MONTHYEARML0213503742002-05-13013 May 2002 Request for Withholding Information from Public Disclosure by Letter Dated 03/28/2002 Project stage: Withholding Request Acceptance ML0220500122002-07-23023 July 2002 Ltr, Proposed Technical Specification Changes and Exemption Request Regarding Use of Framatome and Advanced Mark-BW Fuel Project stage: Other ML0302701122003-01-24024 January 2003 Fax, Request for Additional Information Framatome Fuel Transition Project stage: RAI ML0308003902003-03-21021 March 2003 Request for Additional Information on Small-break LOCA Evaluation in Support of Proposed Technical Specifications Changes and Exemption Request to Use Framatome Anp Advanced Mark-BW Fuel Project stage: RAI ML0309104342003-03-31031 March 2003 Facsimile Transmission of Questions for Proposed Technical Specifications Changes and Exemption Request, Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0316106732003-06-10010 June 2003 Withholding from Public Disclosure, Document Response to Request for Additional Information and Revised Pages for March 2002 Evaluation Report - Framatome Fuel Transition Program Technical Specification Change Project stage: RAI ML0316403882003-06-12012 June 2003 N. Anna, Units 1 and 2 - Framatome Anp Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0323200022003-08-19019 August 2003 Facsimile Transmission of Questions for Proposed Technical Specifications Changes, Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0323906432003-08-20020 August 2003 Request for Additional Information Regarding Realistic Large Break Loss of Coolant Accident Analysis Results for Proposed TS Changes & Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Request ML0326807202003-08-29029 August 2003 Submittal of Approved Topical Report VEP-FRD-42, Revision 2.0-A, Reload Nuclear Design Methodology for Application Project stage: Request ML0325411792003-09-0404 September 2003 Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark - Bw Fuel Small Break Loss of Coolant Accident (SBLOCA) Analysis Results Request for Additional Information Project stage: Request ML0325804552003-09-0505 September 2003 Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Supplemental Information for Realistic Large Break Loss of Coolant Accident (Rlbloca) Analysis Results Project stage: Supplement ML0327315722003-09-0808 September 2003 Facsimile Transmission of Questions on Proposed License Amendment to Use Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0325500032003-09-11011 September 2003 Facsimile Transmission of Questions on Proposed License Amendment to Use Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0327314452003-09-22022 September 2003 Supplemental Information for Realistic Large Break Loss of Coolant Accident (Rlbloca) Analysis Results Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Supplement ML0325908812003-09-23023 September 2003 Exemption from Requirements of 10 CFR 50.44, 10 CFR 50.46 and 10 CFR Part 50, Appendix K, to Allow Use of M5 Alloy for Fuel Cladding Material Project stage: Approval ML0327903962003-09-26026 September 2003 Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel, Request for Additional Information Pertaining to the Icecon Modules in the Realistic Large Break LOCA (Rlbloca) Project stage: Request ML0327904052003-09-26026 September 2003 Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel, Supplemental Information for Realistic Large Break Loss of Coolant Accident (Rlbloca) Analysis Results Project stage: Supplement ML0328205902003-10-0606 October 2003 Meeting Summary - Usnrc/Vepco & Anp - to Discuss Framatome Fuel Transition Program at North Anna, Units 1 and 2 Project stage: Meeting ML0332404512003-11-10010 November 2003 Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Supplement Information for Realistic Large Break Loss of Coolant Accident (Rlbloca) Analysis Results Project stage: Supplement ML0401405102004-01-0606 January 2004 Supplemental Information for Realistic Large Break Loss of Coolant Accident (Rlbloca) Containment Pressure Analysis Proposed Technical Specifications Change & Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Supplement ML0401405642004-01-13013 January 2004 Facsimile Transmission of Question for Proposed Technical Specifications Changes, Use of Framatome Anp Advanced Mark-BW Fuel (Tacs MB4714 and MB4715) Project stage: Other ML0402908102004-01-22022 January 2004 Proposed Technical Specifications Changes & Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel, Response to Request for Additional Information Regarding Assessment of Fuel Assembly Bow Concern Project stage: Response to RAI ML0405505522004-02-12012 February 2004 Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel, Supplemental Information for Loss of Coolant Accident Mixed Core Effects Project stage: Supplement ML0406909252004-03-0101 March 2004 Supplemental Information for SBLOCA Slot Breaks, Per Proposed Technical Specifications Changes and Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Supplement ML0409703402004-04-0101 April 2004 Tech Spec Pages for Amendment No. 216 Use of Framatome Anp Advanced Mark-BW Fuel Project stage: Other ML0409600402004-04-0101 April 2004 Issuance of License Amendment Use of Framatome Fuel, TAC MB4715 Project stage: Approval ML0419502182004-07-0101 July 2004 Day Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes Pursuant to the Requirements of 10 CFR 50.46 Project stage: Request ML0423306592004-08-20020 August 2004 8/20/04, North Anna, Unit 1, Issuance of Amendment Re. Conversion to Framatome Advanced Mark-BW Fuel Project stage: Approval ML0423305602004-08-20020 August 2004 Technical Specification Amendment No. 237, Pages 2.0-1, 4.0-1, 5.6-3, 5.6-4, 5.6-5 Project stage: Other 2003-09-22
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
July 23, 2002 Mr. David A. Christian Senior Vice President - Nuclear Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060
SUBJECT:
NORTH ANNA POWER STATION, UNITS 1 AND 2 - PROPOSED TECHNICAL SPECIFICATION CHANGES AND EXEMPTION REQUEST REGARDING USE OF FRAMATOME ANP ADVANCED MARK-BW FUEL (TAC NOS. MB4700, MB4701, MB4714, AND MB4715)
Dear Mr. Christian:
The purpose of this letter is to inform you that the NRC staff cannot commit to completing the review of your submittal dated March 28, 2002, by the January 31, 2003, due date you had requested.
During an April 19, 2002, conference call, the NRC staff informed Virginia Electric and Power Company (VEPCO) and Framatome that the requested review completion date of January 31, 2003, would be difficult to meet due to unresolved issues involving the evaluation models for core peaking for loss-of-coolant accident (LOCA), small-break (SB) LOCA noding, and end-of-transient justification. In a May 13, 2002 submittal, VEPCO sought to reduce the scope of the staffs review by proposing to provide large-break (LB) LOCA calculations that were based upon the currently approved Framatome ANP LBLOCA evaluation model and the existing licensing basis of North Anna Power Station, Units 1 and 2. During a second conference call with Framatome and VEPCO on May 22, 2002, the staff stated that there were still outstanding issues such as the end-of-transient justification that might prevent them from successfully completing the review of VEPCOs submittal by January 31, 2003. In addition, the staff expressed concerns about the non-conservative modeling of the downcomer region and downcomer boiling in approved Title 10 of the Code of Federal Regulations Part 50, Appendix K LOCA evaluation models when applied to certain types of Westinghouse-designed pressurized-water reactors.
By letter dated June 19, 2002, VEPCO stated the NRC staff was on schedule to complete the review of the March 28, 2002, submittal by January 31, 2003, and VEPCO intended to submit the modified analysis approach for the outstanding LBLOCA and SBLOCA items to the staff for review by September 30, 2002. After reviewing this letter, the staff is providing the following issues that could adversely impact the staffs ability to complete the review of the submittal by January 31, 2003. (1) A Request for Additional Information (RAI) dated May 7, 2002, consisted of six questions on Topical Report BAW-10166P-A, Beach - A Computer Program for Reflood Heat Transfer During LOCA. This RAI discussed the staffs concern that peak cladding temperature and clad oxidation have been under predicted and the FLECHT-SEASET test predictions under predicted the peak cladding temperature in four of the five cases. The staff
received a response dated July 15, 2002, from Framatome ANP. (2) A second RAI was sent to Framatome ANP on June 3, 2002, to address the potential impact of downcomer boiling in the currently approved 10 CFR Part 50, Appendix K evaluation models for certain Westinghouse pressurized-water reactors with low backpressure containment designs or low safety injection flow rates. The staff disagrees with Framatomes decision to terminate the REFLOD3B calculation when the downcomer and lower plenum reach saturated conditions and not to include a two-phase model to determine the effects of downcomer boiling. (3) Additionally, to date, the staff has not received the SBLOCA, the end of transient justification evaluation model using Framatome fuel, or the REFLOD3B modification.
The staff will work with VEPCO and Framatome to perform an expedited review of the outstanding items, which include submittals not yet received and staff RAIs. However, VEPCOs proposed submittal date of September 30, 2002, may not provide the staff with adequate time to complete the reviews. Based upon staff workload projections, the staff had contracted external resources to assist in the review of VEPCOs submittals; however, this may not be available to the staff during the Fall 2002. Based upon this and the content of the submittals, the staff cannot commit to meeting the January 31, 2003, deadline at this time.
If you have any questions, please call me at (301) 415-1544.
Sincerely,
/RA/
Stephen R. Monarque, Project Manager Project Directorate II-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339
Framatome ANP on June 3, 2002, to address the potential impact of downcomer boiling in the currently approved 10 CFR Part 50, Appendix K evaluation models for certain Westinghouse pressurized-water reactors with low backpressure containment designs or low safety injection flow rates. The staff disagrees with Framatomes decision to terminate the REFLOD3B calculation when the downcomer and lower plenum reach saturated conditions and not to include a two-phase model to determine the effects of downcomer boiling. (3) Additionally, to date, the staff has not received the SBLOCA, the end of transient justification evaluation model using Framatome fuel, or the REFLOD3B modification.
The staff will work with VEPCO and Framatome to perform an expedited review of the outstanding items, which include submittals not yet received and staff RAIs. However, VEPCOs proposed submittal date of September 30, 2002, may not provide the staff with adequate time to complete the reviews. Based upon staff workload projections, the staff had contracted external resources to assist in the review of VEPCOs submittals; however, this may not be available to the staff during the Fall 2002. Based upon this and the content of the submittals, the staff cannot commit to meeting the January 31, 2003, deadline at this time.
If you have any questions, please call me at (301) 415-1544.
Sincerely,
/RA/
Stephen R. Monarque, Project Manager Project Directorate II-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339 Distribution DHolland SMonarque PUBLIC RidsNrrDlpmLpdii EDunnington PDII-1 R/F RidsOgcRp RidsAcrsAcnwMailCenter CWu RidsRgn2MailCenter MKowal UShoop DJackson RLobel FOrr FAkstulewicz Accession No. ML022050012 OFFICE PDII-1/PM PDII-2/LA SPLB/SC PDIV-2/SC SRXB/SC PDII-1/SC NAME SMonarque EDunnington SWeerakkody SDembek FAkstulewicz JNakoski DATE 07/16/02 07/16/02 07/19/02 07/22/02 07/16/02 07/23/02 OFFICIAL RECORD COPY
Mr. David A. Christian North Anna Power Station Virginia Electric and Power Company Units 1 and 2 cc:
Mr. C. Lee Lintecum Mr. David A. Heacock County Administrator Site Vice President Louisa County North Anna Power Station P.O. Box 160 P.O. Box 402 Louisa, Virginia 23093 Mineral, Virginia 23117-0402 Ms. Lillian M. Cuoco, Esq.
Senior Nuclear Counsel Mr. Richard H. Blount, II Dominion Nuclear Connecticut, Inc. Site Vice President Millstone Power Station Surry Power Station Building 475, 5th Floor Virginia Electric and Power Company Rope Ferry Road 5570 Hog Island Road Rt. 156 Surry, Virginia 23883-0315 Waterford, Connecticut 06385 Dr. W. T. Lough Robert B. Strobe, M.D., M.P.H.
Virginia State Corporation State Health Commissioner Commission Office of the Commissioner Division of Energy Regulation Virginia Department of Health P.O. Box 1197 P. O. Box 2448 Richmond, Virginia 23209 Richmond, Virginia 23218 Old Dominion Electric Cooperative Mr. William R. Matthews 4201 Dominion Blvd. Vice President - Nuclear Operations Glen Allen, Virginia 23060 Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Mr. Stephen P. Sarver, Director Glen Allen, Virginia 23060-6711 Nuclear Licensing & Operations Support Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117