ML022240374

From kanterella
Jump to navigation Jump to search
Initial Submittal of Walkthrough Jpms for the Dresden Initial Examination - June 2002
ML022240374
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/03/2002
From: Otten M
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation
References
50-237/02-301, 50-249/02-301, ES-301-2 NUREG-1021, Rev 8
Download: ML022240374 (96)


Text

INITIAL SUBMITTAL OF WALKTHROUGH JPMS FOR THE DRESDEN INITIAL EXAMINATION - JUNE 2002

n i

System / JPM Title ES-301 Control Room Systems and Facility Walk-Through Test Out1 -2 Form ES-301-2 T) 32 Co:e*

Date of Exam'-ation: June 3, 2002 Exam Level (circle Oper2ing Test No.: ILT 01-1

=acility: Dresden

a.

Standby Liquid Control System / Initiate SBLC Hard Card with RWCU valves failing to close automatically, DOP 1100-02; WA: 21 1000A4.06, 3.9 13.9 B.1 Control Room Systems N, A S,

~

b. Low Pressure Core Spray System / CS Pump Operability Test with pump failure to meet acceptance criteria, DOS 1400-5; WA: 209000A4.01, 3.8 / 3.6 D, A,. S,
a.

Isolation Condenser I Isolation Condenser Makeup Pump Start with Faulted Lube Oil Pressure, DSSP 100-CR; WA: 295016AA1.09,4.0 14.0

~~

c.

Recirculation System / Startup of second Recirculation Pump with failure of discharge valve to open, DOP 0202-01; WA: 202000A4.01, 3.7 13.7 Main and Reheat Steam System / Drain, Pressurize, and Open the Main Steam Lines, DOP 0250-01; WA:

239001A4.01, 4.2 / 4.0 A. C. Electrical Distribution I Restoring Normal Feed to MCC 28-7/29-7 from Bus 29, DOP 6500-10; WA:

262001A4.01, 3.4 I 3.7 Rod Worth Minimizer System / Take a Rod Out of Service, DOP 0400-02; WA: 201006A4.06, 3.2 I 3.2

d.
e.
f.

D, A (4)

Heat Removal from Reactor Core N, A S, L

b.

Reactor Protection System I Transfer RPS to Reserve Power Supply, DOP 0500-03; WA: 212000K4.03, 3.0 I 3.1 1

D. S. L D

(7)

Instrumentation N, S. L D. S

c.

Instrument Air System I Unit 2/3:lnstrument Air Cross-D, R r.

Connect Operation, DOP 4700-03; WA: 29501 9AA1.02, 3.3 / 3.1

~~

g. Standby Gas Treatment System / Start Standby Gas Treatment, DOP 7500-01; WA: 261000A4.02, 3.1 / 3.1 (8)

Plant Service Systems Safety Function (1)

Reactivity Control (2)

Reactor Water Inventory Control (4)

Heat Removal from Reactor Core (3)

Reactor Pressure Control (6)

Electrical (7)

(9)

Instrumentation Radioactivity Release NUREG-1021, Revision 8 Rev 1 E x a m S u b m i t t a l

Exelan,.

Nuclear Nuclear Generation Group Job Performance Measure Injection with SBLC JPM Number: B.1.a Revision Number: 00 Date: 0311 3/02 Developed By:

Fachity Author Date Fac i I ity Re pres en ta tive E x a m S u b m i t t a l 1

JPM Nuinber B.

1.a Job Performance Measure (JPM)

Revision Record (Summary)

1. Revision 00, This JPM was created for use during the ILT Class 01-1 NRC Exam.

0 E x a m S u b m i t t a l 2

JPM Number B. 1.a Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE:

It is acceptable to use an IC similar to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert the following malfunctions or remotes:

0 IMF RDFHYLK (this is a hydraulic lock of the CRDs) 0 IMF CIRWCUAP (this fails the RWCU inboard isolation valves open) 0 IMF CIRWCUBP (this fails the RWCU outboard isolation valves open)

3. Perform the following lineup on the simulator:

0 Depress the manual scram pushbuttons 0

Initiate ARI 0

Place the Mode Switch in SHUTDOWN E x a m S u b m l t t a l 3

.TPM N L I I I I ~ C ~

B.

1.a Job Performance Measure (JPM)

INITIAL CONDITT (-) NS

1. You are the Unit 2 NSO.
2. The Unit Supervisor has ordered a manual scram -

to a feedwater transient to scram when the manual pur:- - xtons AND ARI pushbuttons the Mode Switch was placed - Shutdown, placing the Unit in I /

4. Unit Supervisor has authorized Hard Cards and a:-:\\>unced that Transient Annunciator Response is in effect.
5. Torus temperature is 108F AND rising.

INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBL C.
2. Inform the Unit Supervisor when the task is comF:-te.

Fill in the JPM Start Time when the student acknouvlciges the Initiating Cue.

UNSAT requires written comments on respective step

  • Denotes CRITICAL steps.

Number any comments in the Comment Number cc. imn on the following pages. Then annotate that comment in the Comments section at :x bottom of the page. The comment section should be used to document the reas-rl. that a step is marked as unsatisfactory and to document unsatisfactory perforxince relating to management expectations.

Some operations that are performed from outside of tr r control room may require multiple steps. These items may be listed as individui iteps in this JPM. It is acceptable for the candidate to direct the local operator to perfor goups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledgt -he initiating cue.

4

JPM N m b e r B. 1.a Job Performance Measure (JPM)

JPM Start T i : x STEP ELEMEST STANDARD

  • 1. Place the S3LC INJECTION OPERATES SBLC INJECTION CONTROL keylock switch to SYS 1 & 2 >rSYS2& 1 position.

CONTROL key lock switch.

"2. Verify the fJl1owing RWCU Closes the following valves:

valves closs:

. 2-1201-1

. 2-1201-1'4

. 2-1201-3

. 2-1201-1 2-1201--

2-120 1-1 2-1201

-lA 2-1201-2 2-1201-3 2-1201-7 Note:

The RWCL-valves will have failed to close automatically and the student must close them manuaIl y

3. Verify:

VERIFIES SBLC System

~

0 Amber SQUIB A AND INJECTING.

SQUIB B pilot lights NOT LIT.

PUMP 1 AND PUMP 2 pilot lights lit.

0 0

FLOW pilot light lit.

SBLC SQUIB VLV CKT FAILURE annunciator alarms (902-5 H-6).

4. Notifies Unit Supervisor that Examinee notifies the Unit 2

~

SBLC System is Injecting Supervisor.

CUE:

Report acknowledged.

The JPM is considered complete at this time.

JPM Stop Time:

l l

l l

W l

l l

l l

l l

l 8

l l

l l

l l

l l

l l

l l

l l

l l

l l

l l

l l

l l

l l

l l

~

l l

l l

~

W l

l l

l 8

l l

l l

W l

l

~

l l

l l

l l

l l

l E x a m S u b m i t t a l 5

m i

Number B. 1.a Job Performance Measure (JPM)

Exam i nee s N ame :

Job

Title:

RO El SRO a JPM

Title:

Injection with SBLC JPM Number: B. 1.a Revision Number: 00 Task Number and

Title:

21 1 L002, Inject SBLC into the reactor K/A Number and Importance: 21 1000A4.06; 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:

CI Simulator 0

Plant CI Control Room Testing Method: CI Simulate Perform Alternate Path: H Yes CI No Time Critical: CI Yes No Estimated Time to Complete: 8 minutes Actual Time Used:

minutes References :

I. DOP 1 100-02, Injection of Standby Liquid Control, Rev 1 I

~

x a

m s u b m i t t a l 6

Job Performance Measure (JPMI EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

CI Yes 9

Y O The examinees perlormance was evaluated against the standards contained in tl- - SPM, and has been determined to be: Cl Satisfactory CI Unsatisfactorj Comments:

Evaluators Name:

(P ri n t )

Evaluators Signature:

Date:

E x a m S u b m i t t a l 7

JPh4 Nun1bcr R.

1.a

1.
2.

9 3.

4.
5.

Job Performance Measure (,JPM)

INITIAL CONDITIONS You are the Unit 2 NSO.

'The Unit Supervisor has ordered a man;:.d scram duc to a fcedwater transient.

'The reactor failed to scram when the nicnual pushbuttons AND ARI pushbuttons were depressed and the Mode Switch I\\ 35 placed in Shutdonn, placing the Unit in and ATWS condition.

Unit Supervisor has authorized I-Iard Czrds and announced that Transient Annunciator Response is in effect.

Torus temperature is 108°F AND rising.

C INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBLC.
2. Inform the Unit Supervisor when the task is complete.

E x a m S u b r n l t t a l a

Nuclear Job Performance Measure Core Spray Pump Operability Test UNSAT JPM Number: B.1.b Revision Number: 02 Date: 03/13/02 Developed By:

Approved By:

Facility Representative Date E x a m S u b m l t t ?

1

Job Performance Measure (JPM)

Revision Record (Summary) 1, Revision 02, This JPM was taken directly from the Dresden fdcility testing materials bank (S-1400-03) for use during the ILT Class 01-1 NRC Exam.

E x a m S u b m i t t a l 2

Job Performance Measure (JPJI)

SIMULATOR SETUP INSTRUCTIOUS I. Reset the simulator to IC 12.

NOTE:

It is acceptable to use an IC similar to the IC listed u-a\\re, provided thc IC actually used is verified to be compatible uith t h i 4 :I- ;i other JPMs that are scheduled to be run concurrently.

2. Start the LPCI room coolers.
3. Insert the following malfunctions or remotes:

0 IMF SER0089 OFF (prevents alarm 902-3 D-7 from ala-iing during this JPM)

4. Have a copy of DOS 1400-05 marked up completed throu& step 1.6 IMF CSPPBDEG 10 (degrades the 2B CS pump 10%)

e E x a m S u D m i t t a l

.Job Performance Measure (JPM)

IN IT1 A L CON 1) I T I ON S

1. The IJnit 2 Core Sp:-- iiperabbility surveillance is due and the 2A Corc Spray pump test has been coniplc-:Li.
2. DOS 1400-05 has 13: :-. completed up to and including Step 1.6.
3. Unit 2 NLO is stand -;

by in the corner room.

4. LPCIKore Spray Ri.-

m Coolers are running.

5. The System Engine?: :.j taking extra data at the Core Spray pumps.
6. You are the Unit 2.\\iiistant NSO.
7. 2B Core Spray S>.ste:: has been declared inoperable due to testing.

INITIATING CUE

1. The Unit Supervisor xects you to complete DOS 1400-05 for the 2B Core Spray pump, starting at steF 1.7.a. up to and including Step 1.7.1-
2. Leave the 2B Core Srray pump running for the System Engineer.
3. Complete Data Shee: : for this surveillance.
4. Inform the Unit 2 Surervisor when the task is complete.

Fill in the JPM Start Tin:? tvhen the student acknowledges the Initiating Cue.

E x a m S u D m i t t a l 4

Job Performance Measure (JPM)

UNSAT requires written comments on respecti\\Jc step.

  • Denotes CRITICAL steps Number any comments in the Comment Number column on the following pages. Ihen annotate that comincnt in the Comments section at thc bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory perforniancc relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

I I D. D I I ~. D ~ D. D D ~ ~ D I I I I D ~ D D I = ~ I I I I I D D I I I I I I I I ~ I I I I I I ~ I I ~ I I D I I I I I D I D I I I ~ I I I

~

x e

~

S u b m i t t a l

.IIW ~ u l l l ~ ~ c l.

r3. I.t>

,Job Performance Measure (,JPM)

JPM Start Time:

STEP ELEMENT Note: Provide examinee with a marked up copy of DOS 1400-05 with Data sheet 1.

The examinee should begin the surveillance at Step 1.7 Note:

1. Verify the following valve line UP.

STANDARD

2. Verify 2B CORE SPRAY MOTOR has adequate lubrication and records results on Data Sheet 1 CUE: Report as NLO that 2B CORE SPRAY motor oil level is at Oil Sightglass standstill line.

e d

m e

d z

3 m

0 MO 2-1402-43, CLOSED 0 Verifies Green Closed light MO 2-1402-38B, OPEN 0 Verifies Green Open light 2-1402-63, OPEN 0 Verifies Green Open light e

MO 2-1402-253, CLOSED 0 Verifies Green Closed light 0

MO 2-1402-3B, OPEN 0 Verifies Green Open light 0

2-1 402-40B-SV, CLOSED 0 Contacts the NLO to verify Unit 2, 2-1402-40B INST SV is closed.

position of valve.

CUE:

3. Verify 2B I,PCT/CS Room Cooler is operating properly.

CUE: Unit 2B LPCI/CS room cooler is operating normally.

Contacts NLO to verify proper

~

oil level.

Contacts NI,O to verify proper

~

room cooler operation.

E x a m S u b m i t t a l 6

,Job Performance hIe;l.;ut-e (<JPM)

STEP ELEMENT STAND.-IRD 3

4. Directs EA to open 2-1402-4013-Directs S I 1 - I -4O2-40R open.

~

SV and report pressure.

OPEN.

Pressure is 7 psig.

Note:

Evaluator may act as Verifier.

r --

5. Calculates 2-1402-8B initial Obtains D i i i i Pressure from closed dp.

902-3 pane: ?I-2-1450-1B.

2-1450-1 E

-90 psig 1402-4i83.

7 psig

-83 dp Initial

  • 6.: Close PP DISCH VLV,MO 2-Closes MO 1-1402-24B.

1402-24B

'7. Start 2B CORE SPRAY Pump.

Starts 2B C. r2 Spray Pump.

~~~

Note: May notify the NLO starting the pump and may flag annunciators H-13 and A-5

8. Verify alarms 902-3 B par':, tI-13 in alarm.

e 902-3 A-5, CORE SPRAY I'P RIJNNING.

Note: If operator requests another NSO to track the time the evaluator may perform this function.

E x a m S u b m i t t a l 7

STEP ELEhlENT

.T1'41 Nulnhcl. B.

1.b Job Performance Measure (JPM)

STANDARD "9. Open FLQW TEST VLV MO 2-MO 2-1402-4B Red Open light.

1402-4B Tracks tiinc throttled open.

10. Verifj. ?:IN FLOW VLV h4O 2-Verifies MO 2-1402-3813 closes.

~

~

I402-?83 closes.

Note: May terminate surveillance as soon as candidate recognizes failure of pump. This could happen before the flow rate of 4600 to 1650 gpm is achieved.

obtain a :low rate of 4600 to 4650 gpm.

on FI 2-1450-4B.

  • 1 1. THROTTLE MO 2-1402-4B to MO 2-1 402-4B Throttled (double

~

indication) to 4600 to 4650 GPM

  • 12. Recognizes that 2B CS pump Unit Supervisor informed of will not meet Acceptance Criteria Acceptance Criteria failure.

and reports to Unit Supervisor.

CUE: I understand 2B CS pump does not meel DOS 1400-05 Flow Rate Accsptance Criteria.

Leave thc 2B Core Spray Pump running for the System Engineer.

We will terminate the surveillame.

i The JPhl is considered complete at this time.

JPM Stop Time:

.l..~ll..ll.l.llllll.l.llllll.lll.lll,lll.lll.ll.lll~

E x a m S u b r n l t t a l E

Job Performance Measui-e (JPM)

Examinees N anic :

Job Titlc:

RO 0

SRO U JPM

Title:

Core Spray Pump Operability Test IJNSAT JPM Number: B.

1.b Revision Number: 02 Task Number and

Title:

209L004, Perform Core Spraj pump test nith torus a\\ ailablc WA Number and Importance: 209000A4.01; 3.8 / -3.6 Suggested Testing Environment: Simulator Actual Testing Environment:

cl Simulator 01 Plant cl Control Room Testing Method:Cl Simulate R Perform Alternate Path: R Yes 0 No Time Critical: 01 Yes No Estimated Time to Complete: 26 minutes Actual Time Used:

minutes References :

1. DOS 1400-05, Core Spray System Pump Test with Torus Available, Rev. 26 E x a m S u b m i t t a l

,Job Performance Measure (JPM)

EVALUATION SIJMMARY:

re a I 1 the <' r i I i cal El em cn t s pe I' fo rm cd s at i s f iic t o t' i 1 y ?

Cl Yes

-I N O The examinee's perfbrmance was ciduated against the staiidards contain, - i n this JPM, and has been determined to be: 0 Satisfactory 0 IJnsatisfa 1.)'

Comments :

Evaluator's Name:

(Pr I t )

Evaluator's Signature:

Dx:

E x a m S u D m i t t a l 1 0

,Job Performance Mcasure (,JPM)

IN I TI :I L CONDITION S 1. Ihc Unit 2 Core Spray opcrabilit! survcillancc is due and the 2A Corc Spraj. p u m ~ ~

test has been completed.

2. DOS 1400-05 has been completed up to and including Stcp T.6
3. Unit 2 NLO is standing by in the corner room.
4. LPCIKore Spray Room Coolers are running.
5. The System Engineer is taking extra data at the Core Spray pumps.
6. You are the Unit 2 Assistant NSO.
7. 2B Core Spray System has been declared inoperable due to testing.

INITIATING CUE

1. The Unit Supervisor directs you to complete DOS 1400-05 for the 2R Core Spray pump, starting at step I.7.a. up to and including Step 1.7.1-
2. Leave the 2B Core Spray pump running for the System Engineer.
3. Complete Data Sheet 1 for this surveillance.
4. Inform the Unit 2 Supervisor when the task is complete.

E x a m S u t S m i t t a l 1 1

Nuclear Nuclear Generation Group Job Performance Measure Core Spray Pump Operability Test UNSAT JPM Number: B.1. b Revision Number: 02 Date: 03/13/02 Developed By:

Facility Representative Date

-2LAzaQ Date NRC o n S I t e v a I idat ion (JPMS)

Nuclear Nuclear Generation Group Job Performance Measure Startup of second Recirculaticn Pump with failure of discharge valve to open JPM Number: B.l.c Revision Number: 00 Date: 03/13/02 Developed By:

Fa c i I i ty' A u t h o r Date Approved By:,){c;-:q/- /

Facility Representative

~.

Date E x a m S u D r n i t t a l 1

.JIhl Nuinher 3. I.C Job Performance Measure (JPM)

Revision Record (Summary)

I. Revision 00, l-his.lPM is ncw and \\vas developed for the Dresden ILT Class 0

1 - 1 NRC Exam.

2 E x a m S u

~

m ttal

Job Performance Measure (tJPM)

SIM1JLATOR SETUP INSTRUCTIONS

1. Rcset the simulator to IC 5.

NOTE:

It is acceptable to use a similar IC to thc IC listed above, provided the IC actually used is verificd to be compatible with this and othcr JPMs that are scheduled to be run concurrently.

2. Trip the 2B Recirc Pump
3. Close the 2B Recirc Pump discharge valve (MO 2-202-513) and rcturii C/S to
NORMAI,
4. Insert following Malfunctions and/or Remotes 0

IOR RRDSBCLS CLOSE 0

IORRRDSBOPN OFF IOR RRDSBJPS OFF 0

IOR RRDSBJIP OFF

5. Place the Recirc Pumps in individual manual control
6. Complete DOP 0202-01 up through Step G.4 E x a m S u D m i t t a l 3

Ilhl Number 13. 1.C Job Performance Measure (,JIM)

INITIAL CONDITIO?

I. 213 Recirc Pump was inadvertently tripped one (1 ) I!

.: ago duc to 17ersoniicl error.

2. The immediate actions of DOA 0202-01 have been 7ipletcd.
3. All prerequisites of DOP 0202-01 have been met.
4. Seal Purge to the 2B Recirc Pump has been establisl-!: 1.
5. DOP 0202-01 has completed up to and including stc; i.4.

INITIATING CUE

1. You have been directed by the Unit 2 Supervisor to r:.:xrt the 2B Recirc Pump IAW DOP 0202-01 starting at step G.5.
2. Inform the Unit 2 Supervisor when the task is comp1;:-

Fill in the JPM Start Time when the student acknowledgri [he Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number colurr on the following pages. Then annotate that comment in the Comments section at the -83ttom of the page. The comment section should be used to document the reason - ; i t a step is marked as unsatisfactory and to document unsatisfactory performanL 1 relating to management expectations.

Some operations that are performed from outside of the c - trol room may require multiple steps. Thcse items may be listed as individual st::< in this JPM. It is acceptable for the candidate to direct the local operator to perform g-ips of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges tl- - nitiating cue.

E x a m S u b m i t t a l 4

.ll)hi N11tnhcr R.

1.c Job Performance Measure (JPM)

.IPM Start Time:

STEP ELEMENT STANDARD c,

5 2 U'Z E a E E

1. Verify MO 2-201-513,2B PP MO 2-202-5B Red Closed light DISCH VLV, is CLOSED AND C/S is in the NORhl position.

AND C/S is in the NORM position.

"2. Start the 2B MG ?>I. holding 2B Turns 2B M-G Set Drive Motor MG SET DRIVE LIOTOR switch in START for 3 seconds.

Control switch to START and holds for 3 seconds.

3. Observe the follo.,.i.ing:

Observes or monitors the following :

MG set Closei indicator 0

0 Speed meter rjes to a peak of MG Field brezker CLOSES comes on 60% to 80%.

seven seconds after MG DRIVE MOTOR breaker closes.

and then deca: s to approximatel! 78%

0

% Speed mete: settles out b

2B M-G Set Drive Motor Blue On light illuminated.

Monitors speed on Percent speed meter.

MG Field breaker Blue Closed light illuminated.

Monitors speed on Percent speed meter.

Note:

dual valve posi:ion indication is NOT obtained viithin 2 minutes of pump start, THEN trip the Recirc Pump.

E x a m S u b m i t t a l

STEP ELEMENT Note: The MO 2-202-5B, 2B PP DISCI4 VLV, will NOT OPEN SIW ~~~~~~i~~~

r3. I.c Job Performance Measrire (,JPM)

4. While observing APRM response AND Recirc loop flow indications after each individual open step (jog), perform the f0 11 owing :

0 Open, MO 2-202-58,2B PP DISCH VLV, just to the point of dual valve position indication.

STANDARD Attempts to OPEN MO 2-202-5B, 2B PP DISCI I VLV by one of the following:

Throttling opcn with 2B PP DISCH VLV Control switch OR Jog open by using 2B PP DISCI-I VLV Jog control.

"5. If dual valve position indication Trips 2B Recirc Pump within 2 is NOT obtained within 2 minutes of pump start, THEN trip the recirc pump.

minutes 6 Reports to the Unit 2 Supervisor Unit 2 Supervisor notified.

~

that the MO 2-202-53,2B PP DISCH VLV, did not have dual indication and the 2B Recirc Pump was tripped.

CUE: Acknowledge report.

The JPM is considered complete at this time.

E x a m S u D n i t t a l E

Job Performance Measure (,JPM) 1 sa m i nee s N m i

c: :

.[ob

Title:

IlO CI SRO 3 JPM

Title:

Startup of second Recirculation Iump \\\\it11 failure of discharge vallfe to npc-JPM Number: B. 1.C Revision Number:OO Task Number and

Title:

2021,002, Perform a linit 2 Recirculation systeni startup K/A Number and Importance: 202000A4.0 1 ; 3.7 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:

CI Simulator Plant CI Control Room Testing Method: c1 Simulate W Perform Alternate Path: W Yes c1 No Time Critical: Cl Yes W No minutes Estimated Time to Complete: 14 minutes Actual Time IJsed:

References :

1. DOP 0202-01, Reactor Recirculation System Startup, Rev. 33 E x a m S u b m l t t a l

Job Performance hleasrire (JPM)

Tlic esaniiiiccs pcrformancu \\ l a c evaluated agal- -.I the standards contained in this JPM, and has been deterniined to be: Cl Satisfactor.

Cl I In c at i s fact or y Comments:

Evaluators Name:

(Print)

Evaluators Signature:

Date:

E x a m S u b m i t t a l e

.IPbl Nun1ber R.

1.c

.Job Performance Measure (JPM)

I N IT I A L CON DIT IONS

1.

2B Rcc rc hinip \\vas inndvel-tently tripped one (1) hour ago due lo personncl error

_ 1

2.

I he in::xt.diate actions of IIOA 0202-0 1 have been completed.

3.

All prcrquisites of IIOP 0202-0 1 ha\\.e been met.

4.

Seal PL:rge to the 2 0 Recirc Pump has been established.

5.

DOP 0103-01 has completed up to and including step G.4 INITIATING CUE

1. You have k e n directed by the Unit 2 Supervisor to restart the 2B Recirc Pump IAW DOP 0202-01 starting at step G.5.
2. Inform the Vnit 2 Supervisor when the task is complete.

E x a m S u b m i t t a l

Draining and Pressurizing the Main Steam Lines JPM Number: B.1.d Revision Number: 00 Nuclear

,Job Performance Measure Date: 03/13/02 Date E x a m S u b m i t t a l 1

.iP'.! Y~iiiibcr 6.1.d Job Performance Measure (,JPM) lievision Record (Sum ma ry )

1. Re\\.ision 00, This JPM \\vas taken directly from thc Thsdcn faL ! t i tcsting matcrials bank (S-0250-01) for use during the ILT L'lass 01 -1 NRC Exam.

2 E x a m S u o m ~ t t a l

Job Performance Measure (,JPM) 1. Reset the simulator to IC' 5.

NOTE:

It is acceptablc to use 2:. IC siniilar to the IC listed above, provided the IC actually used is 1;erifisC :i, be compatible \\\\;it11 this and other JPMs that are scheduled to be run co:::;irrently.

2. Close the following valves:

0 On the 902-3 panel:

0 All eight (8) MSIVs.

0 0

MSL DRN VLVs MO 2-220-1, MO 2-220-2, MO 2-220-3, and MO 2-220-4 All four (4) MSL DRN 'I-LVs MO 2-220-90 A (R), (C), and (D).

0 On the 902-7 panel:

0 Main Steam Line Drain 410 2-3005.

0 CONTROL VLV ABO1.E SEAT DRN.

3. Set Analog output of the 902-7 ??anel "Turbine Throttle Pressure" to 30 p s

than reactor pressure.

E x a m S u b m i t t a l

,Job Performance Measure (,JPM)

INITIAL CONDITIONS

1. Unit 2 has just becii stabilixd following the initiation ola Group 1 isolation and subsequent scram during plant startup/heatup.
2. An IM has -just notified the Shift Manager that he bumped the steam line pressure switch rack on the corner room landing causing the Group 1 isolation.
3. Reactor level is normal (+30), the turbine stop \\.alvcs are closed, and the scram and Group 1 isolations have been reset.
4. The Main Steam 1,ines were NOT flooded during the event.

INITIATING CUE The Unit 2 Unit Supervisor has directed you to drain and pressurize the main steam lines in accordance with DOP 0250-01, Notify the Unit 2 Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may rcquire multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

4

,Job Performance Measure (tJPM)

JPM Start Time:

STEP ELEMENT STANDARD 1

Note: Steps 1-3 are at the 902-3 panel 1

Opens MO 2-220-4

  • 2.

"3.

TO CONDR.

OPEN Outboard MSIVs:

A 0 2-203-2A A 0 2-203-23 AO2-203-2C A02-203-2D OPEN MSL DRN VLVs:

MO 2-220-1 MO 2-220-2 MO 2-220-3 Opens all 4 outboard MSIVs Opens all 3 MSL DRN VLVs 1

Note: Steps 4-5 are at the 902-7 panel 1

~

"4, OPEN CONTROL VLVS Opens the CONTROL VLVS ABOVE SEAT DRNS ABOVE SEAT DRNS.

M02-3004A M02-3004B M02-3004C M02-3004D

Note: Step 6-8 are at the MSL LEAD Opens the MSL LEAD DRN

~~~

VLV.

9 0

2 3

1 E x a m S u b m i t t a l 5

,Job Performance Measure (JPh'I~

Y STEP ELEMENT

  • 6. OPEN MSI, DRN VLVS MO 2-220-90A MO 2-220-900 MO 2-220-90C 0

MO 2-220-90D STANDARD Opens the MSI, 13.Y VLVS rr; 3

o z Note: Time compression is uscd for draining the steam lines.

When valves are open give the following cue.

CUE: Inform examinee that lines are drained.

7. Verify the following valves are CLOSED (Inboard MSIVs):

A 0 2-203-1 A A 0 2-203-1 B A 0 2-203-IC AO 2-203-1 D

8. Verify the following valves are OPEN (Outboard MSIVs):

A 0 2-203-2A A02-203-2l3 A02-203-2C A02-203-2D I Note: Steps 9-10 are at thc 902-7 panel I

~

Verifies Inboard !.ISIVs are closed.

Verifies Outboari LlSIVs are open.

E x a m S u t > m i t t a l E

STEP ELEMENT

.11)11 Kuiiihx B. 1.d Job Performance Measure (JPM)

STAND A I< I1 4

4 r / )

  • 9, Close CON IRI 11, VI,VS Closes the CONTROI, VI,VS ABOVE SE:Zl DRNS AI3OVI SEAT DRNS MO 2-300: i MO 2-3001R MO2-3001C a MO 2-3001Il DRN VLV VLV

Step 1 1 - 13 are 3t the 902-3 panel I 1 1. Verify OPEN rhs following MSL Verifies the valves open

~

DRN VLVs to condenser:

MO 2-220-90A a MO 2-220-50B 0

MO 2-220-?0C 0

MO 2-220-?OD 12 Verify OPEN 31SL DRN VLVS:

Verifies the valves open

~

MO 2-220-1 0

MO 2-220-1 MO 2-220-3

Closes the MSL DRN VLV E x a m S u t s m i t t a l

STEP ELEMENT

.T Ph.1 N ~ 1 1 1 bcr B, 1. d

,Job Performance Measure (JPM)

STANDARD 14 Verify differential pressure is equalized to less than 70 psiti the MSIVs by Inparing reactor pressure (902-5 panel) to turbine throttle pressure (902-7 panel).

TO D

e t erin i nes d i ffe re n t i a 1 press ii re less than 70 psid by comparing,...

902-5 panel PI-2-640-28 (RPV pressure) 902-7 panel PI-2-3040 (Turbine [ L - L - ~ \\ j throttle pressure)

, + \\ - \\ % j.,

~

i{

t P

L \\ -\\

Note: Step 15 is at the 902-3 panel

~~

  • 15. Open Inboard MSIVs Opens the following valves:

~

A 0 2-203 - 1 A A 0 2-203 - 1 B A 0 2-203-1 C A 0 2-203-1 D A 0 2-203-1A A 0 2-203-1B A 0 2-203-1C A 0 2-203-ID

\\

Note: Steps 16 and 17 are at the 902-7 panel ABOVE SEAT DRNS.

  • 16. OPEN CONTROL VLVS Opens the CONTROL VLVS

~

ABOVE SEAT DRNS.

M02-3004A M02-30043 M02-3004C M02-3004D

~

DRN VLV.

VLV.

18. Report to Unit 2 Supervisor that Examinee verbally reports to

~

the main steam lines are drained and pressurized.

Unit 2 Supervisor that the main stearn lines are drained and pressurized E x a m S u b m i t t a l e

,Job Performance Measure (,JPM)

STEP ELEMENT CUE: Report acknowledged.

The JPM is considered complete at this time.

STANDARD c

Y.

3 JPM Stop 'Time:

E x a m S u D r n ~ t t a l E

<Job Performance Measure (,JPM)

I?xaminees Name:

JPM Tit1e:Draining and Pressurizing the \\lain Steam 1-ines JPM Number: 13.l.d Iievision Number: 00 Task Number and

Title:

2391,002 Pressur:/e the main stcain lincs WA Number and Importance: 239001 A<.~lI

4.2 / 4.0 Suggested Testing Environment: Sin?:ilator Actual Testing Environment:

c7 Simulator Cl Plant c1 Control Room Testing Method: 0 Simulate Faulted: 0 Yes No W Perform

.llternate Path: 0 Yes No Time Critical: 0 Yes No Estimated Time to Complete: 32 minutes Actual Time Used:

minutes

References:

1. DOP 0250-0 1, Draining and Pressurizing the Main Steam Lines, Rev. 9 E x a m S u D m l t t a l 1c

Job Performance Measure (JPM)

'I'h t' 2 \\ami t i ee ' s pcr fo rnim ce \\\\'as cv a 1 11 at ed ag ai 11 s t t 11 e stand a rd s contained i 11 this 11) MI and.--is been determined to be: 0 Satisfactory LI I J ns at i s f 'ac t o ry Cor. xents:

E: aluator's Name:

(Print)

Evalxator's Signature:

Date:

E x a m S u t s r n r t t z 1 1

Job Performance Measure (JPNI)

INITIAL CONDITIONS 1. linit 2 hasjust been stabilized following the initiation o f a Group 1 isolation and sub sequent scram d ur i ng p I ant start up/hea t up.

2. An IM has just notified the Shift Manager that he bumped the steam line pressure
3. Reactor level is normal (+30"), the turbine stop valves are closcd, and the scram and Group 1 isolations have been rcset.
4. The Main Steam Lines were NOT flooded during the event.

switch rack on the corner room landing causing the Group 1 isol, d t' 1011.

INITIATING CUE The Unit 2 Unit Supervisor has dirccted you to drain and pressurize the main steam lines in accordance with DOP 0250-0 1.

Notify the IJnit 2 Supervisor when the task is complete.

E x a m S u b m i t t a l

Exelon,..

Nuclear Nuclear Generation Group Job Performance Measure Restoring Normal Feed to MCC 28-7/29-7 from 3us 29 JPM Number: B.1.e Revision Number: 00 Date: 03/13/02 Developed By:

' Fac i I i ty Author d,'

Approved By:

Facility Representative Date C.

x c g Date E x a m S u b m i t t a l 1

Revision Record (Summary) 1 Revision 00, TI1

~

PA4 was created for lisc during thc 11, 1 Class 0 1 - 1 NRC r i k -

E x a m S u I 3 m i t t a l 2

JIM Numbei-B.

1.C Job Performance Measure (JPM)

S I M I 1 L AT 0 R S ET lJ I I N ST RI J CT IO N S

1. Reset the simulator to IC 12 NOTE:

It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Hold MCC 29-7/28-7 Feed from Bus 29 in TRIP until MCC 29-7/28-7 Feed from BUS 28 CLOSES.

E x a m S d. o m i t t a l

JPh4 Numbcr n. I.c Job Performance Measure (,JPM)

INITIAL CONDITIONS

1. MCC 28-7/29-7 is powered from Bus 28.
2. Power has been restored to Bus 29.
3. You are the Unit 2 Assistant NSO.

INITIATING CUE You have been directed by the Unit Supervisor to restore the normal feed to h4CC 28-7/29-7 per DOP 6500-10 Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

~

x a

m s u b m i t t a l 4

STEP

  • l.
  • 2.
3.
4.

CUE: r I P h i Nuiiibcr 13. 1.c Job Performance Measure (JPM)

.JPM Start Time:

ELEMENT Open the feed breaker from Bus FROM BUS 28, by placing control switch in TRIP AND maintain switch in TRIP.

28, MCC 29-7/28-7 FEED Close feed breaker from Bus 29, BUS 29.

MCC 29-7/28-7 FEED FROM Release feed breaker from Bus FROM BUS 28, control switch.

28,MCC 29-7/28-7 FEED Notify the Unit 2 Supervisor that normal feed has been restored to MCC 28-7129-7.

Report acknowledged.

The JPM is considered complete at this time.

~

Opens the fee, Treaker AND maintains the :,,itch in TRIP.

~

Closes the feec 5reaker

~

Releases feed trsaker control switch

~

~

Unit 2 Super\\.i:.:r notified, JPM Stop Time:

.. l. l n.. l.. l.. l ~. l. l. l. l ~ ~ ~ =. l n l.. l l. l l. l ~ l l l. l l. l l.,

E x a m S u b m i t t a l

Job Performance Measure (JPM)

Esarninees K:aie:

Job Ti::;.:

RO U

SRO r7 JPM

Title:

Res:>ring Normal Feed to b1CC 28-7/29-7 from Bus 29 JPM Number B.

1.e Revision N u r n b e r : a Task Number.-nd

Title:

2621,026, Restore Normal Feed to MCC 28-709-7 from Bus 29 WA Number a?.d Importance: 26200 1 A4.0 1 ; 3.4 / 3/7 d

Suggested Testing Environment: Simulator Actual Testing Environment:

c1 Simulator c1 Plant cl Control Room Testing Method: 0 Simulate Faulted: c1 Yes H No Perform Alternate Path: 0 Yes H No Time Critical: c1 Yes No Estimated Time to Complete: 12 minutes Actual Time Used:

minutes

References:

1. Reference DOP 6500- 10. Rev. 4 E x a m S u b m i t t a l

JIM Numticr B. I.e

,Job Performance Measure (JPM)

EVALUATION SUNIMAIIY:

Were all the Critical Elements performed satisfactorily!

0 Yes cl N

0 The examinees perforniance \\vas evaluated against thc standards contained in this JIM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:

Evaluators Name:

(Print)

Evaluators Signature:

Date:

E x a m S u b m i t t a l 7

JPM Number B. 1.e Job Performance Measure (JPM)

INITIAL CONDITIONS

1. MCC 28-7/29-7 is powered from Bus 28.
2. Power has been restored to Bus 29.
3. You are the Unit 2 Assistant NSO.

INITIATING CUE You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6500-1 0 Notify the Unit 2 Supervisor when the task is complete.

f

'I.

E x a m S u b m i t t a l E

Nuclear Nuclear Generation Group Job Performance Measure Take a Rod Out of Service JPM Number: B.1.f Revision Number: 00 Date: 03/13/02 Developed By:

Facilfty Author Facility Representative Date 3 -& -<.&

Date C

I' E x a m S u b m i t t a l 1

JPM Nuniber B. 1. f Job Performance Measure (JPM)

Revision Record (Summan-)

1. Revision 00, This JPM IS taken directly from the Dresden facility testing materials t.mk (S-0400-03) for use during the ILT Class 0 I - 1 NRC Exam.

E x a m S u b m i t t a l 2

JPM Number B. 1.f Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS I. Reset the simulator to IC 12.

2. Select Control Rod B-IO and drive it to 00, ensure to deselect rod after driving the rod to position 00.
3. Insert the following malfunctions or remotes:

0 IRF RODB 1 ODA (this disarms the accumulator for rod B-IO) 3 E x a m S ~ s r n i t t a l

~~

-~

JPM Number B. 1.f Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Control rod B-10 was discovered uncoupled. All attempts to couple the rod per DOA 0300-5 were unsuccessful. The control rod was then inserted to position 00 and electrically disarmed. The Control rod was tagged and logged per DOS 0300-06 and a QNE has been notified.
2. You are the Unit 2 NSO.

INITIATING CUE You have been directed by the Unit 2 Supervisor to take rod B-IO out of service on the Rod Worth Minimizer per DOP 0400-02, Rod Worth Minimizer Step G.3.c.(2).

Notify the Unit 2 Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are perform4d from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is aveptable for the candidate-to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

1 8. 8 8 8 8 8 8 8 8 8 8. 8 8.. 8. 8 8. 8 8 = 8 8 8 8 8 8 8 8. 8 8 8 B. 8 8 =. 8 8 8 8 8 8 8 8 8 8 8 8 8. 8 8. 8 8

  • 8 8 8 8 b. 8 8 8 1 E x a m S u b m i t t a l 4

JPM Number B. 1.f Job Performance Measure (JPM)

JPM Start Time:

STEP ELEMENT STANDARD CUE: Provide examinee with a copy of DOP 0400-02.

1.

"2.

  • 3.

"4.

5.
  • 6.

A maximum of eight Control Rods may be taken Out-Of-Service.

From the primary display screen, touch the area marked SECONDARY FUNCTION Touch the area marked ROD OUT OF SERVICE.

Select the proper control rod on the touch screen by touching its position indication on the screen.

Visually verify that the selection is correct.

If the selection is correct, confirm the request by touching the ENTER REQUEST box.

Verifies eight :

less rods 00s.

Selects SECOl t3ARY FUNCTIONS : n RWM screen.

Selects ROD C,--T OF SERVICE on RWM scree:.

Control rod B-:ll position indication outlkd with blue box and shown on 3WM screen as SELECTED.

Verifies rod B-:

0 is selected.

Touches ENTEX REQUEST Note: The rod is already at position 00 so the student will NOT need to move the rod.

7. Touch the EXIT FUNCTION RWM returns I:.Main Display.

box to return to the Main Display.

(kite:

The next step is optional I

8. May select rod B-10 to ensure Selects rod B-! and rod in and out blocks are applied. acknowledges :
d block alarm. - - -

E x a m S u b m i t t a l

Job Performance Measure (JPM)

STEP ELEMENT STANDARD

9. Notify Unit 1 Supervisor that rod B-10 has bee:. taken Out-Of-Service.

Notifies Unit 2 Supervisor CUE: Acknowledgt report.

The JPM is wnsidered complete at this time.

JPM Stop Tim?:

JPM Number B. 1.f E x a m S u b m i t t a l E

JPM Number B. 1.f Job Performance Measure (JPM)

Examinees Name:

Job

Title:

RO CI SRO 0 JPM Tit1e:Take a Rod Out of Service JPM Number: B. 1.f Revision Number:OO Task Number and

Title:

201L027; Operate the RWM in the 00s mode.

WA Number and Importance: 201006A4.06; 3.2/3.2 Suggested Testing Environment: Simulator Actual Testing Environment:

CI Simulator CI Plant CI Control Room Testing Method: Ll Simulate H Perform Alternate Path: Cl Yes H No Time Critical: Ll Yes H No Estimated Time to Complete: 18 minutes Actual Time Used:

minutes

References:

1. DOP 0400-02, Rod Worth Minimizer, Rev. 17 E x a m S u b m i t t a l 7

Job Performance Measure (JPM)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Ci Yes Ll No The examinees performance was evaluated against the standards contained in 11::

i JPM, and has been determined to be: 0 Satisfactory Ci Unsatisfactory Comments:

Evaluators Name:

(Print)

Evaluators Signature:

Date:

E x a m S u b m i t t a l 8

JPM Number B. 1.f Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Control rod B-1 0 was discovered unco::pled. All attempts to couple the rod per DOA 0300-5 were unsuccessful. The control rod was then inserted to position 00 and electrically disarmed. The Control rod n-as tagged and logged per DOS 0300-06 and a QNE has been notified.
2. You are the Unit 2 NSO.

INITIATING CUE You have been directed by the Unit 2 Supenisor to take rod B-1 0 out of service on the Rod Worth Minimizer per DOP 0400-02, "Rod Worth Minimizer" Step G.3.c.(2).

Notify the Unit 2 Supervisor when the task is complete.

E x a m S u b m i t t a l 9

Nuclear Generation Group Job Performance Measure Start Standby Gas Treatment (SBGT)

JPM Number: B.1.g Revision Number: 00 Date: 03/13/02 E x a m S u b m i t ~ a l Developed By:

Facilik Author Date I

Approved By:

Facility Representative

JPM Number B. 1.g Job Performance Measure (JPM)

Revision Record (Summary)

1. Revision 00, This JPM was taken directly from the Dresden facility testing materials bank (S-7500-01) for use during the ILT Class 01-1 NRC Exam.

E x a m S u b m i t t a l

JPM Number B. 1.g Job Performance Measure (JPh1)

SIMULATOR SETUP INSTRUCTIOYS

1. Reset the simulator to any IC with Reactor Building Ventilaiioii operating in a normal lineup.
2. The 2/3A SBGT train is in STBY and the 2/3B SBGT train is in PRI.

I E x a m S u b m i t t a l

JPM Number B. 1.g Job Performance Measure (JPM)

INITIAL CONDITIONS

1. HPCT operability sur\\.s::lance is about to be performed.
2. In order for this survei::mce to be run, SBGT needs to be on.
3. No painting is in p r o p s in the Reactor Building or Turbine Building and no painting has been done in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUE

1. The Unit 2 Supervisor ?.JS directed you to start the "A" train of the SBGT system in accordance with DOP -iOO-Ol.
2. DOP 7500-M1/El, U2 5 Standby Gas Treatment System Checklist is complete.
3. Operator Daily Surveill3nce Log for the shift is complete for all Process Radiation Monitors.

Notify the Unit 2 Supervisor when the task is complete.

Fill in the JPM Start Time \\;:hen the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

8 8 8 8 8 8 8 8. 8 8 8 8 8 8 8 8 8 8 8 8 m m m 8 m m 8 = 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 m 8 8 8 8 8 = 8 = = 8 8 8 8 8 8 8 1 UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in th: "Comment Number" column on the following pages. Then annotate that comment in th? "Commentsyy section at the bottom of the page. The comment section should be ued to document the reason that a step is marked as unsatisfactory and to docummt unsatisfactory performance relating to management expectations.

Some operations that are perr'ormed from outside of the control room may require multiple steps. These items nay be listed as individual steps in this JPM. It is acceptable for the candidate to direct thf local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when ttt candidate acknowledges the initiating cue.

4 E x a m S u b m i t t a l

JPM Number B. 1.g Job Performance Measure (JPM)

JPM Start Time:

STEP ELEMENT STANDARD

  • 1. Place "A" SBGT SELECT "A" SBGT SELECT SWITCH in SWITCH to PRI position.

PRI.

"2. Place "B" SBGT SELECT "B" SBGT SELECT SWITCH in SWITCH to STBY position.

STBY.

3. Verify the following:

Conditions VERIFIED.

0 2/3 A(B)AIR HEATERS 2/3 A(B) FANS OFF.

0 Annunciator 923-5 A-6 and B-6 NOT in alarm state.

OFF.

4.'" Verify IIBII SBGT SELECT VERIFIES "B" SBGT SELECT - __

SWITCH in STBY position.

SWITCH in STBY position.

  • 5. Place "A" SBGT SELECT STARTS "A" SB GT.

SWITCH to START position

. a Z x a m S u b m i t t a l 5

JPM Number B. 1,? -

Job Performance Measure (JPM)

STEP ELEMENT STANDARD

6. Verify the following on the "A" Equipment VERIFIED.

SBGT:

INLET DAMPER 2/3 7505 A OPENS.

OUTSIDE AIR DAM 2/3 7504 A CLOSES.

2/3 "A" AIR HEATER ON.

2/3 "A" FAN ON.

SBGT TRN FAN DISCH MO 2/3 7507 A OPENS.

Flow rate between 3900 to 4700 scfm on SBGT DISCH FLOW FI 7540-13.

7. Verify the following on the "B" train:

INLET DAMPER 2/3 7505 B CLOSE.

0 OUTSIDE AIR DAM 2/3 7504 B OPEN.

0 SBGT TRN FAN DISCH DAM MO 2/3 7507 B CLOSE.

8. Directs an operator to inspect the "A" train for:

Excessive vibration High bearing temperature 0

Abnormal noise CUE: Report as NLO that the 2/3A SBGT is running with no abnormal conditions Equipment VERIFIED.

Directs an operator to inspect the "A" SBGT train.

E x a m S u b m i t t a l 6

STEP ELEMENT JPM Number B. 1.g Job Performance Measure (JPM)

9. Notifies Unit 2 Supervisor that the 2/3 A SBGT train is running CUE: Report acknowledged.

The JPM is considered complete at this time.

JPM Stop Time:

STASDARD Uni: 3 Supervisor notified.

E x a m S u b m i t t a l 7

JPM Number B. 1.g Job Performance Measure (JPM)

Examinez's Name:

Jab

Title:

RO Q

SRO #

JPM

Title:

Start Stanbv Gas Treatment (SBGT)

JPM Number: B. 1.g Revision Number:m Task Number and

Title:

261L001; Start the SBGT system.

WA Number and Importance: 26 1 000A4.02; 3.1 /3.1 Suggested Testing Environment: Simulator

/

Actual Testing Environment:

Q Simulator 0

Plant Cl Control Room Testing Method: CI Simulate Perform Alternate Path: L l Yes NO Time Critical: 0 Yes No Estimated Time to Complete: 16 minutes Actual Time Used:

minutes

References:

1. DOP 7500-0, SBGT System Operation, Rev. 16

?

E x a m S u b m i t t a l e

JPM Number B. 1.g Job Performance Measure (JPM)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

01 Yes 0

No The examinees performance was evaluated against the standards contained in this JPM, and has been determined to be:

Cl Satisfactory Cl Unsatisfactory Comments:

\\

Evaluators Name:

(Print)

Evaluators Signature:

Date:

E x a m S u b m i t t a l 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. MPCI operability surveillance is about to be performed.
2. In order for this surveillance to be run, SBGT needs to be on.
3. No painting is in progress in the Reactor Building or Turbine Bui:_ing and no painting has been done in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUE

1. The Unit 2 Supervisor has directed you to start the "A" train of the SBGT system in accordance with DOP 7500-0 1.
2. DOP 7500-MlE1, U2/3 Standby Gas Treatment System Checklis: is complete.
3. Operator Daily Surveillance Log for the shift is complete for all Pr:sess Radiation Monitors.

Notify the Unit 2 Supervisor when the task is complete.

E x a m S u b m i t t a l 1 0

Nuclear Nuclear Generation Group Job Performance Measure Isolation Condenser Makeup Pump Start JPM Number: B.2.a Revision Number: 00 Date: 03/13/02 Developed By:

FaciliGLuthor u,',.--<

Approved By:

Facility Representative Date I

E x a m S u b m i t t a l 1

JPM Number B.2.a Job Performance Measure (JPM)

Revision Record (Summary)

1. Revision 00, This JPM was taken directly from the Dresden facility testing materials bank (P-1300-03) for use during the ILT Class 0 I - 1 NRC Exam.

E x a m S ~ 3 r n i t t a l 2

JPM Number B.2.a Job Performance Measure (JPM)

MATERIALS

1. Copy of DSSP 01 00-CR, Attachment I i

i E x a m S u b m i t t a l 3

JPM Number B.2.a Job Performance Measure (JPM)

INITIAL CONDITIONS I. Smoke in the Control Room has led to a control 1-0:

n evacuation.

2. The Unit 2 Isolation Condenser is in service and niAeup to the shell side is required.
3. Valve 2-4399-74 valve (ISOL CDSR CLEAN DE!.ITN WTR FILL VLV) is open.
4. The 2/3 Makeup Demineralizers are secured.

INITIATING CUE You have been directed by the Unit 2 Supervisor to staq an isolation condenser makeup pump in accordance with DSSP 100-CR, Attachment I India).

Inform the Unit 2 Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledses the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number colmn on the following pages. Then annotate that comment in the Comments section at thz bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual geps in this JPM. It is acceptable for the candidate to direct the local operator to perform Sroups of procedure steps instead of calling for each individual item to be perfornied.

The timeclock starts when the candidate acknowledges :he initiating cue.

8m.8...........8.~==..=...m=...m..8..==..1~.w~.a..=.=..=.=.8.....=8=.,

E x a m S u b m i t t a l 4

JPM Number B.2.a STEP

1.
  • 2.

Job Performance Measure (JPM)

JPM Start T : m :

ELEME3T Obtain CB-1 or CB master key for entry kiil the IC Makeup Pump Roc I.

Place RE>!l.ITE-OFF-RUN toggle s w k h on Engine Control Panel 222- - I26A(B) in RUN.

CUE: If operatic of the correct switch was correcdy described, then the engin? has started.

3. Verify engLie starts and comes to stable speeJ using RPM meter on Local Pane: 2223-126A(B).

Note: The indicaxr to check is a LCD display. Mhen the engine is running the parameters constantly scroll on the screen.

With the ergine shutdown the parameters will not be displayed.

CUE: If engine RPvi is being checked correctly, then meter is reading 900 rpm mJ steady.

  • 4. Verify e n g h oil pressure is 2 20 psi on Panel 2223-126A(B) indicator.

CUE: If indicator is being checked correctly, t k n oil pressure is 15 psi and waw temperature is 165°F.

STANDARD CB-1 or CB master key obtained and IC Makeup Pump Room entered.

The REMOTE-OFF-RUN toggle switch at Panel 2223-126A(B) is placed in RUN.

Engine start verified using RPM meter on Panel 2223-126A(B).

Engine oil pressure checked on Panel 2223-126A(B) indicator.

~

.~..... -..-

E x a m S u b m i t t a l 5

STEP ELEMENT JPM Number B.2.a Job Performance Measure (JPM)

Note: With oil pressure less than 20 psi (on Panel 2223-126A(B) indicator), the examinee should immediately stop the 2/3-43 122A(B), IC Makeup Pump and then start the 2/3-43 122B(A), IC Makeup Pump.

5. Place REMOTE-OFF-RUN toggle switch on Engine Control Panel 2223-126A(B) in OFF.

CUE: If operation of the correct switch was correctly described, then the engine has stopped.

STANDARD The REMOTE-OFF-RUN toggle switch at Panel 2223-126A(B) is placed in OFF.

6. Place REMOTE-OFF-RUN The REMOTE-OFF-RUN toggle toggle switch on Engine Control Panel 2223-126B(A) in RUN.

switch at Panel 2223-126B(A) is placed in RUN.

CUE: If operation of the correct switch was correctly described, then the engine has started.

7. Verify engine starts and comes to stable speed using RPM meter on Local Panel 2223-126A(B).

Engine start verified using RPM meter on Panel 2223-126A(B).

CUE: If engine RPM is being checked correctly, then meter is reading 1900 rpm and steady.

  • 8. Verify engine oil pressure is 2 20 psi on Panel 2223-126B(A) indicator.

Engine oil pressure checked on Panel 2223-126B(A) indicator.

E x a m S u b m i t t a l 6

JPM Su--.her B.2.a Job Performance Measure (JPM)

STEP ELEMENT correctly, then oil pressure is 60 psi and water temperature is 160°F.

9. Monitor engine parameters to ensure limits are NOT exceeded.

I CUE: If indicators are being checked correctly, then Lube oil pressure is 60 psi.

Water temp is 160°F.

Engine RPM is 1900.

10. Notifj Unit 2 Supervisor that an IC Makeup Pump is running.

1 CUE: Acknowledge report.

The JPM is considered complete at this time.

JPM Stop Time:

STANDARD Engine parameters monitored to ensure limits are NOT exceeded.

Unit 2 Supervisor notified.

E x a m S u b m i t t a l 7

JPM Number B.2.a Job Performance Measure (JPM)

Examinees Name:

Job

Title:

RO CI SRO 3 JPM Tit1e:Isolation Condenser Make:?

Pump Start JPM Number: B.2.a Revision Nuni%r: 00 Task Number and

Title:

207L009, @?rate the IC makeup pumps locally WA Number and Importance: 29501 6.L41.09; 4.0/4.0 Suggested Testing Environment: Plant Actual Testing Environment:

CI Simulator c3; Plant cl Control Room Testing Method:

Simulate Faulted: 4 Yes c1 No c1 Perform Alternate Path: Cl Yes 4 No Time Critical: c7 Yes W S o Estimated Time to Complete: 1 1 minutes Actual Time Used:

minutes

References:

1. DSSP 0 1 00-CR, Rev. 22 E x a m S u b m i t t a l e

JPM Number B.2.a Job Performance Measure (JPM)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

CI Yes Cl No The examinees performance was evaluated against the standards contained in this JPM, md has been determined to be: Ll Satisfactory Ll Unsatisfactory Comments :

Evaluators-Name:

(Print)

Evaluators Signature:

Date:

E x a m S u b m i ~ t a l

JPM Number B.2.a Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Smoke in the Control Room has led to a control room evacuation.
2. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
3. Valve 2-4399-74 valve (ISOL CDSR CLEAN DEMIN WTR FILL VLV) is open.
4. The 2/3 Makeup Demineralizers are secured.

INITIATING CUE You have been directed by the Unit 2 Supervisor to start an isolation condenser makeup pump in accordance with DSSP lOO-CR, Attachment I (India).

Inform the Unit 2 Supervisor when the task is complete.

E x a m S u b m i t t a l

Nuclear Nuclear Generation Group Job Performance Measure Transfer RPS to the Reserve Power Supply JPM Number: B.2.b Revision Number: 00 Date: 03/13/02 Developed By: /5&

Facilify Author Approved By:

Facility Representative Date E x a m S u b m i t t a l 1

JPM Number B.2.b Job Performance Measure (JPM)

Revision Record (Summary)

1. Revision 00, This JPM was taken directly from the Dresden facility testing materials bank (P-0500-0 1) for use during the ILT Class 0 1 - 1 NRC Exam.

E x a r r S u b m i t t a l 2

JPM Number B.2.b Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS N/A - JPM is conducted in-plant E x a m S u b m i t t a l 3

JIM Number B.2.b Job Performance Measure (JPMI)

INITIAL CONDITIOYS

1. Unit 2 was at 70% power when the 2A RPS MG %t tripped.
2. MCCs 25-2,28-2 and 29-2 are ALL energized.
3. The Load Dispatcher has been notified that Unit 1 XPS is to be transferred and there is a possibility of a reactor scram.
4. The Gaseous Effluent Monitoring systems are in :.?:vice.
5. Scram Fuse integrity is complete (2202-22A thru X)

INITIATING CUE You have been directed by the Unit 2 Supervisor to ti-gsfer the Unit 2 RPS Bus B from its NORMAL to RESERVE power supply in accordzzx with DOP 0500-03, RPS Power Supply Operation, Step G.3.

Inform the Unit 2 Supervisor when the task is comple:?.

Fill in the JPM Start Time when the student acknowlcises the Initiating Cue.

UNSAT requires written comments on respective ster

  • Denotes CRITICAL steps.

Number any comments in the Comment Number cci:xmn on the following pages. Then annotate that comment in the Comments section at <:e bottom of the page. The comment section should be used to document the reas: n that a step is marked as unsatisfactory and to document unsatisfactory perfonrmce relating to mhagement expectations.

Some operations that are performed from outside of t L control ro,om may require multiple steps. These items may be listed as individui: steps in tlhs JPM. It is acceptable for the candidate to direct the local operator to perforc groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledge: the initiating cue.

8 8

8 8

8 8

8 8

8 8

8 8

8

~

~

8

~

8 8

D

~

~

8

~

8 8

8

~

~

~

8

~

~

8 8

8

~

a 8

~

8

~

8 8

8 8

8 8

8 8

~

8 8

8 8

~

E x a m S u b m i t t a l 4

JPM Number B.2.b Job Performance Measure (JPM)

JPM Start Time:

STEP ELEMEKT STANDARD Note: Provide examinee with a current COPY of DOP 0500-03.

Steps 1 and 2 can be performed in reverse order.

1. Obtain keF (#I209 for Unit 2) for RPS Reserve Power Supply Key Operated Interlock from the WEC.
2. Verify all applicable prerequisites have been satisfied.

Power available to MCC 25-2 Load Dispatcher notified Gaseous Effluent Monitoring Systems in service Scram Fuse integrity is complete

  • 3. Verify the following breakers are closed:

0 MCC 25-2 Breaker A4,2-500 Rx PROTECTION SYS BUSES RESERVE FEED MCC 3-2 Breaker A5,2-500 Rx SAFETY SYS & INST BUS B-ACKUP TRAKSFORMER E x a m S u b m i t t a l Key #209 obtained.

Prerequisites verified (supplied in Initial Conditions).

Breaker vei-ified closed.

Breaker verified closed.

I 0

I

JPM Number B.2.b Job Performance Measure (JPM)

Y STEP ELEMENT STANDARD Equipment Room.

I

4. Verify POWER IN, RPS Red indicating light verified ON, RESERVE FEED red indicating light ON at EPA Relay 2AB-I,
5. Verify the following indicating Indicating lights verified OFF.

lights are OFF at EPA Relay OVER VOLTAGE UNDER VOLTAGE 0

UNDER FREQUENCY 2AB-1.

  • 6. Close breaker on EPA Relay Breaker closed on EPA Relay 2AB-1.

2AB-1.

CUE: The breaker is in the position you described.

I I

7. Ensure POWER OUT, RPS BUS Red indicating light ON.

red indicating light ON at EPA Relay 2AB-1.

CUE: The light is in the condition you described.

8. Verify POWER IN, RPS Red indicating light ON..

RESERVE FEED red indicating light ON at EPA Relay 2AB-2.

CUE: The light is in the condition you described.

I 8

E x a m S u b m i t t a l 6

STEP ELEMENT JPhl.!mber B.2.b Job Performance Measure (JPM)

STANDARD

9. Verify the following indicating Indicating lights verified OFF.

lights are OFF at EPA Relay 2AB-2.

OVER VOLTAGE UNDER VOLTAGE UNDER FREQUENCY CUE: The lights are in the condition you described.

Breaker closed on EPA Relay 2AB-2.

CUE: The breaker is in the position you described.

1 1. Ensure POWER OUT, RPS BUS red indicating light ON at EPA Relay 2AB-2.

CUE: The light is in the condition you described.

Red indicating light ON.

12. Notify control room of supplying Control room notified of power to RPS Bus.

supplying power to RPS Bus B. - - -

1 CUE: Reportacknowledged. 1 Note: Step G.3.1 is skipped.

13. Bypass APRM #1 a

Contacts control room to have the control room bypass APRM

  1. 1 I

I.,

, a,.

I I

1 CUE: APRM # 1 is bypassed

  • 14. Unlock FROM MCC 25-2 RPS BUS RESERVE breaker.

FROM MCC 25-2 RPS BUS RESERVE breaker unlocked.

E x a m S u b m i t t a l 7

JPM Number B.2.b Job Performance Measure (JPM)

~~

CUE: The breaker is in the condition you described.

STEP ELEMENT STANDARD 1

CUE: The breaker is in the condition you described.

CUE: The breaker is in the condition you described.

CUE: The switch is in the condition you described.

CUE: If switch correctly positioned, then the W S MG has stopped.

18. Place VOLTMETER VOLTMETER TRANSFER TRANSFER switch in BUS.

The switch is in the condition you described.

switch placed in BUS.

CUE:

19. Verify AC VOLTS is 1 I 1 to I22 volts.

111 to 123 volts.

AC VOLTS verified between 1

reads 120 volts, otherwise meter reads as is.

E x a m S u b m i t t a l 8

JPM Number B.2. b Job Performance Measure (JPM)

STEP ELEMENT STANDARD h-ote: Examinee could inform control that transfer of RPS Bus B is complete through step G.3.o at this time and the rest of the procedure needs to be completed in the control room.

If this occurs go to Step 22 of the JPM Kdte: If examinee inquires if jumpers were installed provide the following cue.

CUE: No jumpers were installed.

10. Directs control room to remove Informs control room that APRM APRM # 1 from bypass.
  1. 1 can be removed from bypass.

CLT: Report as Unit 2 NSO that:

APRM #1 has been removed fi-om bypass.

2 1. Informs control room to Informs control room to complete step G.3.r complete step G.3.r I

1 CUE: Report as Unit 2 NSO that:

Step G.3.r is complete.

W S Bus B has been transferred to Reserve Power.

22. Notify Unit 2 Supervisor that Unit 2 Supervisor notified.

CLT: Acknowledge report.

The JPM is considered complete at this time.

E x a m Sub-t t a i

.TPM Number B.2.b Job Performance Measure (JPM)

Examinees Name:

Job

Title:

RO CI SRO Q JPM Tit1e:Transfer RPS to the Reserve Power Supply JPM Number:B.2.b Revision Number:@

Task Number and

Title:

2 12L001, Perform RPS Power Supply Operations WA Number and Importance: 212000K4.03; 3.0/3.1 Suggested Testing Environment: In Plant Actual Testing Environment:

0 Simulator Ei Plant CI Control Room Testing Method:

Simulate 0 Perform Alternate Path: CT Yes No Time Critical: Cs Yes No Estimated Time to Complete: 29 minutes Actual Time Used:

minutes

References:

1. DOP 0500-03, Reactor Protection System Power Supply Operation, Rev. 1 8 E x a m S u b m i t t a l 10

JPM Number B.2.b Job Performance Measure (JPM)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

2 Yes 0

NO The examinees performance was evaluated against the stardards contained in this JPM, and has been determined to be: Ll Satisfactory i Unsatisfactory Comments:

Evaluators Name:

(Print)

Evaluators Signature:

Date:

E x a m S u b m i t t a l 1 1

JPM Number B.2.b Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Unit 2 was at -
2. MCCs 25-2, Ii-7 and 29-2 are ALL energized.

O power when the 2A RPS MG Set tripped.

3. The Load Dispxher has been notified that Unit 2 RPS is to be transfen-ed and there is a possibilitJ-1 f a reactor scram.
4. The Gaseous E3uent Monitoring systems are in service.
5. Scram Fuse inre,;rity is complete (2202-22A thru H)

INITIATING CZ-E You have been dire-ted by the Unit 2 Supervisor to transfer the Unit 2 RPS Bus B from its NORMAL to RESERVE power supply in accordance with DOP 0500-03.

Inform the Unit 2 5.ipervisor when the task is complete.

I L

E x a m S u b m i t t a l 1 2

Exe I tl) n SM Nuclear I

Nuclear Generation Group Job Performance Measure Crosstie Unit 2 and Unit 3 Instrument Air Headers JPM Number: B.2.c Revision Number: 00 Date: 03/13/02 Developed By:

Facility h h o r Approved By: )y$!!-..-./-E Facility Representative Date

-1

- 3 2 Date E x a m S u b m i t t a l 1

JPM Nuinbe: B.2.c Job Performance Measure (JPM)

Revision Record (Summary)

1. Revision 00, This JPM was taken directly from the Dresden facility testin:

materials bank (P-4700-01) for use during the ILT Class 01 -: NRC Exam.

E x a m S u b m i t t a l 2

JPM Number B.2.c Job Performance Measure (JPM)

E x a m S u b m i t t a l SIMULATOR SETUP INSTRUCTIONS N/A - JPM i conducted in-plant 3

JPM Number B.2.c Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Unit 3 is shutdown for a refueling outage.
3. Unit 2 is at 100% power and is experiencing an Instrument Air transient causing the Unit 2 Instrument Air header pressure to drop slowly.
3. The Unit 2 Service Air to Instrument Air cross-tie valve is open and the Unit 2 Instrument Air header pressure is still dropping slowly.
4. The Shift Manager has given permission to carry out cross-connect operations.
5. The Instrument Air system is aligned in accordance with Figure 1, Instrument Air Turbine Building Plan View of DOP 4700-03.

INITIATING CUE You have been directed by the Unit 2 Supervisor to cross-connect the Unit 2 and Unit 3 instrument Air headers by opening BOTH the North and South Instrument Air header cross-tie valves in accordance with DOP 4700-03.

.Appropriate portions of DOP 4700-03, steps G. 1 through G.7 have been completed.

Inform the Unit 2 Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue, E x a m S u b m : t a l 4

JFM Number B.2.c Job Performance Measure (JPW Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

E x a m S u b m i t t a l 5

JPM Number B.2.c Job Performance Measure (JPM)

JPM Start Time:

STEP ELEMENT STANDARD

1. Proceed to Step G.8 in DOP 4700-03.

Proceeds to Step G.8.

d 3 may be performe vi z

~~~

"2. Open 2-4705-330, U2 INST AIR SYS Valve 2-4705-330 is XTIE VLV TO/FROM THE U3 INST AIR SYS.

OPEN.

~

CUE: The valve is in the position you described.

Note: Valve 3-4712-501 is located near the stairs to the TBCCW pumps.

"3. Open 3-4712-501, U2 TNST AIR SYS Valve 3-4712-501 is XTIE VLV TO/FROM THE U3 INST AIR SYS.

OPEN.

CUE: The valve is in the position you described.

4. Notify the Unit 2 Supervisor that both the North and South Instrument Air header crosstie valves are open.

Unit 2 Supervisor notified. - - -

CUE: Acknowledge report.

I The JPM is considered complete at this time.

~

JPM Stop Time:

E x a m S u b m i t t a l 6

JPM Number B.2.c Job Performance Measure (JPW Examinees Name:

Job

Title:

RO 0

SRO Cl JPM Tit1e:Crosstie Unit 2 and Unit 3 Instrument Air Headers JPM Number: B.2.c Revision Number:W Task Number and

Title:

278L005, Respond to instrument air system failure K/A Number and Importance: 295019AA1.02; 3.3/3.1 Suggested Testing Environment: In Plant Actual Testing Environment:

0 Simulator D

Plant 0

ControlRoom Testing Method:

Simulate Faulted: Q Yes W No 0 Perform Alternate Path: Cl Yes H No Time Critical: 0 Yes W No Estimated Time to Complete:. 20 minutes Actual Time Used:

minutes References :

1. DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation, Rev. 10 E x a m S u b m i t t a l 7

JPM Number B.2.c Job Performance Measure (JPM)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Q Yes Cl No The examinees performance was evaluated against the standards contained in this JPM, and has been determined to be:

Cl Satisfactory Q Unsatisfactory Comments:

Evaluators Name:

(Print)

Evaluators Signature:

Date:

= x a m S u b m i t t a l 8

3 I

JPM Number B.2.c Job Performance Measure (JPM)

INITIAL CONDITIONS

1. Unit 3 is shutdown for a refueling outage.
2. Unit 2 is at 100% power and is experiencing an Instrument Air transient causing the Unit 2 Instrument Air header pressure to drop slowly.
3. The Unit 2 Service Air to Instrument Air cross-tie valve is open and the Unit 2 Instrument Air header pressure is still dropping slowly.
4. The Shift Manager has given permission to carry out cross-connect operations.
5. The Instrument Air system is aligned in accordance with Figure 1, Instrument Air Turbine Building Plan View of DOP 4700-03.

INITIATING CUE You have been directed by the Unit 2 Supervisor to cross-connect the Unit 2 and Unit 3 Instrument Air headers by opening BOTH the North and South Instrument Air header cross-tie valves in accordance with DOP 4700-03.

Appropriate portions of DOP 4700-03, steps G. 1 through G.7 have been completed.

Inform the Unit 2 Supervisor when the task is complete.

E x a m S u b m i t t a l 9