Technical Specifications, Issuance of Amendment Elimination of Requirements for Post Accident Sampling System
ML022390065
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/26/2002
From:
NRC/NRR/DLPM
To:
Tam P, NRR/DLPM, 415-1451
References
TAC MB5272
Download: ML022390065 (1)


Text

6.13 Fire Protection Inspection utilizing either 6.13.1 An independent fire protection and loss prevention inspection and audit shall be performed annually qualified off-site licensee personnel or an outside fire protection firm.

than 3 years.

6.13.2 An inspection and audit by an outside qualified fire consultant shall be performed at intervals no greater 6.14 Systems Inteqrity of Section Procedure shall be established, implemented and maintained to meet or exceed the requirements and recommendations such time as administrative 2.1.6.a of NUREG 0578. The requirements shall apply to the Post Accident Sampling System (PASS) until leakage path(s).

controls provide for continuous Isolation of the associated penetration(s) or a modification eliminates the potential 6.15 Iodine Monitoring Procedures shall be established, implemented and maintained to meet or exceed the requirements and recommendations of Section 2.1.8.c of NUREG 0578.

6.16 10 CFR 50 Appendix J Testing Program Plan 10 CFR 50.54(o) and A program shall be established to implement the leakage rate testing of the containment as required by 10 CFR 50, Appendix J, Option B. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, dated September 1995 with the following exceptions:

entitled "Performance-Based Containment Leak-Test Program,"

and

1. Type A tests will be conducted in accordance with ANSI/ANS 56.8-1994 and/or Bechtel Topic BN-TOP-1, 70,
2. The first Type A test following approval of this Specification will be a full pressure test conducted approximately rather than 48, months since the last low pressure Type A test.

is 35 psig.

The peak calculated containment intemal pressure (Pac) for the design basis loss of coolant accident air weight per day.

The maximum allowable primary containment leakage rate (La) at Pac shall be 1.5% of primary containment Leakage Rate Surveillance Test acceptance criteria are:

is less than 1.0 L,.

1. The as-found Primary Containment Integrated Leak Rate Test (Type A Test) acceptance criteria The as-left Primary Containment Integrated Leak Rate Test (Type A Test) isacceptance criteria is less than or equal to
2. integrity required.

0.75 La, prior to entering a mode of operation where containment is less than 0.6 L8,

3. The combined Local Leak Rate Test (Type B & C Tests including airlocks) acceptance criteria integrity is required.

calculated on a maximum pathway basis, prior to entering a mode of operation where containment 373 AMENDMENT NO. 442-, -,-59174