August 9, 2002 Mr. Jay K. Thayer Site Vice President - Vermont Yankee Entergy Nuclear Vermont Yankee, LLC P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - CORRECTION TO AMENDMENT NO. 208 (TAC NO. MB5291)
Dear Mr. Thayer:
On July 31, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 208 for the transfer of ownership and operating authority under Facility Operating License DPR-28 from Vermont Yankee Nuclear Power Corporation to Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. This amendment contained license pages reflecting this change. On page 3, paragraph B of the license, amendment number 208 was inadvertently left out. Paragraph B should read; The Technical Specifications contained in Appendix A, as revised through Amendment 208, are hereby incorporated in the license. Entergy Nuclear Operations, Inc. shall operate the facility in accordance with the Technical Specifications.
We apologize for any inconvenience this may have caused. The revised license page 3 is enclosed.
Sincerely,
/RA/
Robert M. Pulsifer, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosure:
License page 3 cc w/encl: See next page
Vermont Yankee Nuclear Power Station cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. David R. Lewis Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, DC 20037-1128 Ms. Christine S. Salembier, Commissioner Vermont Department of Public Service 112 State Street Montpelier, VT 05620-2601 Mr. Michael H. Dworkin, Chairman Public Service Board State of Vermont 112 State Street Montpelier, VT 05620-2701 Chairman, Board of Selectmen Town of Vernon P.O. Box 116 Vernon, VT 05354-0116 Mr. Michael Hamer Operating Experience Coordinator Entery Nuclear Vermont Yankee, LLC P.O. Box 250 Governor Hunt Road Vernon, VT 05354 G. Dana Bisbee, Esq.
Deputy Attorney General 33 Capitol Street Concord, NH 03301-6937 Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108 Ms. Deborah B. Katz Box 83 Shelburne Falls, MA 01370 Mr. Raymond N. McCandless Vermont Department of Health Division of Occupational and Radiological Health 108 Cherry Street Burlington, VT 05402 Mr. Gautam Sen Manager, Licensing Entergy Nuclear Vermont Yankee, LLC P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Resident Inspector Vermont Yankee Nuclear Power Station U. S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354 Director, Massachusetts Emergency Management Agency ATTN: James Muckerheide 400 Worcester Rd.
Framingham, MA 01702-5399 Jonathan M. Block, Esq.
Main Street P. O. Box 566 Putney, VT 05346-0566 Mr. Michael R. Kansler Sr. Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
Mail Stop 12A 440 Hamilton Ave.
White Plains, NY 10601
August 9, 2002 Mr. Jay K. Thayer Site Vice President - Vermont Yankee Entergy Nuclear Vermont Yankee, LLC P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - CORRECTION TO AMENDMENT NO. 208 (TAC NO. MB5291)
Dear Mr. Thayer:
On July 31, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 208 for the transfer of ownership and operating authority under Facility Operating License DPR-28 from Vermont Yankee Nuclear Power Corporation to Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. This amendment contained license pages reflecting this change. On page 3, paragraph B of the license, amendment number 208 was inadvertently left out. Paragraph B should read; The Technical Specifications contained in Appendix A, as revised through Amendment 208, are hereby incorporated in the license. Entergy Nuclear Operations, Inc. shall operate the facility in accordance with the Technical Specifications.
We apologize for any inconvenience this may have caused. The revised license page 3 is enclosed.
Sincerely,
/RA/
Robert M. Pulsifer, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosure:
License page 3 cc w/encl: See next page DISTRIBUTION:
PUBLIC R. Pulsifer OGC C. Anderson, RI PDI-2 R/F G. Hill (2)
R. Dennig S. Richards T. Clark ACRS J. Zimmerman Accession Number: ML022200216 *via e-mail OFFICE PDI-2/PM PDI-2/LA*
PDI-2/SC(A)
NAME RPulsifer TClark JZimmerman DATE 8/8/02 08/08/02 8/8/02 OFFICIAL RECORD COPY E. Entergy Nuclear Operations Inc., pursuant to the Act and 10 CFR Parts 30 and 70, l
to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility.
- 3. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Section 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
A. Maximum Power Level Entergy Nuclear Operations, Inc. is authorized to operate the facility at reactor core l
power levels not to exceed 1593 megawatts thermal in accordance with the Technical Specifications (Appendix A) appended hereto.
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment 208, are hereby incorporated in the license. Entergy Nuclear Operations, l
Inc. shall operate the facility in accordance with the Technical Specifications.
l C. Reports Entergy Nuclear Operations, Inc. shall make reports in accordance with the l
requirements of the Technical Specifications.
D. Records Entergy Nuclear Operations, Inc. shall keep facility operating records in accordance with l
the requirements of the Technical Specifications.
E. Environmental Conditions Pursuant to the Initial Decision of the presiding Atomic Safety and Licensing Board issued February 27, 1973, the following conditions for the protection of the environment are incorporated herein:
Amendment No. 206, 208