Tech Spec Pages for Amendment Nos. 207 and 188 Options B of Appendix J for Local Leakage Rate Testing
ML022520144
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 09/04/2002
From:
NRC/NRR/DLPM
To:
Shared Package
ML022540005 List:
References
TAC MB3565, TAC MB3566
Download: ML022520144 (18)


Text

Containment 3.6.1 3.6 CONTAINMENT SYSTEMS 3.6.1 Containment LCO 3.6.1 Containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Containment inoperable. A.1 Restore containment to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> McGuire Units 1 and 2 3.6.1-1 Amendment Nos.207 & 188

Containment 3.6.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1 --------------------------------- NOTES -------------------------------

1. The space between each dual ply bellows assembly on penetrations between the containment building and annulus shall be vented to the annulus during Type A tests.
2. Following each Type A test, the space between each dual-ply bellows assembly shall be subjected to a low pressure test at 3 to 5 psig to verify no detectable leakage, or the assembly shall be subjected to a leak test with the pressure on the containment side of the assembly at Pa.
3. Type C tests on penetrations M372 and M373 may be performed without draining the glycol-water mixture from the seats of their diaphragm valves if meeting a zero indicated leakage rate (not including instrument error).

Perform required visual examinations and leakage rate In accordance with testing except for containment airlock testing, in the Containment accordance with the Containment Leakage Rate Testing Leakage Rate Program. Testing Program Amendment Nos. 207 & 188 McGuire-Units 1 and 2 3.6.1-2

Containment Air Locks 3.6.2 ACTIONS (continued)

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I

SR 3.6.2.1 --------------------------------- NOTE --------------------------------

1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.
2. Results shall be evaluated against acceptance criteria applicable to SR 3.6.1.1.

Perform required air lock leakage rate testing in In accordance with the Containment accordance with the Containment Leakage Rate Testing Leakage Rate Program.

Testing Program.

SR 3.6.2.2 Perform a pressure test on each inflatable air lock door 6 months seal and verify door seal leakage is < 15 sccm.

SR 3.6.2.3 Verify only one door in the air lock can be opened at a 18 months time.

McGuire Units 1 and 2 3.6.2-5 Amendment Nos. 207 & 188

Containment Isolation Valves 3.6.3 (Z"M i .a...l\FI ANr.P. PPfl . HIREMFNTS

. - (continued)iL SURVEILLANCE FREQUENCY I1 SR 3.6.3.4 --------------------------------- NOTE --------------------------------

Valves and blind flanges high radiation areas may be in verified by use of administrative controls.

Verify each containment isolation manual valve and blind Prior to entering MODE 4 from flange that is located inside containment or annulus and MODE 5 if not not locked, sealed, or otherwise secured and required to performed within be closed during accident conditions is closed, except for the previous containment isolation valves that are open under 92 days administrative controls.

SR 3.6.3.5 Verify the isolation time of automatic power operated In accordance with containment isolation valve is within limits, the Inservice Testing Program In accordance with SR 3.6.3.6 Perform leakage rate testing for containment purge lower the Containment and upper compartment and Instrument room valves with Leakage Rate resilient seals. Testing Program SR 3.6.3.7 Verify each automatic containment isolation valve that is 18 months not locked, sealed or otherwise secured in position, actuates to the isolation position on an actual or simulated actuation signal.

(continued)

McGuire Units 1 and 2 3.6.3-6 Amendment Nos.207 & 188

Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY In accordance with SR 3.6.3.8 Verify the combined leakage rate for all reactor building the Containment bypass leakage paths is < 0.07 L, when pressurized to Leakage Rate a Pa, 14.8 psig. Testing Program McGuire Units 1 and 2 3.6.3-7 Amendment Nos 20 7 & 188

Programs and Manuals 5.5 5.0 ADMINISTRATIVE CONTROLS 5.5 Programs and Manuals The following programs shall be established, implemented, and maintained.

5.5.1 Offsite Dose Calculation Manual (ODCM)

The ODCM shall contain the methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring alarm and trip setpoints, and in the conduct of the radiological environmental monitoring program.

Licensee initiated changes to the ODCM:

a. Shall be documented and records of reviews performed shall be retained.

This documentation shall contain:

1. sufficient information to support the change(s) together with the appropriate analyses or evaluations justifying the change(s), and
2. a determination that the change(s) do not adversely impact the accuracy or reliability of effluent, dose, or setpoint calculations;
b. Shall become effective after the approval of the Station Manager; and
c. Shall be submitted to the NRC in the form of a complete, legible copy of the entire ODCM as a part of or concurrent with the Radioactive Effluent Release Report for the period of the report in which any change in the ODCM was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (i.e., month and year) the change was implemented.

5.5.2 Containment Leakage Rate Testing Program A program shall be established to implement the leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, "Performance-Based Containment Leak-Test Program," dated September 1995.

(continued)

McGuire Units 1 and 2 5.5-1 Amendment Nos. 2 0 7 & 188

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.2 Containment Leakage Rate Testing Program (continued)

The peak calculated containment internal pressure for the design basis loss of coolant accident, Pa, is 14.8 psig. The containment design pressure is 15 psig.

The maximum allowable containment leakage rate, La, at Pa, shall be 0.3% of containment air weight per day.

Leakage Rate acceptance criteria are:

a. Containment leakage rate acceptance criterion is < 1.0 La. During the first plant startup following testing in accordance with this program, the leakage rate acceptance criteria are < 0.75 La for Type A tests and < 0.6 La for Type B and Type C tests.
b. Airlock testing acceptance criteria for the overall airlock leakage rate is <

0.05 La when tested at > Pa. For each door, the leakage rate is < 0.01 La when tested at > 14.8 psig.

The provisions of SR 3.0.3 are applicable to the Containment Leakage Rate Testing Program.

Nothing in these Technical Specifications shall be construed to modify the testing frequencies required by 10CFR50, Appendix J.

5.5.3 Primary Coolant Sources Outside Containment This program provides controls to minimize leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to levels as low as practicable. The systems include Containment Spray, Safety Injection, Chemical and Volume Control, Nuclear Sampling, RHR, Boron Recycle, Refueling Water, Liquid Waste, and Waste Gas.

The program shall include the following:

a. Preventive maintenance and periodic visual inspection requirements; and
b. Integrated leak test requirements for each system at refueling cycle intervals or less.

5.5.4 Deleted McGuire Units 1 and 2 5.5-2 Amendment Nos. 2 07 & 188

SR Applicability B 3.0 BASES SR 3.0.1 (continued)

Upon completion of maintenance, appropriate post maintenance testing is required to declare equipment OPERABLE. This includes ensuring applicable Surveillances are not failed and their most recent performance is in accordance with SR 3.0.2. Post maintenance testing may not be possible in the current MODE or other specified conditions in the Applicability due to the necessary unit parameters not having been established. In these situations, the equipment may be considered OPERABLE provided testing has been satisfactorily completed to the extent possible and the equipment is not otherwise believed to be incapable of performing its function. This will allow operation to proceed to a MODE or other specified condition where other necessary post maintenance tests can be completed.

SR 3.0.2 SR 3.0.2 establishes the requirements for meeting the specified Frequency for Surveillances and any Required Action with a Completion Time that requires the periodic performance of the Required Action on a

"*once per ... " interval.

SR 3.0.2 permits a 25% extension of the interval specified in the Frequency. This extension facilitates Surveillance scheduling and considers plant operating conditions that may not be suitable for conducting the Surveillance (e.g., transient conditions or other ongoing Surveillance or maintenance activities).

The 25% extension does not significantly degrade the reliability that results from performing the Surveillance at its specified Frequency. This is based on the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the SRs. The exceptions to SR 3.0.2 are those Surveillances for which the 25% extension of the interval specified in the Frequency does not apply.

These exceptions are stated in the individual Specifications. The requirements of regulations take precedence over the TS.

An example of where SR 3.0.2 does not apply is in the Containment Leakage Rate Testing Program. This program establishes testing requirements and frequencies in accordance with requirements of regulations. The TS cannot in and of themselves extend a test interval specified in regulations.

As stated in SR 3.0.2, the 25% extension also does not apply to the initial portion of a periodic Completion Time that requires performance on a Revision No. 32 McGuire Units 1 and 2 B 3.0-10

Containment B 3.6.1 B 3.6 CONTAINMENT SYSTEMS B 3.6.1 Containment BASES BACKGROUND The containment is a free standing steel pressure vessel surrounded by a reinforced concrete reactor building. The containment vessel, including all its penetrations, is a low leakage steel shell designed to contain the radioactive material that may be released from the reactor core following a design basis Loss of Coolant Accident (LOCA).

Additionally, the containment vessel and reactor building provide shielding from the fission products that may be present in the containment atmosphere following accident conditions.

The containment vessel is a vertical cylindrical steel pressure vessel with hemispherical dome and a flat circular base. It is completely enclosed by a reinforced concrete reactor building. An annular space exists between the walls and domes of the steel containment vessel and the concrete reactor building to provide for the collection, mixing, holdup, and controlled release of containment out leakage. Ice condenser containments utilize an outer concrete building for shielding and an inner steel containment for leak tightness.

Containment piping penetration assemblies provide for the passage of process, service, sampling, and instrumentation pipelines into the containment vessel while maintaining containment integrity. The reactor building provides shielding and allows controlled release of the annulus atmosphere under accident conditions, as well as environmental missile protection for the containment vessel and Nuclear Steam Supply System.

The inner steel containment and its penetrations establish the leakage limiting boundary of the containment. Maintaining the containment OPERABLE limits the leakage of fission product radioactivity from the containment to the environment. SR 3.6.1.1 leakage rate requirements comply with 10 CFR 50, Appendix J, Option B (Ref. 1), as modified by approved exemptions.

The isolation devices for the penetrations in the containment boundary are a part of the containment leak tight barrier. To maintain this leak tight barrier:

a. All penetrations required to be closed during accident conditions are either:

McGuire Units 1 and 2 B 3.6.1 -1 Revision No. 32

Containment B 3.6.1 BASES BACKGROUND (continued)

1. capable of being closed by an OPERABLE automatic containment isolation system, or
2. closed by manual valves, blind flanges, or de-activated automatic valves secured in their closed positions, except as provided in LCO 3.6.3, "Containment Isolation Valves";
b. Each air lock is OPERABLE, except as provided in LCO 3.6.2, "Containment Air Locks";
c. All equipment hatches are closed and sealed; and
d. The sealing mechanism associated with a penetration (e.g., welds, bellows, or O-rings) is OPERABLE.

APPLICABLE The safety design basis for the containment is that the containment must Design Basis SAFETY ANALYSES withstand the pressures and temperatures of the limiting Accident (DBA) without exceeding the design leakage rates.

The DBAs that result in a challenge to containment OPERABILITY from high pressures and temperatures are a loss of coolant accident (LOCA) and a steam line break (Ref. 2). In addition, release of significant fission product radioactivity within containment can occur from a LOCA. In the DBA analyses, it is assumed that the containment is OPERABLE such that, for the DBAs involving release of fission product radioactivity, release to the environment is controlled by the rate of containment leakage. The containment was designed with an allowable leakage rate of 0.3% of containment air weight per day (Ref. 3). This leakage rate, used in the evaluation of offsite doses resulting from accidents, is defined in 10 CFR 50, Appendix J, Option B (Ref. 1), as La: the maximum allowable containment leakage rate at the calculated peak containment internal pressure (Pa) resulting from the limiting design basis LOCA. The allowable leakage rate represented by La forms the basis for the acceptance criteria imposed on all containment leakage rate testing. La is assumed to be 0.3% per day in the safety analysis at Pa = 14.8 psig (Ref. 3). Satisfactory leakage rate test results are a requirement for the establishment of containment OPERABILITY.

The containment satisfies Criterion 3 of 10 CFR 50.36 (Ref. 4).

B 3.6.1-2 Revision No. 32 McGuire Units 1 and 2

Containment B 3.6.1 BASES LCO Containment OPERABILITY is imiaintained by limiting leakage to < 1.0 La, except prior to the first startup after performing a required Containment Leakage Rate Testing Program, leakage test. At this time, the applicable leakage limits must be met.

Compliance with this LCO will ensure a containment configuration, including equipment hatches, that is structurally sound and that will limit leakage to those leakage rates assumed in the safety analysis.

Individual leakage rates specified for the containment air lock (LCO 3.6.2), purge valves with resilient seals, and reactor building bypass leakage (LCO 3.6.3) are not specifically part of the acceptance criteria of 10 CFR 50, Appendix J. Therefore, leakage rates exceeding these individual limits only result in the containment being inoperable when the leakage results in exceeding the overall acceptance criteria of 1.0 La.

APPLICABILITY In MODES 1, 2, 3, and 4, a DBA could cause a release of radioactive material into containment. In MODES 5 and 6, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, containment is not required to be OPERABLE in MODE 5 to prevent leakage of radioactive material from containment. The requirements for containment during MODE 6 are addressed in LCO 3.9.4, "Containment Penetrations."

ACTIONS A.1 In the event containment is inoperable, containment must be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time provides a period of time to correct the problem commensurate with the importance of maintaining containment OPERABLE during MODES 1, 2, 3, and 4. This time period also ensures that the probability of an accident (requiring containment OPERABILITY) occurring during periods when containment is inoperable is minimal.

B.1 and B.2 If containment cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and to MODE 5 within Revision No. 32 B 3.6.1-3 and 22 McGuire Units 11 and McGuire B 3.6.1-3 Revision No. 32

Containment B 3.6.1 BASES ACTIONS (continued) 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.1.1 REQUIREMENTS Maintaining the containment OPERABLE requires compliance with the visual examinations and leakage rate test requirements of the Containment Leakage Rate Testing Program. Failure to meet specific leakage limits for the air lock, secondary containment bypass leakage path, and purge valve with resilient seals (as specified in LCO 3.6.2 and LCO 3.6.3) does not invalidate the acceptability of the overall containment leakage determinations unless the specific leakage contribution to overall Type A, B, and C leakage causes one of these overall leakage limits to be exceeded. As left leakage prior to the first startup after performing a required Containment Leakage Rate Testing Program leakage test is required to be < 0.6 La for combined Type B and C leakage, and < 0.75 La for Option B for overall Type A leakage. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of < 1.0 La. At < 1.0 La the offsite dose consequences are bounded by the assumptions of the safety analysis. SR Frequencies are as required by the Containment Leakage Rate Testing Program. These periodic testing requirements verify that the containment leakage rate does not exceed the leakage rate assumed in the safety analysis.

The Surveillance is modified by three Notes.

Note 1 requires that the space between each dual-ply bellows assembly on containment penetrations between the containment building and the annulus be vented to the annulus during each Type A test.

Note 2 requires that following each Type A test, the space between each dual-ply bellows assembly be subjected to a low pressure leak test with no detectable leakage. Otherwise, the assembly must be tested with the containment side of the bellows assembly pressurized to Pa and meet the requirements of SR 3.6.3.8 (bypass leakage requirements).

Note 3 allows penetrations M372 and M373 to be tested without draining the glycol-water mixture from the associated diaphragm valves (NF 228A, NF-233B, and NF-234A) as long as no leakage is indicated. This test may be used in lieu of 10 CFR 50, Appendix J, Option B as defined Mc~ure nit ad 2B 136.14 Reisin N. 3 McGuire Units 1 and 2 B 3.6.1-4 Revision No. 32

Containment B 3.6.1 BASES SURVEILLANCE REQUIREMENTS (continued) in ANSI/ANS56.8-1994 Section 3.3.5 (Test Medium). The required test pressure and interval are not changed.

All test leakage rates shall be calculated using observed data converted to absolute values. Error analysis shall also be performed to select a balanced integrated leakage measurement system.

REFERENCES 1. 10 CFR 50, Appendix J, Option B.

2. UFSAR, Chapter 15.
3. UFSAR, Section 6.2.
4. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).

McGuire Units 1 and 2 B 3.6.1-5 Revision No. 32

Containment Air Locks B 3.6.2 BASES APPLICABLE SAFETY ANALYSES (continued) defined in 10 CFR 50, Appendix J, Option B (Ref. 1), as La = 0.3% of containment air weight per day, the maximum allowable containment leakage rate at the calculated peak containment internal pressure Pa = 14.8 psig following a design basis LOCA.. This allowable leakage rate forms the basis for the acceptance criteria imposed on the SRs associated with the air locks.

The containment air locks satisfy Criterion 3 of 10 CFR 50.36 (Ref. 3).

LCO Each containment air lock forms part of the containment pressure boundary. As part of the containment pressure boundary, the air lock safety function is related to control of the containment leakage rate resulting from a DBA. Thus, each air lock's structural integrity and leak tightness are essential to the successful mitigation of such an event.

Each air lock is required to be OPERABLE. For the air lock to be considered OPERABLE, the air lock interlock mechanism must be OPERABLE, the air lock must be in compliance with the Type B air lock leakage test, and both air lock doors must be OPERABLE. The interlock allows only one air lock door of an air lock to be opened at one time. This provision ensures that a gross breach of containment does not exist when containment is required to be OPERABLE. Closure of a single door in each air lock is sufficient to provide a leak tight barrier following postulated events. Nevertheless, both doors are kept closed when the air lock is not being used for normal entry into or exit from containment.

APPLICABILITY In MODES 1, 2, 3, and 4, a DBA could cause a release of radioactive material to containment. In MODES 5 and 6, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, the containment air locks are not required in MODE 5 to prevent leakage of radioactive material from containment. The requirements for the containment air locks during MODE 6 are addressed in LCO 3.9.4, "Containment Penetrations."

ACTIONS The ACTIONS are modified by a Note that allows entry and exit to perform repairs on the affected air lock component. If the outer door is inoperable, then it may be easily accessed for most repairs. It is preferred that the air lock be accessed from inside primary containment by entering through the other OPERABLE air lock. However, if this is not practicable, or if repairs on either door must be performed from the barrel B63.6.2-2 Revision No. 32 McGuire Units 1 and 2

Containment Air Locks B 3.6.2 BASES ACTIONS (continued) status, assuming that at least one door is maintained closed in each affected air lock.

D.1 and D.2 If the inoperable containment air lock cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and to MODE 5 within 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.2.1 REQUIREMENTS Maintaining containment air locks OPERABLE requires compliance with the leakage rate test requirements of the Containment Leakage Rate Testing Program. This SR reflects the leakage rate testing requirements with regard to air lock leakage (Type B leakage tests). The acceptance criteria were established during initial air lock and containment OPERABILITY testing. The periodic testing requirements verify that the air lock leakage does not exceed the allowed fraction of the overall containment leakage rate. The Frequency is required by the Containment Leakage Rate Testing Program.

The SR has been modified by two Notes. Note 1 states that an inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test. This is considered reasonable since either air lock door is capable of providing a fission product barrier in the event of a DBA. Note 2 has been added to this SR requiring the results to be evaluated against the acceptance criteria which are applicable to SR 3.6.1.1. This ensures that air lock leakage is properly accounted for in determining the combined Type B and C containment leakage rate.

SR 3.6.2.2 Door seals must be tested every 6 months to verify the integrity of the inflatable door seal. The measured leakage rate must be less than 15 standard cubic centimeters per minute (sccm) per door seal when the seal is inflated to approximately 85 psig. This ensures that the seals will remain inflated for at least 7 days should the instrument air supply to the McGuire Units 1 and 2 B 3.6.2-6 Revision No. 32

Containment Air Locks B 3.6.2 BASES SURVEILLANCE REQUIREMENTS (continued) seals be lost. The Frequency of testing has been demonstrated to be acceptable through operating experience.

SR 3.6.2.3 The air lock interlock is designed to prevent simultaneous opening of both doors in a single air lock. Since both the inner and outer doors of an air lock are designed to withstand the maximum expected post accident containment pressure, closure of either door will support containment OPERABILITY. Thus, the door interlock feature supports containment OPERABILITY while the air lock is being used for personnel transit in and out of the containment. Periodic testing of this interlock demonstrates that the interlock will function as designed and that simultaneous opening of the inner and outer doors will not inadvertently occur. Due to the purely mechanical nature of this interlock, and given that the interlock mechanism is not normally challenged when the containment air lock door is used for entry and exit (procedures require strict adherence to single door opening), this test is only required to be performed every 18 months. The 18 month Frequency is based on the need to perform this surveillance under the conditions that apply during a plant outage, and the potential for loss of containment OPERABILITY if the surveillance were performed with the reactor at power. The 18 month Frequency for the interlock is justified based on generic operating experience. The Frequency is based on engineering judgment and is considered adequate given that the interlock is not challenged during the use of the interlock.

REFERENCES 1. 10 CFR 50, Appendix J, Option B.

2. UFSAR, Section 6.2.
3. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).

McGuire Units 1 and 2 B 3.6.2-7 Revision No. 32

Containment Isolation Valves B 3.6.3 BASES SURVEILLANCE REQUIREMENTS (continued)

OPERABILITY. The isolation time test ensures the valve will isolate in a time period less than or equal to that assumed in the safety analyses.

The isolation time is specified in the UFSAR and Frequency of this SR are in accordance with the Inservice Testing Program.

SR 3.6.3.6 For containment purge valves with resilient seals, additional leakage rate testing beyond the test requirements of 10 CFR 50, Appendix J, Option B, is required to ensure OPERABILITY. The measured leakage rate for containment purge lower compartment and instrument room valves must be < 0.05 La when pressurized to Pa. The measured leakage rate for containment purge upper compartment valves must be _ 0.01 La when pressurized to P,. Operating experience has demonstrated that this type of seal has the potential to degrade in a shorter time period than do other seal types. Based on this observation and the importance of maintaining this penetration leak tight (due to the direct path between containment and the environment), these valves will not be placed on the maximum extended test interval, but tested on the nominal test interval in accordance with the Containment Leakage Rate Testing Program.

SR 3.6.3.7 Automatic containment isolation valves close on a containment isolation signal to prevent leakage of radioactive material from containment following a DBA. This SR ensures that each automatic containment isolation valve will actuate to its isolation position on a containment isolation signal. The isolation signals involved are Phase A, Phase B, and Safety Injection. This surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position under administrative controls. The 18 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power. Operating experience has shown that these components usually pass this Surveillance when performed at the 18 month Frequency. Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.

McGuire Units 1 and 2 B 3.6.3-12 Revision No. 32

Containment Isolation Valves B 3.6.3 BASES SURVEILLANCE REQUIREMENTS (continued)

SR 3.6.3.8 This SR ensures that the combined leakage rate of all reactor building bypass leakage paths is less than or equal to the specified leakage rate.

This provides assurance that the assumptions in the safety analysis are met. The Frequency is required by the Containment Leakage Rate Testing Program. This SR simply imposes additional acceptance criteria. I Bypass leakage is considered part of La.

REFERENCES 1. UFSAR, Section 15.

2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
3. UFSAR, Section 6.2.
4. Generic Issue B-24.
5. UFSAR, Section 6.2.4.2 McGuire Units 1 and 2 B 3.6.3-13 Revision No. 32