.S. Section 3.3.5.1 Table 3.3.5.1-1, 3e action D

are 0l 0

BP Declares s HPCS suction shift logic inoperable and directs the placing of the HPCS suction on the suppression pool.

n

-forces OPS expectations and standards f

Ensures operations are conducted within the bounds of Tech Specs and JAW Cperations standards and approved procedures.

.ontats Shift Manager and recommends notifications.

I TS ctinon the suppres C.

sion pool, SRO has addressed T.S. requirements.

5 A..

55 54.

:NUYES:,,

'. 5.

.5 5.'

.5.....

55 8

30

2D a

S 1

Se o two.

EXAM.DATE:. 7/29/2002 ILTO011-i Operator Actions

,.n s

Page Descrpt Lo f

1 isolation Itai AtrH I

f is addressed, on the signal of lead examiner Intaiw Afer CS

-ai

-ur e

i differential pressure alarm, Vacuum dropping, Group 1 Time T Position Applicant'sActions orBehavior RO CPS-3215 01, Off-Gas step 8.3.1:

As directed reduces power by reducing RR flow and inserting rods

As directed perforns Rapid Plant Shutdown per CPS 3005.01, Unit Power Cl 10 Lowerr reactor power using RR FCVs until core flow is - 43 Mlbm/r
2. Place the 'mode switch in SHUTDOWN 5_1'Abana, Place mode switch in Sutdwn

-X

- 0.

Check and report power unchanged Operate FW to control level 3 to 8 Report level and pressure are following expected trends V-Verify turbine and generator.are tripp Verbifyz tu ssrbie andeneato aretripe

-Coordinates with BOP operator to monitor and control RPV le&

Subsequent Scram actions:

Insert IRMs and SRMs 3/4 Ose-rves and reports:

'71.

LSs of Vacuum

  • rip othe TG I Trp of the RFPTs Grup IIsolation Coordinnates with BOP operator to monitor and control RPV level and P BOP eports Of as panel alarms toSR M es plant announcement for reactor scram Make 0 a plant announcement that the plant is performing a Rapid Plant Shutdow Should make plant announcement to evacuate Containment.

Should make plant announcement of a group I Isolation

.9

_ A N,

a 0

a

r Evnt~os) 7-~~;Page`-

2 of'61 Posiion su Jiu or SRO Directs action Lite aoe Per

'EOP IetrEPl' 3"

5-.

Terminus: Manual s&rn iiiitiated and Group 1..

<.--.

'.--.-

3-.

'.*'.3.33 3333...3 3..3 3"'...

3'3-

3 A

33

.

333' 3

3333.'.

33

33--3.

in>' - -

'--.3.

3

.

3-.

-. 3--in.,

3.

.3.

2

3

'.3'

"33 3.

3.

3

-. 3. 3 3 3.3 3 3 .'3.3 3

3 3 3

.3

3.

33 333.

33 3-333.

.-.333

'.3.3.

3 3

3 33

'.3

'.3

.. 3  .Th3 3 '

33'

-"3-" ".333'.3'3"'

3.

33 3

3.

'33 3-.

3 -'3 3

3<3--'-'--'-33

'3-3 3

3 3.

3-3'.-

.3 3

3 3,3'.

3'.

-'3 33

-'3 3

'-'3,

.'33'.3333.33..

3--.3 33

-. 3 3

-..-

'33'.3.

33-

-..3-3

3.

.3

'.3.

33

.3" 3 33'.

'3.3..3.

(33' 3-3

.3.3.33,.3.33 3-.

3 3

.3.

.3' 3

3-3 3.333-

.3 3

3 3

3 3-.

3

.3 3 3

-.3 3

3,

.3 3.

3 3.3 3'

.3 3

3-,

333 3--

3333

3 3.

3 33'3

-'3'

33 '3 3-3-3 33 3

333 3

-3 3' 3

.3 3

-3 3

.3 3 3-

.3 3.

3.'.33 3'.3'.

3 3

3

3 333 3

33'

-'3'

.333 3

3.3 3

.3 3

3.

33-3 3

3 33 3.-.3 "33-3 3

10 33 3

3 3

D Dynamic Simulator Scenario two EXAM DATE: 7/29/2002 Event No.(s):

8,9,10

==

Description:==

Failure to scram, SLC failure, RHR pump trip Initiation: Initial condition Cuis: Rods fail to insert upon Scramming Position Applicant's Actions RO Performs EOP actions as directed by SRO:

Arms and depresses MANUAL SCRAM pus Initiates ARI.

2 a Task Inserts control rods manually per CPS No 22.2

.Insertion Verifies RR downshifts at Level 3, and trips CQ.'t.j k

Terminates and prevents injection CB[FX and preventing injection:

X 0t

_AND 9

MINIW as When RPV level reaches -60", control RP' using only the listed Preferred ATWS Sysi Tls*

Terminates and prevents injection CB/FM and preventing injection:

AND When reactor power reaches 5% control I perscribed level using only the listed Prefe Coordinates with BOP to monitor and contro BOP Performs EOP actions as directed by SRO:

Inhibits ADS.

Verifies needed auto actions.

  • Isolations DG Start Dispatches area operator to monitor I Performs EOP actions as directed by SRO Per CT Starts A&B SLC pumps 2

AObserves and reports:

One system fails to respond Other train squib valve fails to actuate, 2

+i Task Directs personnel to resolve SLC system prol Notifies SRO that SLC is not injecting and required, step 2.2 OTES:

d tE',S.,.'-.

ILT0101-2 Page 1 - - f J,.Ajq or Behavior 2

h-buttons.

4411.08, Alternate Cont at Level 2.

Tsystems CPS 4411.02, Terin g

V water level between TAa

~ems2 2

systems CPS 4411.02, Te tPV water level between n

rred ATWS Systems 22.

I RPV level and press.

)Gs 2.,2

)S 4411.10, SLC Operatio

,lems so it will inject Alternate Boron Injection i.

..2.2222/ 2 22.222.

p2 2

.22.222.

22.p22

'22 222 2;2 2 22.

2 2 2

<.22 22 2

2 22

2.

22 2

2-22 2

.:t -

S

. - -2, Dynamic Simulator Scenario two EXAM DATE:____9200 8,9,10 i'agr e of 3

'osition t

¶ 1

Applicant's Actions orehavior BOP Terminates and prevents injection systems CPS 4411.02,Terminating gand preventing injection:

1. IBl'CS
2. RCIC
3.

LPCS

4.

LPCI Stabilizes RPV pressure below 1065 psig Performs EOP-6 actions as directed by SRO Starts H2/02 Monitors as directed Per CPS 3312.0 1, Residual Heat Removal, Step 8.1.9, places RR in pps pool cooling o

Start IA/l B RHR Pump, reports RHR A tripped o Directs field operator to investigate cause for trip 0.

o Establish RHR flow.

Open IE12-F024B open.

Shut IE12-F048B closed Lineup SXto the RHRHeat exchanger Coordinates with RO to monitor and control RPV level and preg SRO Directs entry into EOP-1IA and EOP actions as entry conditions are' e I. Inhibit ADS

2. Ain and depress MANUAL SCRAM push-buttons
3.

Initiate ARI ok

4. Determines Power to be greater than 5% and Directs injection of~

7

5. Insert control rods manually per CPS No. 4411.08, Alternate n

insertion-

6. Verifies needed auto actions. X
  • - Isolations

)

X DG Start

_k

7. Terminate and prevent injection of Detail F1 CPS 4411.02 preventing injection AND
8. When RPV level reaches -60", control RPV water level between using only the listed Preferred ATWS Systems 12

j-Dynamic Simulator Scenario two EXAM DATE: 7/29/2002 f Event No.(s):

8,9,10 N I Time Position [

Applicant's Actions c XticfT>,k>

SRO

9. When suppression pool temp reaches Boror by Terminate and prevent injection of Detail I preventing injection until:

Power is less then 5%

Water level is less than -140" AIl SRVs shut m

T10.

When reactor power reaches 5% control I perscribed level using only the listed Preferred

11. Directs crew to stabilize RPV pressure below
12. Dispatch Operator to investigate SLC System X 11 k13.

Directs personnel to perform alternate bor Directs entry into EOP-6; and EOP actions as eni Directs and verifies performance of appropris I.

Start H202 monitors.

2.

Monitor status and hold condition of idet specified values.

3. Start all available pool cooling.

I4.

Monitor status and hold condition of ider specified values.

General:

On transient, positions himself as command a

  • Acknowledges immediate operator actions ai Enforces OPS expectations and standards.

Contacts Shift Manager and recommends not Terminus:

Level lowered per EOP-IA RPV level stable and under control in required band

  • XRods being inserted Alternate boron injection actions directed Upon approval of lead examiner

-NOTES:

Ij l;j'.

13

)r Behavior i Injection Tem]

F1 CPS 4411.02, RPV water level I ATWS System 1 065 psig i Failures.

-on injection

.ry conditions arc

?ate actions per El itified parameter itified parameter authority on the L id directs subseq ifications IAW C ILTOiO-Pae 3

f perature loweirlevel Terminating and bb IS met DP-6:

s below"(wiAthin)"~-

s below (within) tnit.

uent act..o.

.i

)P-AA- 020

.. i....,..,,

S..,-ti X-1 1/4 1/4

11) 2 Dynamic Simu1aor Scenario two EXAM DATE 1/29/2002 ILTOlOI 2 Simulator Operator Instructions 2

A.'.' A>

iioI I

Verify daily lamp test completed

.fr>;

2 Reset to IC 1 (Verify/Adjust Power to 3104 MWth with flow to match turiiover)

-



plan "for this '"

c".

4

1ac& simulator in RUN A

A" '

4 "A'

A'A.AAA(AASA -,

5. Make sure 8 CPs are in operatIon

AA"'"'

'A

"''

6 Se1et the B FWIlXlevel instrument

"

A A

A.

.'.

7 OG I4ydrogen ahal'zer A placed into Manu1 and Zero Purge A

A 8

Tuin on nd advance recorders 7 9

Verify the AR/PR server isning and stabilize AR/PR A

.7' A

A-A, fl' "A

10 Wang OOS tags per turnover A;

-A A

A

'"'A..'A II Identify T/S is'sues"associated with QOS and turnover

,A A

12. Verify simulat6f&oriditions tclt turnover

A

'A

'

A-'

"A A-A'

.A A

AAA>

A A.,

A'AAAkA

'A' A A.'*'A' A

A

<'A A'..'

AA



A 13 Pcwidet 3005.01.

A

-

""A-A' 14 CPS900009markeduptostep49@ 18 A'

  • A',

A 'A4'A'"

A""

A"

,.'A AAA A'

.4 AA A.'.AAA'"'A.AA A A A,

V.A A

A' A

A A A A

A' A

A A'

A A.

'A A A'

"AA"'A A

A A

A

.4 A

A A

.5 A

A A A.

A A' A A'AA'"

A5A",A.'A..4AAA'AA'A

'A "A

A A A A'

A"

-'AA:

'A A A

A A A A' A

-A A

A" -

' A"A' A AA

AA' AAAAAA'.tTA'<A.A'AA>AA>,A'A

'A AA 

'A A

A

.A.A..'A',',"'A, A

A A' A A

A

A A '

A A,AA'A

'A.

A A' A A'

A A

A

,A A

'A.'

'At' A,

A A

A -

A' A A"

AAA"'A'



AAAAA

'A A',

A AA

A A AA A

"

A A'

A

'A

'AAA'

A

A A A A A

A A

A A

A A' A'

'AAA,,

A A

A A

A A A A A

,AA. A A A '4A -

A A

AA..AA 14 A A A

D2, Pnami Simulator Scenario two EXAM DATE:_____

1/2o Event Triggers and Role Play

  • 6 I Shift Ptan a

pedn rgesto support VP shift b

Rl lya h field operator Open dampers, StatteAV hle tpte1 V'cilradsu dampers CoN6.

trips..,>.6.0.-.

4 eaig r.xreeyniya

-a Reoet2ge on request from lead evaluator 6<

ayas fCheiedoprytator tov reonfithed breaer / tippso vrtre n h oo per o u to blck aptsion th empaint Supr tru fthe standbyrDmpservice 4 GE cmprssohihvmto inteumperaturelhg

. Renite trgger on request from lead evaluator 5PWC oil~

eieaizera condciiy goes uPS 903..1O a' 1emottiger 2on rhequest fro leadnevluator3 663,6.

b. Roe ply as hemitrypthatrhaveicnfirmdteFDi elte n

ed aka'hadpeotd c:

ts groupin I acisonationrmv h

/

rmsrie 6

a. Reite trigger 6 on request from lead evaluator b Upon~rquerspovidel an copy ofiCSeld

.C3 Rleply-tausof heATs at Pael the13-P663 (1) rumb65C lingscintripp d, radin10 (2) 1t22-N655G Ch 1 no tripped readingq-34"..

2~. ?i (2) ute investigation shows the LP exhaust hood nekb bot ha failed'

2"bynamic Simulator Scenario two EXAMD 8 Falureto scram-Initial condition Role P 1, InSupport FOP actions by activiating a o

p SLC fablure MALFitial condition 2

a 'Role Play - respond to assist in recovery f StC yallowa 10 RIo pump strip

-Initial condition 0

Role Play - Field operator finds breaker t

S TE], Instructor Actions Already Active t:

INTUTION TYPE DEMAND RAPDELAY TIME TR ODNT VALUE T

I O

OFF RPO 1Auto and MALF TRUE Initial Manu h

"scram failure A-6E, Lo Press PIC-NSO2 Xrd to AS REM 0Inta IIntole STPT C/S Xrd, J'to AS sys OVER TRUE

-z-'

->;Initial.

, C/S~ Xd to AS sys OVER False001Inta j'- MO-ndr~i MALF 10%

0 I' e akge L

A-FIl Sq A fire MALF TRUE Initial Sqp wsOVER TRUE' Initial 02 RlOA-RH APp Trip MALF TRUE initial OG`Vauflt temp high MALF 4

niia

~galarm t-locked Condition A -Reactor Scram (NOT H_02_All DO

)At(O 0

l S21 N

2 ynamic Simulator Scenario two EXAM DATE:7M L

SE2,Instructor Actions A/ed ctiv'e 0INTRUCTION TYPE DE MAND RAMP DY ME E

C NOTE K

~VALUE TIMIE TM OF WCI F/D A Eff. For REM 93%

fin I :

Con I" A04 A30 DS36_1, OVER FALSE L Initial A

A2O M161, OVER 0

Imtiar XRD/MSTo AS Sys STP 3 3, Condensate pump trips on remote I 2

INSTRUCTION TYPE DEMAND RAMPD TIE T

-,VALUE TIME L

ON O

WOACDPp 1A MIvA LF TRUE1

-C

--C C.

C'

.,& S 4, RWCU filter de-inerAlizetc6nductivity goes up on rmote 2 INCTRUCTION TYPE DEMAND RAMP D

T T

ON NOTE VALUE Time TM K

F C

) Eff. Cond.

REM 50.9 1:00 2

5 U1Oi-RWCU F/D REM FALSE en 5

S E 5,Pending actions to suppor VPshift:

ISTROTION TYP DEMAND RAMP.

EE VALUE TIME TM I

F YL UXEMT(660), VP OVER TRUE pn 1

7"ElALl"T7 177 YPXRMT(66 1), VP OVER FALSE

'pnd' d

'C 11~

17-.

C.

DD Simulator Scenario two EXAM DATE: 7/29/2002 copreo hmotor temperature on remote 4:

NTRCIN TYPE DEMAND RAMP DELi VALUE TIME TIM

5019, S

MALF 2

STEP 7 slevel instrument fails high on remote 5 N

TYPE DEMAND RAMP DEL)

VALUE TIME TIM 50 ES PooI Hi MALF 2

T8Lsr I I isolation on remote 6 I

-TYPE DEMAND RAMP DEL)

VALUE TIME TIM MCOI "CDR Ale MALF 1%

00:30 MC 3

01, CD RA-Ileakt MALF 10%

2:00 7:0C 4-.0 INT CIN TYPE DEMAND RAMP DELI VALUE TIME TIM EP2O0'

-REM TRUE 0:01:(

REM TRUE 0:05:1 EPII-REM TRUE 0:10:(

E14REM TRUE 0:05:1 EP1O07A REM TRUE 0:12:(

EP3:

REtM TRUE 0:05:(

EP2051 REM TRUE.,

0:05:(

EP20 REM TRUE 0:05:(

18 ILTO1OI-2

'V k,.;,r,L.-.-.l,,,.-,,,,.._

[E TIME ON TfM O.Y

~

COND NOTE AY TIME CON]) N TE

{E ON OF:

_Y TIME TM CNM E

ON' O

I6 7:<

S

_ ~

~~~

7.-0 0 lltX oz AY IE l

TIME ON o.

30 30 Jo 30 30 I

1

001
0 11 1

NX

1.

1 RIME COND' N1OT 1

OFP

'1'1

X~1en 8v1V0.:.

Pen 8 Wl3 HFe 8X0 Pen 8f:1 01 end; 8

f01C

.nd

POWER STA

"4 4'*4>,*

.4.4 4 44 4 4-4

~

~

~7-Scenario Outline 4.. 44444. 4.44, 644... 444.. 44 44.4 44 444 4.4 44-4444
  • 4 4444 4A.4.v.4. 444244-4.4

44 4444.

... 444.4.44..

  • 4..4-44.44'44444.4444444:444<4.-4.4.$-I4..44.44;4



6 4.444.4...<.4.

4.4.

444 4444 44444

44. 444 444.44'

4

\\ 4 4.y44i4A44.

  • 4444444444

"'44

444-44*4

[

.4444.

.444,

'4*;'

4

  • 441

,.

. i 2. J...........

r m-...

i....rg,,.r.,.

Facility odintower Station Scenario No.: Tree Operating o

o Examiners Op

4. 4 4

c 4A 4I4S>~

Initiaf Conditi6is: 27% power RR LFMG, OG Hydrogen Analyzer A is out of service GC pump out o r

failed

ing, Pulling rods to 30% power for Recirculation pump upsht i

proviede~dby an Electrode Boiler. HPCS Pump is running pool to pool to heat theSuppsion Pool for He;t a'lx-ha'6f er-Performance Test.

1ondensate tank is low and'Radwaste doesn't have any CY gmCrade water a' to is required 11.

Malf No.

tIEvent 1

NA BIOP-N MC-CY transfer 2 :

NA

RO-R Pull rods to raise power 3

451 Ac ROnC Rod drifts outward.

4 A

tion3 4

4444444 OV iER BOP-C HPCS System Ground 4

5 MSs4 BOP-I SSE level control failure YAFWL RO-C CB pump "A" clogged oil filter/b l

e 7

PC12 M

RPV Instrument line failure in the 8

RiPOI M

Auto and Manual scram failure iA :

A

.4 T

4)<

Sw 4

444444.44

.4 444. A 444444.4.4.444 44444.4 444 -.

444

.4 44 44 44.44 4444 44-44444444.

4

.44444'.4 444444444.44-4 4

4.444.. 44

4444.44>44.

44 4* 4 4444.4444.

4 4 4f4

-44444 4444.44444444 4444A-44-4 4.4 *A444A'

4

-444.4444444444

.444.44.4444 4444 444444444 42.4444 4,

44.44444.44 44 444 4444.44.444 4444 44 4-4>44 44.44444.

  • (~ra (RltR eactivity, ZR UIM17A COPY t4

.4.,

(I)nstrument, (C)omponent, (M)ajor Page I of 2 44444444444444 44 4 4

44444.4444.4 4

.4 44.4 44 4 44

.4 44 44 4444 4.4 44 4

4444444.444-44

.4 4

4 4

4 -4 4

44 44 4444 4.4444 4

4-44444 4 44444 44 444 44 4.4 44 4.444 44.

D Scenario Outline J

ScnroNoThree Operating Test No.: NRC0101-3

  • ~ arrtiv Smmary Event#

-Description 1.ertor will lineup and fills the CY tank by transferring MC water to CY.

2. Alow rd withdrawal to raise power.

.ro withdrawal a rod continues to move outward, Off-Normal CPS 40671 rqir operator action to stop its outward movement. Once the rod is scrammed il no longer withdraw. LCO 3.1.3 action C.1&2 is entered.

sn 3 Ground results in the manual Tripping of HPCS, start Ground Isoladti control fails causing level to go low requiring the manual level con

  • ~oelevel on the SSE.
j.

"A" will experience a Clogged oil filter with a bearing oil deficiencys

§euiring the startup of the standby pump and shutdown of the "A" pump.

7.

The RPVinstrument line will break resulting in a partial lost of RPV in strumentation, a steam leak in the secondary containment and EOP-8 entry. Tw ar secondary containment will exceed Maximum Safe temperature requring 8X. Wh/

scrammed, rods will not move resulting in reactor remaining at power and P-1A. This will require insertion of rods and the initiation of SLC to.

thereactor.

X,0 X

scram the reactor prior to one max safe temperature control rods and/or start SLC to shutdown the reactor and Prevent Injection prior to emergency depressurization emergency depressurization once two Max Safe temperatures are exceeded CV feed to Restore level to the prescribed band when RPV presu

/e S

0:.

Page2 of 2

D-2, Dynamic Simulator Scenario three EXAM DATE: 7/29/2002 ILT01101 -3 Shift Turnover Information

=

Day of week and shift Today Day Shift Weather conditions T-STORMS conditions expected over the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

=>

(Plant power level) 27% Power/48% FCL A-2, step 40, 12-21 at 16 937 MWt 281 MWe 31.1 Mlbm/hr CORE FLOW

=

Thermal Limit Problems/Power Evolutions Raise power by pulling rods to 30% then shift RR pumps to fast REis present and available. High Xenon

+

startup with burnout in progress. Gang is permissible, but continues drive is NOT authorized Existing LCOs, date of next surveillance 3.5.1 Action B.1 completed and B.2, 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> CPS 3004.01, STEP 8.3.11 into a 14 day action

=>

Surveillances or major maintenance HPCS running pool to pool Equipment to be taken out of or returned to service equipment A OG hydrogen analyzer is out of service for CI maintenance

+

GC pump out of service failed motor bearing

='

Comments, evolutions, problems, etc.

Online Safety is Green Electrode Boiler is running providing AS CY tank is low, priority is to first transfer 4% from MC-CY NRC SUBMITTAL COPY this shift/maintenance on major plant RWCU A F/D is near its end of life, chemistry is monitoring 1

X

W D-yai iuao cnrotre XAMDT: X/920 LOG 3/4i j

.4 -~

~

Verf

Xsrnpeso peensrAcins27 Eveut~o~s)

~

1h'-

t"'Oag Io own shftun'vrN...1*N Ti me ELs~io LpIcn' ActosorBhvr.

BOL e

yld and Maeu CodXae CS30 0= step 8124

\\Jrfe MC; t ank 0:ipls

..NN00 OpHensO9YL72m

IC2 Dynamic Simlaor cnro~2O LOO PerTubi

.. 'S,,ffipa Opefirator AnctionsztotCS Even 0osj'2'QIF00 Page 1

of I

a

=

,N.

XBO X4 meiit DecDtinPl rd o rae poe ac on'.is'...ye

<N>.X P

iat Sn c n'z' C1 sate R2 2202

_l ot z;A t

rd t rr OP M,

r t e o

Montor cofro rom anes ad otiiestheSR ofanyununa ortinxpete SRO Dircts ctinslited bov Enue prtosaecnutdwthntebud fTc pc n A

D<, Dynamic Simulator Scenario three

'.X NN~y.

EXAM DATE: 7/29/2002 iLTOI&I-3 N'

'N Operator Actions E nt No(s) 3 Page I.o f

1 Destcrilption: R'od drRifts' outiward Initiatkiii Once thyf ii manipulation is complete, when Rod 36-45 is bein t

Cue Ro

,alarms Time Position Applicant's Actions or Behavior RO~ Per Inadvertent Rod Movement, CPS 4007.02:

Immediate actions 0- :

Sele>

0 ct and fully insert the moving rod with the In Timer Skipbo Suibsequent actions; Once fully inserted release the In Timer Skip button

-~

  • Observe rod withdrawal
  • Reinsert rod with the In'Timer Skip button 1?erPS 5006-3D), OPRM Enabled:

Monitor for core instabilities

-BCP Dispatch a field operator to the HCU for the rod 2'6 Directs field operator to Individually scram rod

  • Evaluates thermal limits
  • Evaluate MSL rad monitor values
  • Evaluates OG Rad levels
  • Monitors containment RE SRO ~'

Enter ad direct actions per Inadvertent Rod Movement JS400 0

Control Rod Ope bility, Tech. Spec. LCO

-Tech.

Spec. LCO 3.1.5 B.2.2 is entered once rod is N

ai, Contacts Shift Manager and recommends notifications.

Te mW1100Ocero i fuly inserted and individually scrammed

.2,'

-.2

'-'6'

',2

'.4..

w -

ii i'2.,.~'

NQTES:

iilii,,

vVf,

'41

,~; -

.. 11

. 1.1.

.<.~~~

-=.

AI............

R

. z....

Ej

,er.,

N'

''

4.

4 2

22 N'

.2

2. "

-:'.2.

'4' 6Ž,','

4

-----

b 2:Dynamic Simulator'Scenario three EXAM DATE: 7/29/2002 No

~

AOperator Actions Descripton I.C G

Initiahn:1i bo1Ipwing>

tio rod failure on the signal of lead examiner Cues Groutem, 5062-6B alarms Tm Po si-Applicant's Actions or Behavior BOP Per Grond HPCS System, CPS 5062-6B:

Shutdown the HPCS Pump

-i Remove HPCS control power fuses Con' tact Maintenance for Ground Isolation T Trip or Inhibit Division 3 DG RO Mon..itors reactor to ensure operations remain within establishe i

Mo.nitorr s control room panels and notifies the SRO of any unti

<~~

conditi;

ons SR 0 Directs actions listed above.

J o0 Te0:fA Achnical Specification LCO 3.8.1 Action B.1-4 f A

thegroud.

.4 X 0

9 A0

  • 0 tures. operations are conducted within the bounds of Tech S A

O

.perations standards and approved procedures.

-. ontct ShftManager and recommends notifications.

Termiu~:

WCS ump as`ben tripped and Technical Specifications evaluated.

A A ;,,

NOE:'0 S

-A "f

f A-g_;

wjU~~~~~~~A v*XN,<..sx

..~g¢.~

oi.--Mt;;a

10:

~

a

-To1o13 app aec A,0 1!1_;1.11_-

_;-V%,.

- ---..1-... I----

-.. I 111.1-I..,-

AN A N

,AA' A*AA AAA -

A' A A -

AA-AA

.AAAAAAA.

A.

A A

A AN A,

A



  • 

A'- A AA-.A A

K.

N A-A A

-t I,

A AA A:;.-,.

N,

A A"

AL>

=A N

5

D -

Dynamic::imulator Scenario three EXAM DATE: 7/29/2002 perator Actions 0j Tntiatjon Ati& hsaddressed C--.Ai 1-- -.-.

CP Cues:

nunciaor' 501 a]

n fl_-OP PerCPS 5019 I a a.....JX...'

throttle or ire fiel S

1.

~~~'

Monito;;:?X rs]

SRO ts ac

tnsu re o C~A Qeration FOR THE NEXT ACTIVITY WL

<2.,

'CL 2

1C tl::'2

i~~~

N"'f.

N C "L2<

.AA I.;

1

..... 11 1: L ,

e Pe sge o

dHPCS System Ground problem and on tl

[arming Applicant's Actions or Behavio

-3A, Hi/Lo SSE Shell, OA 2:

pen I GS-S 10, SSE Feed Water Bypass Vlv

d operator to investigate reactor to ensure operationsremain within established bands control room panels and notifies the SRO, of ayunsa ruepc tions listed above..

perations are conducted within the bounds of T66_i Sp s standards and approved procedures.

)PS expectations and standards.

hift Manager and recommends notification Llarm clear

~2'

'C N

A

'C 22 2' C C>

N'

.NC.CL.N Zj.N~,C.2 LNEED TO DISTRACT OR BLOCK BOPOEAO RMTER

'C.

4.

C'L

'C

'. CL " '.

C

~N 6;

0

.1

D-Dynami Si nultorScenario three EXAM DATE: 7/29/2002 Operator Actions A" clged oil filter/bearing oil deficiency failure has been addressed, on the signal of lead examner IH:'0-1 alarning, Applicant's Actions or Behavior C= S 500 1-111, Clogged Oil Filter CB IA:

  • irects field operator to turn Cuno filter OPS QQ9-3H, PMS Alarm Display and observes CB A high bn compumer po nt S 3104.01, CD/GB step 8.2.2:

Startp standby GB pump Shtown leaking GB pump onitors reactor to ensure operations remain within tishe bands

  • 4ntos control room panels and notifies the SRO o n n.silo 'efce conitons.
  • Dircts ations listed above.

EnocsOPS expectations and standards Ensues oeraions are conducted within the boundsofTcSpsanLW Operations standards and approved procedures.

v C"~ph~pstarted and shutdown the GB pump with an oil deficiency

,:.'C

:C>

W STO DISTRACT OR BLOCK BOP OPERATOR 1

.R. X 2

W, k,

7C

yni o

nario three I:12ne failure in the s in Int

~

a examiner

-t t

Evn ent N

)areate SO NiNng 3

f x, 7

e >

E :E EXAM DATE: 712912(

'perator Actions

)02 ILT0101-3

. Page secondary containment, Failure to scram iperature and area radiation alarms, Rods fail to ins 1

of 57 I

.f ert upon

  • -7f-3/4' NNNNNN N-;;,

-"N

'NtNNN

N' NC Tim Position

.Applicant's Actions or Behavior

,---..-: -0.J

-,: a:

RO Rpforts EOP-8 entry on Hi temperature

-Performs EOP actions as directed by SRO Initiate a manual reactor scram before first max safe temperature is exceeded Per CPS 400'0 1, Reactor Scram:

-. '-NPlace mode switch in Shutdown Check and report power unchanged Operate FW to control level 3 to 8 C:Xheck rods, reports shutdown criteria is not met X

.-. Report level and pressure are following expected trends

- X' M tbilize pressure <1065 psig

oordinates with BOP operator to monitor and control RPV level and press B
"Rep-orts secondary containment high temperature and rad alarms to SRO Makes plant announcement for reactor scram
  • Shuldmake plant announcement to evacuate Fuel/Aux buildings.
1qerformns EOP actions as directed by SRO
erifies operation of area coolers
  • Veri.,-

_Jpfies operation of VF, Fuel Bldg Vent.

.vAdacuates affected areas of Secondary Containment :

M:onitors area temperatures, levels and radiation levels

1.

l 0 T

orts a secondary containment Max Safe temperature being approached to SR

4. Reports two secondary containment Max Safe temperatures are being exceeded A

'SRO

' Coordiates with RO to monitor and control RPV level and press

-N

_0 f

NOTES Nf.

NN'

-N

... 1-,.-

;'X',

I. - : :.

-I%

,

.M I

N NNNN.NNNN-N N N N N N

NN..

N N N N N

N N NNN N N'

N N N N N

- N N N

NN 3NNNN*

N

-N N N N N N

N 8

N N

N N

N

love

.4.,

j

'k P

C 5"T' 0

11 Z.---

r g

-jup f.7' 6fIj' Q 4604 6 ypojandvedfle M,

0 0,

saw; P-P 1_,A fi

S S

d d"'

)-2, Dynamic Simulator Scenario three EXAM DATE: 7/29/2002 1-7,8 Applicant's Actions or Behav 7::

s r

Performs EOP actions as directed by SRO:

Arms and depresses MANUAL SCRAM push-butto Initiates ARI.

CPS No. 4411.08, Alternate Control Rod Insertion Inserts control rods until RPC lockup Directs defeating RPC for futher rod insertion Verifies RR downshifts at Level 3, and trips at Leve Terminates and prevents injection CB/FW systen When RPV level reaches -60", control RPV wate using only the listed Preferred ATWS Systems II I Performs EOP-IA actions as directed by SRO:

Inhibits ADS.

Verifies needed auto actions.

Isolations DG Start Dispatches area operator to monitor DGs Starts and verifies injection of SLC trains 'A' and Terminates and prevents injection systems CPS 4

1. HPCS
2. RCIC
3.

LPCS

4. LPCI Stabilizes RPV nressure helow 1065 nDwi
.:fage 3 1 -

tior t 12.

ns CPS 4411.02 r level bewe AFad-0

-C Y. i-S 41.0'.

'i55.

41i

-K..

'5" S-5-

5 5

rl r->_,

I I 1, .

. I   -

- , -  n -

 1, ,    il 

I M ; .,

I 10

amic Simulator Scenario three EXAM DATE: 7/29/2002 IL Evt No.(s):

7,8 Page 4

Tie Position Applicant's Actions or Behavior SRO Directs entry into EOP-IA and EOP actions as entry conditions are met i

W 0

0

.1.

Inhibit ADS 0:

2. Arm and depress MANUAL SCRAM push-buttons r : itial tk.
3. Initiate ARI
5. Determines Power to be greater than 5% and Directs injection ofgl n;-
6. Insert control rods manually per CPS No. 4411.08, Alternate Control Rod insertion 7.

Verifies needed auto actions.

lIsolations

8. Terminate and prevent injection of Detail F1 CPS 4411.02
9. When RPV level reaches -60", control RPV water level between :t using only the listed Preferred ATWS Systems X
10. Enters EOP-6 for High Drywell Temperature=
11. Directs crew to stabilize RPV pressure below 1065 psig

.- R.

Monitor status and hold condition of identified parameters below (withified value's'.

3*33A3'.3~3

  • On transient, positions himself as command authority on the unit.
  • Acknowledges immediate operator actions and directs subsequent acn
  • Enforces OPS expectations and standards.
  • Contacts Shift Manager and recommends notifications IAW OP 0

t;

-3 3-3 i' 3t ffi W-. --.T X ;1

IF

-2Dynamic Simultor Scenario three EXAM DATE:

Event No.(s):

7,8 P

5 o 5

Time Position Applicant's Actions 9r RO Performs EOP-3 actions as directed by SRO I1,-

Task, Termination and prevention of injecto falF ytm
1.

CBJFW At less then 138 psig:

Refeed to level band OF -60 to -TAF

-77BOP Performs EOP-3 actions as directed by SRO.

  • termination and prevention of injec

~Ci~ticaiT.4ask1. LPCS

~Wca1 ask

2. LPCI initiation of ADS and verify 7 ADS av open SRO Enters EOP-3 and direct Blowdown once exced e t v.

4

~areas i

l Directs termination and prevention of injetion Of X

Syste

  • Directs initiation of ADS and verify 7 ADS vavs0e
  • Directs Refeed at 138 psig
  • Directs level band at -69 to -TAF Terminus:
  • Eop-8 actions initiated 44.4'

. ~SLC started R

Rod Insert commenced 4.'

~

  • RPV level lowered
  • ADS initiated
  • Level restored and stabilized44
  • Upn aprova of lead examiner 3/4 44.4 4! 44 'Ct'4 k

.4.444.

.4444*44..44.4.4.'4.

4 44 4

,44 44

.40 -

4 G

f ',

X12 4<4.44 444 4444<44.4 4 444

4.

4 4.

.444.

4.4 44 4 4.4 44. 4 4

444.4.4 44 444 4 4 4 4 4

4.

4 4 4.

'N

.



'*

D-2 Dynamic three 7/29/2002 ILTOI 014'



SWnuIafor'Scenario EXAM DATE_________

Simulator Opeitor Instructions......

.

'N,..-.'



7.jNjr,.N....N.

'1 Verify daily lamp test completed 2 Reset to IC 22 (Verify/Adjust Power to 27% with rods and to match turnover)

N.'N..

4 Place simulator n RUN

""

,.'..

3 LohelessonpIanjtit1iis scenario N...N 5 Sejecf the'FVVLC level instrument B and Verify the Startup level controller is set to 20



N "Zero "N.'.'.yNN N



Ot'A1ydruglIaIia1yL1 placed into Purge.

N N

N,'.

7. GC A Pump C/S PTh with an Info tag N..
8. Place HPCS in ooI-to Pool full flow test operation and place its OOS switch in OO

N" N

N N'

'N N.N N

N

9. Trnon and advance recorders N.'

v eriry roan set is at ouu Mwe

'N N.'

N.N' N'.NN..

A I I Verify die AR!PR selver is running and stablize Atb'PR N*NNN4.

12 Ensure CV Tank Level is hear 15 OR

.NN'..NN.

NNNN'.N N

N "N.

N NN.,.N..'., 'N...,N.,,.NNNNNN.N.A.

N.N.NN.N, NNNNNN

.N'NNNN

  • N.'NNN N' N.NN.N'

'N.NN'NN'N'.

VN N'. NNNN N.NN, N.

.NN NN.NNNN

,.'.N'NN

-"'.A'.

N... ;/'

N



13 flang UU tags perturnover N

'N'

4IN.

14 Identify T/S isde associated with OOS and turnover N 'N N'

N...N.N.

'.NNN'..'.N.,,'.N.

'-'N.

NNNNNNNNNNN N

'N

"'N N

-'N - 'N

N simulator'conditions mtch turnover 15 verity a

the

/

N'N

16. &PS 9000.09 marked up step 40, 12-21 at 16 N' *NNN.

N N...



.N.N'N 17'. Provide marked up CPS 3004.01 complete to 'tep 8 3 10'

Nk<.

'N N' N" NNSNNNN



<N N'N' N



N' N



N NN''N'





.""VN$*'

N N

..N N N, N N

N NN N N'.

,.N N,

N'NN'.NN',NN.'NN',

N..,

N N

'N

N N

N' N N

'IN N

NNN'NN N N.

N N

  • NNNN

'N.

'N' "N'.N N

N NNN>NN

'N NN'NNNN N'.

N' N

N N"

N N

NNNNN.NN,

,.'N' N

,',,.N

'N' N 'N

.,

'.N N

  • NN, N

N N

'N '.

N N N' 'N N ''

'N N

NN.

NA N

N

'*NN

NN'NNNNN N

N N N NN

, N.

N N NN N N N

,NNN N.

N NNN N'

1

'N' "N.

N.

'N",

N.N N

NNNNN N

N NN N

N N' N N N, N N"'

, ' N N

N' 'N'.,'

N

'N N

N N'

'N' N

A N

N' N.NNN N'

N N N N' NN N N

N.

N

'N N

'NNNN N

'N N

N N

N N N

N 'N N N

N N

N.

N N..

N N N N,,

N NNNNNNN N N N N N N 'N

'N N NN N

N,



N N

N N

N

N

N.

N.

N N NNN NNNNNNNN N.'

NNN NN

'

's'.

N N

N N

N N

N N

>NNN.NN

'

"N N"

'

NN N

N N

N N

N N N N

N N N

N N

'N N N N

N' N N

N

'N N

N N

N NN N

N N

N '.

N N

N N

N NN<,

N N N N

N

N' N N N

N N N N

N N

NNN N N

N N

NN,"'.

N

'N N.

N N N N

.

N.

N N

N' N' N

N N

N N N

N N1

N.

'N N N'

N.

'N N

N N

N

" N N

N N

N

~ 02, ynaicii Simulator Scenario three EXAM DATE: I. 2O

<Lho

' ii~enf ri~grs ad Role Play 1 MC-V transfer

-'Cx 6.

oie layas chemistry that sample is SAT on MC tank, a O

oC rd ae 2 Pulrodtorase power a No triggers nstartup with burnout in progress. Gang' isprisblbu otn dr i$1T

~3 Rd dif~soutard.

aN eoetiger 1 - When Rod 36-45 is being withdranfo psto 8to20.

b Noprobem ights at the RGDC or RCCs c RolePlay -Field operator reports no indications of problem at;ie HCI d RE 3 ran termal limits have not been approached orexed.

fcm'msarakdfoRd 36-4 the areto position 43 in.27 seconds, 29 in.65 secnds and 13 i

.3sod t90pi

e. '~ei~directed to scram the rod remove the drift malfntio h cii~ h e~n cint c~

therodandreport it completed. When asked accumulator N r~u~ s10 sgatrrdi K.-'-' ~~

4.

Ground

. ~

a.. Rmote riggr 2 on request from lead evaluator 2b Rol plyField Operator to locate the source of thegrudWIe dicedRkot brakr ndplace DG in MAINTENANCE c Repon asmaintenance to do ground location/isolation.

~N~N'

'"'K"'failure.

a reote'Trigger 3 on request from lead, evaluator b Role pay As field operator no indications locally that, woulexanfaiie.

~~fii~A" logged oil filter/bearing oil deficiency

'k<~iiie tigr4 on request from lead evaluator b Wath comuterpoint CBBA044 for temperature to rise t 8 FteiatvaetepnigF'

c. ~(le pay -Field Operator to turn the Cuno filter for theCJ1Apmanrpottdoeevehialm in.Suportstartup of the standby CB pump MoreEven~rigersand Role Play on the next page C14

D2 DynaicSimnulator Scenario three EXAM DATE 1920 Loo-7 PVlnstruiiiet lie fail~ife in the secondary containment a Rmoe rigger oreuest from lead evaluator..

he r t"'he X3printout is requested provide attachmn

~ Roe ply aspersonnel in th fiel (1) hn an oeratoris dsatche'd to the 781 East GaCotl unryeptththeraapartoava semleak.. You~ are unable to enter.

  • ~

Auto and Maiua scram failure a Triggrs -alread~y active b Perfor ening' act ions when requested STEP1 istrutorActions Already Active:

'K'

'K/K

'-A-KKK-K

I,," R C T O N YPE DEMAND VALUE RAM TIMI TIMEt ON 0F REM TRUE OVER false Initfial OG A

E O ur e OVER FalseI t

KK 0 0 4 1 2M A L F 2

X X X

A n a.I

~ g i

  • o r o s s P w ~r X

M TRUE:I-a;8 DW-VL MALF 19.00

_nitXal CX TLVL Co:

M ALF 3.65 IXiti C';,.,'---,,7::-^

s>.

!i a::f,:r,,_'S~'\\S...................-..^
x='r.,S6 K,

K K

K

K K 

K KKK 15

ULL-L-

i D-2, Dynamic Simulator Scenario three

'STEP 2, Rod drifts outward on remote 1 77INSTRUCTION TYPE DEM VAI ROD:3645-will drift MALF TR1 R

345-Single rod MALF TR Sca Vave PB on OVER TR IS~

3, HPCS System Ground on remote w

,-.s--,,

g.

i EXAM DATE: 7/29/2002

,LO 01:

./

AND LUE RAMP TIME DELAY TIME TIME ON OFFS. ;.......

COND

i S

.f NOT'..

UE UEPend 3

UE pe d 3

?e 2 bi

'3/4 ~

..,,:. l-,,

I INSTRUCTION TYPE DEMAND VALUE IT -T-I 1-I."-~

1 Io-RAMP TIME DELAY TIME TIME ON TIME-

.OFF COND

$062B HPCS System MALF 2

1 1

2 STEP 4, SSE level control failure on remote 3:

INSTRUCTION TYPE DEMAND RAMP DELAY TIME T

CO

_IVALUE TIME TIME ON

3FF M'OAGEWFV Fail to MALF 10.0%

-STEP'5 CEB pump "A" clogged oil filter/bearing oil def iciency on remote 4:

0 i

j I

Y INSTRCTION TYPE DEMAND VALUE RAMP TIME DELAY TIME TIME ON TIM OFI COND JA I lba Pmpbearing eff.

MALF 30%

6:00 4

6" 500-l, Clogged Oil MALF 2

4 009-31,PMS Alarm MALF 2

P 6

T 6PV Instrument line failure in the secondary containment on remote 5 INSTRUCTION TYPE DEMAND RAMP DELAY TIME T

CN C

NO0h VALUE TIME TIME ON 0FF PCl12-kef Leg Leak in MALF true 5

l P; I

.,- x.

U

.- v

-f,Zv

,i%,

I 'I..

....... I-,

C

' .

16

D-IDy~n~amic Simulator, Scenaothe EMOA 72IO LTOI3'-

STE 7,Peding Actin

]?SRJTO YE1EA4)RAMP DELAY T

`ETIME ON)NO VAUETIENIM O

OF YPRM(32) -

RE0`E

~

f00 Pxirn YP )

'ET(776)

RE RE*:~

23 en, J4 EP2O5 IV H20/PSTLOCA M YP REM(777) -

REM;TU-00-0

~

. ~

edn EP2 6- ~DI2 H20/PQT LOCA M YPXET750) -

REM'.TU.00 0

edn EP11-1NERT ROD 1

VP' )~EMJ48) -

RM TU 10 edn

~ ~?I1kX~SLGIC YP' XMT(749) -

RM TU005 0

edn tPIA-WILOGIC EI1QA-A.AND GRP 4(

IISLAION-<_____

D ynamic Simhulat-or S cepa r io tre EA AE72iO2r~l'-

.1-17 t

4KI AC'LRM

~<.

Attachm..t.1..

'17B8Es~

I 121 124C AlAM C-ZC.

612O~781tto121.......

~

~C 4 C~

C

'C..C....

Fa'cilitya>,.C I.'.

la, y

'~~~

Tu'rnover aa a.'*a..a.a\\a

~

a UiSu iRnestbevcrsstie to1eorbeke Mt-aa T

tI Even Maf N

Evet

.a.~

~-a-a..~

Eent s-No2Tp"t~snto I

A BP rosiuusult 7,.,,-.

-a-.a2

_______OP- __

f aa'

-P, 4>

..j

eni DScenario Outlne Scenai I~oFour Operating Test No.: NRC0101-4 4 ~

Nrratve ummary Event :

_Description 1 Te 80VAC unit sub I H is cross-tied to I I and its supply breaker is open to' sulp port 2.~~W Poe1wl be reduced with RR flow to support surveillance testing tRD ugh temperature requires the RO to insert the fully withdrawn rod to position 6.toA ro tortmto normal temperature CPS No. 3304.01.

An'SR opens requires entry to CPS 4009.01. The SRV shuts when the A' & §f Wsleo s

a removed. The ADS SRV is declared inoperable LCO acton5 A

d The SRV opening results in a loss of FW heating requiring power to bew FC pump trips the FC007, 8, 37 and 38 are required to be shut to islatee ii rturn flow paths to retain water in the upper containment pools. Enter'sOR'~5 jActijon 3.5.2 for Test Prep Switch in Test.

6.io A rFPT flow signal fails high resulting in mismatch in automatic control of e wofe ptnsThe RFPT will need to be placed in manual to stabilize level control.

V,8 Y instrument line fails resulting in a loss of one division of RP w

Tiwilresult in a coolant leak into the Drywell causing Dywlprsueidtiirai&

t16). A leak from the Drywell to the containment w prsueto rise requiring containment spray. The water from containmentspasilcae

'-~-.-'~an eectrcal aultthat results in a loss of one division of RPV water level inciain Ath~-

r lh s

and RPV pressure drops the remainder of the RPV instruRme I

sing and become non-functional resulting in a RPV level beig k

Tiwilrequire entry into EOP-2......

Insers a anua scram when the restricted zone is entered Iniit cotiment sprays IRP-V is flooded to the Main Steam lines Page2 of 2

~ t 2DynamicSimulator Scenario" four EXA AE~I92O LOO-Sfturnoerinforatonblems/Power4 Evolution.4

'.44.4ce4 power with.4 flow4*4444to444844 Is.4>44444 date of next surveilla444c4

  • ~Today Day-Shift erso.nnel who wil~>-4

.4

'~

Wether cnditinsalyzer>A4is4ou-

o.

ervice (Plantpower level)ons,4 problems,4..etc.

  • 5% Power/wer Freductieon@1 A

i narit en o

lfe is m onitoring4..4444.44.4.4444.44..4444.4.

S 4

~A Opd era Atins Even No(s:'

I I - 1 "I-,

A 3/4cdei

.~titn H

's;-ionsor~

v i

 . ',

  • W.

i

'iv',

I k'er UP'S JMIZ.U1, 4Z8UV L)istribution, Step MA.4 iphaseangle difference between the to o

  • C s The 480 V U nji~ ub l i I iI T ie B reaker
  • O p n t e 4 0 V nit S u b lI Z ain B re a k e r R Jo Montor re cto to~

n~ e o eraions rem ain w ithin established 1 to n

anid notifies the SRO of an usu 0'

SRO

  • En n~sope ati ns ae y ndu tedwithin the bounds of Tech Speces ao onsada anaprovd procedures.

I i"

> Id e r m i n s -:

hitS n.s o ¶.:

x r

6 e d w it

@ts 1O ~ C ni ai n fe e d e r o p e n S

7NOTES J'o;z 444"-

NW.

j

Oprao Ac

St ions Do~

PagpI f

M D ipion; &educe poipfr with fow.

Initiatiotn: Fo Iowng-rs ii ii u 7o I~-.

~

~

Tie Position.

4 Apjcn cons, orehvo BOP 0

16 qifies C emnistry andR of pcwrrdcin.

  • Ch PrkeOG Pre a SPf tretmntos--
  • Moii~i~p rector to einsure, pera tiop remaiwi~ salse ad "SoROi ot~ ro

~esa~tfe~~~SOo n nu~a ruepce T-, mi

,chyr.6 2K

.".~.

Temns R

Drc44~dcio

~

rio m~

N

~

Evno.(s:. -

Decipin CR1 tep ig 11Ini01tiain Folowing Recluce power wi Time Position Per CPS:3304.

RO Step 83.2 in BOP

  • Iispactc h fie 5Mntor re
X~~m X, lvtoi-to<--H\\r s, cot 4.-

,-S..L~conit,,ons...,5

_ -,X.

t four EXAM DATE: 7/29/2002 ILTOIOI-4

'N "N

<.55.' "'N..,

N, Operator Actions

-n2WII

. K.N N.

N N

.NNcN.5sK.5.N'C

N'S-.N""'NKNNN.,

5., 5..

N'....

.

I th flow, on the signal of lead examiner

'_ A Applicant's Actions or Behavior

,,,.;- S.;Na.

N';.-.i.gf 1, Control Rod Drive Hydraulics:

sert control rod to position 46 r

Id operator to RD temp recorder and the rod's WU' actor to ensure operations remain within established bar 1 room panels and notifies the SRO of any unusua `

I -SRO ircts at

  • nsures op Opeations Term nus ko ivth hgh~e~iipe at ions listed above.

erations are conducted within the bounds of Tech Spi standards and approved procedures.

re inserted to 46 and alarm cleared "SN"'.'.

5.51N N'..,.>.

'2.".,'

NNN N

'N'.N"'

KS S's N

.5  N"

'N N

'N N N..

N N N N N N N

N N

K..

N N

N N

N N N N N

N N

4

m Sfour EXAM DATE: 7/29/2002 Operator Actions IL.z I

\\

t.

P.age °...-,i0S;.

.;s 1ss

.izM- -6 Evenit No.(s)

~ Iiti~'~fl a~lfr~finphion th Cues:Ai~o q78L,5066-5B, alarme R

PCPS4 0:01, U

  • euc.flo to BOP er CPS:4009.0

'i ycle SRV huts SRV Pane 1fll1-P661:

solin A

ASolin S.O ;tr

,00

ndrec
  • Thiutesoerati4 Opertos stan, Term-n'i Clal0beyll ln ep SRV use ou reultig te SV gingSh e signal of lead examiner

~~..~..

.-.\\

.!g,

d Applicant's Actions or Behavioror0

)ss of Feedwater Heating:

maintain power 1, Inadvertently Opened SRV:

lB21FO41D C/S to Open then OFF on P601 and back by removing fuses at:

Aod - Bay-(B-A145), Fuse - (XF2),Device -

(B2p Aod - Bay-( B-A147), Fuse - (XF2),Device - (B21C-06V) oid - Bay (C-A145), Fuse - (XF2),Device - (B21 oid - Bay (C-A147), Fuse - (XF02),Device - (B21 5'.01, Loss of Feedwater Heating & 4009.01, Inadve nt actions listed above.

ions are conducted within the bounds of Tech Spees and JAW dards and approved procedures.

'RV IB2IF41D Inoperable and applies Techni ec ic 1

a-0CSR

  • 5>

'a,'

Na-a 5

.-a-.--a

.5555<

5.

nse from change in power level.

Ut and Technical Specification LCO 3.5.1 Acti I

.a

.-.e ':.'..-.'".:d?:.:..<;.::.

B.';.-:-'2t' ".'"-':'.'n'.-°2.-iL.--.'.t>q9=

-- K 5

?C CC C CC CC: :ZC 4 C CC C?

v:

CC Cyan o

iuaorSeai four CA C'.Ci i

C0' s

i f Evt4

,)C CC I:

7

=

DD ET

d u

EXAM DATE: 7/29/2002

--Operator Actions C.

-C--

- --C-C--

-C;C CC7 C

or

.S,

)

C C C C

z-Page 1

I of I

nitiatidh Afte e hs addressed SRV failure, on the signal of lead examiner CC ICE 5040-5F alarming C

~Tim PitolApplicant's Actions or BehaviorC BOP Per CPS 3317.01, Fuel Pool Cooling and Cleanup steps:

8 8.1.3.2 Isolate flow to upper containment pools per Section 8.1.4.13b efore-C c o n t in u in g o n w ith th is s e c tio n 8

79.1.4.13 CC C

.irect fi operator to route a CY hose per Section 8.1.4.12 Secure PC return flow from Containment pools by closing at least one of C

vCCalvves:

  • 0 1 F C O O 7 v C 0 0

, F C C nm t

O u tl t I n b d V l v. ( D iv 2 )

C C

OR

CCFC007, FCCCCCC 1EFC0080 FC Cnmt Outl t Outbd Vl v. (Div 1)

After lFC007/IFC008 are closed, then secure FC supply by closing at l o

C f>\\:o. wing valves:

C0 1FC 00 S F C037, FC Supp Cnm t Inbd Isol Vlv. (Div 2) 0 CXC C 1F 036, FC Supply Cnmt Outbd Isol Vlv. (Div 1)

O CC reac tor to ensure operations remain within established bane CCC CC C

C ~

ntos control room panels and notifies the SRO of any unusualorunexpect C

C CCn s

C o d t o s C CCCCtC\\CC C

S.

CR CQk iects actions listed above.

CCC C

E operations are conducted within the bounds of Operations standars CC-C CX CC 7proved procedures.

  • -t t-ermines that there is adequate upper pool level to satisfy Tech Spe.L 3

C Cf

C Cs C-C n o e n t r y t o A c t i o n A.1 I r e q u i r e d.

C 4; "Enters ORM 2.5.2 Action 3.5.2 for Test Prep Switch in Test.

CC -:0Contacts Shift Manager and recommends notifications.

CCC C ;

C C C CCC C CC CCCC C

C CCC ~ C5C C

  • C C C CCCCC CC C

CC C CCCC C,

C C

Cif\\

CCZ g

C C>C

C C

CCCCC C-CC CC SE...-.,,

C: C CC <CC C C C C C C C

b,-a.;=s f -A-.
-

n pper pool supply and return iso C C C C CC C

C C lated, SRO directed actions accordingly and R has CI C C C CCCCCCCC CCC C C C CCCC CC CCCC CCC CC <

CCC CCCCCC C 4CC-CC CCCCCCC x.'

.1 t.A 1 1.'.

1, 4.1.I

... I...........

.-~

4.

C:. ~

C~

C.z

,.~'!~,.

_ X "

.."BUN I

v,-,zIj-:,

in

2 rc o four n tiapton-nAt trp nth.

us Ctfhid alarmed ei <

C S5:0.;:2QRV N t?

i$<

Vs..
:*

L~agtoseand determ S < 000PT A into Tv BOP t

sGTAs e'--

'N Dscrptin:

~IF flw ipwt siga faitrls r

0
~~.

Initx

~

~

~BatiinAt'"

rpon the RO Per *~PS 402-2Q,0RV1

  • :::-~os an'etr

'.".lO '

l~rinsGT

'X

..is'.heildoe codtons.

Terinu.

~r hited to, A Man~ual, B on S EXAM DATE: 7/29/2002 LO

)perator Actions

'N...'.

signal of lead examiner Applicant's Actions or Behavioi Vater level Hi/Lo:

line RFPT A is operating erratil tanual to stabilize level control

. Alarm rator to the A RFP nsure operations remain within e m panels and notifies the SRO o' above.

-e conducted within the bounds a and approved procedures.

Abnormal RPV Level/Loss of TARTUP level control

-;..¢.,

"NNNN.-

N.NNNN.N N'N

N'

... N

'N N

N.

N N

N'

'N.j''

NNN N.

A

'N.

N, N\\N.,

N..N

<N N

N N N'

N

'N N

A.

N '

tnoy~icsmlo~ cnn four S-'A:.

. -x::',. Evet, (s)

---.vr EXAM DATE: 7/29/2002 Operator Actions ILT o1&.-4

- 11......-

Page3:

1 I' -

-3NN Np.

-N N N.''

N;

-'*

N..

3'-

De~crpt~o:Jnsrnninotlinfdire of 2'

NJ..>9.

D.t..,.

mer F 1iai:

for FWLC failure has been addressed, on the signal ofl e

C-2-2P alarming, radiation alarms, Drywell pressure rising S=

b.i, r

~T im Pfo osition Applicant's Actions or Behavior R

PerCPS'4008.01, Abnormal Coolant Flow:

  • On0 Rp;ump downshift verify entry to the Resticted Zone and s aM u PerCPS 4100 01, Reactor Scram:

o Pace mode switch in Shutdown O Checkand report power 1% and trending down Trip one RFPT when level is rising trip second RFPT OP perate to control level 3 to 8

-~

Chek rods, reports shutdown criteria is met eport level and pressure are following expected tends "Verify turbine and generator are tripped 0Staibilize pressure *1 065 psig Codinte wihBPoerator to monitor and control RPV level and pres 0- Ob es and reports loss of Division 1 Level indication

  • i~S 3302.0-1, Reactor Recirculation step 8.2.3 Shutdown RR p~~p nal~f

'Cq.. ooing BOP

1. Make S gts plant announcement for reactor scram m

plant announcement to evacuate the Containment.

Moniors Containment parameters

-ab rvsand reports loss of Division I Level indication

  • EOP1 actons/verifies automatic action upon Hi D/W pressure Autoati Islations

?rvnsLPCS and LPCI injection EQP-'6 actos

.N,?NN. 1202moitors started 3

N S mixers Mntr Containment parameters N'...

N....;



N NN.N..

.3.3..

NN NUTEN'~

. S:

- - I-. -I I- ; 1-I I-I.-. -I,, I Z...

N.....

N> A.

-N-

..3

-.-'N

'N.

NN N<

.. 5.

I.,

- 4 V,':.

t7,7

", :',

.1 NN'N.4N..N I

'N-....

8 N.--.

E 7

N k

Fe 2"f T'

A SRO Diect acTOPn1 istd abovse a

'v

"'g"-'-o"

  • Eters EPlndretteabvaton

'C-C-EntersOi n dircs h aoeactios

,nersCPR Pi tgr Qgoi andietthabv

  • nforces' OPS.expecttins d sadrs
  • esures pperatimos ar a

c dnducew~tin the bonsofTc psanl

~-

Operations s'tandards andiapprhived pi'oteu Termnus~

Recto is niiI1 camid, EOI?

n-fe-re'd RR hton

~;*

N CC'CC.CCC

.CCC-aC-

-C 4

u-i CY s~c.C

..4C'C m

C C

C-

D-2, Dynamic Simulator Scenario four EXAM DATE: 7/29/2002 Operator Actions Event No.(s):

8,9

==

Description:==

Loss of all RPV level instrumentation, Leak between the DW and Initiation: Upon initiation of Containment sprays and dropping RPV pressu Cues: SPDS, level indications not tracking Time Position Applicant's Actions or Beh RO Performs EOP actions as directed by SRO

.s Reports Containment pressure rising Injects with following to flood the MSLs CPS 4411.

  • Condensate/Condensate booster Coordinates with BOP operator to monitor and control NNN rIi-oioi-4 N-N-.NN.

-N..

  • NN'NVN
1.II.

. -111

_-111 I;

^

=

-. 11

-I, --.

1-,-

1,1,\\

Pagre- 'i'

.NANojfNN.7

' 'W 8ESiES r49^ B>-J i7e i -. g.gh

^

ire A-.

. I" ~

........ t NZ' N'" -..

lavior

..03 Injf looding Sourc-es->.'

I P lodn NNll N

N.-NN i

. -. 1

,

Mgk IMIA

BOP Initiates Containment Sprays CPS 3312.01, Residualep8.

Arm and depress both Cntmt Spray Pushbuttons INITIATES ADS, CPS 3101.01, ADS, step 8.2.2 Observes and reports 6 SRVs open Manually opens I SRV Shuts:

1. MSIV,
2. MSL drains
3. RCIC steam isolation valves

.B:

Injects with following to flood the MSLs CPS 44110ou

1. HPCS
2. LPCS
3.

LPCl

"\\.

.22.1.

'N.'-'.'

NN.

N. N. NA

.A N.N N

AN.'. N'-

N2tNN.N NNN 1.

N. 4AINN,.NA,.gWN

.NI N

NOTES 7

.7.

A NNNNNN*N'VN N-NA

.N.'N.N "

N.

N N

N N N

.N N

-'N N

N N

N N

N.

N.

N N.

N. N.NN.NN..N.N N.

N>

NN.

NA

-ANN-.

N

., N N.' N N'.

.N N

.NN.N N.

NN.N.NNN<NNN.

N NN.

N NN N

,N.NN.NN N

N N.

N

-N.

N N

A. N N N N N N N N N.

N N.

N.'

N N.

N N

N

'N NN.

N N

N. N N N. N N,

N N

N' N

NNNNN N NA N

N' N N N.

NN N N

. *N.

N INN' I

N.NN N. N.

N N.

N N

N N. N N

N.

N. N N N N. N.. N N

N N N NN N

N. N N.

N 10

2, Dynamic Simulator Scenano four EXAM DATE 7/29/2002 Event No.(s):

8,9 KK

' Time Position Applicant's Actions or Beh SRO Monitors Containment pressure approaching Figure Gu.i iD~

Y

1.

Initiate ADS, CPS 3101.01, ADS

2.

Determine 7 ADS/SRVs are open.

3.

Direct shutting the

MSIV, MSL drains RCIC steam isolation valves I

s

4.

Directs RPV injection to flood the MSLs CI with:

MDRFP Condensate/Condensate booster K

CRD

~;KK...

PCS LPCS LPCI lS,

5.

Monitors for indications of MSL flooded:

  • Acoustic Monitors activated
  • SRV/ADS Tail Pipe Temp lowers RPV pressure - 10 psig +
  • RPV pressure Sudden large + indicates solid
  • MSL -Flow Hi Flow dP SP Level + after initial drop
  • Drastic step changes on level
  • Fill Rate vs. Leak/Usage Rate General:

On transient, positions himself as command author Acknowledges immediate operator actions and dir

  • Enforces OPS expectations and standards.

Contacts Shift Manager and recommends notificat Terminus:

'K K

Containment sprays initiated ADS has been initiated MSLs, drains and RCIC steam isolated RPV Flooded to the MSLs K

  • Upon approval of lead examiner

. -..... 00 000;1 1 a for f

P

)e s, 8S:

u r~j e",,u

,to exeein V

-di t

i i

KnK 441.0

-S ai;

  • .f -LTOI-i4 KK*K

..K.

K K

'io diinsaemt

tynamic Simurator Scenario four EXAM DATE 1126/2002 tLTOO1-4





.,



.r.,V.Ž





4.

V.

)>CV.

r V.>



C-C..

V- *....A-.C....

C>,,



-C,



-. C-.--C'..

C -,

Ct.

'C

,.-CCCCCC.XCV.CC..-CCC

.CC>'CC

,C VV-CV-C' CC' C.CCCV'CCC.

V'

.C',-j

'C'*''CC,C.

.CC'.>.C-CV' CC..C.,,.



CC'CC' "C>.'. C>



A..

C' XV."" CCC.CCCj

,CCV'.C-'.C V.'".'

'< VCCA.

CCCCVC**

CC"

ŽC.,C'C'C.

.'.,CC.,.

V 

.CCV..

-CCC..,C'C'C CC'

'C'C'.'CCC' CCC.

... CC?-...

'C.

C'C"V'C'CV' C'.C'V.C..CCCC.

'.'-CC C>. -.

V.

.. V,...C.CV

.C' CC-.

VCCCCC..'C.C..-..'C CCC.'CC.'.'...C.C','.'..

"'C'.

C.'C'C-..CC C.XC C.' C'CCC-'VV C-C-rCCCCCCC'CCCC\\C-"',.'CC'C'CCCVNCC'CCCC CC'



VC...VC.'.C.V CCC



C C .,C'CC-

. C C.C., 'C CC, CCC

-

'CC,.CC.CC

.,C.C'CCC 

."'.C -C-CCCC'VC'



C *CC.'.C -

'C'"

CCC' '

.'C



C' CC.

C'-"'C.C"'

CC

. C.C..C C.

C'-'-

-CC-..'

CCC* CC.

CC'.C".C'

CCC C.C.'.,......

-C'..C.>VC C

'CCCC-C'

C' C.' *C,,;V.

C...CC-'-..C.C V..V'....-CC.

...'.-C;..'.

."'C-C

CC"...- g'V.L.'C..'..

.VC-C.VCC.

.,CV.C.CC.

V.C,..'

.VCC'C.

C)2CSC..1C'.VC>VC$C' C

....*



.>

C' CVC'C' C.>....

  • \\V',.

...."'s.C.V'CC,

..'C;V VC'.CC'VCCCCCCCC'

-CCCV.

CC

CV...CCCC.Cf

.AC'CC".

C

'.CCC.C 'C'C, 'C - C'V'.C-C' V...VC-C'.-

,C.C

'CC,.CCCC'CC CC

'V

'." C CC  .

CC-*'C'.C.

'.-CCVC '-&,' C C

"'C."C' CC..'

V.

" 'V'-C'

'CC-CCCC.C.C-C'

'*V'C'C C



C>'.-



,,'.VCVCCC'C

C C CV',C" CC' CCC

CCVC'

'CCC'" 

, C CC C'- 'C V'.,.C.'.C

.,'C.C..' "'.

CC, C*CCC-CCC V....

C-V'V.CC CU 

.. 'p'V.CC.*

'CC',C"C."CC'

'C",

C-C."'.'

C.-CC CC'"

"'V..CCC C.

,.'.CCX.CC,'.CC-..C...2CC...'...''CVCCCC'C V

C'.C'C'

CC.CC.

C.CC-.CC.'C C.

V."."

'C'

C.--. ' V - C

-CC CC' '..

.'.!.C.

'CC CC,CC.CC.C



'..-.C'.,.,C'..-'-

CCC".

'VC"

'C"' CC.

VCCCC.C.

'-CCC "C'".C'.C

"'CC\\' CC. 'C,'.

C>'

"C.C,"C'

.CC C.'.C.

CCCCCCCC'-CC.

'C C'..

C C

CCC C'.

C V C...'..,CC'.C'.

CVCC"'CC'..'C' CC..;C C'

'C C C -

C

'C

.CC'.'.V..,

C C,

CC-CCCC

C V

V C.CCCCCVCCC*CCCCC

  • C.

V.'

C..

C C CCC C

'CC-CC'

'CCC C

.

C C

V C

C C

C....

'C' CCCCCC.CCCC CC

C C

02?...-.

C C

'.C

V

'CC C

C C

CC

C.

C,,C CC C

C *CC

. C C

C" C

C C C

C' C '

C

C12 C

C V C C. C

b- bynamic SimuIator Scenario four EXAM DATE 7l20O2 ILTOIOI-4

-

.. a

'N."

Simulator iperator Inifrrns>..



""A'.

-cv' 3/4""

A" %. ..,.Th;.A'A.."

.. 4 A.

I idily

'A'



"kefio,

1mp test completed 90%

-

.

to to match turn6ver)



,N.'"'

A A

Load dWiv""

3 eesson lanfor this scenario

"'"'..?<''

"'

.z;.; 

4 Place simuljor in RUN.-v.



c,'v'..-

'A-c-cA"'..' "'-c

<N

.. A'..

"A.'

'"the YWLCfl1eve1insfrument 5 Select 6 OG Hydrog'ti analyzer A placed intoNMamial and Zero Purge

..J N.

A'"'*'

A 7 Pocumeni rod postioiona CPS 9000 O1D00

4

,

N 8

on and advance recorders 4'

'.4 A' r'

N'4"'

4 A':..



Verify the ARIPR server is running and stabilize ARAR

-c.

10. Hang 005 tags pr tumcArer



.

Ii IdentrfyTf ine a.sociated with OOS and turnover

"

s ocx

.4'

  • 0

\\

'.A'x--c AC

04 12 Verify sunu1a oiiditions match the turnover

.. '......





.A'(A....xA'...A'..

cv A4cA.-cN.A.-

N....-c..' -'A'

.. A..A."N.A.-*.cA'.



.'.'."""A-c1'. Provide cPS 3005 1

".,.j:



v'..

'.,..,..,.'.A' A"'....

.4.

y.

A"

.4'..4.

N.,

-c'

'A'.A.''

'C.

Kg.44'.4'4'4\\

4-

....,..4..

N

'c..N.

A.'.C4?..4'A.44

'-.4'.

4'

<'A "44.<NA" 4'N

.4N

A'4'N, N'"

-c4".'

4''. '.'."

A'.'.4.4

'4 "' I' Ni

..A.,.

44' N.'.

4' 4

.4.'.'

4 '

A.'AC.4'

'AN'.

A'.'4'.'.4'4.4.'.'.'

.2' 4'

4' 4 4'

C' C

A' c."

4' 44.-c'.....

4' "N

4

.2".'.

'A

\\A-c

4' 4"

A.



444'44..

.2

.4-N.

4' 4'

.4'.

4'

<'A N

.2". N "'

..4'..4'4'4.,4.44

.4 4',

N

'C

4.'

.4'

'.4',

4'

""4 "4

4'.

N 4'

4.4.,

4' C'

4' 4'

c.

4

'.'.



N



NN 4



44' 4'

4' 4

4 A 4' 4'

1A

"'44 4

4' 4

4' 4'

'4" 4'

.4

'4' 4'

4' 4

.4 4

A'.

4

yamcSimulator Scenario four EXAM DATE: 712912002 ITIO-EvnArigr and Role Play S.

2 Reucepwe with flow

~to intriggers46 NN N.NN.NN N.

a eoetrigger 1 onrqetfN la vlao b Rl lyFedoperatorth rond4-9isg 280 degtreesadrsign MAKE tSn o pobemsa IU

. afptb uoisert toa 46.

irce t epuld Dele'edshotly atemprardtsunsred tor 46,140-49 is droFptendngnow Reoetrigger 2 on request from lead evaluator When dietd Operateohrpnin R cotrl, MAK SUr is mnecfrcl dntfe u lipthe Cpul fuestha areum diretedtow bed ptrulled!

vtie c.SRV tailpipeltemperature isa 410hegreeis foral ea BIonlD all lighs n o temae si 4iitrfr AlwtheSRV ton shu by Nareovin the ma/Lfuntrioupon pulngbi st steCRRC fue 1a 6Rrnot trigger 4 on request from lead evaluator b olePay-ie operators an Overpl currente tro onis pumpn mtreiqumeolngWtr lw pprposlevel instrsetabl ti86'6"n.

ipothMC wit anC punaimpeshtdonadsatpatvte 6RPfwinpu signanfailo progresses~'N

a. i~emte Trigger whon requestefromblea evalator N

b."

kolePlayasieldpoperatorneau that threisaumll leakonsthae RF Vs:We IOetpiig

c. G~AR Rippe fondCh 91t Narro Raownge outL triped SresetGTR i1rqet i~nsrunint lne filur

y ic Simulator Scenario four EXAM DATE:T

":X;;

STEP 1, InstructorActions AlreadyActive:

INSRUCTION TYPE DEMAND RAMP DELAY TE CII C O NYE:

VALUE TIME iM

(

OFF E010,~t6-Arrm Rev Pwr REM TRUE Ita

- anan OVER false anal.

MImtal G A0ZERO Purge OVER False Initial Light 5130-5E OGH2 MALF 2

Initial AnDal.High or Loss Pwr A~.4, A

-p CNSTRUCTION

..;i.97..>.ii.

TYPE I DEMAND VALUE RAMP TIME DELAY TIME TIM TI CON", D OFFb!m xw 6G, CRD Temp MALF 2

j j 1

3 STEP 3,

SRV open on remote 2 INSTRUCTION TYPE DEMAND RAMP D

T E

CON])

NOTE VALUE TIME TIn4 N

F 1P#31) F041D ADS MALF 100%

10:00 1:00 2

V L V AIL(pen w4f OID Sol B REM 2

e 4

lI

-41DSoIB REM 1

P-Ped 4

1 41D Sol A REM TRUE P Fend 4

PIAO-F041D Sol B REM TRUE 1 1 Oend 15

Q-2, Dy namic Simulator Scenri fourEA

~t72 20 LOO-5 ~~~~~'

A '

9. a_.ef VY STEP 4, REP flow iptsgafiso eoe3.

N x.

T$NSTRUCTION TYEDMN APDLAY TIME o5N A

N11A M0AL 529 3I IA oC pump E

o m

3/4)'

N, N'

.

TION TYPE I I. ...... I--

'-'.DEMAND

-7VALUE:_Wl'-.

I.-

 z " '.I AAMP

.W.,  I I :T1,

DELAY

, TWI s ,.

 1 I-ITIME

7"

.I I I I

!,:. 7

1'11

p B trip -

MALE 1 > true <

I 1

0 15, ON i M

X' C

STP6Intuent line. failr onreoe-INTRCTION, TYPE DEf DRAM DEAYTME TMECO]

NT

}VLNE TIME TIM ONt OFF

9

-4714t. Line Ref.

L T

X tN7 Len

PR03,

'wRad.

RM i207.

Mn-chi

'2X@

' N P. 023-,,.,;W; R,-.i R--.

E-~

200.,

5-.

7.-. -..; ;

CON~moNA D-I

'NV



N N ECCS LOGINITATED

""

2-'

N.

'9."-

'NN..

9'"'

N.'..'

92-2-S Co N',

N

DA fo r

Em 0 ISRTIN TYPE

~

t~

IETi N

TIME'TM.O F

YPX)MALE(5)

AL 9.%>

B RR1`5B-TB1N0 YPXMAL-SE(559)

AF9,0 JYPXMALSE(5 52) -MAF 2.%_

RRi5t5B1-.N'073G

)TX AL 560_____

YPXMAL'SE(566)-MLF9.%

A'A 5R1SLB21-N40IC

'YPMSE(566 AL 0.0%B A

'RR-IS YPRR5AC.RR1AC MLF

~8%

-7

~-C4N'40CF LL-A-

XQNMTI-2~AAV'

D-2, Dynamic Simulator Scenario four EXAM DATE: 7/29/2002 IL.o..; 4 STEP 8 Division 2 Level Transmitter Failure on condition with a 00.25 de

? w -#-;s-r................

1.

r

-r 1

1f.r -v- -~~~ o -c= L 5XT :Z-< _Ssf I INSTRUCTION TYPE DEMAND VALUE RAMP TIME DELAY TIME TIN 01 4E ThT4E CO' NOTEf' N; ~

,1

0
0^-x:
E.4.

O:

D a\\<

X YPXMALSE(561)

MALF 0

=

j 81EtTB2 -N80BMALF 0 %m.

,t RR15-LTB21-

YXT21-NSE(5962)

MALF 0%

C 15N-LT B2 1 -NO80B R LVL X EFXMALSE(564)

RIR5PLTB21-NO81B XbLVLX.

MALF C9

~i~5QLTB21-NO91B YPMLE(6)-

MALF 10%

k~l~-LTB21-NO9IF PXMA0b -E(5

67)

MALF 0%

C 00B~-N1;MALF b %X

-LB..__.-.21-N40OF YIPXMALSE(568)-

MAF RRI 5T-LT B21 -N027 RNLVL XM YPR1A-R15BMALF 0%

C4N04BFW LVL YPRR15Z -RR15Z-MAF 0C B21-N017 tRX LVL XM__

f f i 12.

CONDITION C Containment spray STEP 9,Alarms and lights on condition with a 00:25 delay:

.. a.- -1r..

INST]

RUCTION TYPE DEMAND VALUE RAMP TIME DELAY TIME Thy RH D2 ATM CAL/GR OVER TRUE Statu lit 75065-8B, RH B OOS MALF 2

5-gC R C0 ALF 2
5
065-8C, RH C OOSML

~~~~M L

2 fE lI TM CNDNph 18

D2 mic Simulator Su ISF 10, Div 4 L6-eviIn

'rzitaii#

TIO VLEr TIM TIMF YPMAS(570)-

Ai 7

~ RRIV-LT 21-NO8OD YPYT~E 572)-

A Rl5Xr~r21-N073D AA YXMAL' E(571)

ML 8

R:15WLTB21 -

NQ73HRLVL XA YIPXMALS(573)-

Rk 15'-U2-NO81D ML 7

YPXMALE(557)

ML 6

A RR15-LrB1-N400EA NA' YPXALE(59)~

MALo RRILJT B2-044D

-AOfITION D RPV Prest rp o45pi

.AA-N-A

D2Dyamic Simulator P1, Pending FOP I.II.,

,,E TR 0.: 4 Pending 1 I~

05:O A11.~`~

TR T-;E j"

!.aW perandlis-eipaitment

A9.'AA9.'A K

A"-

IA AA*AAA-Appeiidix D AAA*AAA.AAAAA Scenario Outline A'AACA

-

A:A'A.

.. A A

AA

AQAA AAAAA AAAAAA

'A"'

"A AA'A

'A.,".

'A'.

A-A.,' AA



AAA,

\\A-A A

A

AAA Fai Clinton Power Station Scenario No.: Five Operating Test No C

,<~~~

.A. A 0-'

Ex~tni ers:

_____Operators Initial Conditions: 83% power, A OG hydrogen analyzer is out of service p

o servicealed mot bearing turniover:

PoWd>eascension to 90%

VThu g RD pump needs shutdown to support scheduled work acticv Ent Malf. No.

Event ven IType*

IDescijin 1

NA RO-R Raise power with flow 2

NA BOP-N Swap RD pumps 3

YACULO RO-C RWCU leak in the heat exchae 29 4

YAMSA BOP-C MC pump coupling fails A

VFP(16)

OVERRI RO-C Spurious start of RFP IC DE

.A.'9A.

6 ED02A BOP-C Loss of RAT A 7 EG05B M

GC pump trip/generator lockout A

EGO2 A.

8 -

HP13N M

SRV opens on pressure transi a

R105 M

RCIC flow system isolates 0

HP03 M

HPCS motor breaker trips

.RRO6 M

RR pump seals failure A

A A

AAAAA A A A'

A 9.

A A A A A A A A

A A A A A A

(A

'A A

AAAAA A

AAA.

AAA*AA*A

.' 'A

'AA.AAA AA

>AAA A" AA AA A

'A

'A A

AA' a~-'N~rnl, (R)eactivit, (I)

R.v'SUBWTTA COPY Instrument, (C)omponent, Page I of 2

( M a o

A E _

E _

X i

',, Af :

S:.

A.

A A

\\ '

A..S0 A

A AX A.-

.. A Ae A....................................

A..-

~~--~Appendix D

~Scenario Outline -.--

omE Scnro'o:Five Operating Test No.: NRC0101-5 P~rrtie ummary

<--'~>

-Eent

  1. Description

-'--'-'-~<-'~ 1 Ris racorpower with RR flow

2. T~

stndbyRD pump will be started up and therung imshtonospor

£out~e maitenace.

3ThRWUsystem developsamllek causing contaimr tarone ciiyt elevat requrigsWC.U shlUutown adisolation.

4. AMCpumpcouling fails results in thelo ssof makeup conure he tatupof hestandby pump.

9-

5.

Th RFP1C, which is standby, will spuriously start cuig' eedpipscto

'p~ueto significantly drop requiring this pump to be §huitdo' ndrmoe fo serice19stabilize the feed pump suction pressure.

~6. he RATwill become de-energized causing the safety biusedto-n-omenai-yede enrieupon transfer to the ERAT. The Containmnent IAk Il Shu duetth n~ometaryloss of power, and needs to be reopened. Tec& ia p~fc~o ctnA.1 entry required.

7. ~~e tinii GCpump will trip causing TG runback and generator ocntouet itena falueresulting in unit scram.

RP rssure will spike and a SRV will open and stay'open~p ieutn ma A Ont.

o fogsof RV inventory.

-9;<

~&1. RICwill isolate upon startup. When HPCS is streiiwl trip' A.,erirrn RP eve rops to th o-of-Active fuel requiring blolwdown" n fe t&Aoreorlee' abovthe op of active fuel.

11`R plp seals failure resulting in RPV level drop due to los's" ofinetr EmerencyDepressurize when RPV level reaches TAF

-9'

  • Fee to rstore level above TAF

'4

\\-

of 2

1) 2Dynaic iniulator Scenario five E)1MAI72922 LO6A

~j~f Tun~wr Iforation 4

~ Dayof wek andshift i...<

4-

'".* Tday~aShift 4

~

,...,.."""~~

'"v

  • ~~ ST~kMS conditions expected ~ h et2 or

~...-

~~ ~P~ant poeevel)

.. ?'7~K'A.;.

  • "4'8%2owr/2%

FCL A~C

~

~

O 1 tp8

~

~

=~ heria LiitProblems/Power Eouin 4

  • ?owe ascesion to 90%

4.i..

~> 'zistng'L~sdate of next surveilac

$SUrvelnce rmajor maintenance

.4 M..,

be taken44.

ou.t of'4 4'or quiep.

~

S 4..4..A' 44,4

.4.4analyzer is4 4out of se 4

4 of service failed 44 44:.

4.ionsC

.4..-

ble.4t

~;.

14 45,424 i's4 G reen4.4.A'A

'4.44'1~

~A F/D i

near.is end is monitoring

~'

~

F~'ijiii'4C OPY ae u fo eune osm lisi"mineaeo ao ln

DZ Dn~nic unuftorSceari fiv EXM DTE:7/29/2002 OprtrActions 4.l S4'Astep 8...-

BO

-rE"tmi Event No.(

Des io:

Raseperwihoworle,

<0 A:I: BP7nitiration: Folloing hf~~r.

Tu-v -e I oio

'1~pjat' Aotifins th Rais power wt low 0

V X,~trsoto rom paes n ntfist

.J

'..- 'N.

ir Behavi 16:

within D

SROc bounds es.

vel.

44.

ag 1

of 4' 4' 0

.44.

'"A of TehSes nX

'4,444.4'.

.4.4

.4

<".4.4,

'4'.'.. 4 4 44

1

.4.

4 4

44 4,..44,4 A.'

.4 4'

4 2

.4 4'4' N

.4

.4. 4.

.4 4 4'...4' 4 4

.4

.4 444 4

.4

.4' 4

4'.4 '4 

.4, 4

.4'

.4

4..

,' '!

'R"', i i i: -

I. 

S'.'

A

'N'42..A'.444.

"A 4'.

444.44; 4,

4 4'

'4.4 4.4

'4441/2'

.4.4,

.4 '4.

4'

'.44'.

44 '

." 4' "'



'4' 4

. ".4 4'

4.

44

'.4

4' 44

.4.

4 4 4' 4' 4'

  • 4.4.4

.4 4'.'

4 4

.4 4'

4*..

4 4'

.44.

.4 4 4'

4' 4.4'

4.

4

D2 Dnamc Siulaor Seirriofive Eve'flit (s

2 I

De o

ap p

Cs:

r Tgo ingt RO'4, "N

r Mofirect' fieldo

  • Str stadb C/s RO ;

Monitors reacto

.4~~ Rnurperatii Opofeeaions stan A'k.

4 tfre OPS e C Teftns Stadb RD edand EXAM DATE: 7/29/2002 Operator Actions S

Applicant's Actions or Behavior od Drive Hydraulics step 8.1.2:

rator to. perform supporting task RD Aux Oil Pump RD Pump' mp is running and Aux Oil Pump has autc CRD Pump or to ensure Operations remain within estat

)I room panels and notifies the SRO of an listed above.

ems are conducted within the bounds of Te dards and approved procedures.

xpectationss and standards.

.N N :. -.:.-..

Pa ei t.-.\\.

N I

o::,S r' unus'a or un ece ch Spec 'nd' "4

f0 S

"AN 4

I running pump shutdown r i

=

- --I -1 " -_1 -,, t_,_.-lv__

. ze;

.. g

.- y..<-:;

_..  -- _. - - _-._.-__-_._.1 I------ 11 I .

 I --

I--- .

 . -

  • N'N$(

A. 4' 4"' N '.4 N

N "N '4 "' 'CC

' C' "

4.4,44

-.4CN

'C "N

C-, 4,

6

466.66666

.66.

66.

,

6 46

+6664' 466.

.6.666,666.. 66666.

iD 2 Dynamic Simulator Scenario five 6

.666666..46..

666666

.66 66466666 44.6 6,.

.6 6

46.64.646A6&.46.666 6

6..

66 6

61/2446, 6,6.46,46 6.6.66666.6.6*.6.'6466.

66.

46 Event N)

-t 6 --.. 6 6 4 : 6 6 6 6 6.

66.666646.666

[ Description 6O}a66iin the heat exch

6 66.66 4.46

-

EXAM DATE: 7/29/2002 Operator Actions anger room Iio Rbe ution and on the signal of lead examiner XC k`ttfdifFeinfia annunciator, CAM alarming, and field reports

-646< 5.44566.6<665466 666 6, 6

.6  446 6.6.6 66

.666(.

666 6

I II   -

, ! -,,v,.

I J I 1,. o-Time

11 ofit Applicant's Actions or Behavior

-45.6<4

6

.66.66 I

RO IPer CPS5000-IF, REACTOR WATER CLEANUP DIFFERE Verify Automatic isolation ally isolate upon failure to isolate requires to:

Trip the pumps Shut the RWCU isolation valves

1.

G33-F001, RWCU. Suct Inbd Isol.

.2.

1G33-F004, RWCU Suct Outbd Isol.

3 IG33-F054, Pump Disch Outbd Isol.

.4.

G33-F053,-Pump Disch Inbd Isol.

5 1G33-F040, RWCU Inbd Rtn Isol.

6.

I1G33-F039, RWCU Outbd Rtn Isol.

J 7.

IG33-F101, Bot Hd Drn Suct.

Per C51.41, 5140.33, Containment CAM alert alarms:

ter CPS 4979.01, Abnormal Release Airborne Activity N aose leakage on RWCU

'.6*

56 666

.666.46.6 6

66 6

66.666 6.66

.6 6

66

.66.466.6 ILTO1OI-5 6

6 6.66466466 66.6>66666 64

$666 66 6.6:6.64

.6 446

.6 6 66.6 6.

6

.6 666 66

.6.64 66.4.6)...

.66,6.666

.6.6.

666" 66...6 6.. 44 6666;

.6.6.666.66666666.6 64.6:46..466:.;446.6.646.6.6..

  • 6;664.6.6.

Page 1

of I

.654646645.4,6666666.6666666.

,..6.j6664.6..46666 4.6.66 66664'..6 6,66.

666.64465.

64. 64 44 6. 6.6 666.6 6 44

.6.

,.t,.6.6' 6

64 6666 44666664466.464<

.64666' 46.666646,65.66.

66.6466.6.66.4.4 6 66 NTIAL FLOW HIGH.

'6'"'

66.66.66666.66,6466 666666.64.6

.6.

t..,46

.66.6646.666

.6666.6.4.64

.66.66.6665

)66 664.6 6.66.6'.6.6..6,.6..6666,.666666646666,6664666 66,6666666

  • ...6A445

66.66446 44.66 6.46.646.

6666.<4.6

.666,6.44<6 6666466. 6666

  • '66.-45... A

.666,6 6,66.

6..&66 6 44).

646 ished bands 6,6.

666.6666.6,6 unusual er6unexpected

.664.6.

6.6 6666.664.665.

I directs actions listed

.66.66 6,

666A64.66t66 6*66*6.

46466.66'.6 h Specs 6

64.6,66.6646466666 6, 46.66

.6.6.6666 4666 6.6.6,66666,.

6

'6 4.6

.6 6

6.6 6 6 6

r~

?~

  • C:'--,4 66..

66 6 6, BOP

5. 666 6<446 66 66:6

_epond to CAM alarms computer points 6 s~~ in diagnosing leakage on RWCU

~itrs reactor to ensure operations remain within establ oitrs control room panels and notifies the SRO of any itions..

  1. Y r

446,46.,

Y6.6,6.1 SRO I

Enters CPS 4979.01, CPS 4001.02 Automatic Isolation an(

_9vbe.

njiects isolation of RWCU.

operations are conducted within the bounds of Tec m Nrations standards and approved procedures.

nforees OPS expectations and standards.

ont Shift Manager and recommends notifications.

v. !

t t

Term-i"i---- RWCUQ slat

-I

6.

~

, ~j va ves closed

-~~~~

a;.>.

-;-,

Z.

- -%..

6 NOTES

6.

-6 :

66 66:

6.6 6

66.66 E

6 6

66 6, 6

6 6

6 6 6 D

D.6 6

6 6

6. 66

.6 66

.6

~6 66

6.

666.666 4

t..

6.6.C 666-e

.6 6 6

D 2 Dyami Siufaor ceario five EXAM DATE: 7/29/2002

-~

Operator Actions WVV In 0:

m.a Iit~

iTAA'e &W hs WCUislaiono the signal of lead examine Tiiu I~oitio Aplicant's Actions or i r

ing the discharge valve and reopen i Stat p hestandby pump

  • Shudownthe failed pump RO' Mo ors reactor to ensure operations remain w
  • Moitorsk control room panl anhoiie b rcond ctions.

-SRO.

listed above.

  • Enotce OPSexpectations and standards.

Manager and recommends notifil

"'m""

Termunns ktanb Pupsatdand shutdown of the failed pump D

0

.A<.

A A

7<



ILTOlOl 

"4 

p.

n X

.a NUFES'l

~>J~7 A

N.'

At V.. -

.'.

N

  • '

N'.-

-K N'

N.?',,

3'.

io-7s-I -'f

~-.,i~yamc imuatr cearo five EXAM DATE: 7/29/2002 IT'0-Operator Actions Evn N s)5Page 1

f

_7 I

C.

-e "

C'

"-Init' i olmp problem and on the signal of lead examiner Cues 5

-0M.iK Auo tat FP i C and 5002.04F Low pressure RFP suction-header"'

T Po n

Applicant's Actions or Behavior

.j0

2. I

-n RO' CPS 52002.04F Low pressure RFP suction header directs entry to CPS 40 01 a CPS 103.01,Feedwat, step 8.1.10.3&5toremovethen automatic startup capability:

  • P#' adhold the RFP I C STOP pushbutton
  • Prss te LOCKED pushbutton to shutdown the Aux. Oil Pum

-

  • kelasethe REP IC STOP pushbutton flOP :

Monitors reactor to ensure operations remain within established b3 Monitors control room panels and notifies the SRO of any u o

______________~

onit ons.

SRO

  • 0 n l;

'@5 ECPS 4002.01 and 3103.01, dirs t lis above.

Operaions standards and approved procedurs Enorces OPS expectations and standards.-

"i-Contacts Shift Manager and recommends notifications.

7 Teriu W.PIC an t

uilary Oil pump are shutdown and locked out X~~

'A

7'"S.-'-'-; :-

X S -

, S.

74

-'7,

,-','7E 0

'7"'

'-'_7'.

0 6

C"'

.4.4 14.4.4



.4.44 4-

-4

.4

-

"'4.4

.4NN.4 

44

'N



.4-..44-44



44.4.4

4'4

-.4.4 Do 2five Evn Ns:

Description", Loss-oflT n

Aftii a

of RFP 1 Cus:Nmerpl nAK~

ir along witl

... =

~

7 EXAM DATE: 7/29/2002 Operator Actions ILT0101-5 C.problem has been addressed, on the signal oi h 5003-SM alarming

~

.~~'..-..

.4-'

laam

_ LL:e lMie Position Applicant's Actions or Behavior BOP Perl'5003-5MOA 3:

A A005 IA Cnmt Iso ] mi

1S811A, 006S IA Cnmt Isol V

IA0; 07 7 D/W Isol 00lg, DGC C

sol Dw Vvol Pei CPS 3316.01, Containment Combustible Gas Control, step 8.3':

LVWY OPEN:

0 0

1CX088C, SSW CNMT Outbd IsoI VI I SX089B, SSW CNMT Inbd Isol Vlv
. r.:

X096, SSW CNMT Inbd ISO]v I ISX097B, SSW CNMIT Outbd ISO] VIv Places MOV Test Prep Switches into TEST 2StartCGCS Hydrogen Crmpr l B, IHG02CB.

4--

  • Record start time IAW CPS 9094.01 DOO I 3

erifyl1HGO09B, CGCSC CprlB Suct Vlvoes "``Verfyl1SX095B, SSW CGCSPm CIr Coil Outlt Vlvoes S~CU11NGDRY WELL BURPING I Sop CGCS Hydrogen Cmpr I B, I HG02CB.

  • Record stop t~ime lAW CPS 9094.01IDOOI 2

-- Vrify IHG009A(B), CGCS CmprIB Suct Vlv shuts.

-3"' Shu't/verify shut I SX095B3, SSW CGCS Rm Cir Coil OutlitVv PlcsMOV Test Prep Switches into NORMAL

.~,.4.4 PerPS 3317.01, Fuel Pool Cooling and Cleanup steps:

~;. ---c

~

81.32 Isolate flow to upper containment pools per Section 8.1.4.3bor

-C-niiug on with this section

~;8J.4.1.oprto route aCY hose per Section 8.1.4.12.

S~ecure Fretumn flow from Containment pools by closing at least one of iefllwn IFClOO7, FC Cnmt Outlt Inbd VIv. (Div 2)

  • 1E008,FC Cnmt Outit Outbd Vlv. (Div 1)

-.4:44-14-.44-

.4;'-

..4.4.4.

.4.-

.44

'.44.4

..44.444.4)4.4 S 4

4.44.444.4-4 4'

-.4.4.4 4

.4-'

W.'

N':

.4.4,

.4.4.4

.4.4 4

4

.4

.4

.4

.4

.4

.4

Ž4

.4-.4.4

.4.4

.4.4 4.4.4.4

.4 4.4.4

.4.4 4

.4

.4

.4.4

.4

.4

.4.4 4

-- : 7

.... 7.

I-..

°.

?.-.7.7.7

.7

Event Nso (s) 6--f-.o;l- > :<--

EXAM DATE: 7/29/2002 A

Posf Applicant's Actions or Behav BOPAfter

,1FCPO7/1FC008 are closed, then secure FC suppli

_fow~ing va ves:

A-C-0-37, FC Supp Cnmt Inbd Isol Vlv. (Div 2)

  • f '

=' 1 6rFC Supply Cnmt Outbd Isol Vlv. (Div 1)

Direc fied operator to investigate and support MCR acd Pe CPS 3404.01 Fuel HVAC step 8. 1, Restart VF Reportsi:;

VP chiller tripped

, 

, -

I



 in-1 s: Monitrs reactor to ensure operations remain within opnitgors control room panels and notifies the SRO 7-.;.

7. '

t S::^';;.5:i,-

........-=j..-... _

  • .7..

I 0 i,

7.

1,. - 7 M: e

,>:_, f. 7 _

SRO~

0Ent.'CPS4200.01, LOSS OF AC POWER directs actions

  • D RAT and secondary containment inoperabl ei-lipties with action statement(s) for T.S. Section 3 in one hour and A.2 to restore Operability in
n s OPS expectations and standards operations are conducted within the bounds pao standards and approved procedures.

thift Manager and recommends notificatioi ior y by closing at leas one of thel

:7 5 f ^RtC ie, 7.7.f.7 T:.

Lions established bands

if any unusualr nxctd:

i sted above e.

.8. 1, Action Aito copleteS 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of Tech Specs a lAW ris.

F operation, d..71 t::;"-

"::i-,

e,:

.:;Wa-e,.

.7..7A.7.EW, 7 ',,..,, ?,'>-

,,_i~=

A

  • 11

'-,.'_;"4,'.'=.'--5J

.7.

, I iced actions to restore V

'

,,- 1'. -

-1.

.7.7.7

.7.7.7

.7.7.7.7

.7





.7.7.7.7

.7.7'

.7

.7

.7.7.7

.7

.7

.7

.7

.7.7

.7.7.7.7

.7

.7

.7

.7

.7.7'.7..7A>.7.7

.7

.7.7

.7

.7<k.7

.7

.7.7

.7.7 "<-.7.7.7

.7.7.7

.7.7.7.7.7.7

<.'.7

.7

.7.7

..7[

.7.7.7.7.7.7.7.7.7

.7.7

.7

.7

.7.7.7.7

.7.7.7

.7

.7

  • .7.7,.7

.7.7

.7

.7

.7

.7.7

.7.7.7

.7.7

.7

.7.7

.7

<.7.7

.7.7, 2

.7.7.7.7.7.7

.7 8

a 'five EXAM DATE: 7/29/2002 Operator Actions Page 2 I,

or lockout and SRV opens on pressure transient and staysp i

o r trips a addressed, on the signal of lead examiner lockout, Scram and Group I isolation, RCIC isolates HPCS te Applicant's Actions or Behavior m, loss of Non Vital Busses ce mode switch in Shutdown

-ck and report power 1% and trending down port level and pressure are following expected trends rify turbine and generator are tripped bilize pressure <1065 psig with SRVs

)P/ON actions as directed by SRO

)rts SRV still open s both trains of SLC

inhibited when timers start iation of ADS verifies 7 valves open, CPS 3101.01, ADS ores to Level 3-8 with BOP operator to monitor and control RPV level and

)P/ON actions as directed by SRO es plant announcement for reactor scram and to evacuate cotn fy all rods in ttes/Verifies initiation of HPCS/RCIC UPS 5062-4B, HPCS MOTOR OVERCURRENT:

Direct field operator to investigate Attempt to restart HPCS eports trip of HPCS pump s up RCIC and report isolation PS4001.02, Automatic Isolation:

Verifies isolation Reports RCIC status startup startup matic Isolations s actions for stuck open SRV sthe Auxiliary seal injection pump rimize injection with LPCS, LPCI to restore RPV level above T S

03 ction/Flood Systems weith RO operator to monitor and control RPV level and pres

.11e,-

2M

,.'-Ž





I 7:7, 77

'-7S-9

ILT0l01 5 0

Directs entry into EOP-1 and actions as entry conditions are met.

  • Directs restoration of RPV level with HPCS and/or RCIC Contacts maintenance to investigate HPCS trip Directs a pressure band <1065 PSIG using SRVs Determines that level cannot be maintained above TAF directs:

Starts both trains of SLC May inhibit ADS when timers start based on plant conditions Maximize injection with LPCS, LPCI to restore RPV level above ACP 4411.03 Injection/Flood Systems Directs control level at Level 3-8 Directs entry into EOP-3 and actions as entry conditions are met Initiation of ADS, verifies 7 valves open, CPS 3101.01, ADS Directs entry into EOP-6 and actions as entry conditions are met:

1)

H202 monitors started

2)

Start H2 mixers

3)

Addresses need for DW cooling A'%

Lvd-A,---

-+-ier st-~Are

J 11.YUKVr,"1 JrI I I UA a Z tal LVU Enters CPS 4200.01, LOSS OF AC POWER directs actions listed above direct startup of the Auxiliary Seal Injection pump Enters 4100.01, Reactor Scram, directs actions listed above Enters 4009.01, Inadvertent Opened SRV, directs actions listed above IS iinitiated

, V level is recover above TAF level stable and under control in required band jet; Ojoiapproval of lead examiner N'-BAK?,

e g O T E :

iA a..........

i..',

10

D 2 Dynainic imuIator Scenario five EXAM DATE: 7/29/2b02 ILTOlOl 5 Simulator iperatur Instructions

'S.-.



<V.5





Setup

'1 Verify daIy lamp test conipleted

...,.,.

'-......

..

2 Ret to [C 3 (Verify/Adjust Power to 83% with rods and/or flow to match funiorer)

'5

,V- 5.

p1

.",,'....S Loadthesson an ivr LH1 scenario tn.. .,

4 4  ciniii1tor inRtiN

<...-..,5.'

.

5 Select the 13 FWLC level instrument S

S

,

<5,

.,

6.

GC pump sWitch to PTh and tagged

,.,

5..

A Hydrogen ahalyzer placed into Manual and Zero Purge 8 uxn.on and, advance recorders

'.5.,..,

,.. Veiify.th Al/PR server is running and stabilize AR/PR S.

ii Identify T/S ssues 

....

12 Vei4fysimui'ator 

match the turiiover t5Z55...Z$5.S.

5.......S%5,

.5>?

<-5.

.. 5..5<.

4





5S.S..,

,,5,13 r6 CP'S'

o9D;A:fj4



,.5,,....



V4<<5,,





emplete 14 Provide marked up CIPS 3005 01 complete to step 8 114...5 A

S 4?',...

S S .

4.1.

'55...

5?

A 5..

5,'5, A..

.5

.55...

.5.5-..-

4,AA..,A>47

.5.-

S 5?-;

.5

.5'-

55 A

'V

'-S.,,-

5

.

'7 S

,..,

.. A' 11

Scenario five

iS D

EXAM DAY Xi

,:.9.,

.!.;.'..E A;.?

t A..fin.'-."".i'

'I A<

0 'em Aft a.

A.

play As field operator, following alo n the IWDp ii system is primed, suction gauge is isoid ea in the heat exchanger room legTrigger 1 lay -NONE coupling fails, VERIFY THE MALFUNCeTINSO Bote trigger 3 on request from lead evaluato lay - MC coupling is failed and supprt p

0 make the pump appear its discharge valve is shut, F ne delay to establish normal MC pressure iutomatic startup ote Trigger 2 play - field operator support shutdowno.

e Trigger 4 on request from lead evaluat play - Call as Security that a lightening B su fproblem is at your end and maybe stormreat poninvestigation of P803, provide AflAC ET ien operators and EMs check the relay ho t

dicating a problem in the CPS Switchyard.

Nis report no obvious problems, they will he6d' ot PS, will request a relay expert, it will take 1J" t0 i20 er containment pool level is 826 ft 6 inches rFcted to check on the reason for the RAT SVCTbe riggers and Role Play on the next page Y-

-12

Dynamic Simu1ator'Scenario five EXAM flATh 7/29/2002 ILTOlbI S "N

<.NN...

'N CC pump

N'*"N

lockout

---

-





"enioie Trigger 5 onrequest froii lead eValuator

b. 'kole play As field oprator that the dC pump has a locked rotor shaft RAC"Cs l& 2 Prl1ghfisO&
.,.'.-)I:7':

,N

'N

-N-.-.-'.

8 SRV opens oii pressure transien open

.'N.NA' a

Trigger is automatic onSRY opiin u

directed to support closure of the SRV When pertorm the pending aflions

4'.

N N

- N -

..N NY N-z a





-

- N-9 KUIC 110W system isolates I

"--

a Trigger is automatic on ROTC startup

:k6le Play -A field operator RP assistance is needed to go m the room N

N N>1.

N - -

10 T4PCS nxaorNbreaker trips



.

N

-- j.

.- -N. -

aTiiggr is automatic on IW(% startup N NN

.NNNN.N-



2 Role Play As field operator there is an overcurrent PLAG on the braker the breaker has an oveiturrent trip flag the pump motor looks okay

-N;:-'

-..,-,-NN-I N

..N..

N. N-N N<NVNNNVNN-S NN N-*NNNNNN-.

NN...N .'N N.4.4 N.

NNN.

.

N.NNNN;;-N



ANNNNNNNN N.-N.".NN-V



NI N N N

N- NN 

N -N

'NNNN -.. NNNN NNYNN.NN.-.

NN N



N N

N *,N N.NVVNN;N NN NNNNNNN.N NNN N-I K'.NN'N NY -

N N NV, N

'NN'.- -

N N N IN N-N

.N..

-1 N N -

NN N-' N-*N'N-

'N I

N..'I" I'

N-N..N(.,,.N..

\\,I.<N.NNNNNC N

N N N N N-

,N N

N

N-N

.. NNNN.N4.NN N'

N'

-k N.-

N NN;N. N -

NNNNNIN..N'N.NN

.NN N N 1N N

,.-...NN..N,. I..,..'

N

'N-N -

N N N

'(N N.N

.

N

,I

'NN"N-

.NNN-.N

N

-NN''

'N.

ON' N'

'N1

N.

N NN tN. N.I.

N

'(N" NNN

N-I N N N

N N

N N -

N -

N. N N - N

-N -

N N -

  • N.

.>N, Z4.i.CN

-N..INNNNN..\\N NI.--

  • 'NNNNNNN -

NNN



N

'NN N-N'NN-N-NN.

NC.N-.N-N'.N'.

N-N .-NN-N' N.

N N. N- -

N N N N

N N-YNN N N.NN -

.NNNN,NN N'-

'.1.

YIN". -

N

-N N. N N-f'.N IN NNN.N,.

N

NI N'.- N' N'N N' -

IN-N-N NIN I.NN N N N N NN.N'N.N N-'

N'N.

N N--

N-N N N-

- -

N-INN

,N N

N N I N -

N-N N

'N NN N

.. N N'

'N NN N. I I N N

N -.

N.

Zr.--

'N N

I N N I -



N-N*

'N I

N N N N N N N N.

NN-N I

'N

N N-

N N-NN N-1

'N 1

1, N

N N -

N N

N N N1NN

N NN N X N N

-

N -

N

N N

N N

N

N-N N

N

,

N' N

N N'

N 1

N NNN N

N

  • N N N

N N

I N

-N N N N N

N- - N N

N NI

'N N

N N

N N

N I

N N

N N

N N

N N

N N -

I N N N

N N

N N N N N

  • N'

N N

.N' N

N'

N N-N' N 13 N

N N

IN N

N -

N



N..

N N

N N

N N

N N

N-N N N-N * - 1N -

N N -

N I

N N -

NNNNNIN

N N

N -

N

- N N

N N

N N

N. -

N N- - N

KD2, Dynamic Simulator Scenario five EXAM DATE: 7/29/02tT)0

'S~iEP 1,. Instructor Actions Already Active.-

.=,.

=

NINSTUCTION TYPE DEMAND RAMN DLYTIE TM CON]) NOE VALUE TIME TIE O

OF YP XMFTB(4103) -

MALF TRUE tal 0

HP03'- IJPCS Pump EG02-GEN Trip MALF TRUE A,

7 Cndr Tube Fouling Ht REM 100%A 7

R RIIC Sys Isol MALF TRUE B

-EG16-Arm Rev Pwr REM TRUE Initial e

Tri

-M WACKT SWS RED OVER TRUE LITIT 345 VOLTS LIT OVER TRUE I

500AAuto trip MALF 4

t1 7GPM Low MALF

.4 l

Initial CONDTION A-SCRAM CONDITON B - Startup of RCIC

~"'

  • '7:W~

STEP21,Instructor Actions Already Active.

STRUCTION TYPE DEMAND RAMP DELAY T1 TIM1 C

TE VALUE TIME To 5014-4B, Not fully MALF 4

nta 616sed CDS 7

7-

7:7: '-

7:7 7"-

7:

< -,Dynamic Sim'ulator Scenario five EXAM DATE: 7/2'9`/,20;02 LfIS E3, RWC.U leak in the heat exchanger room remote Trigger1

\\

TRUCTION TYPE DEMAND RAMP TIME TIM COND NOTE VALUE TIME TM ON OF 105, RWCU isol.

MALF TRUE 1

2 defeated RT eak between RIHX MALF

.1%

5:00 CA 01 CHI MALF 0.004 1:00

1:

CAMPO26 CH1 MALF

.07 1:00 I 1 2

CAMPRO28 CHI MALF

.06 1:00i 2

C 3

CHI MALF

.069 2:00 l

1 2

5000-iE blocked MALF 4

Iti I4, MC pump coupling fails remote Trigger 3:

INSTRUCTION TYPE DEMAND RAMP DEL TIM M

C VALUE TIME TM~~

F MC PpnB Sheared shaft MALF TRUE3 4

APEFF MALF 100%

Pend MC pEFF MALF 0

1:00 en 4

TE, REP IC Auto Start on remote Trigger 2

.3.

1..-1 _.;.,:..X

-.1!tU '. ;

.33..'..

3.

.2

f.

I I

I S

JCTUCTION A7 t

TYPE DEMAND VALUE RAMP TIME 5002(K, Auto Start MALF 1

RF1 CP; fOver true

.3.

DEI AY T M E T M E C ND N T TIM 014 OFF 1V'<0W':0X01't::-2 2

15

2,Dnic Simulator Scenario five E)

Soss of RAT remote Trigger 4._

(AM DATE: 7/2 I

'A\\

'

>N NSTRUCTION TYPE DEMAND RAMP D

T COND NOTE VALUE TIME TIE O

6F 1O-,A-NORTH BUS MALF TRUE 6

STEP_ 7:,

_GC pump trip/generator lockout on remote Trigger 5 j

.s.'.

_..: z: '

*1*

N-

'N*'

ITRCTION TYPE DEMAND VALUE RAMP TIME DELAY TIME

~TIM ON

TIME, 01*

COND

I LJ;.
3:; ;D EOBGC PpB trip MALF TRUE EGO2ENtrip f

MALF TRUE OQ:3 j=

f

SE8, SRVF051D So! B SW OPENon conditio

-1!-1q1---1-.--,-.--

->'A:S;;

-X 'N

I:

~-IINSTRUCTION 2w

.A

-I I

t.

r r

TYPE DEMAND VALUE RAMP TIME El

S-yr D~L4 TIIM

.. E.

,, Z ~

O FW17 COND NOT I HIP13N-F51C LLS MALF 55%

C A8 VALVE FAILURE Rl F51C LLS B REM 2 1 ld l

lN-l IP1NF5C LLS REM 1Pen'd VALV FALURE HP13-FO5 lLLS REM TRUE e

8 IC LLS REM FALSE Pend HtI1CN-FO51CLLS REM TRUE l

8 ALURE IP 14 5IC LLS VAV FAILURE REM FALSE 1en iT 8:'

at.,

j 4--z.

-__.___-__-L

__-_II___

i. ______I_'_ L'*

N I

I CONDITION C - Actuation of LLS for SRV N-N N '-.

S.-.-

-N' "N-N N

N

-

N

'N' 16

'N

'N..

N'

 

t)-2, Dynaniic Simulator Scenario five

XAM DA'tE 7I29f200L ITAQiO1-5

""'

NNN

'N



"N N.

N SitE linked

.,.,

N$

..NNN.

I'S',

seal failure to

%.

.

N IN7PIJTON TYPE AR PP A seal Al MALF s

t

~~~A sea]

2 SX N..NN.

RR0JB-RP eI2 MALF RRO6C-'RPB sea]IBI MU RR06D - kR P B seal B21 MALF SE ruc utor Actons IN;TRUCTION TYPE NAN 51 30-5EOGH2 MALF AnaHi"iho Loss Pwr STEP11,Loss of RAT srmT

'N N>

NN

----

i N

DEMAN VALOIE-g RAI TIME

.L... AY TI-~ME TiME ONw

-TIM O-.FF COND) 14I -,I.

i0o'c 100 50 1NN.

N A N,*N%.N.,NNNN VNNNNNN>

NNN

>NNN

'NN NN"N§s'<'..>,

yActzveJ,



N\\'NN N



N N N NNNNN'

N N'NN N'.'..>

N.NANNNNNNN NN'NN N.`.N.N.

N

-EAN I RM

.L...

I' 'l-

'Ci'-":

I.....-N.

.7-

-1 DELAY TMkE JIME ON 0'"r;, fi.

.m

... ITIME OFF C" a I

OND.?

~

NOTh

'N NN N N N

N Th.lse NN N N Initial N

N

.N.

N'.

N

'NNNN NNN.N.NNNNN



N..

N N

N, Initial

t

,  V,

  • ..XN'

~gger

 ',- : 1-Z.F.,

,,

f -

INSTUTO E:2ANOT BUS

'X 345K CODiTIONA N

,..",%.N>N.-V' N NNNN..

N N.

N N N N.

N Nj.

NNNNN NNNNN N A'

N..'

'N N

TYRE DEMAND RAMP DBLAY TIME IME CON]) NOTE VALUE TJ1YA'

TIME ON OFF N

MALF



A 6

NNA N.,NN'.N.N...

N N N/NA 

N N,

NNŽ.N

'N N

SCRAM N/NN 'N N.

N N N, N N

NN'N N

NN NN4' N,.'N NNN.'

N-N'N,

N.t.N

NN'NNN NN N

N N

N N

N N

NNNNNN N

NN N

N NN '..N N

N N

N' N

N N

N

.N.

N..;

N..N

.j.N, N

N'

N

'

N NN*N.

'N'NN

'N N

N N N

N "N

'N.

N

NN NN,

.NN

N.N N

N N N N N

NNN NN N N

N N..NN "NNN N N N

N' N

N N,

N N

N N

N NNN N

N N N N

N N

N NN N

N N N

N N N N N

N N

N N N.

N N N N N N

N N

N N

NN N

.'NN N

,N N N N N

N N

N N N N

N N N

N N N N N

N N

N.'

N



NN NN'N



N .

N N

N N

N N

N N N

N N N N

N N

N N N N,

N N

N N

N N

N N N N N

N N N N N

N N

N N

N N

N N

N N N

N N

N

.. \\""A" D-2 Dynamic Simulator Scenario five

-"'*.

flTOlOl-5 "EXAM t)ATE: 7i*i92OO2

.<3

.0 V

  • ATTrACHMENT 1

i1.. 9

-. 

l'aneliii3 P803 A PIS114)

I...?" 3/4""

C.-

0, C"

'C C".

F AUTO TRW.

ThIP/TROUBLE 1C"RP)I'ROUI3LI

TPTrROtE I11NE455 tlN454

LIN4s71 CC3*CII

<<3RLYSYS1

RtA
Ys1OFLOSS loss 34SRVURtAKER L1NE4335

4C"5 LINE4511 45i8

.

TftAIRC"rkI

TRANS1ER ThI?

TRANSFERTRI?

C C""

AUTO TRIP ISTARTIROUBLEI 3 I345IRlAIERI OSCILLOGIAPII I..L2J

'C ""C" C C.. C-



'""<C V"'..C

"C"C""

C"""

C tROUlL7E



""""3 V

4 345"'KVRAIcE

"s....

""""<""""

"""c "1 f"

ThA'W0?MER 422 9 -C



0,..-,.;"

C

"<"s TROUBLE N.""."

p.-".

C "3 "'4A".KV"CRAXR 345 KV IREAKk RELAYII0USE 4302 1JS

SUMP PIt

<3

""C



C".

-C

tROULE <3'" -

RIV" IISE CONT LOSS OF AC Loss o DC POWEI

POWER C"

6 345 ICy BREAKER 345 IV B1EAI(Ek 34"1..

34SKVSWVt)

""CCC"

-

.CC C

II C

C



AUXILIARIES I....

"n

.N".

C C C

C,,.

CC CC -

C C" "C



CC C

C "C C """

C. C "C

N C

C CC

- "

C C

C

"

'""C N

C C

CC".".C".".

".. C

<3 C-C

.. C N>N" C-C' "NC"".."CC-C C-C C-

-C-C-N CC "<C C'

' "<

C-"

N"" C C

CC C-C-"""".

C C-NCCCCNC-C.N

C CC-.-

C< --

C- "

C-CC-N" C

'C CCC C

C-N CCCC C C -

-

C-

  • "C.CC.C'. C""

C N. CC-".

N C C C N C-"

C C-C C

-C N

C' CCC..'

CC -.-

C-RN C-CC-C-C C

C-C -

C -

C C

C C C N -

CC C "C, C C C-N CC" C

C-CC C CC-C- -C C-C C

C C"N





C-"

""C,-..

"CC-C""

.CC-..CCC.

CC-C CC-C"-"

"C



C-C-

"..CCNC

-C

.

.. <3,C- 

C C -

C-C C-C"C- ""

C CC.,."'

C C

..

-C

C C -C-C C

""C-

C C..-C<..:CCC C-



C C ".-

C CC"...

C-C""

C-C" N

C" C

C-.".CC-3 C. N C

-.-"""

-

C" CCC C-N C-C-'

C-

-C C

C-N C C

C N

C

-C C-C C-C C

C-C C

C

.. C C

C C

1t

C C

C-

"CC C-C 10 C'

""C C

CNN



C CC C -

C C-C _

'N C

C -

C N

C C-

"C-C CC-" C C

C C

N

- C C C C-C C C C

C C

C