Low Temperature Overpressure Protection Final Report, Revision 1, Attachment 4
ML022950398
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/15/2002
From:
Enercon Services
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-02-0109 OPP1-REPT-001, Rev 1
Download: ML022950398 (109)


Text

Attachment 4 LIC-02-0109 Reference 10.3 FC06876, Rev. 0 "Performance of Low Temperature Overpressure Protection System Analyses Using RELAP5: Methodology Paper"

PERFORMANCE OF LOW TEMPERATURE OVERPRESSURE PROTECTION SYSTEM ANALYSES USING RELAP5 AT COMBUSTION ENGINEERING-TYPE PWRs METHODOLOGY PAPER 3/15/02 Enercon Services 302 Pendleton Way Oakland, Ca. 94563 510-632-1734 1

TABLE OF CONTENTS I.

INTRODUCTION AND PURPOSE 3

II.

OVERVIEW 4

III.

ANALYSIS CRITERIA 5

IV.

ACCEPTABILITY OF RELAP FOR LTOP ANALYSES 6

V.

DATA INPUTS 12 VI.

NRC LTOP ANALYSIS REQUIREMENTS 15 VII.

ANALYSIS DISCUSSION 17 VIII.

UNCERTAINTY AND THE LTOP SETPOINT CURVE 26 Ix.

CONCLUSIONS 29 X.

REFERENCES 30 2

I. INTRODUCTION AND PURPOSE The Low Temperature Overpressure Protection (LTOP) systems at nuclear power plants provide peak pressure protection for transients that may occur while the Reactor Coolant System (RCS) is at reduced temperatures. The LTOP systems at Combustion Engineering (CE) Pressurized Water Reactors (PWR) typically consist of Power Operated Relief Valves (PORVs) on the Pressurizer with a pressure setpoint that decreases from its full power value when the LTOP system is enabled. This setpoint change is achieved by either a step change to a constant LTOP PORV setpoint value, or is a variable function of RCS temperature in accordance with a LTOP setpoint curve. The PORV acts to relieve pressure should any transient cause a pressure rise approaching the limiting allowable Pressure/Temperature curve (P/T curve). In many cases, the existence of a steam void in the pressurizer is also credited for the LTOP function for certain scenarios. Some CE plants use a shutdown cooling system relief valve for the LTOP function; these plants are not covered by this methodology paper.

There are two main types of LTOP initiation events. The first is a mass addition event, such as a spurious Safety Injection (SI) signal. In this event, all enabled safety injection pumps are hypothesized to start and inject fluid into the RCS. The pressure will rise as the added water increases the density of fluid in the fixed-volume RCS. When the pressure reaches the PORV setpoint, there is an instrumentation and mechanical time delay before the PORV opens. It is necessary to demonstrate first that the time delay will not cause a pressure overshoot that exceeds the P/T curve, and second that the flow rate of the PORV under the given conditions is sufficient to relieve enough fluid to offset the injection rate and maintain or decrease the RCS pressure.

The second type of LTOP initiating event is termed a heat addition event. The limiting scenario is the startup of a Reactor Coolant Pump (RCP) while the Steam Generators (SGs) contain hot secondary fluid. This situation can result after the RCS is put on shutdown cooling and no RCS fluid is circulated through the SGs; hence there is no cooling mechanism for the SGs while there is for the majority of the RCS. When the RCP is started, there is heat added both from the pump itself and from heat transfer from the hot SG. The added heat to the fixed-volume RCS will result in a pressure rise. In this case, the PORVs may open and relieve the pressure. The initial heat input can be very large if there is no administrative restriction on the delta-T between the primary and secondary system. In some cases, it may be necessary to hypothesize a steam void in the pressurizer at the time of first RCP start. A steam void helps maintain a relatively constant RCS pressure (while the steam bubble collapses) over the first few minutes while the RCS and SG temperatures equilibrate.

This report discusses the methodology of analyzing these transients using the RELAP5/MOD 3.2 (RELAP) personal computer code. It uses the Fort Calhoun nuclear power plant as an example plant (Reference 4). The purpose of the report is to describe the methodology, the required assumptions, and the model sensitivities so that RELAP can be applied for safety-related LTOP system analyses at CE plants that use PORVs as the pressure relieving device.

3

II. OVERVIEW A RELAP model is created that represents the RCS up to the boundary of mass or heat injection, and to the boundary of mass relief (the PORV). Details of the modeling are described below. Every effort is made to assure that the model will be conservative in terms of predicting the peak pressure at the critical location. Sensitivity analyses are performed and described here to evaluate some of the modeling choices. Many of the other modeling conservative assumptions are taken from the NRC review of LTOP analyses performed by Combustion Engineering as described in Reference 1. These assumptions include a conservative decay heat, pressurizer heaters failed at full on power, conservative RCP heat addition, and the loss of shutdown cooling. These four assumptions, which cover all credible spurious heat sources, are applied to both the mass addition and heat addition cases.

In many cases, the plant operation is intentionally restricted for the purpose of LTOP. For example, at certain temperatures SI pumps can be intentionally disabled so that their spurious startup does not need to be considered. Similarly, the startup of the first RCP is not considered to be a credible spurious event, so plants can specify required conditions for the start of the first RCP, such as a minimum Pressurizer steam void or maximum primary to secondary temperature differential. When such plant restrictions are credited, the plant must have an assured method of satisfying the requirement, such as a governing Technical Specification. For example, Fort Calhoun Technical Specifications include limitations on minimum steam voids in the Pressurizer during the first RCP start, and on enabled High Pressure Safety Injection (HPSI) pumps at reduce RCS temperatures.

After the conservative RELAP model is created, mass addition and heat addition events can be simulated. Care is taken to select critical initial operating conditions to bound the worse cases in terms of peak pressure. Since the critical scenarios may not be known in advance, typically several different scenarios are proposed and evaluated throughout the LTOP enabled temperature range. The result of the scenario will be a peak pressure to be compared to the appropriate point on the P/T limit curve. The LTOP system is deemed adequate if all peak pressures are below the P/T limit.

For some plants that specify a required Pressurizer steam void to start the first RCP, the transient will be run for ten minutes only. During this time, the RCS and SG temperatures will equilibrate and the heat addition will be effectively mitigated. However, the conservative methodology assumes a continued net heat input (from the decay heat, RCP heat, and Pressurizer heaters). This would eventually need to be mitigated, but the mass addition scenarios, which also include the same net heat input, would bound the transient.

Uncertainty in instrumentation and component performance is modeled conservatively.

Unless otherwise described, a full bias due to uncertainty is applied to initial conditions and boundary conditions, for example, the maximum injection flow rate is used rather than a best estimate flow rate. For plants that use a variable LTOP PORV setpoint based on RCS temperature, the temperature and pressure errors are treated as described in Section VIII.

4

III. ANALYSIS CRITERIA The purpose of the LTOP system is to limit pressure transients to below the P/T curve.

P/T curves are developed in accordance with 1 OCFR50 Appendix G [Ref. 2] criteria based on Effective Full Power Years (EFPY) of Reactor Vessel operation. The P/T curves can be found in a plant's Technical Specifications or Pressure-Temperature Limitations Report (PTLR).

P/T curves are provided for both heatup and cooldown, and vary according to the heatup or cooldown rate. In general, it is possible to develop a composite P/T limit based on the maximum allowed heatup or cooldown rates. This composite curve is the minimum pressures allowed at the given RCS temperature for the maximum temperature change rates. For the purpose of the analysis, the curve is used without any uncertainty, i.e., it is the limiting actual pressure at the actual local temperature based on metallurgical concerns (see Figure 1).

Figure 1: Typical Composite PIT Limit Curve 3500 3000 S2500 S2000 I.

o.. 1500 n 1000 500 0

0 50 100 150 200 250 300 350 400 RCS Actual Temperature (F)

The P/T curve shown in Figure 1 may either be the pressure limit at the reactor vessel beltline, or it can be the pressure limit at the pressurizer. The reason for the latter approach is that only the Pressurizer is instrumented for pressure. When the P/T limit is based on the Pressurizer pressure, some conservative estimate must be made of the pressure difference between the location within the Pressurizer when pressure is measured, and the beltline Reactor Vessel pressure. This conservative pressure difference must include effects of elevation change and flow pressure drops under the maximum possible number of operating RCPs.

5

IV. ACCEPTABILITY OF RELAP FOR LTOP ANALYSES A typical Relap model is shown in Figures 2, 3, and 4. Figure 2 shows the nodalization in the core. Figure 3 shows the left hand loop of a CE-type PWR. This type of reactor has one left hand hot leg, and two left hand cold legs, but since conditions would be identical in both cold legs for all scenarios, they are grouped into a single path. Figure 4 shows the right hand loop with the pressurizer and separately modeled cold legs. It will be noted that this nodalization is less detailed than SBLOCA models, but it is sufficient for the relatively simple transients involved in LTOP analysis.

Figure 2: Typical Nodalization of the Reactor Vessel 150 From Active Core to Outlet Nozzles RELAP5/fvOD3.2 has the ability to model single phase and two-phase flow situations in both nuclear and non-nuclear systems. RELAP5/MOD3.2 uses a non-homogeneous and non-equilibrium calculation model that is based on six equations which represent mass, momentum and energy for both the liquid and vapor phases. Additional features allow inclusion of reactor point kinetics, control systems, pumps, pressurizers, steam separators, and various types of valves.

This version of the RELAP code is considered qualified for safety-related use under ENERCON's Quality Assurance Program. The associated V&V package that qualifies the code for general safety-related applications is on file in ENERCON's Atlanta office and is dated 2/19/98.

6

510 SG PIPE 220 (6N) (Steam Gen Tubes) secondary side water; heat addition only SNGLJUN 231 PIPE 240 SNGLJUN 211 Figure 3: Typical RELAP Schematic, CE Reference Plant, Left Side I

-i SNGLVOL 210 SNGLJUN 201 TMDPVOL 251 SNGLJUN 252 Double Pump Curve I.

I PIPE 260 BRANCH 100 PUMP I BRANCH 250 I ____________

I ____________

PIPE 200 (2N)

Each component defined by:

A - Area (ft)

L - # of nodes* Length (1t)

De - Hydraulic Diameter (ft)

Kf-Forward Loss Coefficient (unit-less)

Kr - Reverse Loss Coefficient (unit-less)

E - Elevation Change (Mi)

SNGLVOL 160 (Upper Head)

SNGLJUN 221 SNGLVOL 230 7

BRANCH 150 PIPE 130 (6N) Core SNGLJUN 121 SNGLVOL 120 (Plenum)

SNGLJUN Il1 ANNULUS 110 (Downcomer)

BRANCH 100 PIPE 260

TMDPVOL 430 VALVE 420 (PORV)

(PORV backpressure)

SNGLVOL 160 (Upper Head)

PIPE 410 6N (Pressurizer)

SNGLJUN 401 PIPE 400 Pigure 4: 1 ypical 1(_LAtf )clnemaaic, 1_L i~eiereucn Plant, Right Side 520 SG PIPE 320 (6N) (Steam Gen Tubes) secondary side water; heat addition only SNGLJUN 311 BRANCH 150 SNGLVOL 300 BRANCH 301 SNGLVOL 302 SNGLJUN 303 SINGLVOL 310 PIPE 130 (3N) Core SNGLJUN 121 SNGLVOL 120 (Plenum)

SNGLJUN 111 ANNULUS 110 (Downcomer)

BRANCH 100 Left:

Right (two):

PIPE 360 TMDPVOL 351 SNGLJUN 352 Single Pump Curve

.4 1

BRANCH 350 PUMP 2 TMDPVOL 381 SNGIUUN 382 Single Pump Curve PIPE 340 BRANCH 330

.4 PIPE 390 L

0 BRANCH 380 PUMP 3 PIPE 370 6

The RELAP5/MOD3.2 code currently qualified is specifically able to accurately predict the plant transient due to a Pressurized Thermal Shock event that actuates LTOP systems in Light Water Reactors. It is assumed that the operation of the LTOP system can be considered a "controlled" Small Break Loss of Coolant Accident (SBLOCA). This assumption is validated by the fact that a small break LOCA has been generally defined to include auo' loss of integrity/break in the PWR pressure boundary which has a break area of 0.5 ft or less. This range of break areas encompasses all small lines that penetrate the RCS pressure boundary including relief and safety valves, charging and letdown lines, drain lines and various instrumentation lines. Additionally, the initiator of the transient (a pressurized thermal shock) as well as the performance of the Pressurizer should be modeled accurately during the plant transient.

The RELAP code manual (in Volume 5 of Reference 3) provides abstracts of reference documentation that have shown the accuracy and capability of the RELAP code through its many years of use. Table 1 presents a list of abstracts that specifically identify the modeling of SBLOCAs, Pressurizers, and Pressurized Thermal Shock events.

Examination of Table 1 shows that some of the published work was performed using RELAP5/MOD2. It should be noted that RELAP5/MOD3 was produced by improving and extending the modeling base that was established with the release of RELAP5/MOD2 in 1985. Code deficiencies identified by members of the International Code Assessment and Applications Program (ICAP) through assessment calculations were noted, prioritized, and subsequently addressed. Consequently, several new models, improvements to existing models and user conveniences were added to RELAP5/MOD2 to make MOD3 of the code. The RELAP5 code manual has a detailed list of some of these features and improvements that have been made to RELAP5/MOD2 and incorporated as RELAP5/MOD3.

Based upon the numerous publications that show the use of the RELAP5/MOD3.2 code for use in SBLOCA analysis, Pressurizer response analysis, and Pressurized Thermal Shock analysis it is deemed acceptable to use the RELAP5/MOD3.2 computer code for use in LTOP system analysis.

9

Table 1: List Of Selected Publications From NUREG/CR-5535, Volume 5, Revision 4

[Ref. 3] that show RELAP Modeling Of SBLOCA And Pressurizer Operations SBLOCA References

1.

Adams, J.P, et. al., 1986, "Numerical Simulation of PWR Response to a Small Break LOCA with Reactor Coolant Pumps Operating",

4th International Symposium on Multi-Phase Transport and Particulate Phenomena, Miami Beach, Florida, December 1986, EGG-M-32686

2.

Ardron, K.H., and P.C. Hall, 1988, "UK Experience with RELAP5MOD2," 15 th Water Reactor Safety Information Meeting, Gaithersburg, Maryland, October 26, 1987, February, Central Electricity Generating Board, Gloucester, England

3.

Babcock & Wilcox Owner's Group Analysis Committee, 1986, RELAP5/MOD2 Benchmark of OTIS Feed and Bleed Test #220899, BAW-1903, March

4.

Choi, H.R., et. al., 1988, "Impact of Safety Injection Flow Rate on Small Break LOCA Behavior." Third International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations, Seoul, Korea, November 1988, Korea Advanced Energy Research Institute

5.

Fletcher, C.D., and C.M. Kullberg, 1985, Break Spectrum Analysis for Small Break Loss-of-Coolant Accidents in a RESAR-3S Plant, NUREG/CR-43 84, EGG 2416, September

6.

Gloudemans, J.R., 1991, Multiloop Integral System Test (MIST): Final Report, Vol. I: Summary of Key Results, NUREG/CR-5395, April

7.

Hall, P.C., and G. Brown, 1986, RELAP5/MOD2 Calculations of OECD-LOFT Test LP-SB-01, GD\\PE-N\\544, November, Central Electricity Generating Board, Barnwood, United Kingdom

8.

Loomis, G.G., and J.E. Streit, 1985, Results of Semiscale MOD-2C Small-Break (5%) Loss-of-Coolant Accident Experiments S-LH-1 and S-LH-2, NUREG/CR 4438, EGG-2424, November

9.

Makowitz, H. and W.H. Gray, 1987, "Investigation of Time Step Insensitivity for RELAP5/MOD2 SBLOCA Simulations," Transactions of the American Nuclear Society, 55, pp.363-364

10.

Yuann, R.Y., K.S. Liang, and J.L. Jacobson, 1987, RELAP5/MOD2 Assessment Using Semiscale Experiments S-NH-1 and S-LH-2, NUREG/CR-5010, EGG 2520, October 10

Table 1 (continued): List Of Selected Publications From NUREG/CR-5535, Volume 5, Revision 4 [Ref. 3] that show RELAP Modeling Of SBLOCA And Pressurizer Operations Pressurizer Operations References

1.

Wang, S., C. Wu, and J. Wang, 1987, "Assessment of the RETRAN02/MOD3 and RELAP5/MOD2 Pressurizer Model," Transactions of the American Nuclear Society, November, pp. 704-705

2.

Lin, J.C., et. al., 1985 "RELAP5[MOD2 Pressurizer Modeling," ASME Winter Meeting, New Orleans, LA, December 1984 Pressurized Thermal Shock References

1.

Bolander, M.A., et. al., 1984, "RELAP5 Thermal-Hydraulic Analyses of Overcooling Sequences in a Pressurized Water Reactor, "International Meeting on Thermal Nuclear Reactor Safety, Karlsruhe, Federal Republic of Germany, September 1984, KFK-3880/1, pp. 311-319

2.

Fletcher, C.D., et. al., 1985, RELAP5 Thermal-HydraulicAnalyses of Pressurized Thermal Shock Sequences for the H.B. Robinson Unit Pressurized Water Reactor, NUREG/CR-3977, EGG-2341, April

3.

Fletcher, C.D., et. al., 1985, RELAP5 Thermal-Hydraulic Analyses of Overcooling Sequences for the H.B. Robinson Unit 2 Pressurized Thermal Shock Study, NUREG/CR-3935, EGG-2335, May

4.

Tuomisto, H., 1987, Thermal-Hydrualics of the Loviisa Reactor Pressure Vessel Overcooling Transients, June, Imatran Voima Oy, Helsinki, Findland

5.

Tuomisto, H., et. al.,1986, "Thermal Hydraulic Analyses of Selected Overcooling Transients in the Probabilistic PTS Study of the Loviisa Reactor Pressure Vessel,"

European Nuclear Conference '86 Tranactions, Geneva, Switzerland, June 1986, Technical Research Centere of Finland 11

V.

DATA INPUTS The RELAP input deck model of the plant RCS is a series of data, for example, pipe lengths, pipe diameters, pump flow rates, etc. All data inputs must be from a verified, quality source, or must be bounded by a value that is known to be conservative. A list of sample required input data and a discussion of the direction of conservatism is provided in Table 2. In the application of this methodology, each datum must also have an accompanying reference source or development discussion. Additional discussion for key data sensitivities is provided in sections VI and VII.

Table 2: Inputs Assumed for the LTOP Analysis Name Direction of conservatism Mass and Energy Sources Use the maximum (licensed value plus 2%) to maximize the heat addition from decay heat.

Use a conservative model to maximize the heat. An acceptable model is the ANS 1971 Std. The decay heat should be increased Decay Heat by an additional 20%, unless specific documentation is provided to assure the utilitized decay heat is bounding and conservative.

RCP Heat Input Use the maximum to increase heat addition to the RCS.

Use the maximum expected temperature difference between the RCS and SG secondary and primary side. A bounding value is to use the Temperatures for maximum secondary side temperature at the time of shutdown heat addition cases cooling initiation, and the minimum RCS temperature for which a RCP may be started. Any lower temperature difference must be justified and administratively controlled Use the maximum for heat addition cases to maximize the heat SGrfHea Trean added from the warmer secondary side to the RCS (do not use Surface Area for mass addition).

Use the maximum for heat addition (either zero tube plugging or SG number of tubes current level), minimum for mass addition (maximum permissible tube plugging level). For the former case, the and tube volumes maximum increases heat addition. For the latter case, the minimum reduces RCS volume.

Use nominal tube thickness, conductivity, and heat capacity. For heat addition cases, heat flows from the secondary to the RCS SG tube thickness, through the tubes. For mass addition events, the tubes are heat capacity and modeled as insulated to prevent the secondary from acting like a conductivity heat sink and removing RCS energy. In both cases, small variations in these parameters are insignificant due to the small total thermal inertia and heat flow resistance.

Pressurizer Heaters Use the maximum power for heaters plus backup heaters to maximize heat addition to the RCS.

12

Name Direction of conservatism Use the maximum pump flow rates. If a maximum has not been specified in previous plant safety analyses, the design flow rate Injection Flow Rate plus 10% can be used or surveillance test data plus uncertainty.

The maximum number of enabled pumps allowed by plant Technical Specifications or other limitations must be assumed.

PORV Data Since RELAP5 uses its own flow equations for PORV flow rate, and since these equations tend to be more realistic and less conservative than typical Relief Valve sizing equations, the PORV Area actual PORV area should not be used. Instead, the RELAP program should be run to generate a valve area that provides the design flow rate. Typically, this will be on the order of 75% of the actual valve area (see Section VII).

Use the maximum delay time. Unless quality data exists for PORV flow at partial opening, assume that the PORV remains PORV Opening completely closed until the full delay time (circuitry and Time mechanical) has passed. Then either model the PORV as instantly full open, or ramped open quickly (see Section VII to understand why the ramped model might be selected).

Appropriate temperatures, such as the LTOP enable temperature or HPSI pump enable temperatures, must be adjusted by the temperature uncertainty. For plants that use variable PORV Uncertainty un LTOP setpoints based on RCS temperature, the LTOP setpoint Temperature must be offset as described in Section VIII. The temperature Measurement uncertainty used must be calculated by a standard instrument uncertainty method such as the square root of the sum of the squares.

The LTOP setpoint must be offset as described in Section VIII.

Unesrtay iThe pressure uncertainty used must be calculated by a standard Pressure instrument uncertainty method such as the square root of the sum of the squares.

The PORV setpoint is generally based on Pressurizer pressure.

The RELAP model uses the minimum pressure to delay PORV Location of opening. The minimum pressure is the midpoint pressure of the Measured Pressure top element. If this elevation is below the actual PORV pressure tap, a non-conservatism caused by elevation difference must be identified in the LTOP analysis write up.

For plants that use a variable LTOP setpoint based on RCS Location of temperature, the analysis will conservatively use the warmest Measured appropriate location to determine PORV lift setpoint (for Temperature example, if the temperature is measured in the cold leg, the warmest RELAP cold leg segment will be used).

13

Name Direction of conservatism Quench Tank Use a conservative maximum Quench Tank pressure for use in Maximum calculating PORV flow rates for cases where the PORV flow is Backpressure for not critical flow.

PORV Miscellaneous Data Use the minimum volumes for the RCS to maximize the relative effect of energy and mass addition. The only exception is for heat addition cases in the steam generators, where the RCS fluid Vessel Sections is initially hot. These should use maximum volumes to increase the heat addition when the RCP is started.

RCS piping resistances should be maximized between the reactor vessel beltline and the pressurizer, in order to maximize Piping Flow the pressure at the critical location relative to the pressure that is Resistance utilized to determine the PORV opening point. Piping resistances should be best-estimate or minimized elsewhere to maximize the RCS flow rate (see also pump head discussion below).

In general, cooler injection flows involve greater mass, but SI injection warmer flows involve greater energy. Unless a bounding value is Temperature, determined by sensitivity analyses, use a maximum T & P to Pressure and Density determine the injection enthalpy, and a minimum T & maximum P to determine the density.

When available, the RCP design homologous curves can be utilized to determine fluid acceleration for heat addition cases.

Conservatism is assured by using a fast time for pump speed RCP performance (such as 1 second to go from 0 rpm to full speed rpm). When imposing the ramp rate as suggested, it is not necessary to model RCP motor torque.

Use a conservative maximum, such as 10% greater than design head, to increase the pressure difference between the reactor vessel beltline and the pressurizer. Note: the model requires a RCP rated head and conservatively high RCS piping resistance between the beltline flow and the pressurizer. Therefore it may be necessary to increase the RCP head even greater than this value to get a desired high RCS flow rate.

Use a maximum uncertainty when specifying the required Pressurizer Level indicated Pressurizer level to satisfy the analytically assumed Indication level, e.g., if the analysis assumes a minimum 40% steam void, Uncertainty the Technical Specification or other operational limit must specify a required indicated void of 40% plus uncertainty.

If Operator Actions are required to mitigate the LTOP transient, Operator Actions these actions must be documented and assured consistent with operator actions credited in UFSAR Accident Analyses.

The single failure for LTOP is typically failure of one PORV to Single Failure open on a two-PORV pressurizer. Other single failures should be considered based on case-by-case review of plant designs.

14

VI.

NRC LTOP ANALYSIS REQUIREMENTS The Combustion Engineering Owners Group (CEOG) produced Report CE NPSD-683 A, Rev. 6, which defined the methodology to be used in LTOP analyses such as this. The NRC's review and approval of this document is a letter dated 3/16/2001 entitled "Safety Evaluation of Topical Report CE NPSD-683-A, Rev. 6, Development of a RCS Pressure and Temperature Limits Report (PTLR) for the Removal of P/T Limits and LTOP Requirements from the Technical Specifications" (TAC No. MA9561) [Ref. 1]. The NRC document stipulates the following requirements for LTOP analyses performed in accordance with the CEOG Report. The ENERCON RELAP LTOP methodology meets all of the subject requirements, with certain explanations as noted here.

1. Initial conditions are the most limiting allowed by Technical Specifications.

ENERCON applies instrument uncertainties to assure conservatism in the initial conditions. For example, if the Technical Specification requires that the RCS temperature be at least 250'F to enable 2 HPSIs, ENERCON assumes 2 HPSIs may be enabled at 250'F minus RCS indicated temperature uncertainty.

2. Only one (1) PORV is credited with opening. The RELAP model only includes one PORV
3. No credit is taken for letdown, RCS volume expansion, or RCS metal thermal inertia. The RELAP model has no letdown flow path, no change in component volumes, and no thermal heat sinks.
4. Water-solid conditions in the PZR are assumed unless Technical Specifications exist to require a steam or other gas volume. ENERCON sets the model's initial conditions consistent with this guideline.
5. Full Pressurizer heaters capacity must be assumed. The RELAP model contains a heat slab component that provides the appropriate heat to the pressurizer water.
6. Decay heat must be accounted for, with the maximum specified cooldown rate used to determine the time after shutdown. ENERCON uses a conservatively minimal time to calculate decay heat, and then increases the value by 20% unless site documentation exists to assure an adequately conservative decay heat without this addition. The RELAP model contains a heat slab component that provides the appropriate heat to the reactor core water.
7. PORV setpoint uncertainty must be treated consistent with RG 1.105 and ISA Standard S67.04-1994. The analysis LTOP setpoint(s) is(are) protected by biasing the field setpoints to account for measurement uncertainty as described in Section VIII The bias amount is based on plant documentation that calculates the appropriate uncertainties consistent with RG 1.105 and ISA Standard S67.04 1994.
8. The mass-addition event is based on the maximum combined flow rate from HPSI pumps and charging pumps, where the flow rates are either the design flows plus 10% or flows based on IST with uncertainty or Safety Analysis limits. The RELAP model uses conservative injection flow rates consistent with this requirement.
9. If a Safety Injection Tank is available to inject fluid, it must be considered as a mass source. The reference plant did not have Safety Injection Tanks that would 15

impact the LTOP scenarios, so they did not appear in this sample model. If such a system is important to the scenario, the RELAP model will include the tanks as additionalfluid sources.

16

VII.

ANALYSIS DISCUSSIONS Discussion is provided here for various sensitivities and how they have been conservatively addressed.

The Shutdown Cooling System, Decay Heat and Pressurizer Heaters For both mass addition and heat addition cases, at the time of assumed transient initiation (typically 2 to 10 seconds into the scenario to allow for steady-state equilibrium to be established), it is assumed that there is a sudden failing of the shutdown cooling system coincident with a sudden failure (on) of the pressurizer heaters and backup heaters. In addition to these heat sources, heat is added for each operating RCP. Heat is added to the fluid at a constant MW rate by RELAP "heat slab" components.

The NRC identified that the decay heat should be added to the analysis as an additional conservatism. The decay heat is based on the fastest allowable time to the scenario's initial RCS temperature using the formula:

Time = (Hot zero power temperature - scenario initial T)/(fastest cooldown rate)

Typically, this is done just for the maximum scenario initial T. The decay heat is then calculated using a conservative model, such as the ANS 1971 standard, and then increased by 20%.

Note: ENERCON has not had any occasion to vary from this conservative approach, but it is noted that the 1971 standard plus 20% decay heat is more conservative than required by Reference 1. Therefore, ENERCON reserves the right to decrease this conservatism with a case-by-case justification.

The impacts of this conservatism can be seen by a trial case. Reference 4 includes a base case model based on a reference CE plant labeled m8Obas. The peak pressure with all model conservatisms for a mass addition event is calculated to be 490.25 psia, as shown in the below Figure 5. Sensitivity Case 1 (SAl) removes the heat inputs for the pressurizer heaters, decay heat, and RCP heat. The new peak pressure is just 483.93, or 6.5 psia lower without the conservative heat inputs. The graph for case SA1 would be very similar to Figure 5, but with a slightly lower pressurization rate. The peak pressure for case SAl occurs at a time of 38.22 seconds, or about 3 seconds later than for the base case.

17

Figure 5: Reference Case Results showing a typical Pressure Trace for a Mass Addition Event. The initial 2 seconds are used to establish a steady-state without RCP flow, the next 18 seconds are to establish a steady-state with RCP flow. The Mass Addition causes a linear ramp until the PORV opens and immediately relieves pressure.

PORV Flow Rate The flow rate through the PORV is based on design flow rate rather than valve orifice area. The reason for this is that the two-phase RELAP equations are less conservative than most relief valve sizing equations (see Ref. 3, Volume 4, Section 7.2, notably figure 7.2-8). If the actual area is used, the flow rate calculated by RELAP will be greater than the design flow rate. Instead, a case run must be made to investigate by trial and error what valve area gives the required flow rate. In practice, this is not difficult because the design flow is choked. Hence the area can be found by proportion with just a single trial.

For example, at the reference site, the valve area was given in plant documents as 0.94 inch2. The area that gave the correct design flow rate in RELAP turned out to be 0.77 inch2.

Once the area is found by this approach, the RELAP code will handle all additional flow calculations.

Note: The exact flow rate through the PORV is not critical to the analysis if the flow is sufficient to halt the pressure rise. That is, if as soon as the PORV is full open, the flow out of the PORV is greater than the RCS volumetric increase (due either to mass addition or heat expansion), then the pressure will fall. Small errors in the PORV flow rate will 18 M80BAS Results (lower P is pressurizer, higher is reactor vessel peak) 600 500 S400 "300 S200

0) 0-100 0-i I

I 0

10 20 30 40 50 Time (seconds)

affect the rate of depressurization, but not the peak pressure. This analysis is only concerned with peak pressure. Should a transient result be found where the pressure is not immediately relieved at PORV lift, the RCS pressure will continue to rise until an equilibrium condition exists. Should this scenario occur, the accuracy of the PORV equation is important to the peak pressure. The analysis write up must determine if this case occurs, and, if so, must document through additional side calculations that the RELAP flow rate is acceptable.

PORV Opening Rate The PORV flow area is conservatively assumed to be zero until the time at which the PORV is fully opened per plant data. Then the valve is modeled as though linearly ramped open from zero flow area to full flow area in some arbitrary brief period such as 0.5 seconds. Since the flow predicted during the ramping period is less than the full flow rate, this approach is conservative.

The reason for using a ramping open model rather than an instantaneous opening is not to add additional conservatism. When an instantaneous opening is used, the RELAP model predicts a negative pressure wave. Upon reflection, this negative pressure wave causes a small pressure spike in the Pressurizer pressure. As far as the pressurizer pressure is concerned, an instantaneous opening causes a slightly higher peak.

To demonstrate this, Sensitivity Case 2 (SA2) makes the PORV open rate le+6/second so that the valve opens in le-06 seconds. The pressure when first opening is less than the base case (489.79 vs. 490.25 psia), but the reflected wave peak is 498.40 psia. It appears that the instant open case is more conservative, but it is not a conservatism worth including in the model for three reasons: it is unrealistic since the actual PORV takes a finite time to open, the resulting pressure graph contains a confusing oscillating pressure trace that is awkward to explain, and the pressure wave spike is limited to the pressurizer and does not impact the pressure in the reactor vessel, which is the critical pressure for LTOP concerns. Therefore the PORV is ramped open at a slow enough speed to avoid the pressure oscillation.

Reactor Coolant Pumps Having RCPs running is conservative for the mass addition cases because they increase the pressure difference from the base of the Reactor Vessel to the top of the Pressurizer where the LTOP system gets its pressure input. An additional 10% is added to the rated head values in order to provide an additional conservative margin to the modeling of RCS flow. The addition of this margin would tend to increase the pressurization rate during the heat addition transient. However, it was determined through sensitivity studies that minor changes in RCS flow rate have negligible effect upon the results of the heat addition analysis. Specifically, a base case heat addition was run (HAbase). The Peak pressure in that analysis is 451.72 psia. In the sensitivity case SA3, the RCP rated flow was decreased by 10% from 47500 gpm to 42750 gpm. The new peak pressure is 450.61 psia.

For pump start up, the pump speed ramp rate is conservatively bounded by a zero-to-full speed acceleration in just 1 second (typical times are on the order of 30 seconds). This 19

manual acceleration means that the pump inertia entered in the RELAP deck is arbitrary.

Although the pump reaches full rpm speed in 1 second, the system's inertia will make the RCS flow rate take an additional time period. This is conservative due to the 10% higher head and fast rpm acceleration. To demonstrate this, a fourth sensitivity analysis was run (SA4) with a pump that ramps to full speed over 30 seconds. The peak pressure was 451.72 in the base case HAbase. With the slower pump, the peak pressure is 449.64 psia.

Note: Since the pump model imposes a linear acceleration from zero to full rpm in 1 second, all the model inputs for pump rpm, rotational inertia, and torque are not used, and the data supplied to the model is arbitrary. That is, the model requires inputs for pump rpm, torque and moment of inertia, but the values are not used.

Mass Addition Cases - Initial Pressure Exploratory runs demonstrate that the initial pressure does not have a significant impact on the peak pressure of a mass addition transient so long as the Pressurizer is water-solid at the time of PORV lift. This is because the mass addition inlet flow rate is a function of RCS pressure and is not a function of time. Whether the system is initially just below the PORV setpoint pressure, or whether the system ramps up to the PORV setpoint from some lower initial value, does not affect the pressure rise rate during the period between reaching the PORV setpoint and the delay time of the PORV opening. This was demonstrated by two cases in Reference 4 (m50p2 and m50p4), the first initiated at 200 psia, and the second at 400 psia. The peak pressure in the first case is 483.63 psia, and the peak in the second is 483.46 psia.

Mass Addition Cases - Initial Temperature The case of m50p2 (initial temperature of 50'F) versus m80bas (initial temperature of 80TF) shows that this methodology predicts a slightly higher peak pressure as temperature rises. The 30TF temperature rise increases the peak pressure from 483.63 psia (m50p2) to 490.25 psia (m8Obas), or 6.6 psi. An additional run in Reference 4 at 166TF demonstrates that the pressure rise due to the 116VF difference from m50p2 is about 16 psi.

The reason for this increase is that the Figure 6: Sensitivity of dv/dT to Temperature change in volume for each Btu of energy addition is faster for water at 80 or 166TF Showing Greater Volume Change per than it is at 50TF. This is shown in Figure 6 Degree F as Temperature Rises at right, recognizing that the heat capacity, 14.000 or dTldh, is pretty close to constant over this g 12.000

2 10.000 temperature range. Thus the decay heat 8.000o addition has a bigger impact for warmer 6.000 initial temperatures. This is, in general, not a 4.ooo00 big impact because the P/T limit curve rises L

2.000 0.000 upward with temperature. It does show the 0

100 200 300 400 need for a greater margin between PORV Temperature (F) setpoint and the P/T limit curve as temperature rises.

20

Mass Addition Cases - Initial Pressurizer Bubble Exploratory runs demonstrate that it is difficult to credit a steam bubble in the Pressurizer with assisting mass addition event mitigation. The RELAP model shows that when a bubble is present, the pressure starts to rise immediately following the start of mass injection. However, when the pressure rises sufficiently, the Pressurizer bubble collapses at a rate that offsets the mass addition, and pressure is constant. Pressure does not continue to rise until after the bubble is completely gone. Hence if the initial pressure is sufficiently below the PORV lift pressure, the bubble vanishes and the peak pressure is the same as if the initial condition was water solid.

Figure 7: Pressure Trace (from Ref. 4)

Figure 8: Bubble Size (from Ref. 4)

This phenomenon is particularly true for LTOP events because of the low density of the steam in the Pressurizer (relative to the steam density at 2100 psia). This low mass bubble is easier to condense than when the plant is operating at power. The condition of a water solid lift is also specified in the NRC SER[Ref. 1].

Case m50b is a sensitivity case that uses m50p2 as a base case. The difference is in the presence of a small pressurizer bubble. The pressure is seen in Figure 7 to hold steady while the bubble collapses, and then to rise after the collapse as though the bubble had never been there (see Figure 8 to see that the bubble shrinks and vanishes). The peak pressure is 486.34 psia. This is slightly higher than the m50p2 and m50p4 cases, but that is an artifact of the conservative methodology which hypothesizes an imbalance in heat addition during the mass injection event (due to an assumed loss of shutdown cooling and high decay heat). Since the bubble takes longer to collapse, the RCS has warmed up a little, and the warmer RCS has already been shown to result in a higher peak pressure. In conclusion, the ENERCON methodology will be to run all mass addition cases assuming water solid conditions, and to investigate temperature effects through direct specification of the initial RCS temperature.

Mass Addition Events - SI Injection Temperature It is difficult to identify the worst-case temperature for SI injection. The volumetric flow rate is constant, which means the mass flow rate is greater for colder temperatures.

However, the injection water enthalpy is greater for higher temperatures. In order to assure a conservative choice, the modeler has two choices: either perform sensitivity analyses at numerous injection temperatures, or bound the possibilities by using a 21 M5OB Results (lower P Is pressurizer, higher is reactor vessel peak) 600

-500 S400 o 300 m200 100 0

0 50 10DO 150 200 250 rime (seconds)

M50B Results Pressurizer Bubble 60O 50 50 1

40 6.30

> 20 10 0

50 100 150 200 250 Time (seconds)

maximum density such as water density barely above freezing (62.42 ibmn/ft3), and an enthalpy associated with the maximum possible safety injection temperature and pressure. This is done by using the greater density when calculating the mass injection flow rate in lbm/s, but specifying maximum expected temperatures and pressures in the RELAP components for SI injection. SA5 evaluates the impact on the m80bas case of using colder injection water (just 500 instead of 250'F). The resulting peak pressure is 489.07 psia as compared to the base case 490.25 psia. In both cases, the boundary mass flow rate is based on a density of 62.42 Ibm/ft3.

Heat Addition Events -- Effect of Temperature Rise on PORV Openina Setpoint The effect of temperature rise during heat addition events can have a critical impact on the LTOP curve requirements if the PORV setpoint varies with RCS temperature. When the heat addition event occurs, the RCS temperature will rise. Since the LTOP system sets the PORV lift setpoint as a function of RCS temperature, the PORV will not lift until the setpoint associated with the higher temperature.

One way to avoid a significant restriction on the PORV LTOP setpoint curve is to mitigate heat addition transients before the Pressurizer steam void is lost. This is done by requiring a large void prior to the first RCP start via an operational requirement such as a Technical Specification, and determining that the void will not entirely collapse by the time that the Steam Generator and RCS temperatures equilibrate. After equilibration, the transient is effectively mitigated. Plants that wish to start RCPs with RCS in a water solid condition will need to impose maximum temperature differentials between the primary and secondary side to limit the energy input.

This concern does not apply to plants that have a flat PORV setpoint over the full range of LTOP temperatures.

Heat Addition Cases - Initial Conditions Heat addition cases are primarily associated with cooldown transients. A conservative bounding assumption is that once the plant is placed on shutdown cooling, the Steam Generators maintain the previous temperature while the Reactor Vessel, Hot Leg, and Cold Leg are cooled. Should a RCP suddenly start up, the hot Steam Generator serves as a heat source and rapidly expands the RCS water as specific volume increases. In accordance with NRC guidance, the pump heat, Pressurizer heaters, and decay heat are all additional heat sources.

With the very conservative assumptions about temperature differentials, the initial energy input into the RCS can be huge. The full power delta-T might only be on the order of 50'F, but the heat addition assumptions can lead to initial delta-Ts on the order of 2500F.

With these huge delta-Ts, even though only a single pump is running in one loop (with potential reverse flow in the other loop), the initial energy input can be on the order of 35% of full power. Figures 9, 10 and 11 are from Reference 4 Case hp503s30, which is the same case as HAbase described above.

22

Figure 9: High Initial Heat Addition 800 S400 200 0

0 200 400 600 Time (seconds)

Figure 10: Rapid Bubble Collapse Figure 11: Pressure Held Constant during Bubble Collapse 4W0 450 S440 420 410 380 370 0

200 400 600 Time (seconds)

As already noted, the methodology involves a net imbalance in heat addition due to the assumption of a loss of shutdown cooling and a high decay heat, RCP heat, and Pressurizer heaters failure (fails on). Thus the transient does not quite come to equilibrium after ten minutes (this is 610 seconds of simulation time because the RCP starts at 10 seconds). This continued transient is due to the conservative assumptions, and it is not the function of the LTOP system to mitigate this slow energy addition. At any rate, this is bounded by the mass addition event, which also includes this conservative assumption of a net heat input.

Heat Addition Cases - Secondary Side Assumption The secondary side is conservatively modeled as isothermal water filling the full volume of the Steam Generator to maximize the latent heat delivered to the RCS. Thus, while the water volume is typically on the order of half or less of the total SG volume (the rest being steam space), this methodology assumes that the full volume is filled with water.

The isothermal assumption is also a conservatism, in that the full mass of water serves as a heat source. In reality, if the steam generator were to be filled to the top, the top half of the steam generator would stratify and not be much of a heat source. This appears to be a large conservatism in that it approximately doubles the amount of heat energy, but it allows a significant simplification of the model. Without this assumption, the model would need to include secondary side water volumes (to model the stratification) and 23 400 300 E S200 S100 0

0 200 400 600 Time (seconds)

thermal inertia in the steam generator metal mass (other than the steam tubes, which are already modeled).

Heat Addition Cases - Pressurizer Heaters The assumption that Pressurizer heaters failed on full power is a net negative impact was investigated. Since mitigation of the heat addition cases relies on a steam bubble remaining long enough for the RCS and SG to equilibrate, it was considered that the Pressurizer heaters might have a net benefit. They tend to warm the pressurizer and promote the steam phase. On the other hand, the added energy also tends to expand the fluid and increase the pressure rise.

A sensitivity case was run (SA6) with no Pressurizer heaters to determine the impact. The peak pressure was 451.56 psia without heaters, as compared to 451.72 with heaters in HAbase. Hence the pressurizer heaters have a net negative affect on pressure, but a very small one. The bubble size 600 seconds after pump start was also a little better (146.7 ft3 without heaters vs. 141.8 ft3 with heaters in the base case). This is because the RELAP model spreads the heat out throughout the pressurizer water (no local boiling). The case with pressurizer heaters does have warmer pressurizer fluid, but it is still well subcooled due to the inrush of cooler RCS through the surgeline. At 610 seconds, the Pressurizer water volumes have the following temperatures with the Pressurizer heaters on (from bottom to top in degrees F: 268, 314, 350, 396, 423.33). Without the Pressurizer heaters, the temperatures are 240, 279, 342, 394, and 423.28.

The conclusion is that the pressurizer heaters have a small negative impact on both bubble size and peak pressure. However, this conclusion was based on a sensitivity run performed at the reference plant. Additional site specific sensitivity runs will be made to assure that this assumption is conservative at other plants.

Heat Addition Cases - PORV Opens It has been described how heat addition cases for large temperature differentials between the RCS and secondary side rely on a steam void to mitigate the transient without lifting a PORV. However, it may be that the PORV will open prior to the RCS-SG temperature equilibrium. This opening is possible if the PORV setpoint uncertainty causes the PORV to open at a lower pressure rather than at the maximum pressure. It is necessary to run a case at each site where the PORV will open (either by manipulating the initial conditions with high initial pressure or small void, or by changing the PORV setpoint). In terms of peak pressure, the limiting case is to manipulate the initial conditions. This is done in Reference 4, in case Hp5 04s30, by raising the initial pressure to close to the trip value, and reducing the bubble to less than Technical Specification size. The result shows that the PORV flow rate is adequate to mitigate the pressure transient, which is not surprising.

The pressurization rate is slower with the bubble, and the steam volume released by a PORV is much greater than liquid volume. The volumetric release easily offsets the RCS expansion. In case Hp504s30, the maximum pressure is 476.3 psia, which is an overshoot ofjust 17.3 psi over the lift setpoint of 459 psia. This is a small overshoot compared to the mass addition cases.

24

tr-r,+/- C'iirxp liim

P1nt ,.Ath TTCIP tncnt tht f11ow the P/T Curve LJLysJtLkL



V There are distinct temperatures where the mass addition case can suddenly become more limiting due to additional mass injection. For example, at a certain plant, the number of enabled SI pumps might jump up incrementally at 255°F RCS T and 305TF. A jagged LTOP setpoint curve could be used in response to these sudden jumps in mass addition, but it would make the circuitry function more complicated, if even possible. Instead, the LTOP setpoint curve is typically developed as a conservatively lower monotonically increasing curve. This approach also identifies a limited number of critical analysis temperatures (255TF and 3050F, in this example) simplifying the choice of initial temperatures for LTOP scenarios. The curve in Figure 12 shows conceptually the "tightest" LTOP setpoint curve allowed by analysis compared to the lower smooth curve used.

Figure 12: Conceptual Diagram of Highest Possible LTOP Setpoint Curve, and Recommended Smooth LTOP Setpoint Curve max P

I i

i 166 255 305 25

VIII. UNCERTAINTY AND THE LTOP SETPOINT CURVE Measurement uncertainty must be addressed because of possible process instrumentation measurement errors associated with the measured pressure and temperature that determine when the PORV open signal is generated. For plants with a flat PORV setpoint over the full range of LTOP events, the treatment is very simple. The field setpoint must be biased by the uncertainty. That is, if the analysis assumed a lift pressure of 460 psia and the uncertainty is 50 psia, the field setpoint must be 410 psia or less. The case is more complicated for plants with setpoint curves that follow the P/T limit curve by increasing the PORV setpoint with RCS temperature. This makes the uncertainty a function of both the pressure and the temperature error.

For the RELAP code analysis scenarios, the PORV setpoints and P/T limit curve are assumed to be correct with no adjustment for uncertainty. For example, if the PORV setpoint at 164TF is 459 psia and the P/T limit is 525 psia, the RELAP code will start to generate a PORV open signal following a mass injection event as soon as the top volume in the Pressurizer reaches 459 psia. The LTOP system is judged to be adequate if the peak Pressurizer pressure during the transient is below 525 psia.

This approach is acceptable so long as it can be assured that when the actual RCS temperature is 164TF, a PORV open signal will be generated at or below a Pressurizer pressure of 459 psia. A conservative approach is to draw a setpoint curve through the point (T+8T) and (P-8P), where 8T is the temperature error and 6P is the pressure error.

However, this is overly restrictive since it is highly unlikely that measurements will be at the extreme of both uncertainties. The temperature and pressure errors are independent random errors.

It is common to use statistical analysis to bound instrument uncertainties with a specific confidence limit, such as a 95% confidence limit (Ref. 5). Latitude is provided for reasonable statistical approaches based on "scientific judgment using all the relevant information available" (Ref. 5, subsection 4.1). In this case, we use an approach that is similar in concept to the square root of the sum of the squares (SRSS) reasoning.

SRSS would develop a net uncertainty based on 5T/T and 5P/P as SQRT((8T/T)2+(8P/P) 2) assuming that the errors have equal weight in affecting the final result. That is not the case here. In the horizontal portion of the curve, the temperature error has no impact. As the curve approaches vertical, the pressure impact approaches zero. Instead a function is needed that approaches the pressure error only for the horizontal portion, the temperature error only as the curve approaches vertical, and SQRT((8T/T) 2+(8P/P) 2) when the curve has a 45 degree slope.

The solution is to offset the curve by 5T*sin(slope) and -. P*cos(slope). Here the sine of the slope will be AP/SQRT(AT 2+AP 2), and the cosine AT/SQRT(AT 2+AP 2). Figure 13 shows conceptually how the LTOP setpoint curve is generated.

26

Figure 13: Conceptual Representation of the LTOP Setpoint Curve Development As slo vertice approe horizo At 45 degi offset = 87 and -8P/S identical t Pythagore pe approaches 1i, offset Lches 5T ntal ree slope, U/SQRT(2),

QRT(2), which is o SRSS by an Theorem Offset = full pressure error of 8P At all points:

Offset=6T*sin(slope) horizontal and - 8P*cos(slope) vertical Temperature ('F)

For example, say two analysis pressure setpoints at RCS temperatures of 250'F and 251TF are 920 psia and 929 psia, respectively. That is, AT = 10F and AP = 9 psi. Say the temperature error 8T is 16.3OF and the pressure error 8P is 66.3 psia. The corresponding point on the LTOP setpoint curve consists of a temperature of:

T+offset =T + 8T*AP/SQRT(AT2+AP2) = 250 + 16.3*9/SQRT(1+81) = 266.20F The pressure is:

P - offset = P - 8P*AT/SQRT(AT2 +AP2) = 920 - 66.3*1/SQRT(1+81) = 912.7 psia A check is made using a simple Monte Carlo simulation to verify that this approach will give acceptable results more than 95% of the time. The approach is as follows:

1. The LTOP analysis curve and the proposed LTOP setpoint curve are drawn on a Pressure versus Temperature graph (Figure 14). The setpoint curve is generated by offsetting each point in the LTOP curve by +8T*AP/SQRT(AT 2+AP2) oF and

-SP*AT/SQRT(AT2 +A&P2) psi as shown in the above example.

2. Random number generators are used to simulate actual pressure and temperature when the sensed P & T lie on the LTOP setpoint curve. For example, the actual 27 P

(psia)

pressure = sensed pressure +(0.5-rando)*2*5P where rando is a number between 0 and 1. The result of the term (0.5-rando)*2 is therefore a number between -1 and +1. A similar equation is used to find actual temperature.

3. These measured point pairs are plotted as a cloud of scatter points. Some 100,000 such points are generated.
4. The result is verified to be within the analysis curve better than 95% of the time.

In 100,000 trials of the reference plant model, 96.8% of the points were within the LTOP curve. Figure 13 shows just 1000 of the 100,000 trials.

Figure 13: Results of Monte Carlo Analysis from Reference 4 28 LTOP Analysis, Setpoint, and Pre-Trip Curves 1800 1600

' 1400 ED=

1200 S120 0 -

LTOP Curve

a.

.LTOP Setpoint L.

800 -

Monte Carlo CL 6 0 0 0

0 50 100 150 200 250 300 350 RCS Temperature (F)

X.

CONCLUSIONS The conclusion is that the ENERCON methodology of using RELAP5/MOD 3.2, for LTOP analyses is acceptable and conservative. The key conservatisms are discussed through this document, but can be summed up here:

1. Addition of a conservative pump heat, decay heat, and Pressurizer heaters heat for both mass injection and heat addition. No credit for shutdown cooling or letdown.
2. Conservative initial conditions, plus a wide range of initial conditions as necessary to bound the worst-case scenario.
3. Conservative PORV open setpoint (i.e., uncertainty applied to field setpoint to protect analysis setpoint), conservative time delay, calculated flow area to match design flow rate, and conservatively high backpressure. Only one PORV is credited.
4. The PORV is conservatively assumed to have zero flow area until the circuit and mechanical delay times to full open have passed.
5. Conservatively small RCS volumes (except for SG tube volume filled with hot RCS for heat addition cases, only), rigid RCS volumes (no expansion),

and no thermal inertia credit for RCS metal mass or fuel mass.

6. Mass addition: conservative mass injection flow rates.
7. Mass addition: conservative mass injection density and enthalpy (even if non mechanistic, i.e., even if the density is associated with a colder temperature than the enthalpy).
8. Mass addition: no heat transfer to secondary side.
9. Heat addition: conservative SG heat transfer area, water mass, and assumption of isothermal secondary-side water.
10. Heat addition: conservative fast ramp rate for RCP.

Additional key analysis features are as follows:

1. Mass addition: no Pressurizer void is hypothesized, since the voids do not impact the final peak pressure.
2. Heat addition: the initial conditions must include the maximum postulated delta-T between primary and secondary sides allowable by plant operation.
3. Heat addition: can credit a pressurizer bubble for the first RCP start if the bubble is required by Technical Specifications or otherwise assured.
4. Heat addition: although the pressurizer bubble may be credited in absorbing heat energy while the RCS and SG equilibrate, i.e., the PORV does not lift on water solid conditions while the SG is still at a much higher temperature than the RCS, there must be demonstrated acceptable results should a PORV open while a steam bubble still exists.

29

REFERENCES

1. "Safety Evaluation of Topical Report CE NPSD-683, Rev. 6, Development of a RCS Pressure and Temperature Limits Report (PTLR) for the Removal of P-T Limits and LTOP Requirements from the Technical Specifications" (TAC No.

MA9561)

2. 10CFR50 Appendix G
3. RELAP5 Code Manual, NUREG/CR-5535, Revision 4
4. Fort Calhoun Low Temperature Overpressure Protection Final Report, ENERCON SERVICES, Rev.1, 3/15/02
5. NIST TN-1297, Guidelines for Evaluating and Expressing the Uncertainty of NIST Measurement Results, US National Institute of Standards and Technology, 1994.

30 LIC-02-0109 Reference 10.15 Letter LTR-CI-02-14, Rev. 00 from WEC (S. T. Byrne) to OPPD (J. Jensen)

"Extended Beitline Limit for Fort Calhoun Station Reactor Pressure Vessel" February 15, 2002

0 Westinghouse Electric Company 2000 Day Hill Road Nuclear Services Windsor, CT 06095-0500 USA Mr. James Jensen February 15, 2002 Omaha Public Power District LTR-CI-02-14, Revision 00 Fort Calhoun Station PO Box 550 Fort Calhoun, Nebraska 68023

Subject:

Extended Beltline Limit Assessment of Fort Calhoun Station Reactor Pressure Vessel

Dear Mr. Jensen:

An assessment was performed of the Fort Calhoun reactor vessel materials. This was undertaken to support submittal and acceptance of a Pressure and Temperature Limits Report (PTLR) for Fort Calhoun Station. In the NRC Safety Evaluation (Reference 1) of CE NPSD-683, Revision 6, the Staff required that all of the ferritic materials that have accumulated neutron fluence in excess of 1.Oxl 017 n/cm 2 shall be assessed as beltline materials. In effect, any ferritic material in the beltline, as defined, would have to be considered in the establishment of the heat-up and cool-down (pressure-temperature) limits.

The assessment entailed the following:

1. The 1.0x10 17 n/cm 2 bounds above and below the core were identified based on peak vessel fluence projections from Reference 2 and an estimate of the axial vessel fluence profile from Reference 3.
2. The material information was tabulated for plates, forgings and welds for all components within the 1.0x10 17 n/cm 2 bounds.
3. The Adjusted Reference Temperature (ART) values were computed in accordance with 10CFR50.61 for 40 and 60 years for all materials within the 1.0xl0 17 n/cm 2 bounds. ART values were generated for all plates, forgings and welds within the 1.0xl 017 n/cm 2 bound using the highest applicable fluence for that component.
4. For the plates and forgings without reported values for the copper content, the highest reported value for the plates and forgings, 0.17%, was assumed for chemistry factor determination.

Determination of Materials in the 1.0x10 17 n/cm 2 Bounds The peak fluence values were obtained from Reference 2 for times corresponding to end of-license (August 2013) and to end-of-extended-license (August 2033). The axial vessel fluence variation from Reference 3 was used to adjust the peak fluence at each azimuth in

Mr. James Jensen February 15, 2002 Omaha Public Power District LTR-CI-02-14, Revision 00 order to generate estimates of the fluence above and below the active height of the core.

Application of the Reference 3 profile is illustrated in Figure 1. It is a plot of the neutron fluence at the 90-degree azimuth as a function of the distance below the centerline of the reactor coolant inlet and outlet nozzles. The highest values correspond to the active fuel length, and the relative fluence falls off rapidly above and below the active core height.

The Fort Calhoun vessel layout is shown in Figure 2 (from Reference 3). Using the axial fluence profiles in conjunction with the vessel layout, the following reactor vessel components were determined to lie outside the 1.0x 1017 n/cm 2 bounds:

closure head and included welds (closure head flange, torus, and dome) vessel flange and included weld inlet nozzles and included welds outlet nozzles and included welds bottom head and included welds (torus, and dome)

Included within the 1.Ox 1017 n/cm 2 bounds are materials from the upper shell plates, axial welds (1-410 A/C), and the intermediate-to-lower girth seam weld (8-410) in addition to the intermediate and lower shell plates and welds. The peak fluence for the upper shell plates and girth weld is approximately 2.8x10 17 n/cm 2 and 3.8x10 17 n/cm 2 for August 2013 and August 2033, respectively. The peak fluence at the upper shell axial welds is approximately 1.gx10 17 n/cm 2 and 2.8x1017 n/cm 2 for August 2013 and August 2033, respectively.

The effect on the 1.Ox 1017 n/cm 2 bounds of increasing the peak (August 2033) fluence by 20% was also assessed. This is intended to encompass future events such as power uprate or fuel management changes that were assumed to increase the fast neutron fluence locally by 20%. It was determined that, even though the peak fluence in the upper shell plates and welds increased, the components lying outside the 1.Oxl 017 n/cm 2 bounds remained unchanged. (Furthermore it was determined that the fluence would have to increase by a factor of eight to include any additional materials in the 1.0x 1017 n/cm 2 bounds.) In other words, no additional materials would need to be considered in the determination of limiting materials if the peak (August 2033) fluence was increased by 20%.

Determination of Limiting Materials in Extended Bounds The determination of limiting materials within the 1.Ox1017 n/cm 2 bounds is shown in Table 1. Determinations were made for August 2033. Table 1 provides a list of components by Code Number and gives the Chemistry Factor for each. The peak fluence in August 2033 for each component is given. The adjusted reference temperature is determined using Regulatory Guide 1.99, Revision 2 for each of the components using the peak fluence, chemistry factor, and initial RTNDT. The margin added was 65.50F for welds and 34 0F for plates in accordance with Position 1.1 of Regulatory Guide 1.99, Revision 2.

Westinghouse Non-Proprietary Class 3

Mr. James Jensen February 15, 2002 Omaha Public Power District LTR-CI-02-14, Revision 00 In this assessment the limiting material is defined as the one with the highest adjusted reference temperature at the reactor vessel base or weld metal-clad interface. (It should be noted that for establishing pressure-temperature limits, the adjusted reference temperature is determined at the one-quarter and three-quarter thickness locations. In that case the limiting material is assessed at the two latter locations and not at the base or weld metal-clad interface.) From Table 1, the limiting material is lower shell weld 3-410 A/C based on the adjusted reference temperature of 268 OF. For the plates and welds located above the intermediate shell course, the predicted adjusted reference temperature is between 38 and 740F, values that are well below that of the limiting material.

Conclusions An assessment was made of the all the materials within the bounds of the limits defined by a fluence of 1.Ox1017 n/cm 2. This determination included consideration of the end of the current license in August 2013 as well as at the end of the extended license in August 2033.

It was determined that the upper-to-intermediate girth seam weld 8-410 and parts of the upper shell course plates and welds 1-410 A/C, would lie within the 1.0xl017 n/cm 2 bounds. This boundary did not extend to the reactor coolant inlet or outlet nozzles or below the lower shell course. The effect on the 1.0xl0 17 n/cm2 bounds of increasing the August 2033 fluence by 20% (e.g., to accommodate power uprate or fuel management changes) was also assessed. It was determined that no additional materials would need to be considered in the determination of limiting materials if the peak fluence was increased by 20%. (It was determined that the fluence would actually have to increase by a factor of eight to include any additional materials in the 1.0x1 017 n/cm 2 bounds.) An assessment was made to determine the limiting vessel material when all of the materials within the 1.Oxl017 n/cm 2 bounds were considered. It was found that the limiting material is the lower shell axial weld seam 3-410 A/C.

The materials in the reactor vessel flange region (sections of the upper shell course plates, vessel flange, closure head flange, closure head torus, and included welds) are above the reactor vessel inlet nozzles. Therefore, the neutron fluence in the flange region is substantially less than 1.Ox107 n/cm 2 such that the bolt-up temperature can be based on the initial RTNDT of the flange region materials.

If you have questions concerning the above please call me at (860) 731-6703.

Sincerely,

"/stingl:use Electric Company Stephen T. Byrne Senior Consultant Westinghouse Non-Proprietary Class 3

Mr. James Jensen February 15, 2002 Omaha Public Power District LTR-CI-02-14, Revision 00

References:

1) Nuclear Regulatory Commission letter dated March 16, 2001, Safety Evaluation of Topical Report CE NPSD-683, Revision 6, "Development of a RCS Pressure and Temperature Limits Report (PTLR) for the Removal of P-T Limits and LTOP Requirements from the Technical Specifications"
2) WCAP-15443, Rev. 0, "Fast Neutron Fluence for the Fort Calhoun Unit 1 Reactor Vessel", dated July 2000, prepared by Stan Anderson
3) CEN-189, Appendix A, "Evaluation of Pressurized Thermal Shock Effects due to Small Break LOCAs with Loss of Feedwater for the Fort Calhoun Reactor Vessel",

December 1981, Combustion Engineering, Inc.

Westinghouse Non-Proprietary Class 3

Mr. James Jensen Omaha Public Power District February 15, 2002 LTR-CI-02-14, Revision 00 Table 1-Determination of Limiting Vessel Materials (August 2033)

Component Component Initial Chemistry Factor, Peak Fluence Adjusted Name Code No.

RTNDT (OF)

(n/cm 2)

Reference (F)

Temperature (OF)

Lower Shell Plate D-4812-1 0

83 3.45E19 144 Lower Shell Plate D-4812-2 0

65 3.45E19 120 Lower Shell Plate D-4812-3 0

65 3.45E19 120 Inter.-to-Lower 9-410

-56 188.41 3.45E19 259 Shell Girth Weld Lower Shell 3-410 A/C

-56*

208.68*

2.43E19 268*

Axial Welds Inter. Shell Plate D-4802-1 0

82.2 3.45E19 143 Inter. Shell Plate D-4802-2 18 72.0 3.45E19 147 Inter. Shell Plate D-4802-3 0

73.1 3.45E19 131 Inter.-to-Upper 8-410

-56 190.4 3.8E17 57 Shell Girth Weld Inter. Shell 2-410 A/C

-56 89.03 2.43E19 120 Axial Welds Upper Shell Plate D-4801 -1

-16 81 3.8E17 38 Upper Shell Plate D-4801-2

-16 81 3.8E17 38 Upper Shell Plate D-4801-3 10 121 3.8E17 74 Upper Shell 1-410 A/C

-56 215.5 2.8E17 55 Axial Welds

  • For the limiting weld wire heat combination only.

Westinghouse Non-Proprietary Class 3

Mr. James Jensen Omaha Public Power District February 15, 2002 LTR-CI-02-14, Revision 00 Fig. 1 Axial Fluence Profile August 2033 at 90 Degree Azimuth 1.OOE+20 1.OOE+19 -

1.OOE+ 18 "1.OQE+ 17

-L S

U V

I F i1 Aa F

Pr-N

-250

-225

-200

-175

-150

-125

-100

-75

-50

-25 Distance Below Nozzle Centerline, Inches Westinghouse Non-Proprietary Class 3 I.

4 a) 0 1 00E+16

Mr. James Jensen Omaha Public Power District February 15, 2002 LTR-CI-02-14, Revision 00 Fig. 2 Fort Calhoun Reactor Vessel Plan View FORT CALHOUN PRESSURE VESSEL VIEW OF PLRNT NUMBER 02 AZIMUTHAL LOCATION nFGRFFS Westinghouse Non-Proprietary Class 3 20 60 U

0 0

140 z

2 180 0

220 260 LIC-02-0109 Reference 10.16 Letter from ISL (W. Arcieri) to OPPD (F. J. Jensen),

"WCA-09-2002: Transmittal of RELAP5/Mod 3.2d,"

August 2, 2002

INFORMATION SYSTEMS LABORATORIES 11140 Rockville Pike, Suite 500

  • Rockville, MD 20852 * (301) 468-6425 - Fax: (301) 468-0883 August 2, 2002 OPPD - Fort Calhoun Nuclear Station Highwy 75 North Fort Calhoun, NE 68023-0550 Attn: FREDRICK J. JENSEN III

SUBJECT:

WCA-09-2002: Transmittal of RELAP5/MOD3.2d

Dear Mr. Jensen,

Enclosed is the CR-ROM that contains the transmittal of the RELAP5/MOD3.2d. The transmittal consists of source code and installation files to allow installation using the Fortran90 compiler on a Hewlett Packard workstation. Other changes made to the program since RELAP5/MOD3.2 are summarized in the "ChangeSummary.pdf' file included on the CD-ROM. The problem that you reported with the strip file has been corrected in this code version. It will also be corrected in RELAP5/MOD3.3. Your diligence in finding and reporting code problems is appreciated.

If you have any questions concerning this transmittal or require installation assistance, please contact me at ISL at (301) 255-2275 or via e-mail at billa(,islinc.com.

Sincerely, William Arcieri Principal Engineer cc:

M. B. Rubin, USNRC (w/o enclosure)

D. Prelewicz, ISL (w/o enclosure)

D. Mlynarczyk, ISL (w/o enclosure)

File:

4421 - RELAP5 Transmittal File (2 copies)

LIC-02-0109 Reference 10.17 Readme.txt for the installation of RELAP5/Mod 3.2d from Reference 10.16

README for RELAP5/MOD3.2d August 2002 See the ChangesSummmary.pdf file for a summary of the changes made to RELAP5/MOD3.2d from the earlier versions of RELAP5/MOD3.2.

RELAP5/MOD3.2d Installation Instructions These instructions are for RELAP5 MOD3.2d.

The installation requires approximately 78 MB (much of this can be deleted after installation if necessary) and takes anywhere from 30 minutes to a few hours.

We assume for these instructions that the transmittal is on a CD-ROM as a tar file.

These files are about 55 Mbytes long.

STEPWISE INSTALLATION PROCEDURE UNIX commands that may be used during the installation are enclosed in

( ).

Step 1. Change to the directory you want to contain the RELAPS files.

Copy the following files from the r5m3.2d tar file on the CD-ROM to your installation directory.

/Local Installation Directory

.--------- > preinst I--------

-> readme.txt I--------

->/manuals


>/sampout I-------- >/source

>cnv32.f


>dinstls


>dutilty


>envrl.s

>goodies


>indecks


>selap.s


>select.f


>usplit.f The indentation of cnv32f and the other files indicates that these file and/or subdirectories belong to the source subdirectory. There are 9 transmittal files in the source subdirectory. These transmittal files are listed below with their approximate size followed by a short description.

1. cnv32.f 11 KB Preprocessor for 32-bit computer changes to the source
2.

dinstls 3 KB Top level installation C-shell script

3.

dutilty 2 KB C-shell script to build the utilities:

usplit.x, select.x, and cnv32.x

4.

envrl.s 1747 KB Concatenated environmental library source files

5.

goodies 50 KB Concatenated group of files that are used by the installation script

6.

indecks 174 KB Concatenated input decks for checking the installation

7.

selap.s 4064 KB Concatenated relap5 and scdap source files

8.

select.f 7 KB Preprocessor for $if def directives in the source files

9.

usplit.f 4 KB Program to split apart a concatenated file into individual files Step 2.

Confirm that you are in the Local Installation Directory on your workstation.

Step 3.

Create a parallel directory to the source directory called install and create links between the 9 files in the source directory and the install directory. This step can be accomplished by using the script file preinst.

(preinst) or by the following seperate UNIX commands.

(mkdir Install; cd Install; ln.. /source/*

.)

The linking enables you to start over by just removing all the files (and subdirectories) in the install directory and starting with step 2 again. The commands to do this, in case you have to do it, are:

(rm -r install)

The resulting directory structure should look like this:

/r5_mod3.2d I-------- > preinst


> readme.txt I-------- >/manuals I--------

->/sampout I--------- >/source

>cnv32.f

>dinstls


>dutilty

>envrl.s

>goodies


>indecks

>selap.s


>select.f


>usplit.f I--------

>/install

>cnv32.f

>dinstls


>dutilty


>envrl.s

>goodies


>indecks

>selap.s

>select.f


>usplit.f Step 4.

In this step, you will build the environmental library, binary files for the steam tables, executable version of relap5 called relap5.x, and run the installation problems.

This step is completed by executing the top level installation script: dinstls.

This installation process will take up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> depending on the clock speed of your computer.

Up to 4 parameters can follow the dinstls command.

The first 3 parameters are required. The last parameter is optional and can be omitted.

Here is the usage command for dinstls:

usage: dinstls

$1 $2

$3

$4 where the parameters are defined as follows:

$1 = machine type parameter cray = CRAY computer with bufin/bufout cray2 CRAY computer without bufin/bufout decrisc = DEC RISC computer decrisc2 = DEC RISC computer with DEC compiler decalpha = DEC Alpha computer decalphao DEC Alpha computer with nawk instead of awk decalp90 DEC Alpha computer with Fortran 90 compiler hp = HP RISC computer hp9O = HP RISC computer using Fortan 90 compiler ibmrisc = IBM RISC computer, uses blkdta sgi SGI RISC computer, defines both sun and sgi sgi64 newer 64 bit SGI computer (in debug mode) stardent = STARDENT computer sun = SUN computer with Sun OS sunnew = SUN computer with Solaris OS vax = DEC VAX computer

$2

= code name parameter relap = RELAP5 code is installed The arelap, asrelap, and srelap options, which are also in the dinstls script, will not work because the arelap requires a special property table and asrelap and srelap require the matpro.s file.

The special property table and matpro.s file is not included in this distribution.

$3

= nuclear plant analyzer (NPA) parameter npa = NPA is included in installation nonpa = NPA is not included in installation The next argument is optional.

If it is not used, those options are deactivated.

$4 = GNU C compiler parameter (used on HP workstations only)

GCC

= use GNU gcc compiler to compile C source code nogcc = use UNIX C compiler to compile C source code (default)

This parameter only works when HP is used for $1 machine type parameter.

It is useful on HP computers that do not have the ANSI C compiler but do have the GNU C compiler.

Examples:

1:

Basic installation on decrisc dinstls decrisc relap nonpa

2:

Basic installation on HP with ANSI C compiler dinstls hp relap nonpa 3:

Basic installation on HP with no ANSI C compiler dinstls hp relap nonpa gcc Step 5.

When the code is completely installed using the dinstls

command, three new directories are created under the /r5 mod3.2d/install directory. These are the envrl, selap, and run directories.

The top levels of the directory structure now looks like:

/Local Installation Directory


> preinst I-------- > readme.txt I-------- >/manuals

>/sampout


>/source


>cnv32.f


>dinstls


>dutilty


>envrl.s

>goodies

>indecks


>selap.s


>select.f


>usplit.f I--------- >/install


>cnv32.f


>dinstls


>dutilty I------------->envrl.s


>goodies

>indecks


>selap.s


>select.f


>usplit.f


>/envrl


>source and header files for environmental library and binary steam tables, tpfh2o


>/selap I------- >source and header files for relap5, makefiles, scripts, and executable code, relap5.x


>/run I-------- >input (*.i), output (*.p),

and restart

(*.r) files from installation problems ENVRL DIRECTORY The envrl directory contains the source and header files that were used to make the environmental library, envrl.a.

These source and header files came from the envrl.s file.

The light and heavy water property tables, tpfh2o and tpfd2o, are also in this directory.

SELAP DIRECTORY The selap directory contains the source and header files that were used to make the relap5 libraries, relaplr.a, relaplq.a. The relap5 executable, relap5.x, and numerous other files that are also created during the installation such as the doitf and doith scripts are in this directory.

The doitf script is used to run a Fortran source file through the two precompilers, select.x and cnv32.x and then to the compiler to generate the object file.

The doith script is used to run a header file,

.H file, through the two precompilers, select.x and cnv32.x to generate a h

file.

The dloadr, dloadrn, dloads, and dloadsn scripts are used to link the newly compiled object files with the appropriate libraries to create a new executable file or files.

The dloadr is used to create relap5.x, dloadrn is used to create relap5.x with the NPA links, dloads is used to create the scdap version of relapS, and dloadsn is used to create the scdap version of relap5 with the NPA links.

These scripts are used when making changes to the source code.

RUN DIRECTORY The run directory contains links to the relap5.x executable in the selap directory, and the water property tables, tpfd2o and tpfh2o, in the envrl directory. The run directory also contains the installation test problem input

(*.i) output (*.p),

and restart

(*.r) files from running these installation problems.

The output files should be checked to make sure all the installation problems ran successfully.

EXECUTION OF RELAP5 The basic command line usage statement for running RELAP5 is:

relap5.x -i indta -o outdta -r rstplt

-w tpfh2o where indta

= input file name (indta is the default name) outdta = output print file name (outdta is the default name) rstplt

= restart/plot file name (rstplt is the default name) tpfh2o = water properties file name (tpfh2o is the default name)

Note:

For heavy water use -d tpfd2o in addition to or instead of

-w tpfh2o.

If there is only one system and it contains heavy water, then use the -d option.

If there are two systems, and one contains heavy water and one contains light water, then use both the -w and -d options.

Example:

Run the Edward's pipe test problem from the installation set. The input deck name is edhtrk.i relap5.x -i edhtrk.i -o edhtrk.p -r edhtrk.r

The default water properties table, tpfh2o, is correct for this problem so it is not included in the command line.

The output print file will is called edhtrk.p and the restart file is called edhtrk.r. XMGR5 can be used to make plots from the restart

file, edhtrk.r, because the restart file is really a combination file containing both restart and plot information.

REFERENCES:

To submit user problems or to review previous user problems, or for basic information on the usage of RELAP5, including command line options of RELAP5, see Volume II of the RELAPS

manual, which can be obtained via the World Wide Web in the NRC RELAP5 Home Page:

http://www.nrc.gov/RES/RELAP 5

For other questions, contact RELAP5 Hot Line: 301-231-5378 For submitting user problem reports, fill out the form on the Web page:

http://www.nrc.gov/RES/RELAP5/

or submit E-mail to:

relap5@nrc.gov LIC-02-0109 Reference 10.18 Changesummary.pdf that summarizes the modifications to RELAP5/Mod 3.2d from Reference 10.16

RELAPS MOD3.2d August 2002 RELAP5/MOD3.2d, which is the current version of RELAP5/MOD3.2, evolved through a series of changes starting with the RELAP5/MOD3.2 program. The first in the series was RELAP MOD3.2a, which is RELAP5 MOD3.2 with the added ability to compile the code on the SGI 64 bit computer (sgi64)and the DEC alpha computer using the new awk (decalphao).

RELAP5 MOD 3.2b is RELAP5 MOD3.2a with the added ability to compile the code on the HP computer using the f90 compiler. In the process of making and testing the changes to RELAP5/

MOD3.2b, a coding error was discovered in the RPIPE.F subroutine. This error has probably been in the code since it was first written but it has no safety implications. RELAP5 MOD3.2c is RELAP5 MOD3.2b with this coding error in RPIPE.F corrected. RELAP5/MOD3.2d is RELAP5/MOD3.2c with corrections made to: 1) produce an input processing error if more than one mesh interval is specified in the fuel - cladding gap and 2) correct a formatting error in the header line in a strip file that prevented plotting with xmgr5.

There are nine files in the distribution CD and changes were needed in four of the files.

The five files in which changes were not needed are: CNV32.F, DINSTLS., INDECKS, SELECT.F, and USPLIT.F. The following sections document the changes needed in the other four files.

dutilty The DUTILTY script is used to compile the utility programs: CNV32.F, SELECT.F, and USPLIT.F. The DUTILTY script required the addition of an 1 hp90 option that used the f90 com piler. This option required changing the i +Ti option on the f77 compiler command line to H P rem oved the +T option from the f90 com piler and added this new option in its place.

envrl.s The call to IGETARG, which is in the HP library, now requires three arguments instead of the two arguments it required under f77. The additional argument is the length of the ARG vari able. This was added to the code by defining a new variable, L = LEN(ARG), and including L as the third argument in the IGETARG call.

All the thermodynamic property generation had their two underflow trapping statements:

on real*4 underflow call trap4 on real*8 underflow call trap8 replaced by one statement:

ON EXTERNAL ERROR IGNORE

This change was necessary in the following programs: STGBLOOD, STGD20, STG GLYC, STGH2, STGH20 STGHE, STGK, STGLI, STGLIPB, STGN2, STGNA, STGNAK, and STGNH2.

goodies Goodies had the i hp90 machine option added to the various scripts that are in the goodies file. These additions use the i+fpexception! f90 compiler command line option instead of the 1 +Ti f77 compiler command line option.

selap.s The DDOT.F and DNRM2.F files had optional compiler statements added that set the returned function value to zero. These functions are not called, so this change has no affect on the answers, but the 90 compiler requires a return value for a function. The f77 compiler was not as strict about returning a value. The optional compiled statements that were added are:

$if,defhp9o ddot = 0.0 or dnrm2 = 0.0

$endif The UNDERFLOW trap statements in the RELAP5 program on real*4 underflow call trap4 on real*8 underflow call trap8 were replaced by the statement on external error ignore A few format statements that had the i 1pi and i gl3.5i run together without a comma, e.g.,

1pgl3.5 needed a comma after the i lpi so that they now read lp, gl3.5 The error in rpipe.F if (xinit(i4+6).ne.O.O

.or. xinit(i4+7).ne.OO.or.

xinit(i4+9).ne.0.0) imap(k+2)

= ior(imap(k+2),4096) had the xinit(i4+9) replaced by xnit(i4+8) so it now reads if (xinit(i4+6).ne.O.O.or. xinit(i4+7).ne.0.0.or.

xinit(i4+8).ne.0.0) imap(k+2)

= ior(imap(k+2),40 9 6 )

Changes were made to the aatl.F routine and the htl inp.F routines in the selap.s library in RELAP5/MOD3.2d. The changes made to aatl.F are made to identify the code version in the out-

put and to correct the formatting in the strip file header line. The changes made to htlinp.F are made to produce an input error if the user specifies more than one mesh in the fuel rod gap. These changes do not affect the computations.

LIC-02-0109 Reference 10.19 Letter from ENERCON Services, Inc (D. R. Whitson) to OPPD (J. Jensen)

August 8, 2002, "Quality Assurance for RELAP5/Mod 3.2"

ENERCON GERV;C5S, IN"C.

'ei Emrployee Owi ud Corripwaiy 5100 E. Skely Dr.. Sulie 450 Ttulsa, OK 74135 A18) 665-7693

8) 665-7232 - cax

,500) 735-7603 August 8, 2002 DRW-02-027 Mr. James Jensen Omaha Public Power District Fort Calhoun Station PO Box 550 Fort Calhoun, NE 68023-0550

Subject:

Quality Assurance for RELAP3i/Mod 3.2

Dear Mr. Jensen:

Enercon recently completed an LTOP analysis for OPPD's Fort Calhoun Station using RELAP5/Mod 3.2. This letter documents the Quality Assurance methods and controls that were applied to this work.

Per contract, our work for this project was conducted under the Enercon Services Quality Assurance Program. Specifically, Enercon's Corporate Standard Procedure (CSP) 3.02, "Control of Computer Software" governs the requirements for use of software in safety-related applications.

Section 3.1 of this procedure allows that software previously developed by entities other than Enercon may be used in safety-related activities provided assurance of the accuracy and applicability of the software is provided, approved by the Project Manager and maintained in the project files. For programs such as RELAP, the CSP would require that the software to be reviewed and verified by Enercon personnel, and that the software can be shown to be accurate and applicable for the intended application. Note that this requires review and approval for use in each application or project. The use of RELAP for the LTOP application was reviewed and approved per Enercon procedure.

For the OPPD project, the standard test cases provided for RELAP5/Mod 3.2 by INEEL were run to check the accuracy of the RELAP code on Enercon's machines. These cases were:

ANS79 EDHTRK EDHTRKN EDRST ESDTRIP PUMP2 TYPPWR TYPPWRN All of the above cases were run satisfactorily. Any differences between the output on Enercon's machines and the INEEL results were justified and determined to be acceptable.

A

- 6 DRW-02-027 Page 2 of 2 To ensure the RELAP code would properly model two-phase flow as compared to an alternate information source, a RELAP model was developed to emulate the test apparatus described in Dr. Ralph W. Pike's Ph.D. Thesis, "The Adiabatic, Evaporating, Two-Phase Flow of Steam and Water in Horizontal Pipe" (July 1962, Georgia Institute of Technology).

The thesis test runs for equilibrium conditions, non-equilibrium conditions and critical flow were modeled in RELAP and benchmarked. The results of RELAP showed good comparison to the test conditions and results. Any discrepancies between the model and test were explained and were considered satisfactory.

It must be noted that before any calculation is performed using the RELAP code, the RELAP code manual is researched to determine if any previous models/analyses using RELAP similar to the analyses to be performed has been accomplished. If previous analyses have been performed, the title of the work is identified and noted in the Computer Certification form that is included in the QA file for the project.

Certain modifications were made to the code for the LTOP project. To increase the speed of the code compilation, various extraneous programs from the INEEL environmental file, envrl.s, were removed. These have no effect on the RELAP code. To be compatible with the NDP Fortran compiler, changes to various environmental file subroutines regarding the timing function, write statements, date, and clock were made. Also for compatibility, modifications to RELAP source subroutines to change the page header title and error trapping routines for Hewlett-Packard computers were made.

Missing carriage returns from Subroutine level and std2x6 were also added. Other changes to the code were the correction of errors in the plotr5 subroutine. None of the above modifications changed the methodology of the code or the numerics.

The Enercon Services Quality Assurance Program has been audited to the requirements of 10 CFR 50 Appendix B on numerous occasions. The Enercon program has been audited by nuclear utilities under the auspices of NUPIC in 1999 and again in 2001. These audits included control of software within their scope, and auditors examined the RELAP quality assurance package as evidence of the Enercon program. No findings related to the RELAP package were generated by either audit.

Enercon appreciates this opportunity to be of service. If you have any questions, please contact me at (918) 665-7693 or through my email address, dwhitson(@enercon.com.

Sincerely, Douglas R. Whitson Client Services Manager LIC-02-0109

Reference:

10.20 R5-02-01, Validation Report for NEPTUNUS Pressurizer using RELAP5/Mod 3.2, April 12, 2002

Validation Report

Title:

NEPTUNUS Pressurizer Code Version: MOD3.2 Manager:

R5-02-01 April 12, 2002 Date:

April 12, 2002 G. W. Johnsen, RELAP5-3D Code Development

1.0 INTRODUCTION

The NEPTUNUS pressurizer experiment is one of a series of separate effects tests used to assess the performance of the RELAP5 code in modeling nuclear reactor thermal-hydraulic behavior.

NEPTUNUS is a scaled model pressurizer located in the Laboratory of Thermal Power Engineering at the Delft University of Technology in the Netherlands. Test Y05 simulated successive insurges, combined with spray, and outsurges in a pressurizer. The assessment tests the accuracy of the interfacial heat and mass transfer models that come into play at the surface of the moving liquid level and in the steam space above the liquid level. To a lesser extent, it also tests the internal wall heat transfer modeling.

Section 2 describes the test facility and the test procedure, section 3 describes the RELAP5/MOD3 model, section 4 discusses and analyzes the results, section 5 summarizes conclusions, and section 6 lists the references. Appendix A contains a listing of the RELAP5/MOD3 input file.

2.0 FACILITY AND TEST DESCRIPTION This section describes the test facility and the test conditions, both of which were obtained from a paper by H. A. Bloemen in which an analysis of test Y05 using RELAP5/MOD1 was discussed'.

The NEPTUNUS pressurizer test facility is about 1/40-scale on a volume basis and consists of a pressure vessel with a surge line at the bottom and a spray line at the top. The basic flow paths in the facility are shown in Figure 1. The flow in the spray line was controlled by a pump connected to a vessel containing hot water. The surge line was connected through a buffer vessel to a cold water vessel pressurized with nitrogen. The flow in the surge line was controlled by varying the nitrogen pressure. The buffer vessel was used to keep a boundary between the hot (548 K) water surging into and out of the pressurizer and the cold (ambient) water in the vessel pressurized with nitrogen. The boundary between the hot and cold fluid was kept in the buffer vessel to prevent thermal shock to the system piping. The spray line and surge line nozzles contained thermal sleeves to prevent thermal shock to the vessel. The flows and fluid temperatures in each line were measured.

The geometric details of the carbon steel test vessel are shown in Figure 2. The vessel was 2.51 m high and 0.8 m in diameter. The surge line nozzle diameter was 0.084 m and the spray line nozzle diameter was 0.027 m. Heater elements with a total power of 17 kW were installed to compensate for environmental heat losses.

The test was initiated with the vessel partially filled (to a level of 1.12 m) with water at 600 K; then an insurge of 548 K water flowed into the vessel, followed shortly by the initiation of spray flow. The temperature of the spray varied from 500 K to 591 K. The test consisted of four successive insurges, combined with spray flow, and outsurges. The magnitude and timing of the spray and surge line flows are shown in Figure 3.

I

The measured data in the vessel were very limited. One pressure and four fluid temperatures were all that were reported'. These data were digitized from the report for comparison with the calculations. The exact location of the measurements was not documented, but in Bloemen's report they were compared with calculated results between the 1.52 m and 1.72 m elevations.

3.0 RELAP5/MOD3 MODEL Figure 4 shows the RELAP5/MOD3 2 nodalization diagram of the NEPTUNUS pressurizer. The pressurizer was modeled using thirteen volumes and twelve junctions. The wall of the pressurizer was modeled using thirteen heat slabs to simulate the environmental heat loss and the condensation effect due to the cold pressurizer wall. Two time dependent volumes were used to simulate the boundary conditions of the cold water supply vessel and spray vessel. The surge line flow rate and the spray rate were modeled using two time dependent junctions. The test-specified surge flow rate and spray rate were input to RELAP5/3D as boundary conditions.

Nitrogen Makeup Figure 1. NEPTUNUS Facility Diagram 2

10.0 8.0 6.0 4.0 I

2.0 0.0

-2.0

-4.0

-6.0

-8.0

-10.0 0.0 Figure 3. Prescribed surge and spray flows in Test Y05 based on measured data Time-Dependent Junction Heat Slabs Time-Dependent Junction Time-Dependent Volume PIPE Component Time-Dependent Volume Figure 4. RELAP5/MOD3 Nodalization Diagram 4

I, 100.0 200.0 Tim e (s) 300.0

4.0 RESULTS Figure 5 compares the calculated and measured pressure near the top of the pressurizer.

RELAP5/MOD3 reproduces the overall trend well, but over-predicts the peak pressures that occur during the insurge phases. This is caused by insufficient condensing of the steam when the spray is activated.

0.

Q)

LI)

CIL L..

14.0 13.0 12.0 11.0 10.0 0.0 I.

100.0 200.0 300.0 Time (s)

Figure 5. Calculated and measured pressurizer pressure This conclusion is supported by the comparison of calculated and measured steam space temperature near the top of the pressurizer shown in Figure 6, and comparisons of steam space temperature and saturation temperature from the test and calculation shown in Figures 7 and 8, respectively. The calculation shows a significant degree of superheating in the steam space during all of the insurges. In the experiment, little superheating occurs during the first and second insurges, where the spray interval closely matches the insurge interval (see Figure 3).

During the third and fourth insurge the spray is delayed, allowing time for the steam to superheat in the experiment.

The apparent degree of disagreement in the temperature data is probably somewhat exaggerated.

When the spray is on in the experiment, it can impinge on the thermocouple located in the steam space, thereby giving a false reading for steam temperature. The RELAP5/MOD3 calculated temperature shown in Figures 6 and 8 is the average steam temperature at the location where the thermocouple was located.

5 RELAP5/MOD3 Data

]

v6 II

620.0 610.0 500.0 590.0 580.0 0.0 100.0 200.0 Time (s) 300.0 Figure 6. Calculated and measured temperature near the top of the pressurizer 615.0 610.0 605.0 600.0 595.0 590.0 585.0 0.0 Time (s)

Figure 7. Comparison of steam space temperature and saturation temperature (test data) 6 QE L..

E I--

L_.

3 Q>

E V-

620.0 510.0 S//

1 500.0 Figr

8. Coprsno ta'pc eprtr n

auaintmeaue(EA/O 590.0 580.0, I

0. 0 100.0 200.0 300.0 Time (s)

Figure 8. Comparison of steam space temperature and saturation temperature (RELAP/MOD3)

The insufficient condensing of steam while the spray is operational indicates an under-prediction of the heat/mass transfer in the steam space, where the "cold" spray droplets are interacting with "hot" steam. The interfacial heat transfer coefficients are clearly too low.

The RELAP5-3D 3 code includes a PRIZER component specifically designed to model pressurizers. It includes the capability to alter the interfacial heat/mass transfer in the steam space. Figure 9 compares the NEPTUNUS pressure data to the MOD3 calculation and a RELAP5-3D calculation. In the latter, the interfacial heat/mass transfer was increased through user input. The agreement with the data is seen to be improved. However, the calculated peaks are high for the first two insurges and low for the third and fourth. Also, the minimum pressures are under-predicted throughout.

5.0 CONCLUSION

S An assessment of the RELAP5/MOD3 code has been conducted by simulating the Neptunus Y05 pressurizer experiment. The results show that the code predicts the correct overall trends but exaggerates the maximum and minimum pressures that occur during the insurge/outsurge cycles.

In this respect, the results could be considered conservative. The principal reason the peak pressures are overstated is insufficient condensation occurring in the steam space when the spray is activated. This was confirmed by running the same problem with RELAP5-3D, in which the interfacial heat/mass transfer can be altered by the user through data input. When the interfacial 7

heat/mass transfer was increased, the agreement with the data improved. This increased interfacial heat/mass transfer is applied all the time, whether the spray is activated or not. It would be more physically realistic if the heat/mass transfer were dependent on whether the spray was on or off.

14.0 0*

o)

,I) 1a) 13.0 12.0 11.0 1r r",

I, 0.0 100.0 200.0 300.0 Time (s)

Figure 9. Calculated and measured pressurizer pressure

5.0 REFERENCES

1. H. A. Bloemen, Verification of the Pressurizer Model in RELAP5/MOD], Energieonderzoek Centrum Nederland, Memo No. 0.375.10 GR 26 (OD 79-24), May 1983.
2. The RELAP5 Development Team, RELAP5/MOD3Code Manual, NUREG/CR-5535, INEL 95/0174, August, 1995.
3. The RELAP5 Development Team, RELAP5-3D Code Manual, Rev. 1.3.a, INEEL-EXT-98 00834, February, 2001.

8

- ----- RELAP5/MQOD3 RELAP5-3D Data I

I 1

.3

.1. I:

I

APPENDIX A. LISTING OF RELAP5/MOD3 INPUT FILE FOR NEPTUNUS Y05

=neptunus y05 0000100 new transnt 0000201 260.00 l.e-6 0.050 p

tempg velfj p

tempg tempf rhofj rhofj velfj velgj p

402 1 1000 1000 002010000 002010000 004000000 002090000 002090000 002090000 004000000 005000000 002120000 002120000 002120000 0000301 0000302 0000303 0000306 0000307 0000308 0000311 0000313 0000316 0000317 0000318 0000501 0000502 0010000 0010101 0010200 0010201 0010202 0020000 0020001 0020101 0020102 0020103 0020104 0020301 0020302 0020303 0020304 0020305 0020306 0020601 0020801 0021001 0021101 0021102 0021103 0021104 0021105 0021106 0021201 0021202 0021301 0030000 0030101 0030200 0030201 surge tmdpvol 0.18550 2.5 0.0 0.0 90.0 2.5 4.e-5 0.0 10 3 501 0.00 125.0e+5 548.0 300.00 125.0e+5 548.0 press pipe 13 0.03398 1 0.28274 3 0.50265 10 0.41169 13 0.11900 1 0.20000 3 0.20083 9 0.15500 10 0.13600 11 0.12450 13 90.0 13 0.00004 0.0 13 00 13 1100 1

1000 2

1100 3

1000 9

1100 10 1000 12 2 12390000.0 0.0 2 12390000.0 1.0 0.0 0.0 0.0 12 0.0 0.0 0.0 6 0.0 0.0 0.0 13 spray tmdpvol 0.50265 2.5 0.0 0.0 90.0 3 501 0.00 128.00e+5 593.98 2.5 4.e-5 0.0 10 A-I time 0 ge null 0 25.0 1 time 0 ge null 0 25.0 1

0030202 0030203 0030204 0030205 0030206 0030207 0030208 0030209 0030210 0030211 0030212 0030213 0030214 0030215 0030216 0030217 0030218 0030219 0030220 2.74 5.00 8.92 19.38 37.19 49.20 71.40

72. 67 97.97 110. 69 135.00 137.35 159.94 169.12 198.34 200.88 215.99 230.53 300.00 0040000 surj4 tmdpjun 0040101 001000000 002000000 0.5542e-2 0.00

.27968

.73981

.90581

.81559

.75604

.45291

.37712

-. 79394

-. 60447

-1.43450

-1.13316

.45651 95272

.76146

.64778

-. 22735

-1.47239

-1.43450

.30134

.84266

.65319

.56297

-. 11368

-. 45651

-1.40563

-1.39119

.38073

.79755

.47817

.49441

-. 72176

-1.32984

-1.36774 0.00 0.00

.27968 0.00

.73981 0.00

.90581 0.00

.81559 0.00

.75604 0.00

.45291 0.00

.37712 0.00

-. 79394 0.00

-. 60447 0.00

-1.43450 0.00

-1.13316 0.00

.45651 0.00

.95272 0.00

.76146 0.00

.64778 0.00

-. 22735 0.00

-1.47239 0.00

-1.43450 0.00

.30134 0.00

.84266 0.00

.65319 0.00

.56297 0.00

-. 11368 0.00

-. 45651 0.00

-1.40563 0.00

-1.39119 0.00

.38073 0.00

.79755 0.00

.47817 0.00

.49441 0.00

-. 72176 0.00

-1.32984 0.00

-1.36774 0.00 A-2 128 - 00e+5 123. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 128. 00e+5 593.98 506.48 500.23 529.40 537.73 578.57 598.15 533.57 539.82 580.65 593.57 535.5 539.82 579.4 593.98 537.73 539.82 584.40 591.07 0040200 0040201 0040202 0040203 0040204 0040205 0040206 0040207 0040208 0040209 0040210 0040211 0040212 0040213 0040214 0040215 0040216 0040217 0040218 0040219 0040220 0040221 0040222 0040223 0040224 0040225 0040226 0040227 0040228 0040229 0040230 0040231 0040232 0040233 0040234 0 502 0.00 1.42 8.82 14.28 19.38 24.32 26.96 30.83 35.00 38.76 50.91 56.19 61.95 70.40 77.18 87.30 95.00 110.79 114.67 121.18 130.33 140.20 148.47 155.00 160.45 169.96 175.00 180.70 190.22 202.54 207.83 225.00 230.72 237.72

spr tmdpjun 003000000 002010000 0.4016e-5 0050200 0 501 0050201

0.

0050202

2.

0050203

6.

0050204

24.

0050205

35.

0050206

70.

0050207

75.

0050208

88.

0050209

95.

0050210 135.

0050211 138.

0050212 149.

0050213 157.E 0050214 198.:

0050215 202.7 0050216 212.7 0050217 212.7 0050218 300.0 10011000 1 2 2 10011100 0 1 10011101 1 0.3 10011201 1 1 10011301 0.0 1 10011400 0 10011401 600.0 00 74 99 96 86 96 49 51 58 35 75 79 86 33 58 77 77 30 0.0000 0.0000 183.2918 432.2958 0.0000 0.0000 252.4651 338.9193 0.0000 0.0000 190.2141 224.8008 0.0000 0.0000 155.6275 155.6275 0.0000 0.0000 0.0000 0.0 0.0000 0.0 183.2918 0.0 432.2958 0.0 0.0000 0.0 0.0000 0.0 252.4651 0.0 338.9193 0.0 0.0000 0.0 0.0000 0.0 190.2141 0.0 224.8008 0.0 0.0000 0.0 0.0000 0.0 155.6275 0.0 155.6275 0.0 0.0000 0.0 0.0000 0.0 1 0.042

22 2

10011501 0020100 10011601 0 0 0 1 10011701 0 0.0 0 10011801 0.0 10.

10011901 0.0 10.

10021000 1 2 2 1 10021100 0 1 10021101 1 0.322 10021201 1 1 10021301 0.0 1 10021400 0 10021401 600.0 2 10021501 0020100(

10021601 0 0 0 1 10021701 0 0.0 0.

10021801 0.0 10.C 10021901 0.0 10.C 00 0 1 0.114

.0 0.0 0 10.0 0 10.0 0.208

)0 0 1 0.119 0 0.0 10.0 10.0 1 0. 114 1

1 0.0 0.0 0.0 0.0 1

0.0 0.0 1.0 1 0.0 0.0 1.0 1 1 0.119 1 1

1 0.0 0.0 0.0 0.0 1.0 1 0.0 0.0 0.0 0.0 1.0 1 10031000 2 2 2 10031100 0 1 10031101 1 0.5 10031201 1 1 10031301 0.0 1 10031400 0 10031401 600.0 10031501 00202 1 0.3 33 2

0000 10000 1 1 0.200 2 0050000 0050101 A-3

0 0 0 1 0.200 0 0.0 0.0 0.0 0.0 10.0 10.0 0.0 10.0 10.0 10031601 10031701 10031801 10031901 10041000 10041100 10041101 10041201 10041301 10041400 10041401 10041501 10041601 10041701 10041801 10041901 2

2 0.0 0.0 0.0 0.0 1.0 2 0.0 0.0 0.0 0.0 1.0 2 2 2 2 1 0.4 0 1 1 0.455 1 1 0.0 1 0

600.0 2 002040000 10000 1 0 0 0 1 0.20083 2 1 0.0 0.0 0.0 2 0.0 10.0 10.0 0.0 0.0 10.0 10.0 0.0 1 2 2 1 0.4 0 1 1 0.455 1 1 0.0 1 0

600.0 2 002060000 0 1 1 0.20083 1 0 0 0 1 0.20083 1 1 1.0 0.0 0.0 1 0.1 10.0 10.0 0.0 0.0 0.0 0.0 1.0 1 0.0 10.0 10.0 0.0 0.0 0.0 0.0 1.0 1 3 2 2 1 0.4 0 1 1 0.4!

1 1 0.0 1 0

600.0 00207 0 0 0 0 0.0 0.0 I(

0.0 i1 2

)000 10000 1 1 0.20083 3 0.0 0.0 3

).0 10.0 0.0

).0 10.0 0.0 1 2 2 1 0.400 0 1 1 0.489 1 1 0.0 1 0

600.0 2 002100000 0 1 0 0 0 1 0.165 0 0.0 0.0 0.0 0.0 10.0 10.0 10091000 10091100 10091101 10091201 10091301 10091400 10091401 10091501 10091601 10091701 10091801 10091901 10101000 10101100 10101101 10101201 10101301 10101400 10101401 10101501 10101601 10101701 10101801 10101901 1 0.165 1 1

1 0.0 0.0 0.0 0.0 1.0 1 10061000 1 2 2 1 0.362 A-4 1 0.20083 2 0.0 0.0 0.0 1.0 2 0.0 0.0 0.0 1.0 2 1 0.20083 3 0.0 0.0 0.0 1.0 3 0.0 0.0 0.0 1.0 3 10051000 10051100 10051101 10051201 10051301 10051400 10051401 10051501 10051601 10051701 10051801 55

10061100 10061101 10061201 10061301 10061400 10061401 10061501 10061601 10061701 10061801 10061901 0 1 1 0.5225 1 1 0.0 1 0

600.0 2 002110000 0 1 0 0 0 1 0.136 0 0.0 0.0 0.0 0.0 10.0 10.0 0.0 10.0 10.0 10071000 2 2 2 1 10071100 0 1 10071101 1 0.397 10071201 1 1 10071301 0.0 1 10071401 600.0 2 10071501 0021200 10071601 0 0 0 1 10071701 0 0.0 0 10071801 0.0 10.

10071901 0.0 10.

0.362 00 10000 1 0.249 2

.0 0.0 2 0 10.0 0.0 0 10.0 0.0 1 0.249 2 0.0 0.0 0.0 1.0 2 0.0 0.0 0.0 1.0 2 10081000 1 2 2 10081100 0 1 10081101 1 0.3 10081201 1 1 10081301 0.0 1 10081400 0 10081401 600.0 10081501 00213 10081601 0 0 0 10081701 0 0.0 10081801 0.0 1 10081901 0.0 1 20100100 20200100 20200101 20200102 1 0.002 97 2

0000 0 1 1 0.035 0.0 0.0 0.0 10.0 0.0 10.0 1 0.035 1 1

1 0.0 0.0 0.0 0.0 1.0 1 0.0 0.0 0.0 0.0 1.0 1 c-steel power 501 1.0 1.0 0.0 0.0 100.0 0.0 1 0.136 1 1

1 0.0 0.0 0.0 0.0 1.0 1 0.0 0.0 0.0 0.0 1.0 1 A-5 LIC-02-0109 Reference 10.21 INEEL/EXT-02-00589, May 2002, SCDAP/RELAP5-3D Code Manual, Volume 5: Assessment of Modeling of Reactor Core Behavior During Severe Accidents, Appendix A12, "TMI-2 Accident"

A12. TMI-2 ACCIDENT A12.1 Introduction The TMI-2 Accident Test Problem provides under full scale conditions an assessment of virtually every in-core damage progression model in the SCDAP/RELAP5/MOD3.3 code. Since the accident was not an experiment, the measured behavior of the reactor during the accident was limited. Nevertheless, the limited amount of information obtained during the accident and the post-accident examinations of the reactor provide a significant amount of information for assessing at least in an indirect manner most of the in-core damage progression models in the code. The TMI-2 accident involved spacer grid meltdown, cladding ballooning, control rod meltdown, fuel rod oxidation, hydrogen production, cladding meltdown, fuel melting, molten pool formation, quenching of hot and embrittled fuel rods, and molten pool slumping.

The measurements obtained during the accident and inferences made from observations after the accident only provide quantitative assessment of a few of the damage progression models, such as models that calculate total hydrogen production, location of previously molten frozen material, and total amount of molten material. Nevertheless, since one damage progression event in the overall chain of damage progression events is dependent upon all the other previous damage progression events in the chain, the correct calculation of a few of the damage progression events cannot be made without a correct calculation of the other damage progression events. So an indirect assessment can be made of virtually every in-core damage progression model in the code.

A12.2 Description of TMI-2 Accident Problem All major components of the TMI-2 primary system were represented in the TMI-2 Accident Test Problem. The RELAP5 module was used to simulate the thermal-hydraulics of the reactor vessel, primary coolant loops, steam generators, and pressurizer. Steam generator secondary side coolant levels, pressures, and feedwater temperatures, and primary side makeup and letdown flow rates were supplied as boundary conditions. The SCDAP module was used to simulate the reactor core, which was divided into five radial regions by grouping similarly powered fuel assemblies together.

The TMI-2 accident is generally divided into four distinct phases for analysis purposes. A] 2-1 Phase 1 (0 - 100 min) is a small-break loss-of-coolant accident (LOCA) through the stuck-open pilot-operated relief valve (PORV). One or more reactor coolant system (RCS) pumps operated continuously during Phase 1 of the accident, thereby providing adequate core cooling. Phase 2 (100 - 174 min) is a continuation of a small break LOCA without the RCS pumps. Core uncovery, heatup, and initial melting occurred during Phase 2. Phase 3 (174 - 200mrin) begins with a restart of feactor coolant pump 2B. Approximately 30 m3 of coolant was injected into the reactor vessel in less than one minute, cooling the peripheral fuel assemblies and forming an upper core debris bed wxith significant zircaloy oxidation. Heatup of the degraded core region, with the formation and growth of a pool of molten material, continued during Phase

3. Phase 4 (200 - 300 min) begins with the initiation of high pressure injection (HPI). The central region of the partially molten core material was not coolable by HPI even through the water level reached the level of the hot legs by 207 min. Between 224 and 226 min, the crust encasing and supporting the molten core region is believed to have failed, allowing molten material to relocate to the lower plenum. Summaries of the measured and observed reactor core damage are given in References A 12-2 and A 12-3.

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-1

The RELAP5 portion of the TMI-2 model was derived from an Oconee plant model described in Reference A12-4. Both TMI-2 and Oconee are PWR's having a two-by-four coolant loop configuration, i.e., two primary coolant loops, each containing one hot leg and two cold legs. Both plants were built by Babcock & Wilcox in the 1970's and have nearly identical design and operating characteristics.

Consequently, the Oconee RELAP5 model was easily adapted to represent TMI-2. Figure A12-1 through Figure A12-4 are nodalization diagrams of the reactor vessel, primary piping, steam generators, and pressurizer respectively.

UVU IE r

Scc The RELAP5 vessel model Figurc AI2-1) represent all major components of the reactor vessel, including the inlet annulus, downcomer, lower plenum, core, core bypass, upper plenum, upper head, reactor vessel vent valves, and the control rod guide tube brazements. The core is divided into five parallel channels, each consisting of ten subvolumes (branch components 10 through 59). Lateral flow between adjacent core channels is simulated using the RELAP5 crossflow model. Annulus component 570 represents the downcomer and pipe component 510 the core bypass. Branch components 505 and 575 represent the lower plenum. The upper plenum is also divided into five parallel regions that are connected laterally by cross flow junctions. This arrangement allows for the development of in-vessel natural circulation under appropriate conditions. Valve component 542 represents the reactor vessel vent valves and pipe components 580 through 584 the guide tube brazements. Fifty-one heat structures were used to model the thermal behavior of reactor vessel metal structures.

Figure A 12-2 is a nodalization diagram of the primary coolant loop A, which consists of one hot leg (components 100 through 114), one steam generator (discussed subsequently), two pump suction legs (pipe components 135 and 165), and two cold legs (components 140 through 151 and 170 through 181).

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-2

Figure A12-2. RELAP5 nodalization of primary coolant loop A.

Primary loop B is identical to loop A, except it does not contain a letdown flow path (time-dependent junction 193) or connections to the pressurizer spray and surge lines. The component numbers for loop B are also increased by 100 (e.g., the primary pumps are numbered 235 and 265 rather than 135 and 165).

The high pressure injection (HPI) system is represented by time-dependent volumes 710 and 715, which are connected to the cold legs by time-dependent junctions 711 and 716. HPI flow is assumed to be split equally between the A and B loops while makeup flow is injected only into the B loop. Eighteen heat structures (per loop) were used to model the thermal behavior of the primary piping.

The nodalization of steam generator A is shown in Figure A12-3. Steam generator B is identical except that all component numbers are increased by 100. The boiler region is divided into two parallel flow channels: an inner channel (volumes 310 through 323), connected to 90% of the steam generator tubes, and an outer channel (volumes 360 through 373), connected to 10% of the steam generator tubes. Crossflow junctions connect the two boiler regions. Auxiliary feedwater is normally injected into the top of the 10%

region. Pipe component 120 represents the primary side of the steam generator tube bundle, while branch components 115 and 125 represent the inlet and outlet plena. The steam generator downcomer is modeled by component 305, and components 345 and 350 represent the steam line. To preheat the feedwater, a portion of the steam flow is bled into the downcomer through an aspirator near mid-boiler (modeled with a junction between component 365 and 305). Valve component 821 represents the main steam valve.

Forty-three heat structures were used to model the thermal behavior of steam generator metal structures (including the tube bundle).

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-3

Figure A12-3. RELAP5 nodalization of steam generator A.

It should be noted that for all the calculations reported here, auxiliary feedwater was injected into the steam generator downcomer rather than into the tube bundle as indicated in Figure A12-3. A previous TMI-2 analyses using SCDAP/RELAP5a indicated that feedwater injection directly onto the steam generator tubes resulted in too much primary-side condensation, which in turn caused the primary system pressure to be underpredicted. It should also be noted that the nodalization of the steam generators differs somewhat from that recommended in the SCDAP/RELAP5 user's guide.A1 2"5 Although the boiler is divided into two parallel regions, the tube bundle (pipe 120) is not. Dividing the tube bundle into a 10%

region and a 90% region may alleviate some of the condensation problems encountered previously.

Figure A12-4 is a nodalization diagram of the pressurizer. The pressurizer upper head is modeled with branch component 615 and the pressurizer cylindrical body and lower head with pipe component 610.

Valve 801 represents the pilot operated relief valve (PORV). Pipes 600 and 620 represent the pressurizer surge and spray lines, respectively, and valve 616 models the spray valve. Single volume component 949

a. C. A. Dobbe, private communication, EG&G Idaho, Inc., March 15, 1994.

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-4

SRV PORtV 610 Fmrm 110 Surge line Spray line S- -

From 170 Figure A12-4. RELAP5 nodalization of the pressurizer.

represents the containment building, which is initially filled with air at 101 kPa. Twelve heat structures are used to model the thermal behavior of the pressurizer shell, upper and lower heads, and the surge line; one heat structure is used to simulate operation of the pressurizer heaters; and five heat structures are used to model the thermal behavior of the containment building.

It should be noted that critical flow through the PORV is modeled using the homogeneous (single velocity) two-phase flow option in RELAP5. Previous TMI-2 calculations using SCDAP/RELAP5a have shown that this option better predicts the PORV flow history reported in the TMI-2 initial and boundary conditions (ICBC) data baseA12-6 than other options. [The PORV flow rates reported in Reference A12-7 were calculated using the Henry-Fauske critical flow model for subcooled conditions and the homogeneous equilibrium critical flow model (HEM) for two-phase conditions.] It should also be noted that for all calculations reported here, a servo valve was installed between the pressurizer and the surge line at 117 min to prevent the pressurizer from draining. In preliminary calculations, the pressurizer drained completely after the PORV block valve was closed at 139 min, which effectively terminated core heatup.

More accurate representations of the surge line and pressurizer might eliminate some of the problems encountered in this and previous TMI-2 analyses. For example, the junction connecting the surge line to

a. C. A. Dobbe, private communication, EG&G Idaho, Inc., March 15, 1994.

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-5

hot leg A should be oriented horizontally rather than vertically (to reflect its true alignment) and the countercurrent flow limitation (CCFL) model should be activated at the junction connecting the surge line to the pressurizer, rather than at the hot leg junction. Also, the CCFL input parameters (currently set to default values) should be reviewed for applicability.

The TMI-2 core was divided into five regions for this analysis by grouping similarly powered fuel assemblies together. Figure A12-5 is a cross-section of the core illustrating each region and its average radial power peaking factor. Table A 12-1 lists the average axial power peaking factors for each region.

Both the axial and radial peaking factors were derived from detailed peaking factor data presented in Appendix A of Reference A 12-6.

Table Al 2-1. TMI-2 axial power peaking factors.

Power factor Distance from Region 1 Region 2 Region 3 Region 4 Region 5 bottom of fuel (m) 01.183 0.665 0.674 0.729 0.690 0.670 0.549 0.933 0.919 0.962 0.951 0.944 0.914 1.134 1.099 1.112 1.132 1.145 1.280 1.216 1.164 1.112 1.168 1.213 1.646 1.248 1.202 1.138 1.192 1.238 2.012 1.262 1.221 1.153 1.206 1.248 2.377 1.225 1.232 1.251 1.241 1.222 2.743 1.078 1.124 1.174 1.131 1.083 3.109 0.792 0.853 0.880 0.834 0.794 3.475 0.448 0.512 0.488 0.455 0.442 One SCDAP fuel rod component is used to represent all the fuel rods in each core region. One SCDAP control rod component is used to represent all the full and part-length control rods, all the guide tubes (including those containing burnable poison rods), and all the instrument tubes in each core region (except region five which contains no control rods). The control rod radii in regions one through four have been adjusted so that the total mass of zircaloy, Ag-In-Cd absorber, and stainless steel is conserved (the burnable poison mass is neglected). In core region five, a dummy fuel rod component is used to represent all the guide and instrument tubes. By specifying a small fuel diameter and zero power, this component essentially behaves as a hollow zircaloy tube. The SCDAP grid spacer model is used to represent the eight inconel spacer grids that are uniformly distributed along the length of each fuel assembly.

Much of the SCDAP input data was obtained from Reference A12-8 and is summarized in Table A12-2. Table A12-3 lists the total number of fuel assemblies, fuel rods, control rods, burnable poison rods, and orifice rods in each core region.

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-6

I E

7 1~

A-

 -i

- r -

t -

t -

t-t -

Radial RepIinn Peaking Faclor 1

1.245 2

1.136 3

1.074 4

1.061 5A Cs.733 Id¢ :i.fl aRD g.'4,,.*li 1 Figure A12-5. Cross-sections of core showing fuel assembly grouping and radial peaking factors.

Table A12-2. Total fuel assemblies, fuel rods, and control rods in each core region.

Core Fuel Fuel Full-lengt Part-leng Burnable Instrument Orifice regions assemblies rods h control th control poison tubes rods rods rods rods 64 I) 13 28 40 48 48 177 2704 5824 8320 9984 9984 36816 144 256 192 384 0

976 0

0 128 0

1 0

0 0

0 128 48 640 1088 177 640 INEEL/EXT-02-00589-Rev 0, Vol 5 64 192 320 384 13 28 40 48 1

2 3

4 5

Total FI A12-7

Table A12-3. SCDAP input parameters.

Parameter Value Fuel rods Active height (m) 3.568 Rod pitch (in) 1.443 x 10-2 Cladding inner radius (in) 4.788 x 103 Cladding outer radius (m) 5.461 x 10 Fuel pellet radius (in) 4.699 x 10-3 Fuel density (% T.D.)

92.5 Mass of He fill gas (estimated) (kg) 1.265 x 10-4 Upper and lower plenum void volume (m 3) 1.490 x 10-5 Control rods Guide tube inner radius (m) 6.325 x 10-3 Guide tube outer radius (in) 6.731 x 10 Cladding inner radius (m) 5.055 x 10-3 Cladding outer radius (in) 5.588 x 10-'

Absorber radius (in) 5.004 x 10-3 Instrument tubes Tube inner radius (m) 5.601 x 10-3 Tube outer radius (m) 6.261 x 10-3 Grid spacers Grid spacer mass (kg)

Grid spacer height (in)

Grid spacer thickness (in)

Table A12-4 compares the initial conditions in the SCDAP/RELAP5 model to those recommended in the ICBC data base.a with the exception of steam generator pressures and temperatures, the calculated (or specified) initial conditions are in good agreement with the data base. For steady-state calculations, a control system is used in the SCDAP/RELAP5 model to automatically adjust steam generator pressures (by varying the flow areas of the main steam valves) until user-specified cold leg temperatures are obtained. For simplicity, the target coolant temperature for all four cold legs was specified to be 565 K.

Table A 12-5 compares the calculated initial conditions on the secondary side of each steam generator to

a. All initial conditions correspond to the time of turbine trip: 04:00:37 hours on March 28, 1979.

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-8

the initial conditions recommended in Reference A12-9. It is seen that the calculated steam generator pressures are in much better agreement with the Reference A12-9 data than with the ICBC data base.a Calculated steam generator coolant levels, however, differ considerably from those reported in Reference A12-9. For future calculations, it is recommended that the steam generator models should be adjusted to better represent the Reference A12-9 data. One way to accomplish this may be to increase the pressure drop across the tube support plates as was done for a TMI-2 analysis performed with the CATHARE code.A 12-10 Table Al 2-4. TMI-2 initial conditions at turbine trip.

ICBC data SCDAP/

Parameter base RELAP5 Reactor power (MW) 2700 2700 Primary system pressure (MPa) 15.2 15.2 Pressurizer level (m) 5.77 5.76 Pressurizer heater power (MW) 1.39 1.39 Cold leg temperature 1A (K) 561 565 Cold leg temperature 2A (K) 548 565 Hot leg temperature loop A (K) 592 593 Hot leg temperature loop B (K) 592 593 Makeup flow (kg/s) 5.44 0.0 Letdown flow (kg/s) 4.18 0.0 PORV flow (kg/s) 2.59 0.0 Feedwater temperature (K) 513 Steam generator A pressure (MPa) 7.31 6.34 Steam generator B pressure (MPa) 7.24 6.28 Steam generator A steam temperature (K) 586 576 Steam generator B steam temperature (K) 585 582

a. The pressures reported in Reference A 12-9 are average steam line pressures measured 10 to 0.1 min before turbine trip.

INEEL/EXT-02-00589-Rev 0, Vol 5 A 12-9

Table A12-5. Steam generator initial conditions.

SCDAP/

Parameter Reference A 12-9 RELAP/

RELAP5 Steam generator A feedwater flow (kg/s) 722 723 Steam generator B feedwater flow (kg/s) 718 717 Steam generator A pressure (MPa)a 6.38 6.34 Steam generator B pressure (MPa)a 6.24 6.28 Steam generator A steam temperature (K) 586 576 Steam generator B steam temperature (K) 586 582 Steam generator A riser level (cm) 526 197 Steam generator B riser level (cm) 538 183 Steam generator A downcomer level (cm) 660 559 Steam generator B downcomer level (cm) 669 543 Steam generator A power (MW) 1346 1332 Steam generator B power (MW) 1339 1378 AO.2.1 Boundary Conditions All boundary conditions, except HPI/makeup flow rates, were obtained from the ICBC data base (Reference A 12-6). The HPI/makeup flow rate history reported in Reference Al12-11 was adjusted until the time of core uncovery (as inferred from hot leg temperature measurements), the time of initial fuel rod cladding failure (as inferred from containment radiation measurements), and the primary system pressure history were predicted reasonable wella Figure A12-6 compares the HPI/makeup flow rate history used for the best-estimate SCDAP/RELAP5 calculation discussed subsequently to that recommended in Reference A12-6. In a previous SCDAP/RELAP5 analysis of the TMI-2 accident, A12-12 using a previous version of the code, better results were obtained by reducing the makeup flow rate from 4 to 2 kg/s between 100 and 174 min. In an analysis performed with the MELPROG/TRAC code,A12-13 it was concluded that the makeup flow rate recommended in Reference A12-6 was too high between 12 and 100 min. For that analysis, the flow was reduced from 6.5 to I kg/s between 12 and 100 min (which was the nominal value given in the original issue of the ICBC data base). Core power as a function of time for the first 400 s following reactor scram was estimated using the reactor (point) kinetics and decay heat models in the RELAP5 code. The decay power from 617 minutes onward was obtained from Reference A12-14. Figure A 12-7 shows the reactor power versus time curve in the SCDAP/RELAP5 model.

a. The uncertainty in HPI/makeup flow is large, particularly between 100 and 174 min.A12-11 Consequently, as noted in Reference A 12-12, it isn't possible to determine which assumptions are better.

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-10

80.0 60.0 0

L-40.0 20.0 0.0 0.0 100.0 Time (s)

Figure A12-6. Makeup flow history for TMI-2 calculation.

0 40 so 120 ISO Time (min) 200 240 2B0 320 Figure A12-7. Reactor power versus time curve used for TMI-2 calculation.

INEEL/EXT-02-00589-Rev 0, Vol 5 Reference A.11-16 Reference A.1 1-11

  • - r *---------

200.0 300.0 100 10 0 CL I-A12-11 401

A12.3 Assessing Using TMI-2 Accident The timing of the opening and closing of the PORV block valve is an important boundary condition for the TMI-2 accident. Figure A12-8 is a plot that shows the times at which the block valve was opened and closed and the calculated rate of mass flow through the valve for the periods of time that it was open.

The plot also shows the calculated rate of flow through the PORV valve. The calculated rate of flow through the open PORV valve ranged from 5 to 35 kg/s.

40.0 "30.0 Co 16 20.0 10.0 0.0 0.0 5000.0 10000.0 15000.0 Time (s)

Figure A12-8. Timing of closure of PORV block valve and history of calculated rate of flow through PORV valve.

The SCDAP/RELAP5 MOD3.3 solution to the TMI-2 Accident test Problem is presented next. The calculated timing of the damage progression is described and calculated results are presented for which measurements are available for comparison and assessment. These calculated results are; (1) location of core material, (2) maximum amount of molten material, (3) reactor system pressure, and (4) hydrogen production. Default values were used for all the modeling parameters subject to being defined by the code user.

The damage to the TMI-2 reactor core began with the ballooning and rupture of the cladding of the fuel rods and advanced to the slumping of a significant amount of molten core material to the lower head of the reactor vessel. The MOD3.3 calculated and measured progression of damage are compared in Table A 12-6. The results of the MOD3.2 calculation of the TMI-2 accident are included in the table. After core uncovery was calculated to occur at 6270 s, core damage was calculated to occur quite rapidly. Cladding failure due to ballooning was calculated by MOD3.3 to begin at 8445 s. MOD3.2 calculated cladding failure to be due to chemical attack by the Inconel spacer grids and to not occur until 9417 s. After cladding failure, double-sided oxidation of the cladding was calculated by MOD3.3 to occur in the vicinity of the cladding failure. The melting of fuel and the formation of a molten pool were calculated by MOD3.3 to begin at 9500 s. MOD3.2 calculated molten pool formation to begin at 10,330 s. The start-up of the INEEL/EXT-02-00589-Rev 0, Vol 5 A12-12

2B-pump at 10,446 s was calculated by both MOD3.3 and MOD3.2 to cause a rapid increase in the pressure of the primary coolant system and to accelerate the rate of hydrogen production. These calculations are in agreement with the measurements. MOD3.3 calculated 9,530 kg of molten material in the core region at the start of the 2-B pump and 27,600 kg of molten material in the core just before the slumping of core material to the lower head at 12,890 s. MOD3.2 calculated 1734 kg of molten material in the core region at the start-up of the 2B-pump and 37,400 kg of molten material in the core just before the slumping of core material to the lower head at 13,379 s. The post-accident examination of the TMI-2 reactor indicated that 40,800 kg of the reactor core was molten at some time. Inferences from the measured system pressure and other measurements indicate that 15,800 kg of molten material slumped to the lower head at 13,500 s. Both the MOD3.3 and MOD3.2 calculated masses of molten material and the time of slumping are in approximate agreement with the measured values. The MOD3.3 calculated location of molten core material was in fair agreement with the post-accident observation of the TMI-2 reactor. The elevations of the bottom surface of the in-core molten pool at the centerline of the core were calculated and observed to be 1.10 m and 0.11 m, respectively. The highest location in the core to become molten was calculated to be 2.9 m and to be located along the centerline of the core. The molten pool was calculated to extend in the radial direction from the centerline of the reactor vessel to the periphery of the reactor core.

The bottom surface of the molten pool at the periphery of the core was calculated by MOD3.3 to be at the elevation of 2.2 m. These calculated results are in agreement with the post-accident observation of the TMI-2 core.

Table Al 2-6. Calculated timing and sequence of core damage progression.

Measured O32O3.

Damage progression parameter or inferred MOD3.2 MOD3.3 Beginning of long term core uncovery (s).

6,390 6,270 Beginning of cladding failure due to 9,417 8,445 ballooning (s).

Beginning of spacer grid slumping (s).

9,418 9,112 Beginning of molten pool (s).

10,330 9,530 Cumulative hydrogen production at start-up of 300 275 365 2B-pump at 10,446 s (kg).

Primary coolant system pressure at start-up of 8.20 5.03 6.96 2B-pump (MPa).

Mass of molten material at start-up of 1734 15,000 2B-pump (kg).

Increase in primary coolant system pressure 6.30 5.21 7.00 after start-up of 2B-pump (MPa).

Final cumulative hydrogen production (kg).

460 453 417 Mass of core material that was molten during 40,800 37,400 27,600 some period of accident (kg).

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-13

r'-

i Table A12-6. Calculated timing and sequence of core damage progression. (Continued)

Measured Damage progression parameter or inferred MOD3.2 MOD3.3 Elevation of bottom of molten region relative 0.71 1.46 1.10 to bottom of core (m).

Smallest distance from side of molten pool to 0.0 0.0 0.0 periphery of core (m).

Time at which bulk of material in molten 13,500 13,379 12,890 material slumped to lower head (s).

Mass of molten material that slumped to lower 15,800 37,400 27,600 head (kg).

Percent of molten material that slumped to 39 100 100 lower head (%).

MOD3.3 calculated a greater rise of the water level in the reactor core after activation of the 2B-pump than did MOD3.2. Both MOD3.3. and MOD3.2 calculated damage progression to be a strong function of the calculated collapsed liquid level in the reactor vessel. Figure A 12-9 are plots of the MOD3.3 and MOD3.2 calculated collapsed liquid levels as a function of time. A temporary core uncovery was calculated by MOD3.3 to begin at 4800 s and the long term uncovery was calculated to begin at 6330

s. After 6330 s, the core continued to uncover until the 2-B pump activation at 10,446 s. The collapsed liquid level was calculated by MOD3.3 to be 0.3 m above the bottom of the reactor core just before activation of the 2-B pump. MOD3.2 calculated the collapsed liquid level just before start-up of the 2B-pump to be 0.2 m above the bottom of the reactor core. After activation of the 2-B pump, MOD3.3 calculated the water level to rise 3.0 in and MOD3.2 calculated the water level to rise 0.8 m. This difference in calculated rise in water level is due to MOD3.3 calculating a significantly greater fraction of the reactor core to be molten at the start-up of the 2B-pump than MOD3.2. Both MOD3.3 and MOD3.2 calculated activation of the HPIS at 12,012 s to cover the entire reactor core with water within 600 s.

The level of water in the pressurizer has an influence on the level of water in the reactor vessel.

Figure A 12-10 is a plot of the measured water level in the pressurizer and the levels calculated by MOD3.3 and MOD3.2. In the period of 10,000 s to 13,000 s, both MOD3.3 and MOD3.2 calculated a lower level of water in the pressurizer than the measured level.

MOD3.3 calculated severe core damage to begin about 800 s earlier than MOD3.2. The onset of melting of the reactor fuel and the beginning of molten pool formation is a mark of the beginning of severe core damage. The timing of damage progression is indicated by plots of the history of the maximum temperature in the reactor core and of the effective radius of the molten pool, as shown in Figures A12-11 and A12-12, respectively. The effective radius is the radius of a hemisphere with a volume equal to the calculated volume of molten material. The MOD3.3 and MOD3.2 calculated timings for the beginning of fuel melting were 9530 s and 10,330 s, respectively. MOD3.3 calculated a significantly more rapid heatup of the reactor core after the beginning of oxidation than did MOD3.2. In the temperature range of 1800 K to 2200 K, when rapid oxidation occurs, MOD3.3 calculated a heatup rate of nearly 50 K/s. The MOD3.2 INEEL/EXT-02-00589-Rev 0, Vol 5 A12-14

Appendix A 12 12.0 10.0

41)

-o 0*

0 8.0 6.0 4.0 -

'.U.nrl,

4. 0 eact core

- /

.Start-up of

...... I "I

I.- -

.1.2 B -p u m p 0.0 5000.0 10000.0 1

Time (s)

Figure Al 2-9. History of calculated collapsed liquid level in reactor vessel.

12.0 10.0 NO

= 8.0 (0L CL S6.0

-o 4.0 MOD 3.3 MOD 3.2 Measured 2.0 0.0 5000.0 10000.0 Time (s)

Figure Al 2-10. Comparison of calculated and measured liquid level in pressurizer.

5000.0 15000.0 INEEL/EXT-02-00589-Rev 0, Vol 5 A12-15

calculated rate of heatup in this range of temperature was significantly less than that calculated by MOD3.3. Both MOD3.3 and MOD3.2 calculated that activation of the 2B-pump at 10,446 s did not result in any reduction in the maximum core temperature. A reduction in temperature was calculated to not occur because a significant part of the core was in the form of a large molten pool and because of an increase in oxidation of fuel rod cladding due to cracking of oxide layers and more flow of steam. The activation of HPIS at 12,012 s was calculated to not cause any cooling of the molten part of the reactor core. MOD3.3 calculated no further melting of fuel after 10,480 s (34 s after activation of 2B-pump), while MOD3.2 calculated fuel melting to occur until 13,000 s. MOD3.3 calculated the maximum effective radius of the molten pool to be 1.20 m. This value is in general agreement with the corresponding measured value of 1.40 m.

3000.0 22000.0 E

E E

E 1000.0 f) 0 0

0.0 L..

0.0 5000.0 10000.0 Time (s) 15000.0 Figure A12-11. History of calculated maximum temperature in reactor core.

The MOD3.3 calculated and measured histories of the primary coolant system pressure were in partial agreement. The measured and calculated pressure histories are compared in Figure A12-13. The MOD3.2 calculated pressure history is also shown. The calculated and measured pressures were in good agreement from the start of the accident until 7,500 s. In the period of 7,500 s to start-up of the 2B-pump at 10,446 s, the calculated pressure was significantly less than the measured pressure. The coolant system pressure was calculated to increase about 7 MPa after start-up of the2-B pump. This calculated increase in pressure was in general agreement with the measured pressure increase of 6.3 MPa. The increase in pressure was calculated to be due to steam generated by pumping of water into the hot reactor core and by heatup of the reactor core by an acceleration in the oxidation of fuel rod cladding. In the period of 10,500 s to activation of HPIS at 12,012 s, the pressure was calculated and measured to gradually decrease a few MPa. After activation of the HPIS, the pressure was calculated and measured to increase a few MPa.

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-16

Appendix A 12 1.5 1

MOD 3.2 (0.6 durability)

MOD3.2 (0.2 durability)

MOD 3.3 0 CL1.0

1.

Molten pool slumped to 0

O*:lower head a 0.5 S

~(10,446 s)*

JStart-up of S~HPIS

.(12,000s) 9000.0 11000.0 13000.0 Time (s)

Figure A12-12. History of calculated effective radius of molten pool.

20.0 15.0 S10.0 U,0 5.0 5.0 0.0 LO-Time (s)

Figure A12-13. Calculated and measured pressures of primary coolant system.

INEEL/EXT-02-00589-Rev 0, Vol 5 15000.0 15000.0 A12-17

Appendix A12 The MOD3.3 calculated pressure history of the primary coolant system was improved using the boundary conditions for the TMI-2 accident applied by Annunziato et 1.A.12-17 The TMI-2 accident has a large degree of uncertainty in boundary conditions that influence the pressure of the primary coolant system. The accident has uncertainties in boundary conditions such as make-up flow rate, performance of the 2B-pump, flow rate through the PORV, and time of its closure. Since there are uncertainties in these boundary conditions, the TMI-2 accident was also calculated by MOD3.3 using the boundary conditions used by Annunziato at al. The pressure history calculated by a slightly earlier version of MOD3.3 with these boundary conditions is compared with the measured pressure history in Figure A12-14. The calculated pressure history in the period of 7500 s to 10,000 s was in general agreement with the measured pressure history. Other aspects of reactor behavior, such as the total hydrogen production and total mass of molten material, were also in general agreement with measurements and the post-accident observation.

20.0

-MOD 3.3 Measured 15.0 210.0 Cd) 5.0 N

0.0 0.0 5000.0 10000.0 15000.0 Time (s)

Figure A12-14. Comparison of calculated and measured pressure histories of primary coolant system for case of boundary conditions from Annunziato.

The calculated hydrogen production was in general agreement with the hydrogen production estimated from post-accident observations and inferences. The MOD3.3 calculated cumulative hydrogen production is compared with the measured hydrogen production in Figure A12-15. The MOD3.2 calculated hydrogen production is also shown in the figure. MOD3.3 calculated the rapid production of hydrogen to begin sooner than MOD3.2. Nevertheless, both the MOD3.3 and MOD3.2 calculations of hydrogen production are in approximate agreement with the measured hydrogen production. At the start-up of the 2B-pump, the MOD3.3 and MOD3.2 calculations of cumulative hydrogen production were 275 kg and 365 kg, respectively. The measured hydrogen production at the start-up of the 2B-pump was 300 kg. The MOD3.3 calculated and measured total hydrogen productions were 417 kg and 460 kg, respectively. Both MOD3.3 or MOD3.2 calculated that no significant amount of hydrogen production occurred 50 s after the start-up of the 2B-pump (10,500 s). Hydrogen production was calculated to not INEEL/EXT-02-00589-Rev 0, Vol 5 A12-18

occur after 10,500 s because the portions of the core with intact fuel rods and some metallic cladding were too cool to rapidly oxidize. This behavior is shown in Figure A12-16, where the MOD3.3 calculated temperature histories are shown of the fuel rods in the outer most fuel assemblies of the reactor core at the elevations of 3.11 m and 3.47 m, respectively. As shown in this figure, hydrogen production at the 3.11 m and 3.47 m elevations was calculated to stop due to the cooling caused by the start-up of the 2B-pump. The oxide layer at this location was calculated to be too thin to crack during the reflood caused by start-up of the 2B-pump.

500.0

.) 400.0 0

'0 V

2 300.0

0.
0) 0

>' 200.0

0)

E S100.0 0

0.0 L 7000.0 9000.0 11000.0 13000.0 Time (s) 15000.0 Figure A12-15. Calculated hydrogen production during TMI-2 accident.

The MOD3.3 calculation of the disintegration of fuel rods into porous debris was in agreement with the post-accident observation of the locations in the reactor core with porous debris. Porous debris regions were calculated to form in the outer most fuel assemblies in the elevation interval of 0.5 m to 1.2 m and across the entire diameter of the reactor core in the elevation interval of 2.6 m to 3.6 m. The calculation of porous debris in the elevation interval of 2.6 m to 3.6 m was consistent with the post-accident observation of the state of the reactor core.

The porous debris thermal hydraulic models in MOD3.3 performed properly after activation of the HPIS, which resulted in two-phase coolant conditions in porous debris in the upper part of the reactor core.

The calculated temperature history at a location with porous debris is shown in Figure A12-17. The plot applies for the location 2.7 m in elevation and in the fourth ring of fuel assemblies. This location disintegrated from intact fuel rods to porous debris soon after start-up of the 2B-pump, and thus was porous debris at the time of start-up of HPIS. As a result, the flow losses and heat transfer at this location during the reflood period beginning with the start-up of HPIS were calculated with the porous debris thermal hydraulic models implemented into MOD3.3. The debris had a porosity of 0.46 and a particle INEEL/EXT-02-00589-Rev 0, Vol 5 A12-19

3000.0 3.11 m elevation 3.47 m elevation 2000.0 0.a E

a)

F-1000.0 Start-up of 2B-pump (10,446 s) 0.0 I

I 0.0 5000.0 10000.0 15000.0 Time (s)

Figure A12-16. MOD3.3 calculated temperature histories of fuel rods in upper part of outer most fuel assemblies in reactor core.

diameter of 3.5 mm. Since the molten pool was located below this location and blocked the upward flow of water from the HPIS, the debris was flooded from the top down. The calculated temperature history of this location following reflood of the reactor core beginning at 12,012 s was consistent with that seen in experiments on the quenching of porous debris, as described in Section AS.

The implementation into MOD3.3 of the integral diffusion model for fuel rod oxidation caused it to calculate a more rapid progression of damage to the reactor core than calculated by MOD3.2. The onset of severe damage was calculated to begin at 9530 s by MOD3.3 and at 10,330 s by MOD3.2. This difference is due to the integral diffusion model for oxidation in MOD3.3 calculating a more rapid heatup due to oxidation at locations with a rich supply of steam than that calculated by the parabolic kinetics model for oxidation in MOD3.2. These differences in calculated behavior also occurred in the analyses of severe fuel damage experiments described in Sections A2 throughA4.

The MOD3.3 calculation of the TMI-2 accident was improved by the implementation into MOD3.3 of the stress-based model for calculating the time of failure of an oxide layer retaining the melted metallic part of the fuel rod cladding. While MOD3.2 applied one model for failure of the oxide layer for analysis of severe fuel damage experiments and another model for the analysis of the TMI-2 accident, MOD3.3 applied the same oxide failure model for analysis of severe fuel damage experiments and the TMI-2 accident. The calculations of the oxide failure model have a strong influence on the calculations of hydrogen production and the extent melting of fuel assemblies. With the stress-based model for calculating oxide failure, MOD3.3 calculated hydrogen production and extent of melting in general agreement with measurements for both severe fuel damage experiments and the TMI-2 accident. On the other hand, when using the same oxide failure model for the TMI-2 analysis as used for analysis of severe fuel damage INEEL/EXT-02-00589-Rev 0, Vol 5 A 12-20

1000.0 900.0 Quenching due to temporary reflood following start-up of S2B-pump 800.0 E

700.0 a)

I Quenching 600.0 following Start-up start-up of HPIS of HPIS 500.0 o H 11500.0 12000.0 12500.0 Time (s)

Figure A12-17. MOD 3.3 calculated temperature history of location with porous debris (2.7 m elevation of fourth ring of fuel assemblies).

experiments, MOD3.2 underpredicted by a factor of two the extent of melting of the reactor core, and did not predict any slumping of molten core material to the lower head.

Another difference in calculated reactor core behavior between MOD3.3. and MOD3.2 was in the calculated ballooning and rupture of fuel rods; MOD3.3 calculated ballooning and rupture of fuel rod cladding to occur significantly earlier than MOD3.2. This difference in calculated behavior is due to corrections made in MOD3.3 to the model for ballooning of the fuel rod cladding.

A12.4 Conclusions The MOD3.3 calculation of the TMI-2 accident showed that its new models result in calculated behavior of the reactor core and primary coolant system in general agreement with measurements and post-accident observations. The calculated and measured hydrogen productions were 417 kg and 460 kg, respectively. The calculated and measured masses of molten material in the core region were 27,600 kg and 40,800 kg, respectively. The MOD3.3 calculation of the locations of porous debris regions in reactor core was for the most part in agreement with the observed locations of porous debris. The calculated temperature behavior of the porous debris was consistent with temperature behavior observed in debris quenching experiments. The calculated and measured rapid increase in primary coolant system pressure following the start-up of the 2B-pump were in good agreement. Except for an intermediate period of the accident, the calculated primary coolant system pressure was in good agreement with the measured pressure for all periods of the accident. An adjustment of boundary conditions within their range of INEEL/EXT-02-00589-Rev 0, Vol 5 A12-21

uncertainty resulted in good agreement of calculated and measured pressure also during this intermediate period. The calculated location of molten material in the core region and the timing of the slumping of this molten material to the lower head were in general agreement with inferences from measurements and the post-accident observation of the reactor core.

The MOD3.3 calculations of the TMI-2 accident differed from the MOD3.2 calculations in some aspects of behavior. MOD3.3 calculated damage progression in the reactor core to occur significantly more rapid than MOD3.2. This difference is due to oxidation of fuel rod cladding in MOD3.3 being calculated by the integral diffusion model instead of by the parabolic kinetics model in MOD3.2. MOD3.3 calculated the ballooning and rupture of fuel rod cladding to occur significantly earlier than MOD3.2. This difference is due to corrections to the ballooning model implemented into MOD3.3. The stress-based model in MOD3.3 for the failure of an oxide layer retaining melted cladding resulted in good agreement of calculations with measurements for both the analysis of the TMI-2 accident and the analyses of severe fuel damage experiments. On the other hand, MOD 3.2 underpredicted the extent of core melting by a factor of two when using for the TMI-2 analysis the same oxide failure model as used for the analyses of severe fuel damage experiments. In the modeling of phenomena causing damage to fuel assemblies during severe accident conditions, MOD3.3 does not require a distinguishing of models for the analyses of severe fuel damage experiments from the models for the analyses of nuclear power plants; one set of models applies for both types of analyses, and all of the models used for nuclear power plant analyses have been assessed using severe fuel damage experiments.

A12.5 References A12-1.

D. F. Guessing, "The Three Mile Island Analysis Exercise," Nuclear Technology, 87, August 1989, pp. 298-301.

A 12-2.

J. M. Broughton, P. Kuan, D. A. Petti, and E. L. Tolman, "A Scenario of the Three Mile Island Unit 2 Accident," Nuclear Technology, 87, August 1989, pp. 34-53.

A12-3.

J. R. Wolf et al., TMI-2 Vessel Investigation Project Integration Report, NUREG/CR-6197, TMI V(93)EG 10, EGG-2734, March 1994.

A12-4.

D. A. Brownson, L. N. Haney, and N. D. Chien, Intentional Depressurization Accident Management Strategy for Pressurized Water Reactors, NUREG/CR-5837, EGG-2688, April 1993.

A12-5.

E. W. Coryell et al.,SCDAP/RELAP5/MOD3.2 Code Manual Volume III: User's Guide and Input Manual, NUREG/CR-6150, INEL-95/6422, Revision 1, November 1996.

A12-6.

R. W. Brower L. J. Fackrell, D. W. Golden, M. L. Harris, and C. L. Olaveson, ICBC Version 3.1, TMI-2 Initial and Boundary Conditions Data Base, GEND-INF-078, January 1988.

A 12-7.

Y. Nomura, POR V Discharge Flow During the TMI-2 Accident, EGG-TMI-7825, July 1987.

A12-8.

D. Coleman, "As-Built Design and Material Characteristics of the TMI-2 Core," Part III in TMI-2 Accident Core Heatup Analysis, A Supplement, NSA C-25, June 1981.

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-22

A 12-9.

J.

L.

Anderson, TMI-2 Once Through Steam Generator Secondary Level Analysis, EGG--TMI-7359, January 1987.

A12-10. P. Dumaz, "Three Mile Island Unit 2 Analysis Exercise: CATHARE Computations of Phases I and 2 of the Accident," Nuclear Technology, 87, December 1989, pp. 946-955.

A 12-1I.

J. L. Anderson, Recommended HPI Rates for the TMI-2 Analysis Exercise (0 - 300 Minutes),

EGG-TMI-7833, September 1987.

A 12-12. D. W. Golden and N. Ohnishi, SCDAP/RELAP5 Demonstration Calculation of the TMI--2 Accident, EGG-TMI-8473, March 1989.

A 12-13. F. E. Motley and R. P. Jenks, "Modeling of the Three Mile Island Unit 2 Accident with MELPROG/TRAC and Calculation Results for Phases 1 and 2,"Nuclear Technology, 87, August 1989, pp. 302-309.

A 12-14. T. R. England and W. B. Wilson, TMI-2 Decay Power: LASL Fission-Product and Actinide Decay Power Calculations for the President's Commission on the Accident at Three Mile Island, LA-804I-MS, Revised, March 1980.

A 12-15. E. L. Tolman et al., TMI-2 Accident Scenario Update, EGG-TMI-7489, December 1986.

A12-16. J. K. Hohorst et al., TMI-2 Analysis using SCDAP/RELAP5/MOD3.1, INEL-94/0157, November 1994.

A 12-17. A. Annunziato, A. Franceschini, and C. Addabbo, "TMI-2 Simulation by RELAP5/SCDAP and COMETA Codes," 8th International Conference on Nuclear Engineering, April 2-6, Baltimore, MD USA.

INEEL/EXT-02-00589-Rev 0, Vol 5 A12-23 LIC-02-0109 Reference 10.23 Letter from ITS Corporation (K. Ross) to OPPD (F. James Jensen)

September 9, 2002 "ITS Corporation's Cursory Review of OPPD's LTOP Analysis"

ITS 01-OPPD:02-004-01-101 Innovative Technology Solutions Corporation Merging Innovation with Technology CORPORATION September 9, 2002 F. James Jensen III Nuclear Design Engineer Fort Calhoun Nuclear Station OPPD P. O. Box 550 Fort Calhoun, NE 68023

Subject:

ITS Corporation's Cursory Review of OPPD's LTOP Analysis

Reference:

Fort Calhoun Low Temperature Overpressure Protection Final Report, Revision 1, 3/15/02, Enercon Services

Dear Mr. Jensen:

ITS Corporation has performed a cursory review of the RELAP model developed by Enercon for OPPD for analyzing postulated Fort Calhoun transients having the potential to exercise the Low Temperature Overpressure Protection (LTOP) System. This letter report documents the review. In summary, no modeling concerns have been identified which question the conclusions of OPPD's current LTOP analysis. The RELAP model seems well designed and the LTOP analysis seems thorough and well conceived. NRC LTOP analysis requirements appear to have been followed. A few modeling specifics that might be improved upon have been identified. They are discussed below. Suggested modeling changes are made in context.

Injection Water Temperature The temperature of the injection water in the mass addition scenarios was taken to be 250 'F. This temperature is unrealistically high for safety injection water and for makeup (charging) water under cold shutdown conditions.

The reasoning behind the use of elevated injection water temperature seems questionable. However, the LTOP report argues convincingly that the elevated temperature is conservative; the reasons being that:

I.

Injection mass flow rates were specified assuming that the injection water was cold.

2.

The peak reactor coolant system (RCS) pressure predicted by RELAP for a particular scenario was compared to the allowable pressure on the P/T curve given the temperature of the RCS at the beginning of the scenario (as opposed to the higher allowable pressure on the P/T curve given the higher temperature of the RCS at the time the peak pressure occurred).

The argument that the use of elevated injection water temperature is conservative is believable. However, a review recommendation is that any future RELAP LTOP calculations be made with realistic injection water temperatures.

PORV Flow Resistance A hand calculation was made to verify the flow resistance offered by the PORV in the RELAP model. This was done to address questions that arose in the course of the review regarding the adequacy of the PORV modeling for subcooled liquid flow. In several of the mass-addition LTOP scenarios, RCS temperature remains below the 1

6000 Uptown Blvd. NE

  • Suite 300. Albuquerque, NM 87110 Ph. 505/ 872-1089
  • Fax 505/872-0233

ITS 01-OPPD:02-004-0-l101 T f Innovative Technology Solutions Corporation Merging Innovation with Technology CORPORATION saturation temperature downstream of the PORV. In these scenarios, the PORV is flowing liquid water. The hand calculation is included as Attachment 1. The results of the hand calculation were compared to the results of the RELAP calculation for the base mass-addition LTOP scenario. The RELAP calculation had to be extended for a comparison to be made. The specific comparison was of the steady-state pressure drop across the PORV given a cold water-solid RCS and a fixed charging flow rate. Critical in considering the mass addition scenarios involving the charging pumps is realizing that these pumps at FCS are positive displacement pumps (as opposed to centrifugal pumps). Such pumps develop a certain flow irrespective of head. As such, the pressure excursion that would be experienced by FCS given spurious operation of all charging pumps (and one operating PORV) in a cold shutdown condition would be lamely different (smaller) than what would be experienced by a plant having centrifugal charging pumps. For 132 gpm charging flow, the hand calculation and the RELAP calculation predict a pressure drop across the PORV of 36.6 and 57.0 psid, respectively. The RELAP modeling then of the flow resistance offered by the PORV to subcooled liquid flow shows to be on the conservative side. (A review recommendation is, however, that PORV modeling be done differently in future RELAP LTOP calculations. The current RELAP modeling of the PORV for subsonic single-phase flow (e.g., cold liquid water flow) is not clean.

Use of the abrupt expansion model should be replaced by the inclusion of a physical flow coefficient (Cv) table.

The current PORV modeling is conservative because the area of the orifice in the valve has been defined 18%

smaller than physical. Were a physically representative orifice area defined, the conservatism in flow resistance offered to cold flowing liquid would be lost. A physically representative C, value of 24.58 for a full-open FCS PORV is calculated in Attachment 1.)

RCS Pressurization Rate in Mass-Addition Scenarios A hand calculation was made to verify the time taken for the RCS to pressurize to the PORV set point in the base mass-addition LTOP case. This was done on account of questions that arose in the course of the review regarding the seemingly slow pressurization rate in the RELAP calculation of further water addition to a water solid system. The calculation is included as Attachment 2. It simply relates the charging flow rate to the volume of the RCS and the compressibility of liquid between the initial RCS pressure and the PORV set point. The hand calculation and the RELAP calculation predict an elapse of 16.9 and 18.3 sec, respectively, from the time charging flows initiate to the time the PORV set point is reached. This good comparison satisfied the review questions regarding pressurization rate.

Reactor Coolant Pumps The heating of RCS inventory associated with irreversible flow losses in the system is accounted for in the RELAP LTOP model by depositing energy in the fluid as it flows through the reactor coolant pumps. This is appropriate but there is a conservatism here that may have been overlooked. As part of the thermal hydraulic solution performed by RELAP, irreversible losses associated with wall friction are deposited in the fluid locally as heat. Typically wall friction accounts for roughly half of the flow loss in an RCS; the other half being attributed to "minor"-type flow losses through fittings, abrupt expansions and contractions, etc. Minor-type flow losses are not deposited in the fluid as part of the thermal hydraulic solution performed by RELAP. Thus, the heat additions made to the RELAP LTOP calculations to account for reactor coolant pump operation are roughly 50% higher than realistic.

It was noticed that in cases where a reactor coolant pump was not operating, the pump component was removed from the RELAP model and a simplistic control-volume component was substituted. It is unclear why this was done. A substantial effort was clearly made in the modeling of the pumps as evidenced by the complete set of homologous curves defined. It would be good to take advantage of the thorough pump modeling given the 2

6000 Uptown Blvd. NE

  • Suite 300
  • Albuquerque, NM 87110 Ph. 505/872-1089
  • Fax 505/872-0233

ITS 01-OPPD:02-004-01-101 Innovative Technology Solutions Corporation Merging Innovation with Technology CORPORATION reverse loop flows that develop in many (all?) of the LTOP scenarios. If the reason for removing the pumps was robustness-related (e.g., code stops), it would have been good to state this in the LTOP report. In any case, it would have been good to include a description of how the resistance offered by a stopped reactor coolant pump to reverse flow was captured in the surrogate component.

Volume Control Flags It was noticed in the course of the review that a handful of control volumes had the calculation of wall friction disabled. It is unclear why this was the case. If this was inadvertent, it would be good to enable friction in these control volumes for consistency.

Pressurizer The pressurizer is modeled as a single stack of 6 control volumes. With respect to interfacial heat and mass transfer considerations, it would be better to use either 2 or more adjacent stacks of cells or simply a single cell to represent the pressurizer. The reason for this is the tendency for unrealistic stratification to develop. In an actual pressurizer, the liquid inventory is well mixed by circulative natural convection flows. In a single stack of control volumes, RELAP has no way to develop such flows. Consequently, stratified layers of largely varying temperature can develop. Relatively cold layers can unrealistically sit atop relatively hot layers. This unphysical stratification can impact the realism of the interfacial heat and mass transfer calculated by RELAP between the liquid region and vapor space of the pressurizer.

The pressurizer inventory in the heat addition LTOP scenarios was appropriately initialized as saturated. In the mass addition cases, however, the pressurizer inventory was initialized at the initial temperature of the RCS. This seems questionable given that 1) before the spurious injection, the pressurizer inventory would have been saturated at the initial pressure of the RCS, and that 2) the pressurizer heaters are assumed to be operating as the pressurizer fills with liquid. It might be more defendable to start mass-addition scenarios with a realistic pressurizer condition (i.e., saturated with level in the nominal range) and then allow the pressurizer to fill with the heaters operating. It could be that the pressure drop across the PORV differs meaningfully dependent upon the temperature of the liquid in the pressurizer. (This might especially be true if the liquid temperature were greater than the saturation temperature downstream of the PORV.)

Steady State A review recommendation is that in future LTOP analyses documentation, results be presented of an extended steady-state RELAP calculation. The objective of including the steady-state results would be to identify close correspondence between the RELAP LTOP model and actual FCS monitored parameters. The calculation should have reactor power at the full operating value, and should include realistic feedwater temperature, active steam generator level control, and active RCS pressure control. The goal here would be to convincingly illustrate the base realism of the RELAP model.

Steam Generators The secondary side of the steam generators and the steam generator tubing metal mass were conservatively excluded from the mass-addition scenarios. In the heat addition scenarios, the generators were initialized entirely full of liquid which was hot relative to RCS temperature. Initializing the steam generators full of liquid seems 3

6000 Uptown Blvd. NE

  • Suite 300
  • Albuquerque, NM 87110 Ph. 505/872-1089. Fax 505/872-0233

ITS 01-OPPD:02-004-01-101 TI~

Innovative Technology Solutions Corporation Merging Innovation with Technology CORPORATION unrealistically conservative. A suggestion of the review is that future heat addition LTOP calculations be initialized with steam generator level in the nominal range consistent with where the operators would maintain it.

Summary In summary, the model shortcomings identified in the course of the review are not thought to have the potential to meaningfully impact the conclusions of OPPD's current RELAP LTOP calculations. The RELAP model seems well suited to performing LTOP transients and is very well documented. Modeling uncertainties appear to have been consistently addressed in a conservative manner.

It needs to be emphasized that ITS Corporation's review of the OPPD LTOP model was cursory only. As such ITS Corporation can not attest that the model is physically representative of FCS or that the LTOP analysis is valid. It does seem though that the model and the analysis performed with it are sound.

ITS Corporation appreciates this opportunity to support OPPD and looks forward to providing future support.

Sincerely:

Kyle Ross Senior Engineer cc:

Jan Bostelman Jack Dallman 4

6000 Uptown Blvd. NE

  • Suite 300
  • Albuquerque, NM 87110 Ph. 505/872-1089
  • Fax 505/872-0233

Tnnnvntivp Tp.-'hnnln nhl ti innz (fn nrntiIn

!I I

............ ~IU1........

K

.fILJ.J.J........."+..J.

CORPORATION Merging Innovation with Technology : Hand Calculation of Fort Calhoun PORV Pressure Drop and Determination of PORV C, for Liquid Flow Problem

1. What would the pressure drop across an FCS PORV be given a 132 gpm flow of 80 'F water.
2.

What would the appropriate flow coefficient (Cv) be for such flow.

Given A 2.5 in valve body with a 0.94 in2 (1.0940 in dia) orifice Basic Equations

[Per Crane Technical Paper No. 410 - see attached]

The rate of flow of an incompressible fluid through an orifice may be expressed by:

2.144A q=C'A 2"g-14."AP Eq. 1 where:

q = rate of flow in units of ft 3/s C orifice flow coefficient A - orifice area in units of ft 2 g =32.2 ft/s 2 AP = upstream gauge pressure in units of psig p = incompressible fluid density in units of ibm/ft3 C in the above is given by the attached chart as a function of Reynolds Number and diameter ratio 3 which are expressed as:

'8=

=di orifice diameter Eq. 2 d2 valve body diameter Re p.V~d Re (based on d2)

Eq. 3 The resistance coefficient K in the formula:

hL =K.V 2/2.g Eq. 4 is given by:

6000 Uptown Blvd. NE + Suite 300

  • Albuquerque, NM 87110 Ph. 505/872-1089
  • Fax 505/872-0233

Innovative Technology Solutions Corporation CORPORATION Merging Innovation with Technology Korice

C2f1 4 Eq. 5 The flow coefficient is given by:

29.9" d2 Cv = 2 (based on d2)

Eq. 6 Solution Solving Eq. 1 for AP:

Eq. 2 gives:

2-g.144 C-A 6

1.0940 in =0.44 2.5 in Eq. 7 Eq. 8 Assuming p = 62.2586 Ibm/ft3 and pt = 1.791 e-5 lbi-sec/ft2, Eq. 3 gives Re = 194,163. Per the attached chart for the above 3 and Re, C is 0.61. Substituting into Eq. 7 gives AP = 36.6 psid.

Substituting for P3 and C in Eq. 5 gives Ko,ifce = 57.82. Substituting into Eq. 6 gives C, = 24.58.

6000 Uptown Blvd. NE

  • Suite 300
  • Albuquerque, NM 87110 Ph. 505/872-1089
  • Fax 505/872-0233

Scan 2-14 CHAPTER 2 -

FLOW OF FLUIDS THROUGH VAiVES AN FitrriNGs Flow Through Nozzles and Orifices Orifices and nozzles are used principally to meter rate of flow. A portion of the theory is covered here. For more complete data, refer to Bibli ography sources 8, q, and io... or to information supplied by the meter manufacturer.

Orifices are also used to restrict flow or to reduce pressure. For liquid flow, several orifices are sometimes used to reduce pressure in steps so as to avoid cavitation. Overall resistance coefficient K for an orifice is given on page A-2o. For a sample problem, see page 4-7.

The rate of flow of any fluid through an orifice or nozzle, neglecting the velocity of approach, may be exoressed by:

q = Ca A y 2g h Eq..oFi 2-27 Velocit y.of approach may have considerable effect on the qluantity discharged through a nozzle or orifice.

The factor correcting for velocity of approach.

\\ ii f

may be incorporated in Equation 2-21 as folios,:

q -

N 2g h, Eqýoii-2-22

- j34 The quantity C'

is defined as the flow coefficient C.

Values of C for nozzles and orifices are *Loaa~oesu n A-20 Use of the flow.goefficiert '-vehC-nates the nec for calculatni" rthi velocity of approach, and Equati 2-2,nmay now be written:

"Eqwrio-2-2i q =C A~ a g h5 = C A\\INil) 4lA Or"es and nozzles are normally used in pipi sys tems as -ime'esring devices and ra ed with flange taps or accordance with ASME specifications. The values of h, and AP in Equation 2-23 are the measured differential static head or pressure across pipe taps located i diameter upstream and o.5 diameter downstream from the inlet face of the orifice plate or nozzle, when values of C are taken from page A-zo. The flow coefficient C is plotted for Reynolds numbers based on the internal diameter of the upstream pipe.

Flow of liquids: For nozzles and orifices discharg ing incompressible fluids to atmosphere. C values may be taken from page A-20 if hi or LP in Equa tion 2-23 is taken as the upstream head or gauge pressure.

Flow of gases and vapors: The flow of compres sible fluids through nozzles and orifices can be ex pressed by the same equation used for liquids except the net expansion factor Y must be included.

iC.A t\\

Eq,°Ie,. 2-24 q =

p The exoansion factor Y is a function of.

1. ",ie specific heat ra.o h.

2 The ratio (0i of orifice or throat diameter to inlet diameter 3, Ra:io of dow*nstream to upstream absolute ri essures This factoro'" has been cxperimcntwily determined on the basis of air. ii hich has a specific hcat ratio of 1 4. ani steam having specific heat ratios of approx imatiy 1.3.

The data is plotted on page A-2 I Values of k for some of the common vapors and gases are given on pages A-8 and A-9.

1he spetini heat ratio. k. may vary slightly for different pressures and temaeratures, but for most practical problems the values given wsill provide reasonably accurate results.

Equation 2-24 may be used for orifices discharging comonpressible fluids to atmosphere by using:

I. Flow coefficient C given on page A-20 in the Reynolds number range where C is a constant for the given diameter ratio. 0.

2. Expansion factor Y per page A-21.
3. Differential pressure AP, equal to the inlet gauge pressure.

This also applies to nozzles discharging compressible fluids to atmosphere only if the absolute inlet pres sure is less than the absolute atmospheric pressure divided by the critical pressure ratio r,; this is discussed on the next page. When the absolute inlet pressure is greater than this amount, flow through nozzles should be calculated as outlined on the following page.

2-14 CRANE

Scan A-20 A-20 APPENDIX A-PHYSICAL PROPERTIES OF FLUIDS AND FLOW CHARACTERISTICS OF VALVES, FI1TINGS, AND PIPE CRANE Flow Coefficient C for Nozzles' C-

1Cdj__,

Example: The flow coeffi cient C for a diameter ratio 0 of o.6o at a Reynolds number of 2c,ooo (2 x ioa equals i.o0 le. - Reynoldsl Number based on d2 Flow Coefficient C for Square-Edge Orifices9, 7 C

di 047

\\

K K

3.',

0'-*--'

  • a-If -

Reynolds Number based on d40 OR,/==

- =

._.2 1 !

d [il~ tt i i

Flee, Cd C,64

'4 a

Rr - Reynolds Number based on dý 1z 8I W. Z I S & 1 0

a*

ý I I..

Scan 2-10 OCAPTER 2 -

FLOW OF FLUIDS THROUGH VALVES ANO FITTINGS Resistance Coefficient K, Equivalent Length L/D, And Flow Coefficient C, -

continued The friction factors for clean commercial steel pipe with flow in the zone of complete turbulence (Jr), for nominal sizes from 1/2 to 24-inch. are tabulated at the beginning of the "K" Factor Table (page A-26) for convenience in converting the algebraic expressions of K to arithmetic quantities.

There are some resistances to flow in piping, such as sudden and gradual contractions and enlargements, and pipe entrances and exits, that have geometric similarity between sizes.

The resistance coefficients (K) for these items are therefore independent ol sice.

as indicated by the absence of a friction factor in their values given in the "'K" Factor Table.

As previously stated, the resistance coefficient K is alwavs associated with the diameter in which the ve di tn tic When a piping system contains more than one size of pipe, valves, or fittings, Equation 2-5 may be used to express all resistances in terms of one size. For this case, subscript -a-relates to the size with ref erence to which all resistances are to be expressed, and subscript "b" relates to any other size in the system. For sample problem, see Example 4-14.

It has been found convenient in some branches of the valve industry, particularly in connection with con trol vaves, to express the valve capacity and the vahle now characteristics in terms of the flow coeffi cient Cv.

The C, coefficient of a valve is defined as the fnow of water at 60 F, in gallons per minute, at a pressure drop of one pound per square inch across the valve.

iocity in the term v1/2g occurs.

The values in -he By the substiui.yon of appropriate equivalent units K< Factor Table are associated with the internal in the Darcy equanio.Th.tca, be showi n that, ameter of the followine pipe schedule numbers for 2Q.0 e various ANSI Classes of valves and fittings.

V K Eqaiio. 2.6 Class 300 and r

e

................. Schedule 40 Class 400 and 600...................... Schedule 80 Class 900......................

Schedule 120 Class 1500.............................

Schedule !60 -

m u of liqed of Class 2500 (sizes Y2 to 6')...................

X lS e" *

t.

n gallons per minute of liquids of Class 2500 (sizes 8' and up).............. Schedule IvO low viscosity' that will flow through the valve can be determined from:

hen the resistance coefficient K is uaed in flow

-qua- /

on 2-2, or any of its equivalent forms given in Chap

_ C"./x Ap Eqaoiio 2-7 ter~~~

I I5 A~u~ui

)-iV v-5~

se a ter *as mquations*-1-e, >-I, -s-anu,-., t' e: ec, ty and internal diameter dimensions used in the equation must be based on the dimensions of these schedule numbers regardless of the pipe with which the valve may be installed.

An alternate procedure which yields identical results for Equation 2-2 is to adjust K in proportion to the fourth power of the diameter ratio, and to base values of velocity or diameter on the internal diameter of the connecting pipe.

fd)'

K[. -K

(-)

EqUct'oi. 2.5 Subscript "a" defines K and d with reference to the internal diameter of the connecting pipe.

Subscript "b" defines K and d with reference to the internal diameter of the pipe for which the values of K were established, as given in the foregoing list of pipe schedule numbers.

and the pressure drop can be computed from the same formula arranged as follows:

AIP -s-

_P _q 62.4 CV Eqatiion 2-7 Since Equations 2-2 and 2-7 are simply other forms of the Darcy equation, the limitations regarding their use for compressible flow (explained on page 1-7) apply.

Other convenient forms of Equations 2-2 and 2-7 in terms of commonly used units are presented on page 3-4.

  • When handling highlyviscous liquids determine flow rate or required valve Cv as described in the ISA Handbook of Control Valves.

2-10 CRANE 2-10

Innovative Technology Solutions Corporation Merging Innovation with Technology CORPORATION : Hand Calculation of Fort Calhoun Pressurization Rate Given a Water-Solid RCS and Full Charging Flow Problem If the FCS RCS were water solid at 200 psig and 80 'F, how long would it take to pressurize the system to the LTOP setpoint of 459 psig if all charging pumps were operating?

Solution V=m/p where:

V = volume m = mass p = density Since the volume of the RCS is constant:

mI / P1 - m2 / P2 where the subscripts 1 and 2 associate with the lower and higher pressures, respectively.

Solving for m2:

M2 = mI P2 / P1 = 3.88877e5 lbm x 62.31098 ibm/ft3 / 62.26142 lbm/ft3 m2 = 3.89187e5 Ibm So the mass associated with the higher pressure is 310 lbm greater than the mass associated with the lower pressure. And so, at a charging flow rate of 132 gpm or 18.356 lbm/s, it would take 16.9 sec to pressurize the RCS from 200 to 459 psig.

LIC-02-0109 Reference 10.25 Letter from Westinghouse (C. L. Stuart) to OPPD (F. James Jensen)

September 11, 2002 "Calculation of the Pressure-Temperature Limits and Minimum Temperature Requirements for Core Critical Operation"

Westinghouse Proprietary Class 2 OWestinghouse Mr. F. James Jensen III Omaha Public Power District Fort Calhoun Station P.O. Box 399 Fort Calhoun, NE 68023 Westinghouse Electric Company Nuclear Services Windsor Service Center 20 International Drive Windsor, Connecticut 06095 USA Direct tel:

Direct fax:

e-mail:

(860) 731-1613 (860) 731-1674 & 1675 Charles.l.stuart@us.westinghouse.com Our ref: CFTC-02-1 September 11, 2002

Subject:

Calculation of the Pressure-Temperature Limits and the Minimum Temperature Requirements for Core Critical Operation

Reference:

OPPD Job Order Notice Number RE-02-001

Attachment:

Westinghouse Letter LTR-02-CI-134 dated September 11, 2002

Dear Mr. Jensen:

The purpose of this letter is to formally transmit the information requested in the referenced JON. The attached document provides a clarification for the calculation of the pressure temperature limits and the minimum temperature requirements for core critical operation. If you have any questions or need additional information, please do not hesitate to contact me or the Project Manager, Boris Nadgor, at (860) 731-6728.

Sincerely, Charles L. Stuart, Jr.

Customer Projects Manager Nuclear Services cc:

John Ghergurovich Carl Gimbrone Bruce Hinton Boris Nadgor Official Record Electronically Approved in EDMS 2000 A BNFL Group company

GWestinghouse Memorandum To:

File Date: September 11,2002 cc:

John Ghergurovich Bruce Hinton From: Boris Nadgor Our Ref LTR-CI-02-134 WIN: 265-6728

Subject:

Calculation of the Pressure-Temperature Limits and the Minimum Temperature Requirements for Core Critical Operation This purpose of this letter is to respond to OPPD Job Order Notice Number RE-02-001 in order to provide a clarification for the calculation of the pressure-temperature limits and the minimum temperature requirements for core critical operation. These requirements are defined by two criteria specified in 10 CFR Part 50 Appendix G.

According to 10 CFR Part 50 Appendix G, the Reactor Vessel (RV) must be at a temperature equal to or greater than the minimum temperature required for the inservice hydrostatic test and at least 40°F higher than the minimum pressure-temperature curve for normal operation heatup or cooldown.

In addition, in the case when the RCS pressure is greater than 20% of the preservice hydrostatic test pressure (PHTP) and the reactor core is critical, the minimum temperature requirement for the RV must be at least as high as

"* the initial RTNDT for the limiting material in the closure flange region which is highly stressed by bolt preload plus 160'F, or

"* the minimum permissible temperature for the inservice hydrostatic pressure test, whichever is larger.

Based on these requirements, Westinghouse calculation A-FC-PS-0001, Rev. 000 defines the minimum temperature for the inservice hydrostatic pressure test as 300'F (Section 7.4). This temperature is larger than Initial RTNDT + 160'F = 10°F + 160'F = 170'F, where Initial RTNDT = 10°F is obtained from Letter No. LTR-CI-01-3, S. Byrne (W) to F. J. Jensen (OPPD), "Fort Calhoun RPV Flange Region Initial RTNDT," dated September 28, 2001.

In order to obtain the data points for the core criticality curve above the minimum temperature for the inservice hydrostatic pressure test, data from Tables 1 and 2 of the calculation are used. The minimum pressure value for each RCS temperature above 260°F will correspond to the temperature point of RCS temperature + 40'F, i.e. the core criticality curve will be parallel to the minimum pressure-temperature curve for normal operation heatup or cooldown with the offset of 40°F to the right.

Official Record Electronically Approved in EDMS 2000 A BNFL Group company

LTR-CI-02-134 Page 2 of 2 September 11, 2002 Therefore, a core criticality curve on Figures 7 and 8 of the calculation may be represented by a vertical line at 300'F and the portion above this temperature of a +40'F offset curve of the minimum pressure temperature limits.

Note, that the core critical limits established above are solely based upon fracture mechanics considerations, and do not consider core physics safety analyses which can control the temperature at which the core can be brought critical.