P40h Erery~.

Duke Oconee Nuclear Station Duke Energy 7800 Rochester Highway Seneca, SC 29672 (864) 885-3107 OmFCE W R. McCollum, Jr. (864) 885-3560 FAx Vice President July 29, 2002 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Duke Energy Oconee Nuclear Station, Unit 1 Docket Nos. 50-269 Third Ten Year Inservice Inspection Interval Request for Relief No.02-005 Pursuant to 10 CFR 50.55a(g) (5) (iii), attached is a Request for Relief from the requirement to examine 100% of the volume specified by the ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition with no Addenda (as modified by Code Case N-460). This request is to allow Duke Energy to take credit for seventeen (17) limited ultrasonic examinations on welds described in the attached request.

During examination of the subject Unit 1 welds, the ultrasonic examination coverage did not meet the 90%

examination requirements of Code Case N-460. The obtainable volume coverage for each weld examination is indicated on the attached request. Achievement of greater examination coverage for these welds is impractical due to piping/valve geometry, interferences, and existing examination technology. Therefore, Duke Energy requests that the NRC grant relief as authorized under 10 CFR 50.55a(g) (6) (i).

If there are any questions or further information is needed you may contact R. P. Todd at (864) 885-3418.

Very truly yours, W. R. McCollum,<f Site Vice Pre dent Attachment

U. S. Nuclear Regulatory Commission July 29, 2002 Page 2 xc w/att: L. A. Reyes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SWW, Suite 23T85 Atlanta, GA 30303 L. N. Olshan, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 xc(w/o attch):

M. C. Shannon Senior NRC Resident Inspector Oconee Nuclear Station Mr. Virgil Autrey Division of Radioactive Waste Management Bureau of Land and Waste Management SC Dept. of Health & Environmental Control 2600 Bull St.

Columbia, SC 29201

Relief Request 02-005 Page 1 of 7 Proposed Relief in Accordance with 10 CFR 50.55a(g)(5)(iii)

Inservice Inspection Impracticality Duke Energy Corporation Oconee Nuclear - Unit 1 (EOC-20)

Third 10-Year Interval - Inservice Inspection Plan ASME Section XI Code - 1989 Edition with No Addenda I. II. & III. IV. V. VI. VII.

Limitation System / Code Requirement from Which Basis for Alternate Justification for Implementation I.D. Component for Relief is Requested: Relief Examinations Granting Relief Schedule Number Which Relief is 100% Exam Volume Coverage or Testing Requested: Exam Category Area or Weld to be Item No.

Examined Fig. No.

Limitation Percentage 1-SGA-WG25 RC System Exam Category B-D See Paragraph See Paragraph See Paragraph See Paragraph Steam Generator IA Item No. B03.130.005 "A".G" "H" Nozzle-to-Vessel Fig. IWB-2500-7(a)

Weld 57.98% Volume Coverage 1-SGB-WG25 RC System Exam Category B-D See Paragraph See Paragraph See Paragraph See Paragraph Steam Generator lB Item No. B03.130.006 "A" "G" "H"I Nozzle-to-Vessel Fig. IWB-2500-7(a)

Weld 57.98% Volume Coverage 1-SGA-WG25 RC System Exam Category B-D See Paragraph See Paragraph See Paragraph See Paragraph Steam Generator IA Item No. B03.140.005 "A".G" IT'&"

Nozzle Inside Radius Fig. IWB-2500-7) (a)

Section 70.21% Volume Coverage 1-SGB-WG25 RC System Exam Category B-D See Paragraph See Paragraph See Paragraph See Paragraph Steam Generator lB Item No. B03.140.006 "A" .G".I" "L" Nozzle Inside Radius Fig. IWB-2500-7(a)

Section 70.21% Volume Coverage I-LDCB-IN- HPI System Exam Category B-D See Paragraph See Paragraph See Paragraph See Paragraph V1 Let Down Cooler IB Item No. B03.150.003 "B" "G" ',I" "L" Inlet Nozzle-to- Fig. IWB-2500-7(a)

Channel Body Weld 27.48% Volume Coverage

Relief Request 02-005 Page 2 of 7 I. II. & III. IV. V. VI. VII.

Limitation System / Code Requirement from Which Basis for Alternate Justification for Implementation I.D. Component for Relief is Requested: Relief Examinations Granting Relief Schedule Number Which Relief is 100% Exam Volume Coverage or Testing Requested: Exam Category Area or Weld to be Item No.

Examined Fig. No.

Limitation Percentage I-LDCB-OUT- BPI System Exam Category B-D See Paragraph See Paragraph See Paragraph See Paragraph V2 Let Down Cooler IB Item No. B03.150.004 "B" .G" 'T' "L" Outlet Nozzle-to- Fig. IWB-2500-7(a)

Channel Body Weld 27.48% Volume Coverage 1-RPV- RC System Exam Category B-G-1 See Paragraph See Paragraph See Paragraph See Paragraph LIGAMENTS Reactor Vessel Item No. B06.040.001A "C".. G .I" "L" Threads in Flange Fig. IWB-2500-12 (a-b-c-d-e-f-g-h) 1800 to 3600 84.52% Volume Coverage 1LP-128-80 LP System Exam Category C-F-I See Paragraph See Paragraph See Paragraph See Paragraph Reducer to Item No. C05.011.007 "D"... G" "K" "L" Valve ILP-18 Weld Fig. IWC-2500-7(a) 59.74% Volume Coverage 1HP- 192-15 HPI System Exam Category C-F- I See Paragraph See Paragraph See Paragraph See Paragraph Pipe to Flange Item No. C05.021.006 "E"... G" "K" "L" Orifice Weld Fig. IWC-2500-7(a) 60.99% Volume Coverage 1-5 1A-01-91A IIPI System Exam Category C-F- I See Paragraph See Paragraph See Paragraph See Paragraph Pipe to Item No. C05.021.043 "D" "G" "K" "L" Valve 1HP-128 Weld Fig. IWC-2500-7(a) 60.84% Volume Coverage 1HP-324-118B HPI System Exam Category C-F- I See Paragraph See Paragraph See Paragraph See Paragraph Tee to Item No. C05.021.065 "D".G" "K" Valve IHP- 119 Weld Fig. IWC-2500-7(a) 61.54% Volume Coverage 1-51A HPI System Exam Category C-F-I See Paragraph See Paragraph See Paragraph See Paragraph 32AA Pipe to Item No. C05.021.078 "D"... G" "K" "L" Valve IHP-23 Weld Fig. IWC-2500-7(a) 60.39% Volume Coverage IHP-393-127A HPI System Exam Category C-F-I See Paragraph See Paragraph See Paragraph See Paragraph Pipe to Item No. C05.021.084 "D" "G" "K" Valve 1HP-105 Weld Fig. IWC-2500-7(a) 59.31% Volume Coverage

Relief Request 02-005 Page 3 of 7 I. II. & IlL IV. V. VI. VII.

Limitation System / Code Requirement from Which Basis for Alternate Justification for Implementation I.D. Component for Relief is Requested: Relief Examinations Granting Relief Schedule Number Which Relief is 100% Exam Volume Coverage or Testing Requested: Exam Category Area or Weld to be Item No.

Examined Fig. No.

Limitation Percentage 1-51A-02-34B HPI System Exam Category C-F-I See Paragraph See Paragraph See Paragraph See Paragraph Item No. C05.021.090 "D" "G" "K" Elbow to Valve I-HP-134 Weld Fig. IWC-2500-7(a) 61.3% Volume Coverage 1HP-193-12 HPI System Exam Category C-F-I See Paragraph See Paragraph See Paragraph See Paragraph "D" "K" "L" Tee to Item No. C05.021.096 Valve 1HP-26 Weld Fig. IWC-2500-7(a) 59.37% Volume Coverage IHP-70-11 HPI System Exam Category C-F-I See Paragraph See Paragraph See Paragraph See Paragraph Item No. C05.021.102 "F' "G" "K" "L" Expansion Joint M-0891 to Elbow Fig. IWC-2500-7(a)

Weld 56.22% Volume Coverage 1-51A HPI System Exam Category C-F-I See Paragraph See Paragraph See Paragraph See Paragraph Item No. C05.02 i. 10 "D".G" "K" "L" 103A Pipe to Valve 1HP- 109 Weld Fig. IWC-2500-7(a) 60.71% Volume Coverage Note: See Attachment A for a drawing on the Steam Generator welds listed above.

See Attachment B for a drawing on the Let Down Cooler welds listed above.

See Attachment C for examination data for all items listed above.

Relief Request 02-005 Page 4 of 7 IV. Basis for Relief Paragraph A:

During the ultrasonic examination of welds 1-SGA-WG25 & 1-SGB-WG25 and the Inside Radius Sections for both nozzles, 100% coverage of the required examination volume could not be obtained. The examination coverage was limited to 57.98% and 70.21%, respectively. Limitations are caused by the nozzle configuration. The percentage of coverage reported represents the aggregate coverage. In order to achieve more coverage the nozzle would have to be re-designed to allow scanning from both sides of the weld, which is impractical.

Paragraph B:

During the ultrasonic examination of welds 1-LDCB-IN-V1 and 1-LDCB-OUT-V2, 100% coverage of the required examination volume could not be obtained. The examination coverage was limited to 27.48%. Limitations are caused by the branch-weld configuration. The percentage of coverage reported represents the aggregate coverage. In order to achieve more coverage the nozzle would have to be re-designed to allow scanning from both sides of the weld, which is impractical.

Paragraph C:

During the ultrasonic examination of 1-RPV-LIGAMENTS, 100% coverage of the required examination volume could not be obtained. The examination coverage was limited to 84.52%. Limitations are caused by the clad area at each stud hole that causes the search unit to lift off the scanning surface. The percentage of coverage reported represents the aggregate coverage. In order to achieve more coverage the flange would have to be re-designed to allow for scanning, which is impractical.

Paragraph D:

During the ultrasonic examination of welds ILP-128-80, 1-51A-01-91A, IHP-324-118B, 1-51A-01-32AA, IHP 393-127A, 1-51A-02-34B, IHP-193-12, and 1-51A-01-103A, 100% coverage of the required examination volume could not be obtained. The examination coverage was limited to 59.74%, 60.84%, 61.54%, 60.39%, 59.3 1%,

61.3%, 59.37%, and 60.71%, respectively. Limitations are caused by the single sided access due to the valve configuration. The percentage of coverage reported represents the aggregate coverage. In order to achieve more coverage the valve configuration would have to be re-designed to allow scanning from both sides of the weld, which is impractical.

Paragraph E:

During the ultrasonic examination of weld 1HP-192-15, 100% coverage of the required examination volume could not be obtained. The examination coverage was limited to 60.99%. Limitations are caused by the flange configuration. In order to achieve more coverage the flange configuration would have to be re-designed to allow scanning from both sides of the weld, which is impractical.

Paragraph F:

During the ultrasonic examination of weld 1HP-70-1 1, 100% coverage of the required examination volume could not be obtained. The examination coverage was limited to 56.22%. Limitations are caused by the expansion joint configuration, which prevents access to both sides of the weld. In order to achieve more coverage the expansion joint configuration would have to be re-designed, which is impractical.

V. Alternate Examinations or Testin2 Paragraph G:

The scheduled 10-year code examination was performed on the referenced area/weld and it resulted in the noted limited coverage of the required ultrasonic volume. No additional examinations are planned for the area/weld during the current inspection interval.

Relief Request 02-005 Page 5 of 7 VI. Justification for Relief Paragraph H:

Ultrasonic examination of welds for item number B03.130 were conducted using personnel, equipment and procedures qualified in accordance with ASME Section XI, Appendix VIII, Supplements 4 and 6 of the 1995 Edition with the 1996 Addenda as administered through the Performance Demonstration Initiative (PDI) Program. Although 100% coverage of the examination volume could not be achieved, the amount of coverage obtained for this examination provides an acceptable level of quality and integrity. (See Paragraph J for additional justification.)

Paragraph I:

Ultrasonic examination of welds for item numbers B03.140, B03.150 and B06.040 were conducted in accordance with ASME Section XI, Appendix I, 1989 Edition with no Addenda. Although 100% coverage of the examination volume could not be achieved, the amount of coverage obtained for this examination provides an acceptable level of quality and integrity. (See Paragraph J for additional justification.)

Paragraph J:

Duke Energy will use pressure testing and VT-2 visual examination to compliment the limited examination coverage.

The Code requires (reference Table IWB-2500-1, item numbers B 15.050, B 15.030 and item number B 15.040) that a system leakage test be performed after each refueling outage for Class 1. Additionally a system hydrostatic test (reference Table IWB-2500-1, item numbers B 15.05 1, B 15.031 and item number B 15.04 1) is required once during each 10-year inspection interval. These tests require a VT-2 visual examination for evidence of leakage. This testing will provide adequate assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), there are other activities which provide a high level of confidence that, in the unlikely case that leakage did occur through these areas/welds, it would be detected and isolated. Specifically, leakage from these areas/welds would be detected by monitoring of the Reactor Coolant System (RCS), which is performed once each shift under procedure PT/1,2,3/A/0600/10, "RCS Leakage". This RCS leakage monitoring is a requirement of the Technical Specification 3.4.13, "Reactor Coolant System Leakage". Leakage is also evaluated in accordance with this Technical Specification. The leakage could be detected through several methods. One is the RCS mass balance calculation. A second is the Reactor Building air particulate monitor. This monitor is sensitive to low leak rates; the iodine monitor, gaseous monitor and area monitor are capable of detecting any fission products in the coolant and will make these monitors sensitive to coolant leakage. A third is the level indicator in the Reactor Building normal sump. A fourth is a loss of level in the Letdown Storage Tank. This will provide reasonable assurance of weld/component integrity.

Duke Energy has examined the welds/components referenced in this request to the maximum extent possible utilizing the latest in examination techniques and equipment. The welds/components identified in Section I of this request were rigorously inspected by volumetric NDE methods during construction and verified to be free from unacceptable fabrication defects. Based on the coverage and results of the required volumetric exams this outage, the additional pressure testing (VT-2) exams, and the various methods for leakage detection, it's our opinion that this combination of examinations provides a reasonable assurance of component integrity. Thus, an acceptable level of quality and safety will have been achieved and allowing relief from the aforementioned Code requirements will not endanger public health and safety.

Paragraph K:

Although the examination volume for C05.011 and C05.021 items as defined in ASME Section XI 1989 Edition with no addenda, Figure IWC-2500-7(a) could not be covered, the amount of coverage obtained for this examination provides an acceptable level of quality and integrity. This weld was examined using procedures, personnel and equipment qualified through the Performance Demonstration Initiative (PDI). In addition, this weld was examined during installation using volumetric and surface NDE methods.

Relief Request 02-005 Page 6 of 7 Current ultrasonic technology is not capable of consistently detecting and sizing flaws on the far side of an austenitic weld for configurations common to U.S. nuclear applications. To demonstrate that the best available technology was applied, PDI provides a best effort qualification instead of a complete single side demonstration. PDI Performance Demonstration Qualification Summary (PDQS) for austenitic piping shows that single sided examination is performed as a best effort. Therefore, the far side of the austenitic weld, which can only be accessed from one side, will be listed as an area of no coverage.

Duke Energy will use pressure testing and VT-2 visual examination to compliment the limited examination coverage.

The Code requires (reference IWC-2500-1, Item Numbers C07.030) that a functional/system inservice test once each period for Class 2 items. Additionally a system hydrostatic test (reference Table IWC-2500-1, Item Number C07.40) is required once during each 10-year inspection interval. These tests require a VT-2 visual examination for evidence of leakage. This testing will provide adequate assurance of pressure boundary integrity.

In addition to the above Code required examinations (volumetric and pressure test), there are other activities which provide a high level of confidence that, in the unlikely case that leakage did occur through these welds, it would be detected and isolated. One is that leakage from these welds would be detected by Operations personnel during their regular rounds (reference OP/I/Ai 102/020. The Nuclear Equipment Operator has been trained to look for any unusual conditions, such as leaks. In addition the procedure addresses leaks as being an item to consider during rounds. All C05.011 and C05.021 items in this request are located in an area where operations personnel will be walking through as part of their rounds, with the exception of item number C05.021.078; therefore, any leak would be identified by visual observation. A second is that air monitors in the exhaust stacks. A third is that if a specific sump has to be pumped frequently would indicate leakage. All of these together will provide reasonable assurance of weld/component integrity.

Duke Energy has examined the welds/components referenced in this request to the maximum extent possible utilizing the latest in examination techniques and equipment. The welds/components identified in Section I of this request were rigorously inspected by volumetric NDE methods during construction and verified to be free from unacceptable fabrication defects. Based on the coverage and results of the required volumetric exams this outage and the additional pressure testing (VT-2) exams, it's our opinion that this combination of examinations provides a reasonable assurance of component integrity. Thus, an acceptable level of quality and safety will have been achieved and allowing relief from the aforementioned Code requirements will not endanger public health and safety.

VII. Implementation Schedule Paragraph L The scheduled third 10-year interval plan code examination was performed on the referenced area/weld resulting in limited volumetric coverage. No additional examinations are planned for the area/weld during the current inspection interval. The same area/weld may be examined again as part of the next (fourth) 10-year interval plan, depending on the applicable code year edition and addenda requirements adopted in the future.

Relief Request 02-005 Page 7 of 7 VIII. Other Information The following individuals contributed to the development of this relief request:

Jim McArdle (NDE Level Ill Inspector) provided Sections II through V and part of Section VI.

B. W. Carney, Jr. (Oconee Engineering) provided part of Section VI.

Larry C. Keith, (Oconee ISI Plan Manager) compiled the remaining sections.

Sponsored By: 0ý1ý. &ADate -7'a-o-.)

Approved By: 4- Date

/1 Attachment A Drawing on Steam Generator Attachment B Drawing on Let Down Cooler Attachment C Copies of Examination Data

4ý-"

Attachment A w

z TOP VIEW Y

WG50-1 BOTTOM VIEW 1 -, - . " J,- TITLE BE PRECEDED BY "ISGB-" , STEAM GENERATOR 0oG/.WE OUTLINE N IN CIRCLES. L _____,'-____ -__"_ WELD _OUTLINE DRW2,RVWD'APPD' DWG NOREV.

NO. REVISION DATE IDA-IDATE ISI-OCNI--004

Apr 24 02 0 3

5 9 p WTS JT QA A8535P. 885 3375 I,
z--zz:z I Is SI J
  • 0 I U c:'- -

ia1.zzzr:1:

5. n

- C

-- - - - - - - -- =

7t C, m

U

-, 1J I 0

i ]i IEEEUI.II EEL III!11! -LIg I p I p a

'r. C=7 I - CC -:3nC-I,

- 0

  • t .3 W'

'U '0 LM 2 7

/

/

Tr 1V7 I---

ul N C'

0 2 on n 0 5 7-9 2

09 t-t till

-4.) OF - Li F- -4 U

z -

-e LL 2

0

.1 i-i-I-i

DUKE POWER COMPANY Exam Start: 0915 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 0959 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-SGA-WG25 Date: 4/9/2002 Weld Length (in.): 152.7 Surface Condition: GROUND Lo: 9.2.1 Surface Temoerature: 84 0 F Examiner: James H. Res Pyrometer S/N: MCNDE 27228 J : Level 1Cal Due: 7/3/2002 Examiner: Gayle E. Hou,* Level: 111 45 El 57 dB 70 []dB Configuration: HEAD TO NOZZLE Procedure: NDE-970 Rev: 0 FC: 45T El 57 dB 70T r dB S1 Flow S2 00-08 60 11 dB HEAD to NOZZLE Calibration Sheet No: 60T 11 dB Scan Surface: OD 0201109, 0201110 Applies to NDE-680 only Other: 00 , 20 dB Skew Angle: N/A Max Mp W L Beam Exam IND #  % Max Max Max Li L2 WI Mpl V2 Mp2 Dir. Surf. Scan Damps Ref I

20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO 1OT WRITE HMA HMA HMA HMA HMA HMA D NOT WRIT" IN T IIS S~CE 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac IN THIS SPACI 100%dac 100%dac 100%dac 100%dac 100%dac 100%dac NRI Remarks:

Limitations: (see NDE-UT-4) El 90% or greater coverage obtained: yes 11 no' M SheetJ[ of 1/q Reviewed Bv: Level: Date: Authoriz InsDe Date: (Do

. Item No:

25./ 02. 10 B03.130.005 0(

V~0 0

DUKE POWER COMPANY Exam Start: 0916 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 1014 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-SGA-WG25 Date: 4/9/2002 Weld Length (in.): 152.7 Surface Condition: GROUND Lo: 9.2.1 Surface Temoerature: 84 F Examiner: Jay A. Eaton Level: III Scans: Pyrometer S/N: MCNDE 27228 Examiner: Winfred C. Leeper evel: II 45 _ dB 70 B dB Cal Due: 7/3/2002 Procedure: NDE-970 'ev: 0 r,FC:

" Configuration: HEAD TO NOZZLE 45T [ dB 70T 11 dB SI Flow S2 00-08 60 0l 78 dB HEAD to NOZZLE Calibration Sheet No: 60T EI 78 dB Scan Surface: OD 0201112 Applies to NDE-680 only Other: dB Skew Angle: N/A Max Mp W L IND# 4  % Max Max Max LI L2 W1 Mpl W2 Mp2 Beam Dir.

Exam Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO 1OT Wl ITE HMA HMA HMA HMA HMA HMA D NOT WRIT IN T 11S SPCE 50%dac 100%dac 100%dac 50%dac 100%dac 50%dac 100%dac 50%dac 100%dac 50%dac 50%dac 100%dac IN THIS SPACl NRI Remarks:

L LTlauonrs; kseeNIljl:-U I-'.I) I 909/o or greater coverage obtained: yes nno L" Reviewed By: )Jý,/A /,

II I, l 0~

0

DUKE POWER COMPANY Exam Start: 0917 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 1014 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-SGA-WG25 Date: 4/9/2002 Weld Length (in.): 152.7 Surface Condition: GROUND Lo: 9.2.1 Surface TemDerature: 84 ° F Examiner: David Zimmerman, -.Level: III Scans: Pyrometer S/N: MCNDE 27228

-_eCal Due: 7/3/2002 Examiner: Marion T. Weave *>/,i Level: II 45 0D 57 dB 70 [ dB C a tion: HEDT2NZL Cofgrto: HEAD TO NOZZLE Procedure: NDE-970 Rev: 0 FC: 45T 0l 57 dB 70T [ dB S1 Flow S2 00-08 60 0l 78 dB HEAD to NOZZLE Calibration Sheet No: 60T El 78 dBA Scan Surface: OD 0201109, 0201110, 0201112 Applies to NDE-680 only Other: 00 8 20 dB Skew Angle: N/A Max Mp W L IND # 4  % Max Max Max Li L2 W1 Mpl W2 Mp2 Beam Dir.

Exam Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO NOT WRITE HMA HMA HMA HMA HMA HMA Do NOT WRIT 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac IN THIS SPAC SIN T IlS SPA*,CE 100%dac 100%dac 100%dac 100%dac 100%dac 100%dac NRI Remarks:

Limitations: (see NDE-UT-4) 0] 90% or greater coverage obtained: yes 0 no 0 Sheet, ofJ/

-3~

Reviewed By: Level: Date: Authorize lnsnector/, D Item No:

Ri d :08"/ '"'z..'-- 803.130.005 WO 0

DUKE POWER COMPANY FORM NDE-UT-4 ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1-SGA-WG25 Item No: B03.130.005 Remarks:

o3 NO SCAN SURFACE BEAM DIRECTION NOZZLE CONFIGURATION E] LIMITED SCAN 01 1 E0 2 0 1 0l 2 0D cw EQ ccw FROM L ....... to L INCHES FROM WO CL to BEYOND ANGLE: 0 0 0 45 0l 60 0 Other FROM 0 DEG to 360 DEG 0 NO SCAN SURFACE BEAM DIRECTION 01 LIMITED SCAN 0 1 03 2 0 1 0 2 03 cw 0 ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 0] 45 01 60 0 Other FROM DEG to DEG 0 NO SCAN SURFACE BEAM DIRECTION 0] LIMITED SCAN 0 1 0 2 03 1 01 2 0] cw 13 ccw FROML toL INCHES FROM WO to ANGLE: 01 0 03 45 03 60 0 Other FROM DEG to DEG SURFACE BEAM DIRECTION 03 NO SCAN 0 LIMITED SCAN 03i1 012 0 10 2 03 cw 0 ccw FROM L to L INCHES FROM WO to ANGLE: 0l 0 0 45 0 60 0 Otherl FROM DEG to Prepared By: JAY A. EATON ,.Level: III Date: 4/9/2002 1 Sketch(s) attached 0 yes Sheetjý of 14 I I - f/

ýý 57 *f . ...

  • ," * //

Reviewed By: Authorized Inpco Date:.r*_-,,a--

-f

-4'

ý0 0 0_

Attachment C Page 5 of 130 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Revision 0 Examination VolumelArea Defined El Base Metal El Weld 0 Near Surface 0 Boltinj D Inner Radius Area Calculation Volume Calculation Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

BASE 33753.6 56307 59.95 WELD 13247.7 24753.6 53.52 TOTAL AGGREGATE COVERAGE 47001.3 81060.6 57.98

Attachment C Page (" of tZ6 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination Volume/Area Defined o Base Metal 0 Weld 13 Near Surface 03 Boltini 01 Inner Radius Area Calculation Volume Calculation SEE EXAM AREA DRWG. 18 SQ. IN.X 152.8 IN= 2750 CU. IN.

18 SQ. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 0 NA 15.7 152.8 2399 2750.4 87.22 2 45 2 16.1 152.8 2460.1 24750.4 9.94 3 45 1 3.4 152.8 519.5 2750.4 18.89 4 60 2 16.9 152.8 2582.3 2750.4 93.89 5 60 1 1.0 152.8 15.3 2750.4 0.56 6 45 CW 8.4 152.8 1283.5 2750.4 46.67 7 45 CCW 8.4 152.8 1283.5 2750.4 46.67 8 60 CW 8.4 152.8 1283.5 2750.4 46.67 9 60 CCW 8.4 152.8 1283.5 2750.4 46.67 13247.7 24753.6 53.52 I Item No: 803.130.005 Prepared By: JAY A. EATON Level: III Date: 4/9/2002 Reviewed By: Level: --- Date:

/J/J44 .! qln logif 62-

Attachment C Page 7 of 136 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination VolumelArea Defined 0 Base Metal 0 Weld 0 Near Surface 01 Boltinq C0 Inner Radius Area Calculation Volume Calculation SEE EXAM AREA DRWG 73.7 SQ. IN. X 152.8 IN. = 11261 CU. IN.

73.3 SQ. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 0 NA 40.6 152.8 6203.7 11261.4 55.09 2 45" 1/2 48.9 152.8 7471.9 11261.4 66.35 3 600 1/2 53 152.8 8098.4 11261.4 71.91 4 45/60 Cw 39.2 152.8 5989.8 11261.4 53.19 5 45160 CCw 39.2 152.8 5989.8 11261.4 53.19 33756.6 56307 59.95

N ALZLtf -13 Ll Pp" p LC~DF2. Q8'

. .rM I,"fO lb" 73..3 IV__

ýLýLb MA Z.6 <

-l 2 .- ) S?/m A34

.4 C

L 0

'F T)A 1<':

f.

T0>

(Do

777- '-Dd to 7-cfiaM.  :ý?; V(T,

A,3 w 7,ýl V Va ?A"'J " p -- 11

ýIBAOý lvl,1ý06Z D

,3VVUAVý -77n4 . []

.,Q* I ,"Ill -- V"7tf;7.T Is L

0 t7 Z+

olý %H-J.3Iq 4 7 x -.1"i Hv yy/

vw. ;UV7 5? V(j a RA ý Hv V(ý, 0

- Jl6 T)c2p a-7z7vH

H/ A47~ fC UPC- zrýOnSMCRAOIZ

,45'ý L6t2AgS (h~LO SA-St

~i -ro S2.L ACD 9. 2 Sý A i ,7 YZ.9 L& - .

q8.q.hv'

-1J V -

,~3?-ro S3+/-

1.7(q.0 ý.

Z.

SE5:4.=X4 / N N1-IL 16 -- /6. Zs ja=mm==m--

"I r eULL Co We2AM5'.

I.Do 0

oc Q A' q I> AICRArof-)

,450 60-A95 (ýYIALý U6LD AfgkML:

Sdi bL3Z A8 E 8.T Al.

,SC- j(-.1+.7S 12.815s I 43 aS L

'N

/TPZF N IN N

1.0"

'z':-1.i 6

  1. ýJCov~e A~C 11 I. D.

QA(:s ________

TA. -1~

r Z 6 rL..- Oh

'I Do C

I JhO

ý?; V(T,

-6(3

!DVa SA"o "p -- 0

=ýl BAQ? -)Vl)ý 16Z.

D

.3VV3,?AQD -nný . f7 is0'1- , 711 - 7v zpp INNS, ý,q Z. F6 -P WA s' + OV)

T s czý- z p 77.&-=C VirA P.4 2 'U' 9- 3G U

-Z,3 -o"v TF v vix U), 5N UV!7 0 ý

ýA-l  ;-.-7/ Y v ac)

.7 1 41:14C v8

0 0

CL Oft

,.o

ýo t!2ý se

!5 0 o -0 'r 7 wo ; o w 7,1,1

,9VV3ýAIDD -nr7_)

o. I ", III -- WIV vr Tr "T Oj- 7 (7
-7v 1-Z9,ý v W Q 1-t? y

\

-(7vlx Y) 5NVýT 00 ý

'1116) OP MZ17VH 5ýq,jy 0VC)

e

--- I I mfic-3mFm ,ýB-J0) a AtC RA<0 Opt..

ýý A A 60 0 . Cor. 2c4lys:

39.2

\JiLb MAýUIAL:

x Z.

N, N

N, IQLr- 'L lit"- 1.0" eULL COV652ACý'

,ýUe&t 2

=?PkflAL COVe ým z q6 COVF- I ZY:

TA fý5:

-72ý7ý 0

k C4, 0

DUKE POWER COMPANY Exam Start: 0921 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 1022 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-SGB-WG25 Date: 4/8/2002 Weld Length (in.): 152.7 Surface Condition: GROUND Lo: 9.2.1 Surface TemDerature: 84 0 F Examiner: David Zimmerman*, fz:. Level: III Scans: Pyrometer S/N: MCNDE 27228

. -evel: II 45 0I 57 dB 70 13 dB Cal Due: 7/3/2002 Examiner: James L. Panel Configuration: HEAD TO NOZZLE Procedure: NDE-970 Rev: 0 FC: 45T EI 57 dB 70T 11 dB SI Flow S2 0__00_ 60 E0 78 dB HEAD to NOZZLE Calibration Sheet No: 60T E 78 dB Scan Surface: OD 0201104, 0201103, 0201105 Applies to NDE-680 only Other: 00 (a 20 dB Skew Angle: N/A Max Mp W L Beam Exam IND# .4  % Max Max Max Li L2 WI Mpl W2 Mp2 Dir. Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO 1OT WRITE HMA HMA HMA HMA HMA HMA Do NOT WRIT IN T IS SPkCE 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac 100%dac 100%dac 100%dac 100%dac 100%dac 100%dac IN THIS SPACE NRI Remarks:

Limitations: (see NDE-UT-4) E0 90% or greater coverage obtained: yes 0 no 0Z Sheet,/ of_._.

Reviewed Bv: 0 j 0 Level: Date: Authorized Date: Item No:

7) ~ /.9.OZ..B03.130.006 0A0 0

DUKE POWER COMPANY Exam Start: 0921 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 1009 Revision 4 Station: Oconee Unit: 17 Component/Weld ID: 1-SGB-WG25 ] Date: 4/8/2002 Weld Length (in.): 152.7 Surface Condition: GROUND Lo: 9.2.1 Surface TemDerature: 84

  • F Examiner: James H. Res II_.,ellScans: Pyrometer S/N:

Gayl E Lousri/#*"/

MCNDE 27228

'Cal Due: 7/3/2002 Examiner: Gayle E. Huse, / Level: 111 45 13 57 dB 70 [] dB Procedure: NDE-970 Configuration: HEAD TO NOZZLE Rev: 0 FC: 45T 0D 57 dB 70T 0 d2 d13 $1 Flow NA 60 [] dB HEAD to NOZZLE Calibration Sheet No: 00- doe 60T dB Scan Surface: OD 0201104, 0201103 Applies to NDE-680 only Other: 00 ( 20 dB Skew Angle: N/A Max Mp W L IND # ,*  % Max Max Max Li L2 W1 Beam Exam Mpl W2 Mp2 Dir. Surf. Scan Damps Ref Dir._Sur_.

20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO 1OT W ITE HMA HMA HMA HMA HMA HMA Do NOT WRIT-2 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac IN T IlS SPjkCE 100%dac 100%dac 100%dac 100%dac 100%dac IN THIS SPACI:

100%dac NRI Remarks:

Limitations: (see NDE-UT-4) 0 90% or greater coverage obtained: yes 0 no 0l Sheet 2 of /1 Reviewed Bv: 4- Level: Date: Authorizedsrecto;'.. Da : Item No:

lp

z4- 'I- 803.130.006

DUKE POWER COMPANY Exam Start: 0920 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 1022 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-SGB-WG25 Date: 4/8/2002 Weld Length (in.): 152.7, Surface Condition: GROUND Lo: 9.2.1 Surface Tem:erature: 84 F Examiner: Jay A. Eaton Pyrometer S/N: MCNDE 27228 L-A*.*=evel" III 45ca-s:Cal Examiner: Winfred C. Leeper .vl1 4  : dB 70 13 dB Due: 7/3/2002 Procedure:

Configuration: HEAD TO NOZZLE NDE-970 4ev: 0 FC: 45T C1 dB 70T [] dB $1 Flow $2 0O-oaA 60 El 78 dB HEAD to NOZZLE Calibration Sheet No: 60T M 78 dB Scan Surface: OD 0201105 Applies to NDE-680 only Other: dB Skew Angle: N/A Max Mp W L Beam Exam IND # e  % Max Max Max L L2 W Mpl W2 Mp2 ir.Scan Damps Ref Dir. Surf.

20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO 1OT WRITE HMA HMA HMA HMA HMA HMA Do NOT WRIT:

IN TIIS SP CE 50%dac 50%dac 50%dac 100%dac 100%dac 100%dac 100%dac 50%dac 50%dac 50%dac IN THIS SPAC.

100%dac 100%dac NRI Remarks:

Limitations: (see NDE-UT-4) El 90% or greater coverage obtained: yes [ no 0 Sheet - of /S.

Reviewed By: Level: Date: Authorized ector: gate; Item No:

/-X'Z7Z- 1303.130.006 0

DUKE POWER COMPANY NDE-UT-6 Ultrasonic Beam Spread Measurement Sheet Revision 1 1 .I 1 I I I I I1 I II I I I I wi 1. -1 Mpl Z -715

\ \\

1/4t wmxa .?- MpMax B IS W2 2- -T Mp2 3' V WI . ZSmpl 5. SS 1/2t Wmax 3 .1 Mpmax (p. Z5 W1 (e. MPl 8.73 3/4t Wma (16Mmax 2 4ACW2 7-5Mp2 10-4Ct Calibration Sheet No: c0Ol 1o0. CAL. "3LC,-- L=3q3 Examiner: Level: Date: R viewed B Level: Date: Authorized Inspe  : D te:

,, M 0

DUKE POWER COMPANY NDE-UT-6 Ultrasonic Beam Spread Measurement Sheet Revision 1

,-I I'I I4I 8 I , I II wi ý561 Mpl 4.o to 1/4t Wmax 4.5 MoMax 4.,

W2 'S -Mp2 S5-IJ Wi 1B.0 Mpl 8.4,*T 1/2t Wmax A o30 MpMax 0 .

2 10.v 19 1.1(

11..0 MPl 110-07

° .' L 2--1 6 AU5Wi

  • wmax 11.; MoMax %4.

W2 1(4.1IT Mp2 14A0 Calibration Sheet No: 07_Z 10 C3AL. L&ZC.i..

40y3 Examiner: Level: Date: Reviewed By: Level: Date: Authorize r: tnsp e:

6' / -,

DUKE POWER COMPANY FORM NDE-UT-4 ISI LIMITATION REPORT Revision 1 ComponentlWeld ID: 1-SGB-WG25 Item No: B03.130.006 Remarks:

O3 NO SCAN SURFACE BEAM DIRECTION NOZZLE CONFIGURATION Ol LIMITED SCAN 1 02 0 10 20 cw ccw FROM L ....... to L INCHES FROM WO t to "fe'io*i ANGLE: 0 0 03 45 0 60 0 Other FROM 0 DEG to 360 DEG o NO SCAN SURFACE BEAM DIRECTION o LIMITED SCAN 02 0i 03 1 03 2 o1 cw ccw FROM L .. to L INCHES FROM WO to ANGLE: 00 0 45 03 60 01 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 0"1 01 2 0]1 03 2 0 cw r ccw FROM L ....... to L INCHES FROM WO to ANGLE: 01 0 03 45 03 60 E0 Other FROM DEG to DEG 0 NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 0 1 01 2 0 13 lOcw 1 12 1 ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 0 45 0 60 Other FROM --- DEGto Prepared By: Level: ]IC Date: ,nSketch(s) attached 0 yes 0t Sheet e4 of /1i -0 >

[Reviewed By: P,_4Date: Auithorized Inspecto, . Date:,/

03

Attachment C Page 2,1 of 130 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination Volume/Area Defined o Base Metal 03 Weld 0 Near Surface 11 Boltinq 0 Inner Radius Area Calculation Volume Calculation SEE EXAM AREA DRWG. 18 SQ. IN. X 152.8 IN = 2750 CU. IN.

18 SQ. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Scan # Angle Direction (sq.in.) (in.) (cu.in.) Required Percnt Coverage (cu.in.)

a4AL A. . ..

I U 152.8 2399 2750.4 87.22 2 45 2 16.1 152.8 2460.1 24750.4 9.94 3 45 1 3.4 152.8 519.5 2750.4 18.89 4 60 2 16.9 152.8 2582.3 2750.4 93.89 5 60 1 1.0 152.8 15.3 2750.4 0.56 6 45 Cw 8.4 152.8 1283.5 2750.4 46.67 7 45 CCW 8.4 152.8 1283.5 2750.4 46.67 8 60 Cw 8.4 152.8 1283.5 2750.4 46.67 9 60 ccw 8.4 152.8 1283.5 2750.4 46.67 13247.7 24753.6 53.52

Attachment C Page 2'1of 130 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet -N Rvso Examination Volume/Area Defined 13 Base Metal 11 Weld 03 Near Surface 0 Boltinqa 0 Inner Radius Area Calculation Volume Calculation SEE EXAM AREA DRWG 73.7 SQ. IN. X 152.8 IN. = 11261 CU. IN.

73.3 SQ. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

I U NA 40.6 152.8 6203.7 11261.4 55.09 2 450 1/2 48.9 152.8 7471.9 11261.4 66.35 3 600 1/2 53 152.8 8098.4 11261.4 71.91 4 45/60 Cw 39.2 152.8 5989.8 11261.4 53.19 5 45/60 CCw 39.2 152.8 5989.8 11261.4 53.19 33756.6 56307 59.95

Attachment C Page R6Of 15o DUKE POWER COMPANY NDE-91-1 N,

Limited Examination Coverage Worksheet Rvso 0 0a Examination Volume/Area Defined 0 Base Metal [] Weld 0 Near Surface 0 Boltina 0 Inner Radius Area Calculation Volume Calculation Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

BASE 33753.6 56307 59.95 WELD 13247.7 24753.6 53.52 TOTAL AGGREGATE COVERAGE 47001.3 81060.6 57.98 No: SItem B03.130.006 Prepared By: JAY A. EATON Level: III Date: 4/9/2002 Reviewed By: . Level: Date:

qq

___~~ UPC~Z~-~(i ll:ý (CýS EXRA PM Ll P?,::f ki;.11D J

VI1!!LD flAr6EIIL:

26F,~

VM /7e i0('

H 0 QA <C &2, 0

I N AP--Z H

AL71I C: -

--V) (S PC 0's-A L, CVifelQoa 2~~A?9 Au4~I(

4-0"X17" 2:7 4 2. 14*0

?--(-2.2 IS. 7. LA,, IN N

N IN N

N.

N

=fLJLL COV62AcCC

--POQnIFL ýOVE tl z qo Co~ve eAG 4%ot D.

Zo.

as- ldoC:

oJ~

tl,ýf)AIAýý 6 Lz Le 't) U 45ý LAMS (PYI0 2ýA-St

'31 -ro Sz AC 1) F 9. 2 S IAA H 4,7 YZ q8.9it-) Al,

,ý?--ro 'sJ-ATF E-- -L-7 o q s.

SET= 4(-q2M/= ý.Oz .s ý. /Y.

.1 IIN IL N

Sa A Lf- -- 112.11- 1.0,

= euLL Coveemiý

--?OerIAL COVe Tre-mor ý& 1 /,3(:0. oo,(o AC J.D. *

sy:

Te'ý5:

z 04 (D

0 Cb

LJLL/ILL.L A7-71 t 0-Al A7it

-ID

-IL) LQ

)45' 6arigs

\JgLD 4)Af 6)4L:

S.-1-0A SZ:

0 ~S /8EG* A SO- D6-j( S, -: 2.816's 6 .w.

/6. 08 & /sq, 43 z. --rb SA2 1%

N 11 PZF-P 1-N N

S ALP-~'t' ' 1.0"%

E(fuu- Co Vi2AlC I W LeA 1(

0 (

-.ýd to -77

?'7 77 0 SWO I p 0

-nn4,,

V9 F6 'R z

IL S- Cz -h + ov v a5,5 v U) T tý 0 a ty SNUJT ou cl, mz-ZVH

N A .1'-? t r- ,in UP(ýI t AD2a-Atr.RArae)-

LS c n t4s XIALI

\ A/;: / r,% M I 1"Af I AL '

q,523 os, s - ILI.

1-1 NIN 1-1 11.1 SO- AL r ýULL Co VaAaiý

--?oerlAL CWEý " I'/If mIr-*Ro 3.

Cove oc ZY:

TA 1'ýf

ý6. PG.

40 m 0

.S.)7

-03 0

Upf; OD - L2c-MCRA<6f-L

-14,5'ý (00" c1pr, LýCAIY-S:

A.Se MA1ý-',014C:

M 4ý62 A :

b 6 N

N IN A Lot eUt.L COV62AC6'

)uAtt

, )ct .....

..... 1,f'e m 6 3. 3 00 qo Nve EAG

1. D.

TA fe: -- - e4 14 /9

DUKE POWER COMPANY Exam Start: 0930 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 0946 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-SGA-WG25 Date: 4/9/2002 Weld Length (in.): 152.7 Surface Condition: GROUND Lo: 9.2.1 Surface Temperature: 84

  • F Examiner: Jay A. Eaton Level: III Scans: Pyrometer S/N: MCNDE 27228 Examiner: Winfred C. Leeper"/ evel: 11 45 d 7. Cal Due: 7/3/2002
  • Configuration: NOZ INNER RADIUS Procedure: NDE-680 Iv: 2 FC: 45T __ dB 70T [ dB S1 Flow S2 60 03 78 dB HEAD to NOZZLE Calibration Sheet No: 60T C _ dB Scan Surface: OD 0201111, 0201113 Applies to NDE-680 only Other: dB Skew Angle: 22.5 Max Mp W L Beam Exam IND # e  % Max Max Max LI L2 W1 Mpl W2 Mp2 Dir. Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO lOT WRITE HMA HMA HMA HMA HMA HMA Do NOT WRIT IN T IS SPACE 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac 100%dac 100%dac 100%dac 100%dac 100%dac 100%dac IN THIS SPACI NRI Remarks: *FC 02-03, 02-08 M >

Limitations: (see NDE-UT-4) 0 90% or greater coverage obtained: yes 0 no 0 Sheet / of "Z (O)

Reviewed By: Level: Date: Authorized Inspegt~gr: Date: Item No:

'9/o~~

~ ~e - B03.140.005 0

DUKE POWER COMPANY Exam Start: 0930 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 0946 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-SGA-WG25 Date: 4/9/2002 Weld Length (in.): 152.7 Surface Condition: GROUND Lo: 9.2.1 Surface Temperature: 84 0 F Examiner: David Zimmerman Level: III Scans: Pyrometer S/N: MCNDE 27228 Cal Due: 7/3/2002 Examiner: Marion T. Weaver Level: II 45 __ dB 70 0D 70.5 dB Procedure: NDE-680 Configuration: INNER RADIUS Rev: 2 FC: 45T [_ dB 70T [_ dB S1 Flow S2 60 [ 78 dB HEAD to NOZZLE Calibration Sheet No: 60T ___dB Scan Surface: OD 0201111, 0201113 Applies to NDE-680 only Other: dB Skew Angle: 22.5 Max Mp W L Beam Exam IND # -  % Max Max Max LI L2 WI Mpl W2 Mp2 Dir. Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO NOT WRITE HMA HMA HMA HMA HMA HMA Do NOT WRIT.:

50%dac 50%dac 50%dac 50%dac 50%dac 50%dac IN THIS SPAC IN T-HIS SPCE 100%dac 100%dac 100%dac 100%dac 100%dac 100%dac NRI Remarks: *FC 02-03, 02-08 Limitations: (see NDE-UT-4) 0D 90% or greater coverage obtained: yes 0 no 0 Sheet 2_ of27 Reviewed By: Level:

  • ),//O-)'Z.. Date: Authorized ReviwedBv:*

-"* *,(_.*-"*Inspect* . Date:

,*",*'* Item No:

B03.140.005 "Jo

FORM NDE-UT-4 DUKE POWER COMPANY ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1-SGA-WG25 Item No: B03.140.005 Remarks:

o- NO SCAN SURFACE BEAM DIRECTION NOZZLE CONFIGURATION EO LIMITED SCAN 01 1 E0 2 0] 1023 2 03 cw 0 ccw FROM L -- to L INCHES FROM WO CL to _ BEYOND ANGLE: 000 13 45 0 60 E0 Other -70 FROM 0 DEG to 360 DEG SURFACE BEAM DIRECTION 0 NO SCAN 0 LIMITED SCAN 0 1 03 2 O3 1 r- 2 0 O3 cw ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 03 45 01 60 01 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 0 1 0 2 0 1 0 2 0 cw 0 ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 03 45 0 60 03 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION O1 LIMITED SCAN 0 1 03 2 O3 1O O2 - cwO3 ccw FROM L to L INCHES FROM WO to ANGLE: [0 0 0 45 0 60 03 Other, FROM DEGto Prepared By: JAY A. EATON Level: III Date: 4/9/2002 Sketch(s) attached 02 yes 0 no Sheet 3 of 7 Reviewed By: Date: q., , Authorized Inspector:,d4 Date:j4--..--

~0

Attachment C Page 34 Of 130 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet

  • Revision 0 Examination Volume/Area Defined 01 Base Metal 0 Weld 01 Near Surface 0 Bolting ID Inner Radius Area Calculation Volume Calculation SEE DRWG FOR CALCULATOINS 4.7 SQ. IN. X 152.8 IN. = 718.16 CU. IN.

4.7 SQ. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) Percent Coverage (in.) (cu.in.) (cu.in.)

1 60/70 CW 3.3 152.8 504.24 718.16 70.21 2 60/70 CCW 3.3 152.8 504.24 718.16 70.21 TOTAL AGGREGATE COVERAGE 1008.48 1436.32 70.21 Item No: B03.140.005 Prepared By: Level: f Date Reviewed By: Level: Date:

/J '/iA AwZu

llw.af, 86-ZzLe- <w', -)&K, kao 1,yipe cf-/Ou IMO ......

-r.

-1)

~TOn-) 0. 'e y I-01

- _T "0 'fAL AgeM q. 6 7V 7 NSPet c/1.

14L e9 47-(k AL )1 G__

CvoVFA (2 sg/

8.0" 4<CJLL COVLEA~t

"?A ViAfL Cove,066 (Do 0(

Attachment C page 3 6 Of 13 G MUIVAV rýcmtev, z

a - z -P-Z. IZI ES1,3 AiE:

Y"s IY, 0) - 1ý01.

0, -7.S z +

-y 3,5 qo.Z,,S - 60 3 Z. S (0,,94LAO(o 1-141-7 )

-L Cý G. t Cý ýý- 5 3-75ýzý

= ZZ-I(00 II 7=. Soo.IV ?Ptl-)A -T-0 -flAc ý4

-X--D C-AL-1 -?>LZC-Y- c4o,:!ý9-L (ocDv' AaocUff,

ýSTE:AM rý407ZZL9--

Fý, - o ý& -D ?C,, -7o 1,4 D C)o A w6KZýS LýL.: -okST,

2z3C) 2 0QL 2OA701 ) 2 oq --- A-7~f

-2\

U. <;-k V~' 23 r'SDZ T- ' 2-c-2a 2 -'~

-:rC VLl, 10 1. C OB13

DUKE POWER COMPANY Exam Start: 0938 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 0959 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-SGB-WG25 Date: 4/8/2002 Weld Length (in.): 152.7 Surface Condition: GROUND Lo: 9.2.1 Surface Temperature: 84 ° F Examiner: David Zimmerman ., _evel: III Scans: Pyrometer S/N: MCNDE 27228 evel: II 45 0 dB 70 E . Cal Due: 7/3/2002 Examiner: James L. Panel/

/ Configuration: INNER RADIUS Procedure: NDE-680 Rev: 2 FC: 45T __ dB 70T __ dB S1 Flow S2 02-03 60 El 78 dB HEAD to NOZZLE Calibration Sheet No: 02-08 60T [] dB Scan Surface: OD 0201106, 0201107 Applies to NDE-680 only Other: dB Skew Angle: 22.5 Max Mp W L Beam Exam IND # e  % Max Max Max Li L2 W1 Mpl W2 Mp2 Dir. Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO NOT WRITE HMA HMA HMA HMA HMA HMA Do NOT WRIT 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac IN THIS SPACI:

IN TI-IIS $P,*,CE 100%dac 100%dac 100%dac 100%dac 100%dac 100%dac NRI Remarks:

Limitations: (see NDE-UT-4) 0 90% or greater coverage obtained: yes 0 no 0l Sheet.J of 7 4A Reviewed Level: Date: Autho rized/ 3ecto r-.,,Date: Item No:

%3

,-'/2 L/f4"( i4. "- 803.140.006 0A(

I U V

DUKE POWER COMPANY Exam Start: 0938 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 0959 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-SGB-WG25 Date: 4/8/2002 Weld Length (in.): 152.7 Surface Condition: GROUND Lo: 9.2.1 Surface Temperature: 84 0 F Examiner: Jay A.Eaton ýA III Level: /(l',/"L Scans: Pyrometer S/N: MCNDE 27228 Leeer [][]Cal Due: 7/3/2002 evel: II 45 1 dB 70 0 70.5 dB Examiner: Winfred C. Leeper Configuration: NOZ INNER RADIUS Procedure: NDE-680 eev: 2 FC: 45T 0 _ dB 70T __ dB SI Flow S2 02-03 60 0l 78 dB HEAD to NOZZLE Scan Surface: OD Calibration Sheet No: 02-08 60T 0 dB Applies to NDE-680 only 0201106, 0201107 Other: dB Skew Angle: 22.5 Max Mp W L Beam Exam IND # .4  % Max Max Max Li L2 WI Mpl W2 Mp2 Dir. Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO NOT WRITE HMA HMA HMA HMA HMA HMA Do NOT WRIT IN T IS SPkCE 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac 100%dac 100%dac IN THIS SPACI 100%dac 100%dac 100%dac 100%dac NRI Remarks:

Limitations: (see NDE-UT-4) E0 90% or greater coverage obtained: yes 0 no 0 Sheet 2 of 7 7 Level:

Reviewed Bv.

I

. /// Date:

-V- --? AB0.4.0 Authorize ,nsIector:/ Date: Item No:

oookCqlL 0

(-cl 0?J

FORM NDE-UT-4 DUKE POWER COMPANY ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1-SGB-WG25 Item No: B03.140.006 Remarks:

o] NO SCAN "SURFACE BEAM DIRECTION NOZZLE CONFIGURATION 01 0 2 0 1 0l 2 01 cw 13 ccw "0 LIMITED SCAN FROM L to L INCHES FROM WO - CL to BEYOND ANGLE: 03 0 0 45 0 60 E0 Other FROM 0 DEG to 360 DEG "SURFACE BEAM DIRECTION 0] NO SCAN

[1 1 03 2 11 2 0 cw 11 ccw

" LIMITED SCAN FROM L to L INCHES FROM WO to ANGLE: 0l 0 03 45 01 60 0 Other FROM DEG to DEG SURFACE BEAM DIRECTION 0] NO SCAN D 1 0 2 1 1 11 2O1 cw 11 ccw 0 LIMITED SCAN FROM L to L INCHES FROM WO to ANGLE: 00 045 01 60 01 Other FROM DEG to DEG SURFACE BEAM DIRECTION 01 NO SCAN 0 1 0 2 01 1I- 2 I-Icw E ccw 0 LIMITED SCAN FROM L to L INCHES FROM WO to F ----

M>

Sheet 3 of 7 (C)

Date: ,- .--.--

(c.%

0 Qq

Attachment C Page 'Wof 'YO t2 0

ci

.13 44 tC) 4 9 4'

4.7

'1E 0

  • 1 I

c'j J- (J 1

21

-~V) ed C\J

(.1

-1

.0.

4 <JJ

- OL 0

Attachment C Page *a of j:o DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso t0 Examination Volume/Area Defined o Base Metal 0 Weld 0 Near Surface 01 Boltinq ED Inner Radius Area Calculation Volume Calculation SEE DRWG FOR CALCULATOINS 4.7 SQ. IN. X 152.8 IN. = 718.16 CU. IN.

4.7 SQ. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 60/70 Cw 3.3 152.8 504.24 718.16 70.21 2 60/70 CCw 3.3 152.8 504.24 718.16 70.21 TOTAL AGGREGATE COVERAGE 1008.48 1436.32 70.21

log

,ý ý,Ib -Dý 2 -N-? I-^ - ý-:l -\")S - \

(7) () o ' <2 V7 k ' I;-C? 9_

0 L *-ýý c-ý- q 0 , "Aa 212 ov -4ýýncjýr wv--13-S YIOIU-ýC, '33VC"DO

'r,00) s:-ior,-ob I It- aCýO.-_)\AC O-C'009 0)0) ' -22 rr If 52--')SC7ý?

-2 ch5 og (S,. 6e C-,

Ecn oev 10 Th GBed IUOW143yaUV

C

'(VL.Attachment Page 4yOof/30 1 + *) COS [ SR. U v

-~

.5 00-5*

eE>PCC'r z oz

DUKE POWER COMPANY Exam Start: 1217 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 1233 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-LDCB-IN-V1 Date: 4/7/2002 Weld Length (in.): 12.75 Surface Condition: GROUND Lo: 9.2.3 Surface Temperature: 72 0 F Level: III Scans: Pyrometer S/N: MCNDE 27228 Examiner: Jay A. Eaton t_o* Level: 111 45 [] 32 d13 70 1:1 d13ClDe: 7320B SConfiguration: Nozzle to Vessel Procedure: NDE-630 Vev: 2 FC: 45T El 34 dB 70T __ dB S2 Flow S1 99-02 60L11 61 dB NOZZLE to VESSEL Calibration Sheet No: 60T 0 d13 Scan Surface: OD 0201093, 0201094, 0201095, 0201096 Applies to NDE-680 only Other: 45L Q 62 dB Skew Angle: N/A Max Mp W L Beam Exam IND# e  % Max Max Max Li L2 WI Mpl W2 Mp2 Dir. Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO IOT WRITE HMA HMA HMA HMA HMA HMA Do NOT WRIT IN T IS SPACE 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac IN THIS SPAC 100%dac 100%dac 100%dac 100%dac 100%dac 100%dac NRI Remarks: ALL ANGLES SCANNED @ REF. dB DUE TO SIGNAL/NOISE RATIO Limitations: (see NDE-UT-4) 0 90% or greater coverage obtained: yes 03 no 0l Sheet of /1 VDO Reviewed Bv*/ Level: Date: Authoriz ector D e: Item No:

'257o q~ B03.150.003 cO

DUKE POWER COMPANY Form NDE-UT-9 ULTRASONIC BEAM ANGLE MEASUREMENT RECORD Revision 3

1. Take thickness measurements between.

wedge locations.

2. Place search unit on straight turn of pipe, and peak the signal.

tI 3. Measure distance (d) between exit points.

(d/2) 4. Calculate beam angle with formula tan 0 =

t as shown using measured wall thickness.

5. Use the measured beam angle to QT1 FT\ determine coverage and when plotting any indications.

Pipe Size: _ Vessel<2"t For thin wall pipe use 2nd Vee path Pipe Schedule: N/A tan o = (d/2) 2t Nominal 45 deg: d= 1.7 t= 0.875_; measured angle= 44.17 deg Nominal 60 deg: d= 0 ;t= - 0 measured angle= 0.00 deg Item No.

Ncjrinal 70 deg: d= _0 t= 0 ;measured angle= 0.00_deg B03.150.003 ate III 4/7/2C III 4/ 712002 D Ae 74f

DUKE POWER COMPANY FORM NDE-UT-4 ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1-LDCB-IN-V1 Item No: B03.150.003 Remarks:

0] NO SCAN SURFACE BEAM DIRECTION DUE TO BRANCH CONNECTION 03 LIMITED SCAN 01 0 2 0 1l 2]cw ccw FROM L to L INCHES FROM WO CL + .5 to BEYOND ANGLE: 0 0 0 45 03 60 0 Other FROM 0 DEG to 360 DEG SURFACE BEAM DIRECTION DUE TO BRANCH CONNECTION o] NO SCAN WELD 01 LIMITED SCAN i 02 El 1 0 2 0 cw 11 ccw FROM L - - - - -L INCHES FROM WO CL - to _ - 0.5 ANGLE: 01 0 01 45 01 60 03 Other FROM 0 DEG to 360 DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 0 1 01 2 01 0l 201 cwO ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 0 45 01 60 0 Other FROM DEG to DEG 0] NO SCAN "SURFACE BEAM DIRECTION "0 LIMITED SCAN 0 1 01 2 03 1iO 2 03 cw 0 ccw FROM L to L INCHES FROM WO to ANGLE: 01 0 0 45 60 0 Other FROM DEG to

>O Prepared By: Level: Date: A4horze Sketch(s) attached 0/yes 0aSheete _ of Reviewed By: Date: q.-8 -0 Authorized Inspector".X Date *0

- 04

Attachment C Page *t2 of 136 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso 2-Examination Volume/Area Defined EJ Base Metal 13 Weld 0l Near Surface 01 Boltinq 0 Inner Radius Area Calculation Volume Calculation See seperate base metal and weld calculation See seperate base metal and weld calculation sheets. sheets.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

Total Aggregate Coverage 59.62 216.96 27.48

-Item No: B03.150.003 Prepared By: Jay A. Eaton Level: III Date: 4/8/2002 Reviewed By: ___ý Level: -z5 Date: ,~e6 II 2-

Attachment C Page 4? of i3o DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Revision 0 'a.

J)

Examination VolumelArea Defined El Base Metal [] Weld 01 Near Surface 01 Boltinq 0 Inner Radius Area Calculation Volume Calculation Inspection Area = 1.87sq. in. ( see attached 1.87 sq. in. x 14.5" = 27.12 cu.in.

calculations).

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.) Percent Coverage 1 45 cW .35 14.5 5.08 27.12 18.73 2 45/60 S2 1.65 14.5 23.93 27.12 88.24 3 45/60 $1 0 0 0 27.12 0.00 4 45 CCW .35 14.5 5.08 27.12 18.73 Base Metal Aggregate Coverage 34.09 108.48 31.43

)* IItem No: B03.150.003 Prepared By: Jay A. Eaton Level: III Date: 4/8/2002 Reviewed By: ýJ,' A P"', Level: Date,:,'--o.-

I / Wa2-

Attachment C Page 56 of /36 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Revision 0 Examination Volume/Area Defined o3 Base Metal El Weld 13 Near Surface El Boltinqi 0 Inner Radius Area Calculation Volume Calculation Inspection Area = 0.95 sq. in. (see attached 0.95 sq. in. x 14.5" = 13.78 cu.in.

calculations).

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.) Percent Coverage 1 45 CW .59 14.5 8.56 27.12 31.56 2 45/60 S2 .58 14.5 8.41 27.12 31.01 3 45/60 S1 0 0 0 27.12 0.00 4 45 CCW .59 14.5 8.56 27.12 31.56 Weld Metal Aggregate Coverage 25.53 108.48 23.53 SIItem No: B03.150.003 Prepared By: Jay A. Eaton Level: III Date: 4/8/2002 Reviewed By: /Level:, ** , //9-'

Date:_

II

DUKE POWER COMPANY NDE-UT-5 I

liT PROFILE/PLOT SHEET Revision 1 EXAMINATION SURFACE 1 EXAMINATION SURFACE 2 WELD 4 3 2 1 q 2 3 4 c 51_ _

Ill.I.1 C XI, l 1111 S4,.5* /l,- ,0 1 1l 1 11l 1 1 I. I I III m 7-E-aG /.7 /,Z.5'* . II -, -L.

S,. W pr -

.2.

.5X,7 -2 .,-/

/

kpeA : z t 3 2 /,U, I I

M r 4Qe Component ID/Weld No. L 'CC " /- _0 Remarks:

270 90 Item No: *3*. io. o...

Examiner: - Level: .. ý7 Date: 9*- :2.-.2_

ReviewedB1.. * .ILevel: -5 Date:,3-c-Z 180 Sheet..0..of.L. (a Authorized lnspectdtf .;e I - Dateý:

Da.._e -L-D-a-te (D pg 0 0

DUKE POWER COMPANY UT PROFILE/PLOT SHEET EXAMINATION SURFACE 1 WELD EXAMINATION SURFACE 2 4 3 2 1 1 2 3 4 5

131-CZ.5X, ý - , . 2-III11f1jI I,,l~fl~l~,,II1 I 1 1 13ll V&

M

-e- (

4 c-raI I

270 90 0(D

NDE-U DUKE POWER (.,.,.,iPANY UT PROFILE/PLOT SHEET Revlslon 1 EXAMINATION SURFACE 1 WELD EXAMINATION SURFACE 2 4 3 2 1 q_ 2 3 4 A~ -b

________i l , -rei ji \/a J i Me'<,1.L Il f

.2 tit.*N,

4. X.3 - _ _ _ _ " .... 1/,

Component ID/Weld No. -_ 1OC, -/IA VI U Remarks:

270 a 90 Item No: 1&5 I*gro..o ExamIner: Level: 1Date:..--7-62.

RleviewedB: B Level: I Date: B- Sheet&o -LLL

(.,a Authorized Ins'pect6*: Date:;-1oSeeo--

00

DUKE. POWER CL 4PANY NDE-UT LIT PROFILE/PLOT SHEET Revision 1 EXAMINATION SURFACE 1 WELD EXAMINATION SURFACE 2 4 3 2 1. 2 3 4

) X-3 nvav 'da&-,Z6 viliiii

-07._

  • / .

q/'. 5ý-:,

, ob L

I S.*c., . ScA.

I Component ID/Weld No. Iu

,/-&L-)0-/6,AI- vI

Remarks:

270 lExaminer:- ,Level:, Date: q ve' Level: f-- Date: ÷- e-k 180 Sheet.L m O Authorized Inspectoi.. / of__

,j


Date:

  • Date:,

0 O

DUKE POWER COMi'ANY UT PROFILE/PLOT SHEET

  • -t, * . -*

t'AAMINA IJUN SURFACE I WELD EXAMINATION SURFACE 2 4 3 2 1 i. 2 3 4 2 3 4 a<v 2 IIII 1 I

IIIlIIllll IIIII III III

\JeI 1E11/2l II

.5 VL~a IA-'~~

-'.S$ýz

/:/0 062 270 0

"I C,

0 0

C.)

DUKE POWER COMPANY Exam Start: 1215 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 1231 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-LDCB-OUT-V2 Date: 4/7/2002 Weld Length (in.): 12.75 Surface Condition: GROUND Lo: 9.2.3 Surface TemDerature: 72 F Exmies,4 Le: 11 Scans: Pyrometer S/N: MCNDE 27228 Ex r JCal Due: 7/3/2002 Configuration: NOZZLE TO VESSEL Procedure: NDE-630 Rev: 2 FC: 45T El 34 dB 70T __ dB $2 Flow SI 99-02 60 LP 61 dB VESSEL to NOZZLE Caliratin Seet 0T [ ____dB o: 60T dBApplies ScantoSurface:

NDE-680 ODonly Calibration Sheet No: t6 dBSk68ng enN/

Appli4s 0201093, 0201094, 0201095, 0201096 dB Skew Angle: N/A Other: 45L (tD 62_

Max Mp W L Beam Exam IND # / e  % Max Max Max LI L2 WI Mpl W2 Mp2 Dir. Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac HMA HMA HMA HMA HMA D NOT WRIT DO IJOT WRITE HMA 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac IN THIS SPACE IN T IS SP1CE 100%dac 100%dac 100%dac 100%dac 100%dac 100%dac NRI Remarks: ALL ANGLES SCANNED @ REF. dB DUE TO SIGNAL/NOISE RATIO Limitations: (see NDE-UT-4) 0 90% or greater coverage obtained: yes 0 no 0 SheetJ___ of//

0O Reviewed Bv / Level:

//(/-)-. Date: 0 Z* Authorized ecto9j ,a*e: Item No:

B03.150.004

Form NDE-UT-9 DUKE POWER COMPANY ULTRASONIC BEAM ANGLE MEASUREMENT RECORD Revision 3

1. Take thickness measurements between.

wedge locations.

2. Place search unit on straight turn of pipe, and peak the signal.

tI 3. Measure distance (d) between exit points.

4. Calculate beam angle with formula tan o = (d/2) t as shown using measured wall thickness.
5. Use the measured beam angle to

[Tý determine coverage and when plotting any indications.

Pipe Size: Vessel<2"t For thin wall pipe use 2nd Vee path Pipe Schedule: N/A tan o = (d/2) 2t Nominal 45 deg: d= 1.7 ; t= 0.875_; measured angle= 44.17 deg Nominal 60 deg: d= 0 t= 0 ;measured angle= 0.00 deg Item No.

No ninal 70 deg: d= 0  ; t= 0- ;measured angle= 0.00 deA B03.150.004 I

M00 00

FORM NDE-UT-4 DUKE POWER COMPANY ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1-LDCB-OUT-V2 Item No: B03.150.004 Remarks:

SURFACE BEAM DIRECTION DUE TO BRANCH CONNECTION 0 NO SCAN O1 LIMITED SCAN 01 1 0 2 E0 1 0 2 0E cw E3 ccw FROM L to L INCHES FROM WO -CL+ .5 __ to -BEYOND ANGLE: 01 0 0 45 0 60 01 Other FROM 0 DEG to 360 DEG SURFACE BEAM DIRECTION DUE TO BRANCH CONNECTION 0 NO SCAN WELD LIMITED SCAN 01 0 2 0l 1 0 2 03 cw O1 ccw 03 FROM L - - - --- toL INCHES FROM WO - -CL _ to 0.5 ANGLE: 0 0 10 45 0l 60 01 Other FROM 0 DEG to 360 DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 1 0 2 0 1iO 2 03 cw 13 ccw 01 LIMITED SCAN FROM L to L INCHES FROM WO to ANGLE: 01 0 0 45 0 60 01 Other FROM DEG to DEG SURFACE BEAM DIRECTION 0 NO SCAN 0 1 01 2 O 1 0 2O1 cw [] ccw 0 LIMITED SCAN FROM L to INCHES FROM WO to ANGLE: 0 0 45 6: Other ae FROM DEG tor....

Prepared By: (. *Level: "*. Date: *lTO?.Sketch(s) attached 0 yes 0,go Sheet_= of.._.*_

Reviewed By: *' d,* Date: /.,_*-'. Authorized Inspector:*,,. ** *Dt~Z V4 >

Zn

Attachment C Page 5,1of /30 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Vo Examination VolumelArea Defined 03 Base Metal 1l Weld 01 Near Surface 0 Boltinqi 0 Inner Radius Area Calculation Volume Calculation See seperate base metal and weld calculation See seperate base metal and weld calculation sheets. sheets.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.) Percent Coverage Total Aggregate Coverage 59.62 216.96 27.48 SI Item o: B03.150.004 Prepared By: Jay A. Eaton Level: III Date: 4/8/2002 Reviewed By: Leel Dae 41-g

  • /j Z -?L Ak!? Z1-k--C2-

Attachment C Page co of (s0 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso

'4' Examination Volume/Area Defined o Base Metal 0 Weld 0 Near Surface 0 Boltina 0 Inner Radius Area Calculation Volume Calculation Inspection Area = 1.87sq. in. ( see attached 1.87 sq. in. x 14.5" = 27.12 cu.in.

calculations).

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.) Percent Coverage 1 45 Cw .35 14.5 5.08 27.12 18.73 2 45/60 S2 1.65 14.5 23.93 27.12 88.24 3 45/60 Sl 0 0 0 27.12 0.00 4 45 CCw .35 14.5 5.08 27.12 18.73 Base Metal Aggregate Coverage 34.09 108.48 31.43 I FItem No: B03.150.004 Prepared By: Jay A. Eaton Level: III Date: 4/8/2002 Reviewed By: Level: Date: q

Attachment C Page Q of 130 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination VolumelArea Defined 11 Base Metal 13 Weld 01 Near Surface 03 Boltina 0 Inner Radius Area Calculation Volume Calculation Inspection Area = 0.95 sq. in. (see attached 0.95 sq. in. x 14.5" = 13.78 cu.in.

calculations).

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.) Percent Coverage 1 45 CW .59 14.5 8.56 27.12 31.56 2 45/60 S2 .58 14.5 8.41 27.12 31.01 3 45/60 S1 0 0 0 27.12 0.00 4 45 CCW .59 14.5 8.56 27.12 31.56 Weld Metal Aggregate Coverage 25.53 108.48 23.53 SI Item No: B03.150.004 Prepared By: Jay A. Eaton Level: III Date: 4/812002 Reviewed By: Level: Date: 4-9-oz_

44ýý-

DUKE POWER COMF X NDE-UT-5 I UT PROFILE/PLOT SHEET Revision 1 EXAMINATION SURFACE 1 WELD EXAMINATION SURFACE 2 4 3 2 1 S'_ L_.. 2 3 4 Iil .CX.9ll .52 lLlW . - li-lS-J I .7fl /.Z* ,~l' lIIl

._.

  • W6ý. 1..
1. 3 /)J ..

Component ID/Weld No.. j .. o &- - .uN.

Remarks:

270 at:- .. 90 Item No: B63. /51. o Examiner: Level:.-7T1 IDate: ,

leviewed B !.- .4 -'ILevel: -- Date:

  • 180 Sheet, 0Zo L _L..

,uthorized tnspectdti D (oo 00 00

-4.

p4.

f I\

DUKE POWER COMPANY UT PROFILE/PLOT SHEET EXAMINATION SURFACE 1 WELD EXAMINATION SURFACE 2 4 3 2 1 1 2 3 4 I11111111 3 4 AIII ,,,i, , --. IISIIII 1. II 1III 5 -/3-C.* ,/" , :' I*.-7*f-& i1ll I 111111111111 JIIII

.'5 Profile taken 270 at:-.. 90 (0

'wo

I I'4U'-u I DUKE POWER CG -,PANY UT PROFILE/PLO1 SEET Revlslor EXAMINATION SURFACE 1 WELD EXAMINATION SURFACE 2 4 3 2 1 2 3 4

z. -" .'H-""
  • i *"H-Z" K-L_-. .  : Zq"
  • A~/Ac t).__

c-~ _ __ _ __

Copoen QDWl No..- /5'-w sVL L

  • OYVlac '74C el- A*L 2.~~~~ae -c . -ý Comnponent ID/Weld No. / -ZJ**-6, -I2.-. o Remarks: ,.... Lee:.5-,Date: q---

270 a: *90 S1/Item No: ju_0. ljo,oo.o Examiner: *)*.dp.*d - Level:*-.77 Date:, c/-7--62...

Reviewed AuthorizedBX:Inipect6*/J*

-Lvel: . Date:

ae &- .8Se.L_

-*- 180 Shee~jof...LL_

bin 00 00

-4, 0

NDE-UT-5-'-"

DUKE POWER COMPANY UT PROFILE/PLOT SHEET Revision 1 EXAMINATION SURFACE 1 EXAMINATION SURFACE 2 WELD 4 3 2 1 1 2 3 4 11 1 i Iltt1 lift I II III III i- i_

i I

I i

II tutu I I I ii iii II I n-e-Z - F r.._ .  : =.SI, 'x I

.1 5~.0 Lit-L~,O/2 2

.5 3 V_--____._.____,__. /a C.,, **_- . . *m_

U Component ID/Weld No. /- LA-6tC13-,)&ý W2,

  • Remarks:

270 Item No: 303./*o.ooL/ "op.

Examiner: Level* 1Date Examiner:

,eviewed By: 1: -'Date: q-9-o'2-- (A3 I" '* * ""." : *- r L*

  • _ . ,,

Authorized Inspector. i - Date: Z-,-rT- 0 F, 00

(

NDE-LIT-ý)

DUKE. POWER COMP~ANY 1ITr PflfFILF-/PLOT SHE ET Revision 1 XAMINA I IUN UIW/L EXAMINA I IUN b=-A" 4 EXAMINATION SURFACE 1 WI 4 3 2 1 ELAi 2 3 4 II ft'Li-c II.

II II

£i ____

ac ýg -G .4 .-1X.8 -- . Sr, ý "'u.

I.oK .'.

. /./ oqz ,V 2.

4VAV Componeht ID/Weld No. / -cbM-06-/- va-

  • Remarks:

270 90 Item No: 6o3. so.co Examiner:

-- A)294FL Level: iZLL I Date: 1-1-7-6z-llevlewe-dW3B, 7iý7 i7 4 ~el: j::IDate: Al g- z-.

180 Sheet. (l-ofU-L..

Authorized :.spectoiv.ý-, Date:

DUKE POWER COMPANY Exam Start: 1820 Form NDE-UT-2A ULTRASONIC EXAMINATION DATA SHEET FOR PLANAR REFLECTORS Exam Finish: 1840 Revision 4 Station: Oconee Unit: 1 Component/Weld ID: 1-RPV-LIGAMENTS Date: 3/28/2002 Weld Length (in.): N/A Surface Condition: Machined Lo: N/A Surface Temperature: 72 0 F Examiner: Jay A. Eaton-vel: III Scans: Pyrometer SIN: MCNDE 27219 Examiner: Gayle E. Houser&A ý- Level: 111 45 11 Cal Due: 8/5/2002 dlB 70 []dBCofgrtn:-VseLians Configuration: Vessel Ligaments Procedure: NDE-640 Rev: 1 FC: 45T 11 dB 70T __ dB N/A Flow N/A

_ 60 _ _ dB N/A to N/A Calibration Sheet No: 60T 0 __ dB Scan Surface: OD 0201051, 0201052 Applies to NDE-680 only Other: 00-44 dB Skew Angle: N/A Max Mp W L Beam Exam IND # 4.  % Max Max Max Li L2 W1 Mpl W2 Mp2 Dir. Surf. Scan Damps Ref 20%dac 20%dac 20%dac 20%dac 20%dac 20%dac DO IOT WRITE HMA HMA HMA HMA HMA HMA Do NOT WRITI" IN T 11S SPCE 50%dac 50%dac 50%dac 50%dac 50%dac 50%dac IN THIS SPACI.

100%dac 100%dac 100%dac 100%dac 100%dac 100%dac NRI 0° Remarks:

  • FC 95-18 & 95-19 Stud Holes @ 1800 thru 3600 Limitations: (see NDE-UT-4) 0 90% or greater coverage obtained: yes 13 no 0 Sheet / of Reviewed By: Level: Date: Authorized I ctor: Date: Item No:

-4 0

k CP 0

FORM NDE-UT-4 DUKE POWER COMPANY ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1-RPV-LIGAMENTS Item No: B06.040.001A Remarks:

SURFACE BEAM DIRECTION See attached sheet for area not scanned 0 NO SCAN at each stud hole.

0] LIMITED SCAN 01 0 2 0 1 03 2 0 cw 0 ccw FROM L See___ to L Remarks INCHES FROM WO to ANGLE: 0l 0 03 45 03 60 0 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN D 1 03 2 0]1 0[ 2 03 cw [] ccw FROM L to L INCHES FROM WO to ANGLE: 03 0 0 45 0 60 03 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 03 LIMITED SCAN 13 1 0 2 01110 2 0 cw 0 ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 01 45 01 60 03 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 0 1 01 2 O 1O1 2O3 cw 13 ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 0 45 01 60 0 Otr FROM DEGto Prepared By: Jay A. Eaton "-*="evel: III Date: 3/28/2002 Sketch(s) attached 0 yes 0 n Sheet- 2 of (ON Reviewed By: 2 ,, I2 -. Date: . Authorized Inspector: . Date:

~0

Attachment C Page ( -¶of 130 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination VolumelArea Defined 13 Base Metal 0 Weld 0 Near Surface 0 Boltinq 0 Inner Radius Area Calculation Volume Calculation Total Area = 25.2 sq. in. 25.2 sq. in. x 6.5" = 163.8 cu. in.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.) Percent Coverage 1 0S 1 21.3 6.5 138.45 163.8 84.52 FiIt-em No: B06.040.001A Prepared By: Jay A. Eaton ,*/lf Level: III Date: 3/28/2002 Reviewed By: Gayle E. Houser * , *,- ee: III . Date: 3/28/2002

IF

-~ 121

-L~Fi r I I o

)

AtC 2

-- --- r L tl-l I; L 1'LlL

Oconee Unit #1 EOC20 NO DATA CALIBRATION SHEET # ozo1 .L

  1. O20o2opz - c'L COMPONENT I.D.# /LP-/Z -o ITEM# C05-01.. 00o7 InhI i na 00.4g.w RSBI &I,Co l+U _,, 0

FORM NDE-UT-4 DUKE POWER COMPANY ISI LIMITATION REPORT Revision 1 Component/Weld ID: ILP-128-80 Item No: C05.011.007 Remarks:

SURFACE BEAM DIRECTION DUE TO VALVE CONFIGURATION 0] NO SCAN 0 LIMITED SCAN 0 [1 2 0l 1 E- 2 [1 cw [] ccw FROM L - - - - -L INCHES FROM WO .75" __ to -BEYOND ANGLE: [100-0 45 [3 60 [1 Other FROM 0 DEG to 360 DEG SURFACE BEAM DIRECTION 0] NO SCAN

] 1 0] 2 1 0 2 [ cw [] ccw 0l LIMITED SCAN FROM L to L INCHES FROM WO to ANGLE: 0l o0 45 0-60 [0 Other FROM DEG to DEG SURFACE BEAM DIRECTION 0] NO SCAN 0 LIMITED SCAN 1 02 - 1 02 cw [I ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 0 45 [ 60 0 Other FROM DEG to DEG SURFACE BEAM DIRECTION 0] NO SCAN 01 02 [1 2 cw El ccw 0] LIMITED SCAN FROM L to L INCHES FROM WO to ANGLE: 0l 0 [ 45 - 60 0l Other FROM DEG to T

w

Attachment C Page 7 3 of 136 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination VolumelArea Defined E- Base Metal El Weld [E Near Surface El Boltinq El Inner Radius Area Calculation Volume Calculation 2.0 IN. X 0.437 IN. = 0.874 SQ. IN. 0.874 SQ. IN. X 40 IN. = 34.96 CU. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.) Percent Coverage 1 60 2 .340 40 13.6 34.96 2 60 1 0.0 40 0 34.96 3 45 CW .874 40 34.96 34.96 4 45 CCW .874 40 34.96 34.96 83.52 139.8 59.74 Supplemental Coverage 2 .534 40 21.36 139.8 15.28 1 60°L el &I Co.

Item No: C05.011.007 Prepared By:' - Level: Date:C '

Reviewed By:B, k fO Level: 5 Date: /-/?,o2

1"'

DUKE POWER COMPANY NDE-UT-5 UT PROFILE/PLOT SHEET Revision 1 EXAMINATION SURFACE 1 CO VAL1LL . EXAMINATION SURFACE 2 WELD 4 2 I L1 2 3 4

,,,, U-4LiIl I 11111

.5 33 2n~n~,~ .)t;-

, I IlJI l*l.I ID/ YyVIU IoU. U

- I u - %_0 Remarks:

270 90 Iror K_

Nr, Examiner: /b ' , Level: .M Date: ,-,dZ Reviewed B 0*z) Level:

  • Date: ,Z-,.

180 Sheet.__._of _q 0 i-kucnorizec inspector: "-'*"' Date: -L.1 Zii 4UUI

0 C

C Lll Agomobi 0 0

H n 0

z G')

tTj tTl C4, tTl 13 A4 b H

14 0 itI_ 0 N

-Q 0

0 -1:

cA 0

1~ 1051- 068d

DUKE POWER COMPANY Exam Start: 1506 NDE-UT-3A ULTRASONIC EXAMINATION DATA SHEET FOR LAMINAR REFLECTORS Exam Finish: 1509 Revision 2 Station: Oconee Unit: I Component/Weld ID: 1HP-192-15 Date: 1/14/2002 Nominal Material Thickness (in): 0.531 Weld Length (in.): 14.2" Surface Temperature: 78 Deg F Measured Material Thickness (in): 0.547 Lo: 9.1.1.1 Pyrometer S/N: MCNDE 27010 Surface Condition: AS GROUND Calibration Sheet No: Cal Due: 2/14/2002 Examiner: James L. Panel, & ., jLevel: II 0201011 Configuration: Pipe to Flange (Orifice)

Examiner: B. Dale Jolly .Level: II S2 Flow S1 Procedure: NDE-640 Rev: 1 FC: PIPE to FLANGE Ampl LI Wi Mpl W2 Mp2 L2 W1 MpI W2 Mp2 ND a rem a rem > rem > rem a rem > rem arem  ?rem arem  ? rem 2.rem Exam NO- BW BW BW BW BW BW BW BW BW BW BW Surf. Damps LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB NRI 0 Remarks:

  • 95-18 & 95-19 Limitations: see NDE-UT-4 0 None: E0 Sheet , of Reviewed By: , *-) Level: Date: Authorized Inspect._ Date: Item No:

FES 2 32002 C05.021.006

-J0 a00

1

item No: cc,- 0 Z?/ 0o;*

Level // -1 Date: /./C.02 4~

Leve:

Date /-/-O?.180

,, Sheeu3.LoL30 DazeFEB 2 32002

DUKE POWER COMPANY FORM NDE-UT-10 ULTRASONIC INDICATION RECORD FOR PIPING Revision 0 Station: Oconee Unit: 1 Component/Weld ID: 1HP-192-15 Date: 1/15/2002 Surface Condition: AS GROUND Item No: C05.021.006 Examiner: James L. Panel , evel: II Procedure: NDE-600 Rev: 14 FC: N/A Examiner: B. Dale Jolly Level: II Lo: 9.1.1.1 Configuration: PiDe to Flanqe (Orifice)

Calibration Sheet No: 0201029 (S2) PIPE to (S1)FLANGE Scan Surface: OD N # .  % Mp W L Li L2 Beam Exam FSH Max Max Max 20 % FSH 20 % FSH Dir. Surf. Scan Damps Remarks 1 60°L 100 1.092 .9" 360° INT. IND. 1 2 AXIAL NO Reviewed Bv: o~, /,, Level: Date: Authorized Insoector: Date: 0(Dc FEB 2 3 200Z Sheetof ct C%

I 0 I 0 DUKE POWER COMPANY NDE-UT-5 UT PROFILE/PLOT SHEET Revision 1 IJAAMINA I1IUN U)URFACE 1 EXAMINATION SURFACE 2 WELD 4 3 2 * '1 2 3 4 5 -

t 1.45 2

2.5 3

Component IU'i/wyeI NO. U

Remarks:

Profile taken 0o Item No: c-ao. a z.i. 0oa 270 at:__- o~~~ 90 Examiner: , ,Level: ii Date: i-iq-oi (*O Reviewed "! 4 "/ Level: ii Date: .

Authorized Inspectory' Date: FEB 2 32t00r* 180 Sheet-iofi 3 2OO

DUKE POWER COMPANY FORM NDE-UT-4 ISI LIMITATION REPORT Revision I Component/Weld ID: 1HP-192-15 Item No: C05.021.006 Remarks:

0' NO SCAN SURFACE BEAM DIRECTION DUE TO FLANGE CONFIGURATION 0 LIMITED SCAN 0] 1 [0 2 0l 1 0l 2 [0 cw0 ccw FROM L - - - to L INCHES FROM WO - 0.3" to BEYOND ANGLE: [0 0 0 45 E0 60 0-Other FROM 0 DEG to 360 DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 0i 02 [0 1 [0 2 cw C] ccw FROM L to L INCHES FROM WO to ANGLE: [1 0 [45 0 60 0l Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 02 01 [ 2 [0 cw C3 ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 [ 45 E0 60 0l Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION E0 LIMITED SCAN 01 02 01 2 Ocw ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 E0 45 0 60 0l Other FROM DEG to Prepared By: , Level: Zr Date: . . Sketch(s) attached 0 yes 0l no Sheet__L of Reviewed By:/,j J * /)f Date: - Authorized Inspector )"ýý,C.

  • DA-EB 2 3 2002 01)1

(,O~

1*I 7 (O

kS

DUKE POWER COMPANY Form NDE-UT-8 ULTRASONIC INDICATION RESOLUTION SHEET Revision 1 Acceptance Standard:

INDICATION #1 WAS DETERMINED TO BE A GEOMETRIC REFLECTOR DUE TO I.D. WELD ROOT GEOMETRY.

THIS WAS DETERMINED BY PLOTTING AND A REVIEW OF THE R.T. FILM.

Item No: C05.021.006 Acceptable Indications: #1 Rejectable Indications: NONE These indications have been compared with previous ultrasonic data 11 Yes El No previous data available Examiner: J***Level: Date: She ._o_...

Sheet 7ofj James L. Panel Rvee:Level: 1I 1/14/2002 Date: IAuthorized InsDector: Date: 0

  • Reviwer 2/20

Attachment C Page Sa of 13 0 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso 0o Examination Volume/Area Defined EO Base Metal -l Weld El Near Surface El Boltina 11 Inner Radius Area Calculation Volume Calculation 0.2 IN. X 1.25" = 0.25 SQIN. 0.25 SQ. IN. X 14.2 IN. = 3.55 CU. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 60 1 0.11 14.2 1.56 3.55 2 60 2 0.0 14.2 0 3.55 3 45 CW 0.25 14.2 3.55 3.55 4 45 CCW 0.25 14.2 3.55 3.55 8.66 14.2 60.99 Supplemental Coverage 1 60°L 1 0.14 14.2 1.99 14.2 14.01 IDEnif nal HSBI4 Item No: C05.021.006 Prepared By:

  • Level: w Date: ///,vl._

Reviewed By: Level: Date: 1-/6-0 t_

__ __ __ __Profile taken t item No: co* o* o*(

270 at: 90 M 0

LC\eie : .. I! D ate: i// ,',// ,Z .

  • ~~~Date:/7-s0
  • .~~ -) n -r,* FDae:

- R:I: 9 n ?tnn? 180 SheeL__of 9

conee Unit #1 EOC20 NO DATA CALIBRATION SHEET # ozo , oo - 4x"* z.

  1. 0oz 6// - xo'L COMPONENT I.D.# II- 51A-o 9Z 1A ITEM # Co0.021.ot0 03 Init ,g&TrE IANIB C*o al n l -*

IHSBI &ICo. 1U#,

60 Z,

DUKE POWER COMPANY Exam Start: 1015 NDE-UT-3A ULTRASONIC EXAMINATION DATA SHEET FOR LAMINAR REFLECTORS Exam Finish: 1018 Revision 2 Station: Oconee Unit: 1 Component/Weld ID: 1-51A-01-91A Date: 1/22/2002 Nominal Material Thickness (in): 0.531 Weld Length (in.): 14.1" Surface Temperature: 100 Deg F Measured Material Thickness (in): 0.536 Lo: 9.1.1.4 Pyrometer S/N: MCNDE 27219 Surface Condition: AS GROUND Calibration Sheet No: Cal Due: 2/14/2002 Examiner: David Zimmerman z.,lda, "[.evel: 111 0201037 Configuration: Pipe to Valve (1HP-128)

Examiner: Larry Mauldin -.. /4..evel: III S2 Flow S1 Procedure: NDE-640 Rev: I FC: VALVE to PIPE Ampl L1 W1 Mpl W2 Mp2 L2 Wl Mpl W2 Mp2 ND arem arem arem arem arem > rem arem arem arem arem arem Exam Damps NO. BW BW BW BW BW BW BW BW BW BW 8W Surf.

LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB NRI 0 Remarks:

  • 95-18 & 95-19 Limitations: see NDE-UT-4 01 None: E3 Sheet . of Reviewed By:  !'A i Level: Date: Authorized Ins Date: Item No:

'/I?- A / C , FEB 23 2002 C05.021.043 vi 0~

(O 0

DUKE POWER COMPANY FORM NDE-UT-4 ISI LIMITATION REPORT Revision 1 ComponentA/eld ID: 1-51A-01-91A Item No: C05.021.043 Remarks:

0] NO SCAN SURFACE BEAM DIRECTION DUE TO VALVE CONFIGURATION 01 LIMITED SCAN D01 0 2 01 1 E0 2 0 cw 11 ccw FROM L - N/A___ to L _N/A INCHES FROM WO - 0.4" to BEYOND ANGLE: 01 0 0 45 03 60 01 Other FROM 0 - DEG to 360 DEG o] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 03 1 01 2 0] 1iD 2 0 cw O1 ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 0 45 0 60 01 Other FROM DEG to DEG 0] NO SCAN "SURFACE BEAM DIRECTION

" LIMITED SCAN 01 1 0l 2 0 1 13 2D cw 11 ccw FROM L to L INCHES FROM WO to ANGLE: 01 0 0 45 01 60 0 Other FROM DEG to DEG SURFACE BEAM DIRECTION 01 NO SCAN 0 LIMITED SCAN 011 012 03 1 11 2 0] cw O3 ccw FROM L to L INCHES FROM WO to ANGLE: 0l 0 01 45 01 60 01 Other FROM DEG to Date: /,2.2</ Sketch(s) attached I1 yes El no Sheetj+/- of M

DareEB 2 3 2002 00

(ýý- -f Ze f F JJVM f

-4 I Authorized Inspector: 0 b5s

Attachment C Page 9 of 130 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso

%a Examination Volume/Area Defined O Base Metal [] Weld 11 Near Surface 0 Boltina 0 Inner Radius Area Calculation Volume Calculation 0.18 IN. X 1.1 IN. = 0.198 SQ.IN. 0.198 SQ.IN. X 14.1 IN. = 2.79 CU.IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 ou U.Uet) 14.1 1.21 2.79 2 60 1 0.0 14.1 0 2.79 3 45 Cw 0.198 14.1 2.79 2.79 4 45 CCw 0.198 14.1 2.79 2.79 6.79 11.16 60.84 RL Supplemental Coverage 60RL 2 0.113 14.1 1.59 11.16 14.25 Initial [ Final ANII _rB DATE&"

HSBI &177o

conee Unit #1 EOC20 NO DATA CALIBRATION SHEET # ozoloo, - 4- 4o" COMPONENT I.D.# 4 ITEM# cos-.pz/.o*

Initial 0 Final , ,

ANII . -DATE HSBI &I Co.

<it , "/,,1mr

DUKE POWER COMPANY Exam Start: 1513 NDE-UT-3A ULTRASONIC EXAMINATION DATA SHEET FOR LAMINAR REFLECTORS Exam Finish: 1517 Revision 2 Station: Oconee Unit: 1 Component/Weld ID: 1HP-324-118B Date: 1/14/2002 Nominal Material Thickness (in): 0.375 Weld Length (in.): 9.02" Surface Temperature: 98 Deg F Measured Material Thickness (in): 0.400 Lo: 9.1.1.1 Pyrometer S/N: MCNDE 27010 Surface Condition: AS GROUND Calibration Sheet No: Cal Due: 2/14/2002 Examiner: James L. Panel =._?, Level:- 1 0201012 Configuration: Tee to Valve (1HP-1 19)

Examiner: B. Dale Jolly , Level: II S2 Flow S1 Procedure: NDE-640 Rev: 1 FC:

  • TEE to VALVE Ampl Li Wi Mpl W2 Mp2 L2 W1 Mpl W2 Mp2 IND a rem a rem a rem a rem a rem a rem rem  ? rem a rem 2 rem  ; rem Exam Damps NO. BW BW BW BW BW BW BW BW BW BW BW Surf.

LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB NRI 0 (oDb (DO 0~

Profile takenV>

at:_ 0 90 o 0o*

So=

180 Sheet_.o__

3 0

DUKE POWER COMPANY FORM NDE-UT-4 ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1HP-324-118B Item No: C05.021.065 Remarks:

El NO SCAN SURFACE BEAM DIRECTION DUE TO VALVE CONFIGURATION 0l LIMITED SCAN 02

[1 D01 E 2 [1 cw [I ccw FROM L to L INCHES FROM WO 0.2" to BEYOND ANGLE: 0l 0 [0 45 [D 60 E0 Other FROM 0 DEG to 360 DEG 0] NO SCAN SURFACE BEAM DIRECTION D LIMITED SCAN D I [D 2 D 1 ED 2 [0 cw [I ccw FROM L to L INCHES FROM WO to ANGLE: 0l 0 [0 45 D- 60 0l Other FROM DEG to DEG D] NO SCAN SURFACE BEAM DIRECTION 0l LIMITED SCAN D D2 1 D 1 0 2 0 cw [D ccw FROM L to L INCHES FROM WO to ANGLE: 00-D 45 Dl 60 Dl Other FROM DEG to DEG Dl NO SCAN SURFACE BEAM DIRECTION

[I LIMITED SCAN Di D2 [D1 1" D 2 cw [3 ccw FROM L to L INCHES FROM WO to ANGLE: [0 0 0l 45 [D60 DEOther FROM DEG to Date: // //, ..- Sketch(s) attached E3 yes D no Sheet Al of 1, >D Authorized Inspector: 6¶ '1'ý7 DFrtB 2 3 2002 0m G3.

"Jo C)

Attachment C Page 14 of 130 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination Volume/Area Defined 11 Base Metal El Weld 11 Near Surface El BoltinQ El Inner Radius Area Calculation Volume Calculation 0.13 IN. x 1.0 IN.= 0.13 SQ. IN. 0.13 SQ. IN. 9.0 IN. = 1.17 CU IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.) Percent Coverage 1 60 1 0.06 9 0.54 1.17 2 60 2 0.0 9 0 1.17 3 45 CW 0.13 9 1.17 1.17 4 45 CCW 0.13 9 1.17 1.17 2.88 4.68 61.54 Supplemental Coverage 1 60°L 1 0.07 9 0.63 4.68 13.46 Initialal FnI ARJDATE ci Item No: C05.021.065 Prepared By: Level: _ Date:

Reviewed By.: " Level: Date:

C) z CD 0

(1) 10 n 0

z4

.1 0

0 NJ N 0 h

k.

10 0O 068Bd

DUKE POWER COMPANY Exam Start: 1431 NDE-UT-3A ULTRASONIC EXAMINATION DATA SHEET FOR LAMINAR REFLECTORS Exam Finish: 1434 Revision 2 Station: Oconee Unit: 1 Component/Weld ID: 1-51A-01-32AA Date: 4/7/2002 Nominal Material Thickness (in): 0.237 Weld Length (in.): 14.1 Surface Temperature: 670 Deg F Measured Material Thickness (in): .225/.274 Lo: 9.1.1.1 Pyrometer S/N: MCNDE 27220 Surface Condition: GROUND Calibration Sheet No: Cal Due: 8/5/2002 Examiner: James L. Panel :7 Level:* 1 0201097 Configuration: CIRC.

Examiner: Marion T. Weae evel: II S1 Flow S2 Procedure: NDE-640 Rev: 1 FC:

  • PIPE to VALVE Ampl L1 WI Mpl W2 Mp2 L2 WI Mpl W2 Mp2 IND a rem >rem  ? rem a rem  ? rem a rem a rem  ?-rem a rem 2 rem 2: rem Exam No. BW BW BW BW BW BW BW BW BW BW BW Surf.

LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB NRI 00 Remarks: *FC 95-18, 95-19 Limitations: seeNDE-UT-4 0 None: Sheet of Reviewed By: .9 1 Level: Date: Authonz d I 7 .toy Item No:

q -q1oZ C05.021.078 II

-43

.*U1 0~

0OCD DUKE POWER COMPANY FORM NDE-UT-4 ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1-51A-01-32AA Item No: C05.021.078 Remarks:

0] NO SCAN SURFACE BEAM DIRECTION DUE TO VALVE 1HP23 03 LIMITED SCAN 01 1 0 2 0 1i0 2 0] cw O1 ccw FROM L - - N/A_ - to L N/A INCHES FROM WO - N/A_ to N/A ANGLE: 03 0 0 45 0 60 0 Other FROM 0 DEG to 360 DEG 0] NO SCAN "SURFACE BEAM DIRECTION

" LIMITED SCAN 03 1 0 2 1 02 cw E3 ccw FROM L to L INCHES FROM WO to ANGLE: 03 0 01 45 01 60 01 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 01 LIMITED SCAN Q 1 01 2 03 1 01 2 ¢w O1 c1 ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 0 45 03 60 0] Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 03 LIMITED SCAN 0 1 03 2 0 1 0] 2 0] cwO ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 0 45 0 60 0 Other FROM DEG to Prepared By:, - Level: Date:./.._o. Sketch(s) attached 0 yes 0 no Sheetof -00>

Reviewed By:" , ,) Date: 1 Authorized InspeC*F,- Date: (D Q

,4 V

Attachment C Page Io6of 130 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet 0 Revision 0 Examination Volume/Area Defined

[] Base Metal [] Weld 0 Near Surface 01 Boltinq 0 Inner Radius Area Calculation Volume Calculation

.079 IN.X .80 IN. = .063 SQ. IN. .063 SQ. IN. X 14.1 IN. = 0.89 CU. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 45° CW .063 14.1 0.89 0.89 2 45° CCW .063 14.1 0.89 0.89 3 600 S1 0 0 0 0.89 4 600 S2 .026 14.1 0.37 0.89 2.15 3.56 60.39 SUPP. COVERAGE 4 60° 2 .037 14.1 0.52 3.56 14.61 I Item No: C05.021.078 Prepared By: Level: .- Date:

Reviewed By: Level: 31r Date: 0,Z

- 2 zz-

conee Unit #1 EOC20 NO DATA CALIBRATION SHEET # ozoo - g:.. go COMPONENT I.D.# J/,o3g./I7A ITEM # cosT. oz1. os,*

nitial 0

'i~a Final 9'-- 0 p

JAMI A "-DATE tH SBI&I Co. " _ _ _ _

  • +++.1-J o/'

DUKE POWER COMPANY Exam Start: 1006 NDE-UT-3A ULTRASONIC EXAMINATION DATA SHEET FOR LAMINAR REFLECTORS Exam Finish: 1009 Revision 2 Station: Oconee Unit: 1 Component/Weld ID: 1HP-393-127A Date: 1/22/2002 Nominal Material Thickness (in): 0.438 Weld Length (in.): li" Surface Temperature: 100 Deg F Measured Material Thickness (in): 0.435 Lo: 9.1.1.4 Pyrometer S/N: MCNDE 27219 Surface Condition: AS GROUND Calibration Sheet No: Cal Due: 2/14/2002 Examiner: David Zimmerman_- Level: III 0201033 Configuration: Valve (1HP-105) to Pipe Examiner: Larry Mauldin Level: Ill S2 Flow SI Prceue:*PIPE Procedure: NDE-640 aRev: 1 FC: PIEt*-AV to VALVE Ampl Li Wl Mpl W2 Mp2 L2 WI Mpi W2 Mp2 N a rem a rem a rem > Frem a rem  ? rem 2,rem  ? rem >rem > rem > rem Exam Damps NO BW BW BW BW BW BW BW BW BW BW BW Surf.

LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB NRI 0 Remarks:

  • 95-18 & 95-19 Limitations: see NDE-UT-4 0 None: 0 Sheet 2 of ,

Reviewed By: - ) Level: Date: Authorized lnspQectozt~ Item No:

J //* FED02lt C05.021.084 V9.P*

0~

0M qp~o

FORM NDE-UT-4 DUKE POWER COMPANY ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1HP-393-127A Item No: C05.021.084 Remarks:

0] NO SCAN "SURFACE BEAM DIRECTION DUE TO VALVE CONFIGURATION "o LIMITED SCAN 0 1 01 2 0 1 0) 2 01 cw 0 ccw FROM L N/A to L N/A INCHES FROM WO 0.3"- - to BEYOND ANGLE: 0 0 03 45 0 60 0 Other FROM 0 DEG to 360 DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 03 1 03 2 01 1 01 2 01 cw 11 ccw FROM L to L INCHES FROM WO to ANGLE: El 0 0 45 0] 60 03 Other FROM DEG to DEG o] NO SCAN SURFACE BEAM DIRECTION 01 LIMITED SCAN 01 1 0 2 0111 2 0 cw [] ccw FROM L to L INCHES FROM WO to ANGLE: 01 0 0 45 0 60 0 Other FROM DEG to DEG SURFACE BEAM DIRECTION 0 NO SCAN 0 1 0 2 01 1 0 2 0 cw 11 ccw 0] LIMITED SCAN FROM L to L INCHES FROM WO to ANGLE: 01 0 03 45 01 60 0 Other FROM DEG to Sheet y of 6 1 3 2002 *0 60~

Attachment C Page166 of 13 0 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination Volume/Area Defined O Base Metal 0] Weld 01 Near Surface 01 Boltinc E0 Inner Radius Area Calculation Volume Calculation 0.145 IN. X 1.0 IN. = 0.145 SQ.IN. 0.145 SQ.IN. X 11.0 IN. = 1.595 CU.IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 60 1 0.054 11 0.594 1.595 2 60 2 0.0 11 0 1.595 3 45 Cw 0.145 11 1.595 1.595 4 45 CCw 0.145 11 1.595 1.595 3.784 6.38 59.31 RL Supplemental Coverage 1 60RL 1 0.091 11 1.001 6.38 15.69 Initial ANII _

11B1&[0I Co.

t DATE Final

/1-'

DUKE POWER COMPANY NDE-UT-5 LIT PROFILE/PLOT SHEET Revision I EXAMINATION SURFACE I WELD .?LtE5 EXAMINATION SURFACE 2 4 3 2 I 1 2 3 4 I j1111HH 11I1 I II III' I))

11111 111111

.5 04:5,T "

7.A@Jt ASS Z.~f'. 177 7 6 v

%)L \.IAV9 S~t7l/i4 o~e' 2 _

f__ C,) 0g 9 2.5 3

V

Remarks:iu'veo O. ,' c 3 Ztt 270 Examiner: IA,4j-- ~--- ILevel:-*7, IDate: ,z Reviewed By: A)U, ,'-7ýy7, i~ve:<-Z-IDate: -

IAuthorized Inspecto:F . '7 I

conee Unit #1 EOC20 NO DATA CALIBRATION SHEET # O2ol11o / --,* o

  1. e~Oiaot2 -- o0 L COMPONENT I.D.# 0-*/A-P-t A3 ITEM # Coso2/.&oo 00

-eI 9*

(o

1051 NDE-UT-3A DUKE POWER COMPANY Exam Start:

ULTRASONIC EXAMINATION DATA SHEET FOR LAMINAR REFLECTORS Exam Finish: 1056 Revision 2 Station: Oconee Unit: 1 Component/Weld ID: 1-51A-02-34B Date: 4/7/2002 Nominal Material Thickness (in): 0.531 Weld Length (in.): 14.1 Surface Temperature: 630 Deg F Measured Material Thickness (in): .567 Lo: 9.1.1.1 Pyrometer S/N: MCNDE 27220 GROUND Calibration Sheet No: Cal Due: 8/5/2002 Surface Condition:

Level: II 0201100 Configuration: CIRC.

Examiner: Marion T. Weaver

'/ Level: II S2 Flow S1 Examiner: Winfred C. LeeperjJ Procedure: NDE-640 .rev: 1 FC: VALVE to ELBOW Ampl LI WI Mpl W2 Mp2 L2 Wl Mp1 W2 Mp2 IND  ?rem >rem  ?-rem Irem arem >rem I >rem >rem

? arem arem arem Exam Damps NO. 4 BW BW BW BW BW BW BW BW BW W BW Surf.

LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB NRI 0Q Remarks: *FC 95-18, 95-19 Limitations: see NDE-UT-4 0 None: 03 Sheet . of 6 Reviewed By: fli Level: Date:2-Y Authorizp_1spe "7" -- Date: -- Item No:

C05.021.090 0 (D i00I o¢o

FORM NDE-UT-4 DUKE POWER COMPANY ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1-51A-02-34B Item No: C05.021.090 Remarks:

0] NO SCAN SURFACE BEAM DIRECTION DUE TO VALVE CONFIGURATION O1 LIMITED SCAN 01 1 0] 2 El 1 13 2 13 cw 0 ccw FROM L to L INCHES FROM WO .3 to BEYOND ANGLE: 01 0 01 45 0 60 01 Other FROM DEG to DEG 0] NO SCAN "SURFACE BEAM DIRECTION

" LIMITED SCAN [0 1 01 2 3 1 2 cw 3 ccw FROM L to L INCHES FROM WO to ANGLE: 01 0 0] 45 0 60 01 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 01 LIMITED SCAN 01 0 2 0] 1iO 20 cw[ ccw FROM L to L INCHES FROM WO to ANGLE: 01 0 03 45 01 60 0 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 0 1 01 2 03 1 03 2 01 cw O1 cow FROM L to L INCHES FROM WO to ANGLE: 01 0 0 45 0 60 0 Other FROM DEG to Prepared By: Level: Date: ., ?6z Sketch(s) attached 0 yes 0A° Sheet__ý_of 4 0 >

Reviewed By: Date: Authorized lnspector&,Ae' -s-- Date: ,2-00 oJ*

oO

Attachment C Page Ila of I3A DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination Volume/Area Defined 0 Base Metal 0 Weld 13 Near Surface E3 Boltinq 03 Inner Radius Area Calculation Volume Calculation 0.177" X 1.0" = 0.177 SQ. IN. (4" PIPE TO VALVE) 0.177 SQ. IN. X 14.13" = 2.5 CU. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 450 Cw 0.177 14.13 2.5 2.5 100.00 2 45° CCw 0.177 14.13 2.5 2.5 100.00 3 600 S2 .080 14.13 1.13 2.5 45.20 4 60° S1 0 0 0 2.5 0.00 TOTAL AGGREGATE COVERAGE 6.13 10 61.30 600 L WAVE SUPPLEMENT COVERAGE 0.00 4 60°L S2 0.097 14.13 1.37 2.5 54.80 54.8% OF 1 SCAN (25%) = 13.7% OF TOTAL WELD

DUKE POWER COMPANY UT PROFILE/PLOT SHEET EXXAMINATION SURFACE 1 1AI jP2 --- "--- -

4 WELD EXýAMINATION SURFACE 2 3 2 1 3 2 1 2 3 4 II II11IIII I lllE(AMINAT1ON 2 3 SURJ FACE ~ 2 I1*IIliii liii

.5 I 270 90 00 p..1 180 Sheet_._o .

0~

0 ,I,

conee Unit #1 EOC20 NO DATA CALIBRATION SHEET # OZO 102 a - 154 ,o

  1. IZooz 3- g.o COMPONENT I.D.# JhyP./*-/z ITEM # Co5.o2/.o9,?Z, jInitial 0 Final Z3i IHsBl &ICo o.

I*BtIc. w,r 1oF* a

DUKE POWER COMPANY Exam Start: 0929 NDE-UT-3A ULTRASONIC EXAMINATION DATA SHEET FOR LAMINAR REFLECTORS Exam Finish: 0934 Revision 2 Station: Oconee Unit: 1 Component/Weld ID: 1HP-193-12 Date: 1/15/2002 Nominal Material Thickness (in): 0.531 Weld Length (in.): 14.2" Surface Temperature: 100 Deg F Measured Material Thickness (in): 0.600 Lo: 9.1.1.1 Pyrometer S/N: MCNDE 27010 Surface Condition: AS GROUND Calibration Sheet No: Cal Due: 2/14/2002 Examiner: James L. Panel," Level: II 0201021 Configuration: Tee to Valve Examiner: B. Dale Jolly /Z , en Level: II S2 Flow S1 Procedure: NDE-640 Rev: FC: TEE to VALVE Ampl LI WI Mpl W2 Mp2 L2 W1 Mpl W2 Mp2 N a rem a rem >rem > rem > rem  ? rem a rem 2: rem a rem  ? rem a rem Exam Damps N . BW BW BW BW BW BW BW BW BW BW BW Surf.

LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB NRI 0 Remarks:

  • 95-18 & 95-19 Limitations: see NDE-UT-4 0 None: 0 Sheet 2 of Reviewed By:*4 <y,) Level: Date: AuthorizedI I Date: Item No:

1?~7- 0 uhrzcn~co- FEB 2 3 2002 C05.021 .096 0- 0 o(DC Z: V

DUKE POWER COMPANY NDE-UT-5 UT PROFILE/PLOT SHEET Revision 1 EX.AMINATION SURFACE 1 EXAMINATION SURFACE 2 WELD 4 2 1 2 3 1r "It III 4

im1 111 ým ý S.. . . . . . . . . . . . . ' ' '

II

  • 1 I

.5 1.5 _ _ _ _ _ _ _ _ _ _ _

2 2.5 3 . .. . . . . . . I _ _ _ _ __I _ _I _ _i Uomponent IU/Weld NO. U Remarks:

270 90 Item No: ,,-/

i-,, /o Examiner: Lev LeveI:..r Da te: /"r0 D

Reviewed % h lLevel: -f- Date: 1.7,? 180 SheeL_.,of .*

k'-Wluuoized Inspectorf P~c 7 Date:FEB 2 3 2002

DUKE POWER COMPANY FORM NDE-UT-4 ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1HP-193-12 Item No: C05.021.096 Remarks:

El NO SCAN SURFACE BEAM DIRECTION DUE TO VALVE CONFIGURATION 0 LIMITED SCAN E] [1 2 E0 1 0' 2 0l cw D ccw FROM L to L ___- - INCHES FROM WO - 0.3" to BEYOND ANGLE: [3 0 [0 45 El 60 [1 Other FROM 0 DEG to 360 DEG El NO SCAN SURFACE BEAM DIRECTION El LIMITED SCAN Di 02 0 102 cw ccw FROM L to L INCHES FROM WO to ANGLE: E0 0o 45 [ 60 [3 Other FROM DEGto DEG

[] NO SCAN SURFACE BEAM DIRECTION 0 LIMITED SCAN 01 02 01 02 cwfl ccw FROM L to L INCHES FROM WO to ANGLE: E0 o0 45 El 60 [0 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION E0 LIMITED SCAN E] 02 010 cw0 ccw FROM L to L INCHES FROM WO to ANGLE: 0] 0 [ 45 0 60 [1 Other FROM DEG to Prepared By: Level: Date: r/ Sketch(s) attached 0 yes E no Sheet of Reviewed By/*L Date: -/oZ Authorized Inspector: AD B 2T2-002 (0

Attachment C Page 118 of 13 0 DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination Volume/Area Defined El Base Metal El Weld [] Near Surface El Boltinq El Inner Radius Area Calculation Volume Calculation 0.2 IN. X 1.0 IN. = 0.2 SQ. IN. 0.2 SQ. IN. X 14.2 IN. = 2.84 CU. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.) Percent Coverage 1 60 1 0.075 14.2 1.065 2.84 2 60 2 0.0 14.2 0 2.84 3 45 Cw 0.2 14.2 2.84 2.84 4 45 CCw 0.2 14.2 2.84 2.84 6.745 11.36 59.37 Supplemental Coverage 1.775 11.36 15.62 I 60°L 1 0.125 14.2

]ANII DATE

[ilill [] Final iH

DUKE POWER COMPANY NDE-UT- 5 UT PR!OFILE/PDLOT SHEET Revision I EXAMIN ATI10 N S UJR)F C-E 1 VVELD EXAMINATION SURFACE 2 1 2 3 4 ml 11 5

1 L zz I, ii

- I-I . .

I I'A i"'

- I- S

'4) 1 'S'~ ~2f i-'92 _ _ _ _ _ Y__

1J4L &2- k iA QOV*L ??4~cL

  • If .2 s I .

2.S u(c __ _ _ _ __ _ _ _ _ _ __ _ __ _ _ __ _ _ __W _ _ __ _ _ __ _

2

_______ ~ ~ ~

it 3Q "4~4 V~?.IAV 2.5 t~~O'~ V 04LaVa

~V ",J~c

'I

-r AOL 4 0c-i- 1..

Z - Y./W 3 -4 Comp~onent ID/ViCkj No. i q SH 2 -/ 0 Remarks 270 90

___ ___ ___ __ ___ ___ __ Item No: C05-. 0?/ .C7 Examiner: -7 ~Lev el1: Da2te: /so Reviewed ____ L\'I~ IDate.-/-W 180 Sheet4Lof -o LAuthorized lnspecýoo 4 n-irt-ttl Z J

conee Unit #1 EOC20 NO DATA CALIBRATION SHEET # 020103)- 45°0 +"so Q COM ozolo32-dC/

-1.1 COMPONENT I.D.# 1.P-7o- I!

ITEM P-_o05. oz0./oz Initial 0 Final g i 0 0(D~

ANII .. -ATE 9..

HSBI &l Co. 00 0

DUKE POWER COMPANY Exam Start: 1501 NDE-UT-3A ULTRASONIC EXAMINATION DATA SHEET FOR LAMINAR REFLECTORS Exam Finish: 1503 Revision 2 Station: Oconee Unit: I Component/Weld ID: 1HP-70-11 Date: 1/16/2002 Nominal Material Thickness (in): 0.237 Weld Length (in.): 14.1" Surface Temperature: 75 Deg F Measured Material Thickness (in): 0.225 Lo: 9.1.1.1 Pyrometer S/N: MCNDE 27010 Surface Condition: AS GROUND Calibration Sheet No: Cal Due: 2/14/2002 Examiner: David Zimmerma ,*I.0201030Level: Configuration: Expansion Joint to Elbow Examiner: James L. Panel/,._ , Level: II S2 Flow S Procedure: NDE-64'0 Rev: 1 FC:

  • ELBOW to EXPAN.

Ampi Li Wi Mpl W2 Mp2 L2 W1 Mpl W2 Mp2 IND a rem >rem a rem 2 rem a rem > rem rem >rem >rem > rem a rem Exam NO.- 4 BW BW BW BW BW BW BW BW BW BW BW Surf. Damps LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB LOB NRI 0 Remarks:

  • 95-18 & 95-19 Limitations: see NDE-UT-4 El None: 0l Sheet 2 of Reviewed By: Level: Date: Authorized Inspect Rc'`~ *FEB 2 Date:

3 2002 Item No:

C05.021.102 (Do

1~v*

M0>

ID0

DUKE POWER COMSjPANY NDEE-UT- S UT PROFILE/PLOT SHýE.EF Revision 1 EXAMINAT[ON SURFACE I te5 15CCýEXAMINATION SURFACE 2 WELD 4 2 I 2 3 4 I

S F -

S.LiA I I e ^, Ir-W A---,=

I / 3 *-O&, 3r N *It - e 2I.5 _ _ _

3 H-UdUlpUHCHL iu/'yyeiu [No. u Il-ip'- -Th - //

Remarks:

20 Profile taken 2t:

1ý It 90 Itemn No:-CO Examiner: , *z L1evel: 7ý-

lReviewed By: 1Dýlte f L 'JC-0 Le

.Authorized Inspector:' 180 Sh-eeLA of_*

2002 CI-

Attachment C Page **a* of I DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Rvso Examination Volume/Area Defined El Base Metal El Weld El Near Surface El Boltinq El Inner Radius Area Calculation Volume Calculation 0.013 IN. X 0.039 IN. = 0.052 SQ. IN. 0.052 SQ. IN. X 14.1 IN. = 0.735 CU. IN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 45 CW 0.52 14.1 0.735 0.735 2 45 CCW 0.52 14.1 0.735 0.735 3 60 1 0.013 14.1 0.183 0.735 4 60 2 0.0 14.1 0 0.735 1.653 2.94 56.22 60°RL Supplemental Coverage 3 60°RL 1 0.039 14.1 0.55 2.94 18.71 Initial 0 Final I ANII DATE4'V*

HSBI &ICo.

Item No: C05.021.102 Prepared By: ,, Level: Date:

Reviewed By: Level: Date: /_/  ?. d,2z.

Aftachment C Page 12,5 of 13 6 l :ý ty) rmmý LAJ 4:tz Lz:

40=ý  ;.I-

-C 3:

co GO w

Attachment C Pagela6of 13o

7.-.

""7U1 LJKE ROVER CO',<DA' ,2" ReVK'7 L_, PROFILE/PLOT S- ,L 7 EXAMINATION SURFACE I L V__I*- V" A:..,,

C)

Sj ",

4 ,,0J~ .

,4 3 I L I-V) w il 1;

.S 1.5 2

2.S 3

Component ID! Weld No.,-___

Remarks:7 PrcFi!e ,q Ite m N, :k Examiner: ,/j, / "I Lvcl: D~e" /

Reviewed By: "z/ j-'. 7"/,-. I:c AuthorizedI nspector: ' ,,*

  • D. Da:: FEB2 ,3200 2

.hee 3 c__

DUKE POWER COMPANY FORM NDE-UT-4 ISI LIMITATION REPORT Revision 1 Component/Weld ID: 1-51a-01-103A Item No: C05.021.110 Remarks:

0] NO SCAN SURFACE BEAM DIRECTION DUE TO VALVE CONFIGURATION 01 LIMITED SCAN 0 1 0 2 0 1 0 2 0 cw O3 ccw FROM L - - N/A___ to L N/A INCHES FROM WO 0.4" to BEYOND ANGLE: 0 0 0 45 0 60 01 Other FROM 0 DEG to 360 DEG 0] NO SCAN SURFACE BEAM DIRECTION 0] LIMITED SCAN 01 02 0 1 0 2 0 cw EO ccw FROM L to L INCHES FROM WO to ANGLE: 0 0 0 45 03 60 03 Other FROM DEG to DEG 0] NO SCAN SURFACE BEAM DIRECTION 01 LIMITED SCAN Q 1 03 2 03 1 0 2 03 cw 0 ccw FROM L to L INCHES FROM WO to ANGLE: 01 0 03 45 03 60 03 Other FROM DEGto DEG SURFACE BEAM DIRECTION 0 NO SCAN 0 LIMITED SCAN 1 02 2 03 1 O 2O-IcwOccw FROM L to L INCHES FROM WO to ANGLE: 01 0 0 45 0 60 03 Other FROM DEG to Date: 1.22-a e.- Sketch(s) attached 0 yes 03 no Sheet q of J

Authorized Inspector: c(':9: P7 f wJJm P 2 3 200 0 0 U

-1 o0

Attachment C Page i'lof 13o DUKE POWER COMPANY NDE-91-1 Limited Examination Coverage Worksheet Revision 0 t0 Examination Volume/Area Defined o Base Metal 13 Weld 11 Near Surface 01 Boltinq 0 Inner Radius Area Calculation Volume Calculation 0.14 IN. X 1.0 IN. = 0.14 SQ.IN. 0.14 SQ.IN. X 11.0 IN. = 1.54 CUIN.

Coverage Calculations Area Length Volume Volume Beam Examined Examined Examined Required Percent Coverage Scan # Angle Direction (sq.in.) (in.) (cu.in.) (cu.in.)

1 60 1 0.06 11 0.66 1.54 2 60 2 0.0 11 0 1.54 3 45 CW 0.14 11 1.54 1.54 4 45 CcW 0.14 11 1.54 1.54 3.74 6.16 60.71 RL Supplemental Coverage 1 0.08 11 0.88 6.16 14.29 1 60RL Initial 0 Final U ANII DATE j*~~

HSBI & I Co.

Item No: C05.021.110

, Level: - Date:

Prepared By:

Reviewed By:

-am

),J A Level:

  • Date: /--. 2

T >

Q C) 0 r*

(so a