ML022560415
| ML022560415 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 09/12/2002 |
| From: | NRC/NRR/DLPM |
| To: | |
| References | |
| TAC MB5328 | |
| Download: ML022560415 (19) | |
Text
Secondary Containment Isolation Instrumentation 3.3.6.2 Table 3.3.6.2-1 (page 1 of 1)
Secondary Containment Isolation Instrumentation APPLICABLE MODES OR REQUIRED OTHER CHANNELS SPECIFIED PER SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS VALUE
- 1. Reactor Vessel Water 1.2.3.
2 SR 3.3.6.2.1 z 177 inches Level - Low (Level 3)
(a)
SR 3.3.6.2.2 SR 3 3.6.2.4 SR 3.3.6.2.5 SR 3.3.6.2.6
- 2.
Drywell Pressure-High 1.2.3 2
! 2 7 psig SR 3.3.6.2.2 SR 3.3.6.2.4 SR 3.3.6.2.5 SR 3.3.6.2.6
- 3.
Reactor Building Exhaust 1.2.3.
- 24.800 cpm Radiation-High (a).(b)
SR 3.3.6.2.3 SR 3.3.6.2.6
- 4.
Refueling Floor Exhaust 1.2.3.
< 24.800 cpm Radiation-High (a).(b)
SR 3.3.6.2.3 SR 3.3.6.2.6 (a)
During operations with a potential for draining the reactor vessel.
(b)
During movement of recently irradiated fuel assemblies in secondary containment.
Amendment 276 I
3.3.6.2-4 JAFNPP
CREVAS System instrumentation 3.3.7.1 3.3 INSTRUMENTATION 3.3.7.1 Control Room Emergency Ventilation Air Supply (CREVAS)
System Instrumentation LCO 3.3.7.1 APPLICABILITY:
The Control Room Air Inlet Radiation-High channel shall be OPERABLE.
MODES 1, 2 and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Channel inoperable.
A.1 Place the CREVAS System in the isolate mode of operation.
Declare both CREVAS OR A.2 subsystems inoperable.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1 hour Amendment 276 JAFNPP I
3.3.7.1-1
Seconaary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 APPLICABILITY:
The secondary containment shall be OPERABLE.
MODES 1, 2, and 3.
During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment inoperable in MODE 1, 2, or 3.
B.
Required Action and associated Completion Time of Condition A not met.
C.
Secondary containment inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
A. 1 B.1 AND B.2 Restore secondary containment to OPERABLE status.
Be in MODE 3.
Be in MODE 4.
NOTE ------- -
LCO 3.0.3 is not applicable.
MW Suspend movement of recently irradiated fuel assemblies in the secondary containment.
C.1 AND 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 12 hours 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Immediately (continued)
Amendment 276 3.6.4.1-1 I
Seconaary Containment 3.6.4.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.
(continued)
C.2 Initiate action to Immediately suspend OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1 Verify secondary containment vacuum is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
> 0.25 inch of vacuum water gauge.
SR 3.6.4.1.2 Verify all secondary containment 31 days equipment hatches are closed and sealed.
SR 3.6.4.1.3 Verify one secondary containment access 31 days door in each access opening is closed.
SR 3.6.4.1.4 Verify the secondary containment can be 24 months on a maintained ; 0.25 inch of vacuum water STAGGERED TEST gauge for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using one SGT subsystem BASIS for each at a flow rate
- 6000 cfm.
SGT subsystem Amendment 276 3.6.4.1-2 JAFNPP
SCIVS 3.6.4.2 3.6 CONTAINMENT SYSTEMS 3.6.4.2 Secondary Containment Isolation Valves (SCIVs)
LCO 3.6.4.2 APPLICABILITY:
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS NOTES -----------------------------------
- 1. Penetration flow paths may be unisolated intermittently under administrative controls.
- 2.
Separate Condition entry is allowed for each penetration flow path.
- 3.
Enter applicable Conditions and Required Actions for systems made inoperable by SCIVs.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more penetration flow paths with one SCIV inoperable.
A.1 Isolate the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange.
Amn 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (continued)
Amendment 276 3.6.4.2-1 I
SCIVs 3.6.4.2 A t"'rT f'flIC f,-,
.,v-*
,mn e*
,,J I-u.,iuI'4 k.L.UIILIIUaU CONDITION D. Required Action and associated Completion Time of Condition A or B not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
D.1 REQUIRED ACTION NOTE --------
LCO 3.0.3 is not applicable.
Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND D.2 Initiate action to suspend OPDRVs.
COMPLETION TIME Immediately Immedi atel y I
Amendment 276 3.6.4.2-3 JAFNPP
SGT System 3.6.4.3 3.6 CONTAINMENT SYSTEMS 3.6.4.3 Standby Gas Treatment (SGT) System LCO 3.6.4.3 Two SGT subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One SGT subsystem A.1 Restore SGT subsystem 7 days inoperable, to OPERABLE status.
B.
Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND not met in MODE 1, 2, or 3.
B.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C.
Required Action and.
NOTE............
associated Completion LCO 3.0.3 is not applicable.
Time of Condition A not met during movement of recently C.1 Place OPERABLE SGT Immediately irradiated fuel subsystem in assemblies in the operation.
secondary containment or during OPDRVs.
OR (continued)
C A 1_1 Amendment 276 JAFNPP
- 0. V.
SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.
(continued)
C.2.1 Suspend movement of Immediately recently irradiated fuel assemblies in secondary containment.
AND C.2.2 Initiate action to Immediately suspend OPDRVs.
D. Two SGT subsystems D.1 Enter LCO 3.0.3.
Immediately inoperable in MODE 1, 2, or 3.
E.
Two SGT subsystems E.1
........ NOTE --------
inoperable during LCO 3.0.3 is not movement of recently applicable.
irradiated fuel assemblies in the secondary containment Suspend movement of Immediately or during OPDRVs.
recently irradiated fuel assemblies in secondary containment.
AND E.2 Initiate dction to Immediately suspend OPDRVs.
Amendment 276 3.6.4.3-2 I
I JAFNPP
CREVAS System 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Control Room Emergency Ventilation Air Supply (CREVAS)
System LCO 3.7.3 Two CREVAS subsystems shall be OPERABLE.
NOTE ---------------------------
The control room boundary may be opened intermittently under administrative control.
APPLICABILITY:
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION A.
One CREVAS subsystem inoperable.
B. Two CREVAS subsystems inoperable due to inoperable control room boundary in MODE 1, 2, or 3.
A.1 B.1 Restore CREVAS subsystem to OPERABLE status.
Restore control room boundary to OPERABLE status.
I I
C.
Required Action and associated Completion Time of Condition A or B not met in MODE 1, 2, or 3.
Be in MODE 3.
C.1 AND I I r -
A COMPLETION TIME 7 days 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 12 hours 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
Amendment 276 3.7.3-1 JAFNPP I
I i
De in M
CREVAS System 3.7.3 ArTTANI t
nirn~i~niir~I L.JI.
JI.
CONDITION REQUIRED ACTION L ____________________
D. Required Action and associated Completion Time of Condition A not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
E.
Two CREVAS subsystems inoperable in MODE 1.
- 2. or 3 for reasons other than Condition B.
-............ NOTE ------------
LCO 3.0.3 is not applicable.
D.1 Place OPERABLE CREVAS subsystem in isolate mode.
OR D.2.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND D.2.2 E.1 Initiate action to suspend OPDRVs, Enter LCO 3.0.3.
COMPLETION TIME Immediately Immediately Immedi atel y Immediately (continued)
Amendment 276 3.7.3-2 I
CREVAS System 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F.
Two CREVAS subsystems inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
N O T E ------------
LCO 3.0.3 is not applicable.
F.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND F.2 Initiate action to suspend OPDRVs.
Immediately Immediately I
SR 3.7.3.2 Perform required CREVAS filter testing in In accordance accordance with the Ventilation Filter with the VFTP Testing Program (VFTP).
Amendment 276 3.7.3-3 JAFNPP kconLinlUeU)
Control Room AC 3.7 PLANT SYSTEMS 3.7.4 Control Room Air Conditioning 'AC)
System LCO 3.7.4 APPLICABILITY:
Two control room AC subsystems shall be OPERABLE.
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room AC subsystem inoperable.
A. 1 Restore control room AC subsystem to OPERABLE status.
I i
B.
Required Action and nccnciated Comnletion B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Time of Condition A AND not met in MODE 1, 2, or 3.
B.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
Amendment 276 3.7.4-1 JAFNPP System System 3.7.4 I
ju Gays
Control Room AC System 3.7.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and associated Completion Time of Condition A not met during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
NE NOTE -
LCO03.0.3 is not applicable.
C.1 Place OPERABLE control room AC subsystem in operation.
OR C.2.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND C.2.2 Initiate action to suspend OPDRVs.
Immediately Immediately Immediately I
D. Two control room AC D.1 Enter LCO 3.0.3.
Immediately subsystems inoperable in MODE 1, 2. or 3.
(continued)
Amendment 276 JAFNPP 3.7.4-2
Control Room AC System 3.7.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E.
Two control room AC subsystems inoperable during movement of recently irradiated fuel assemblies in the secondary containment or during OPDRVs.
-........... *NOTE ------------
LCO 3.0.3 is not applicable.
E.1 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
Initiate action to suspend OPDRVs.
AND E.2 II I
Immediately Immediately Amendment 276 3.7.4-3 JAFNPP I
AC Sources-Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources-Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:
- a.
One qualified circuit between the offsite transmission network and one division of the plant Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8. "Distribution Systems-Shutdown":
- b.
One qualified circuit, which maybe the same circuit required by LCO 3.8.2.a, between the offsite transmission network and the other division of the plant Class 1E AC electrical power distribution subsystem(s),
when a second division is required by LCO 3.8.8: and
- c.
One emergency diesel generator (EDG) subsystem capable of supplying one division of the plant Class 1E AC electrical power distribution subsystem(s) required by LCO 3.8.8.
APPLICABILITY:
MODES 4 and 5, During movement of recently irradiated fuel assemblies in the secondary containment.
Amendment 276 JAFNPP 3.8.2-1
AC Sources-Shutoown 3.8.2 ACTIONS
..-------------------- NOTE LCO 3.0.3 is not applicable.
CONDITION A. One or both required offsite circuits inoperable.
REQUIRED ACTION
............ NOTE ------------
Enter applicable Condition and Required Actions of LCO 3.8.8, when any required division is de-energized as a result of Condition A.
A. 1 OR A.2.1 AND A.2.2 Declare affected required feature(s),
with no offsite power available, inoperable.
Suspend CORE ALTERATIONS.
Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND A.2.3 Initiate action to suspend operations with a potential for draining the reactor vessel (OPDRVs).
AND IOPEINIM Immediately Immedi atel y Immedi atel y Immedi atel y (continued)
Amendment 276 3.8.2-2 I
I JAFNPP COMPLETION TIME
AC Sources - Snutcown 3.8.2 ACTIONS CONDITION A. (continued)
B. One required EDG subsystem inoperable.
REQUIRED ACTION A.2.4 Initiate action to restore required offsite power circuit(s) to OPERABLE status.
B.1 AND B.2 AND B.3 AND B.4 Suspend CORE ALTERATIONS.
Suspend movement of recently irradiated fuel assemblies in secondary containment.
Initiate action to suspend OPDRVs.
Initiate action to restore required EDG subsystem to OPERABLE status.
COMPLETION TIME Immediately Immediately Immediatel y Immediatel y Immediately Amendment 276 JAFNPP I
I 3.8.2-3
DC Sources-Shutoown 3.8.5 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources-Shutdown LCO
3.8.5 APPLICABILITY
One 125 VDC electrical power subsystem shall be OPERABLE to support one division of the plant Class IE DC Electrical Power Distribution System required by LCO 3.8.8.
"Distribution Systems -Shutdown."
MODES 4 and 5, During movement of recently irradiated fuel assemblies in the secondary containment.
ACTIONS NOTE ------------------------------------
LCO 3.0.3 is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A. Required DC electrical power subsystem inoperable.
A. 1 Declare affected required feature(s) inoperable.
OR A.2.1 Suspend CORE ALTERATIONS.
AND A.2.2 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
Immedi atel y Immediately AND (continued)
Amendment 276 3.8.5-1 I
ImmedidLely I
Distribution Systems-Shutoown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Distribution Systems-Shutdown LCO
3.8.8 APPLICABILITY
The necessary portions of the AC and 125 VDC electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE.
MODES 4 and 5, During movement of recently irradiated fuel assemblies in the secondary containment.
ACTIONS NOTE ------------------------------------
LCO 3.0.3 is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required AC or 125 VDC electrical power di stri buti on subsystems inoperable.
A.1 Declare associated supported required feature(s) inoperable.
OR A.2.1 Suspend CORE ALTERATIONS.
AND A.2.2 Suspend movement of recently irradiated fuel assemblies in the secondary containment.
AND immediately Immedi atel y Immedi atel y I
(continued)
Amendment 276 3.8.8-1 i